The document is a project planner chart showing activities, their estimated start dates, durations, late start dates, actual durations and periods of completion. It contains 11 activities labeled A through L, showing their timelines on a grid with 100 periods. Activity A has an estimated duration of 5 periods, starting on period 1 and finishing on period 5. Activity B has an estimated duration of 11 periods, starting on period 1 and finishing on period 11. The total estimated cost of all activities is $105,000.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
38 views1 page
Gantt 1
The document is a project planner chart showing activities, their estimated start dates, durations, late start dates, actual durations and periods of completion. It contains 11 activities labeled A through L, showing their timelines on a grid with 100 periods. Activity A has an estimated duration of 5 periods, starting on period 1 and finishing on period 5. Activity B has an estimated duration of 11 periods, starting on period 1 and finishing on period 11. The total estimated cost of all activities is $105,000.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Project Planner
Select a period to highlight at right. A legend describing the charting follows. 1 Plan Duration Actual Start % Complete Actual (beyond plan) % Complete (beyond plan)