Distribution system
A Thesis submitted in partial fulfillment of the requirements for the Award of
Degree of
Bachelor of Science in Electrical and Electronic Engineering
Submitted by
Md. Abdus Salam (141-33-1818)
Md. Tajmul Huda Taju (141-33-1819)
Supervised by
DR. ENGR. A K M Alamgir
Associate Professor
Department Of EEE
Faculty of Engineering
i
© Daffodil International University
Certification
This is to certify that this thesis entitled “Study of Electrical Power Transmission and
Distribution system” is done by the following students under my direct supervision and this
work has been carried out by the laboratories of the Department of Electrical and Electronic
Engineering under the Faculty of Engineering of Daffodil International University in partial
fulfillment of the requirements for the degree of Bachelor of Science in Electrical and Electronic
Engineering. The presentation of the work was held on -2017.
_____________________
Name: Md. Abdus Salam
ID #: 141-33-1818
Department of EEE
Daffodil International University
___________________
Name: Md. Tajmul Huda Taju
ID #: 141-33-1819
Department of EEE
Daffodil International University
Countersigned
_______________________
Dr. ENGR.A K M Alamgir
Associate Professor
Department of Electrical and Electronic Engineering
Faculty of Engineering
Daffodil International University.
ii
© Daffodil International University
The thesis titled Report on “Power Transmission and Distribution system” submitted by Md.
Abdus Salam, Id No: 141-33-1818 and Md. Tajmul Huda Taju, Id No: 141-33-1819, Session:
Spring-2014 has been accepted as satisfactory in partial fulfilment of the requirements for the
degree of Bachelor of Science in Electrical and Electronic Engineering on 2018.
BOARD OF EXAMINERS
_______________________
Dr. Engr. Chairman
Professor
Department of EEE, DIU
_______________________
Dr. Engr. Internal Member
Professor
Department of EEE, DIU
_______________________
Dr. Engr. Internal Member
Professor
Department of EEE, DIU
iii
© Daffodil International University
Dedicated to
Our Parents
iv
© Daffodil International University
CONTENTS
List of Tables viii
List of Figures ix
Acknowledgment xv
Abstract xvi
Chapter 1: Introduction
1.1 Introduction
1.2 Overview
1.3 Current Status
Chapter 02
1.1. Introduction
Chapter 03
v
© Daffodil International University
3.1.2 Secondary Transmission
Chapter 04
3. Mechanical Design
Chapter 05
4. Electrical Design
Chapter 06
5. Performance Analysis
Chapter -07
1. Construction of Transformer
vi
© Daffodil International University
7.1.4 Step-down transformer
7.5 Fuse
vii
© Daffodil International University
7.7.5 Double Bus bar arrangement
7.8 Isolator
7.8.1 Types of Isolators
Earth Screen
Lightning Arrester
Chapter -08
8.1 Introduction
8.2
viii
© Daffodil International University
8 Power riangle
8.2.1 Disadvantages of Low Power factor
8.2.2 Causes of Low Power Factor
8.4.3
Chapter 09
8. Conclusion
Chapter 10
9. Recommendation
ix
© Daffodil International University
ACKNOWLEDGEMENTS
All praises go to Allah, the Almighty, for the successful completion of this Thesis and
fulfillment of our dream into reality. However, thanks and gratitude are also due to the following
persons for their continuous support in completing this thesis and in preparing this report.
First of all, we would like to express our sincere appreciation, heartfelt gratitude and cordial
thanks to our thesis supervisor, Dr. Engr A K M Alamgir, Associate Professor, Department of
EEE Faculty of Engineering (FE), Daffodil International University, Bangladesh for his
invaluable instructions, continuous guidance, constructive criticisms and thoughtful advice during
pursuing this thesis and preparation of this report.
Special thanks are extended to our fellow classmates of the Department of Electrical and
Electronic Engineering, Daffodil International University, Bangladesh for their helping hand,
continuous support and cooperation during this thesis.
Finally, we proudly acknowledges the great sacrifices, good wishes, moral support, fruitful
advice, inspirations and encouragements from our family members, relatives and friends which
help us to finish the thesis successfully.
x
© Daffodil International University
ABSTRACT
Electricity plays a vital role in the socio-economic development and poverty alleviation. It is
considered as the driving force of all development activities. To alleviate poverty in the face of
resource limitations and high population density, Bangladesh requires an economic growth rate of
about 10% p.a. to provide employment to its rapidly growing labor force that cannot be absorbed
by agriculture. In order to achieve this growth rate, availability of a reasonably priced and reliable
source of electricity is a prerequisite.
The power sector in Bangladesh faced numerous problems characterized by lack of supply
capacity, frequent power cuts, unacceptable quality of supply, and poor financial and operational
performance of the sector entities. The customer service is not praiseworthy. There have been a
number of reforms in the power sector in Bangladesh since her independence, but most of these
reforms failed to bring desired improvements in the power sector. The most pressing problem in
the power sector has been with the distribution system, which is characterized by heavy system loss
and poor collection performance; however, the distribution system seldom got the priority in
reform initiatives.
xi
© Daffodil International University
xii
© Daffodil International University
CHAPTER 1
INTRODUCTION
1.1 Introduction
Bangladesh's energy infrastructure is quite small, insufficient and poorly managed. The per capita
energy consumption in Bangladesh is considered low by global standards. Noncommercial energy
sources, such as wood fuel, animal waste and crop residues, are estimated to account for over half
of the country's energy consumption. Bangladesh has small reserves of oil and coal, but very large
natural gas resources. Commercial energy consumption is mostly natural gas (around 66%),
followed by oil, hydropower and coal.
Electricity is the major source of power for most of the country's economic activities. Bangladesh's
total installed electricity generation capacity (including captive power) was 15,351 MW as of
January 2017. As of 2014, only 62% of the population had access to electricity with a per capita
availability of 321 kWh per annum. Problems in the Bangladesh's electric power sector include
corruption in administration, high system losses, delays in completion of new plants, low plant
efficiency, erratic power supply, electricity theft, blackouts, and shortages of funds for power plant
maintenance. Overall, the country's generation plants have been unable to meet system demand
over the past decade.
xiii
© Daffodil International University
1.2 Overview
Bangladesh Power Development Board (BPDB) was assigned to manage power transmission
system, power generation and power distribution throughout Bangladesh. Today there are 70
operating rural electric cooperatives called Palli Bidyuit Samity (PBS), which bring service to
approximately 93,99,134 new connection being made and more than 2,42,116 kms of line has
been constructed.
Since its inception in 1980, Dhaka Palli Biddyut Samity-1 is playing a vital role in Agricultural,
Industrial and Socio-Economic Development of Dhaka District. The Rural Electrification
Program conducted by Dhaka Palli Biddyut Samity-1 has acted a leap- forward in the
development of socio-economic structure of rural areas in Dhaka District as well as entire
Bangladesh. It has significant and sustained impact on agricultural growth, industrialization and
business & commercial activities in the rural areas. It is a consumer owned entity organized on
the basic principles of Co-operative for distribution of electric power to its members and
operates on No Loss - No Profit basis for the mutual benefits of all its Members.
Bangladesh Power Development Board (BPDB) is a statutory body created in May 1, 1972, by
presidential Order No. 59 after bifurcation of erstwhile Bangladesh Water and Power
Development Authority. BPDB started its operation with Installed Generation capacity of only
200 MW. Installed Generation capacity (April' 2016) has increased to 12,339 MW.
As part of reform and restructuring a number of Generation and Distribution companies have
been created. The subsidiaries of BPDB are:
xiv
© Daffodil International University
- West Zone Power Distribution Company Ltd. (WZPDCL)
The BPDB is responsible for major portion of generation and distribution of electricity mainly in
urban areas except Dhaka and West Zone of the country. The Board is under the Power Division
of the Ministry of power, Energy and Mineral Resources, Government of Bangladesh.
In Bangladesh, natural Gas is used as primary energy in most of the existing power plants. 88
per cent of total electricity is produced from gas-based power plants. Besides gas, a small
amount of electricity is produced using diesel, furnace oil and coal. In addition, almost 3 percent
of total electricity is produced from Karnafuly Hydro Power Plant. Due to the increase of
multiple use of gas in fertilizer, industries, factories and other sectors it is not possible to supply
adequate quantity gas (extracted from the existing gas fields) to meet the demand of the power
plants. Due to insufficiency of gas supply at present approximately 500MW less electricity is
produced from existing power plants.
xv
© Daffodil International University
Figure 1: Energy Generation by Fuel (%).
CHAPTER 2
2.1 Introduction
Demand for electricity in Bangladesh is projected to reach 34,000 megawatts (MW) by 2030 and
the Government of Bangladesh has plans to increase power generation beyond expected demand to
help propel growth in the export-oriented economy and to meet the demands of a growing middle
class. Total investment in the sector over the next 15 years is estimated at $70.5 billion. While
installed generation capacity is 13,179 MW as of February 2017, shortfalls exist due to poor
distribution infrastructure and a mismatch between the types of energy plants and fuel mix
available. Private power production units are approaching half of total installed capacity.
Only two-thirds of Bangladesh’s population is currently connected to the electricity grid. This
indicates an untapped potential market of up to 60 million people connecting to the national grid in
coming years as Bangladesh continues its growth trajectory.
The fuel mix of Bangladesh’s power plants is heavily based on natural gas. The Government of
Bangladesh plans to reduce dependence on natural gas and move towards coal with plans to
generate 50 percent of total electricity using coal-based power plants by 2030. Other solutions
include importing electricity from neighboring countries, importing liquefied natural gas (LNG),
and expanding use of renewable resources, including solar and wind.
U.S. companies play a strong role in the power and energy industry in Bangladesh. U.S.
companies produce over 55 percent of Bangladesh’s domestic natural gas supply and are among
xvi
© Daffodil International University
the largest investors in power projects. U.S.-origin power turbines currently provide 80 percent of
Bangladesh’s installed gas-fired power generation capacity.
Electricity is the major source of power for most of the country's economic activities.. Bangladesh's
total installed electricity generation capacity (including captive power) was 15,351 MW as of
January 2017.[2] As 2015 92% urban population and 67% rural population have the access to the
electricity for their source of light . Average 77.9% population have the access to the electricity in
Bangladesh [3]. Problems in the Bangladesh's electric power sector include , high system losses,
delays in completion of new plants, low plant efficiency, erratic power supply, electricity theft,
blackouts, and shortages of funds for power plant maintenance. Overall, the country's generation
plants have been unable to meet system demand over the past decade .
2.2.1 Vision
To be an enabler of economic development and social progress by providing safe, reliable,
sustainable electricity and to deliver uninterrupted quality power to all.
xvii
© Daffodil International University
2.2.2 Mission
To secure continuous growth of electricity for sustainable development and ensure customer
satisfaction.
Power Division is responsible for formulating policy relating to power and supervise, control and
monitor the developmental activities in the power sector of the country. To implement its mandate
the Power Division is supported by a number of organizations, related with generation,
transmission and distribution. The organizational linkage is as follows
xviii
© Daffodil International University
Figure 2.1: Power Sector Structure
xix
© Daffodil International University
areas and 10% in rural areas) has access to electricity, and per capita commercial energy
consumption is among the lowest in the world.
xx
© Daffodil International University
Chapter 3
Transmission and Distribution
1. Primary Transmission
2. Secondary Transmission
1. Overhead Transmission
2. Underground Transmission
xxi
© Daffodil International University
Fig: 3.1: Overhead Transmission line Fig: 3.2: Underground Transmission line
a) Short Transmission Line : When the length of an overhead transmission line is up to 50km
and the line voltage is comparatively high (<20KV), it is usually considered as a Short
b) Medium transmission line : when the length of an overhead transmission line is up to 50-
150km and the line voltage is comparatively high (>20KV <100KV), it is usually considered as
c) Long transmission line: When the length of an overhead transmission line is more than
150Km and the line voltage is comparatively high (>100KV), it is usually considered as a Long
transmission line. R L C consideration
3.3 ADVANTAGES AND DISADVANTAGES OF HIGH VOLTAGE DC
TRANSMISSION
Advantages:
Disadvantages:
The main function of an electrical power distribution system is to provide power to individual
consumer premises. Distribution of electric power to different consumers is done with much
low voltage level.
Distribution of electric power is done by distribution networks. Distribution networks consist of
following main parts
1. Distribution substation,
3. Distribution Transformer,
4. Distributors,
5. Service mains.
The transmitted electric power is stepped down in substations, for primary distribution purpose.
Now these stepped down electric power is fed to the distribution transformer through primary
distribution feeders. Overhead primary distribution feeders are supported by mainly supporting iron
pole (preferably rail pole). The conductors are strand aluminum conductors and they are mounted
on the arms of the pole by means of pin insulators. Some times in congested places, underground
cables may also be used for primary distribution purposes.
Distribution transformers are mainly 3 phase pole mounted type. The secondary of the transformer
is connected to distributors. Different consumers are fed electric power by means of the service
mains. These service mains are tapped from different points of distributors. The distributors can
also be re-categorized by distributors and sub distributors. Distributors are directly connected to the
secondary of distribution transformers whereas sub distributors are tapped from distributors.
Service mains of the consumers may be either connected to the distributors or sub distributors
depending upon the position and agreement of consumers. In this discussion of electrical power
distribution system, we have already mentioned about both feeders and distributors. Both feeder
and distributor carry the electrical load, but they have one basic difference. Feeder feeds power
from one point to another without being tapped from any intermediate point. As because there is no
tapping point in between, the current at sending end is equal to that of receiving end of the
conductor. The distributors are tapped at different points for feeding different consumers; and
hence the current varies along their entire length.
In early days of electrical power distribution system, different feeders radially came out from the
substation and connected to the primary of distribution transformer.
But radial electrical power distribution system has one major drawback that in case of any feeder
failure, the associated consumers would not get any power as there was no alternative path to feed
the transformer. In case of transformer failure also, the power supply is interrupted. In other words
the consumer in the radial electrical distribution system would be in darkness until the feeder or
transformer was rectified.
3.4.2 Structure of Power Sector Distribution
Power Division is responsible for formulating policy relating to power and supervise, control and
monitor the developmental activities in the power sector of the country. To implement its mandate
the Power Division is supported by a number of organizations, related with generation,
transmission and distribution. The organizational linkage is as follows
In this way, supply to the consumers connected to the healthy zone of the ring, can easily be
maintained even when one section of the ring is under shutdown. The number of feeders connected
to the ring main electrical power distribution system depends upon the following factors.
1. Maximum Demand of the System: If it is more, then more numbers of feeders feed
the ring.
2. Total Length of the Ring Main Distributors: It length is more, to compensate the voltage drop in
the line, more feeders to be connected to the ring system.
3. Required Voltage Regulation: The number of feeders connected to the ring also depends upon
the permissible allowable, voltage drop of the line.
The sub distributors and service mains are taken off may be via distribution transformer at
different suitable points on the ring depending upon the location of the consumers. Sometimes,
instead of connecting service main directly to the ring, sub distributors are also used to feed a
group of service mains where direct access of ring distributor is not possible.
Chapter -07
Fault and protection in
Transmission & Distribution Lines.
The primary winding is connected to a 50 hertz ac voltage source. The magnetic field
(flux) builds up (expands) and collapses (contracts) about the primary winding. The
expanding and contracting magnetic field around the primary winding cuts the secondary
winding and induces an alternating voltage into the winding. This voltage causes
alternating current to flow through the load. The voltage may be stepped up or down
depending on the design of the primary and secondary windings.
1. Step-up Transformer
2. Step-down Transformer
Step-Up Transformers are one of the really common and vital electrical tools used
in power transmission and modification. They are usually the first major transformer in a
transmission system and are often used in various forms throughout the system. Step- Up
Transformers are based on the same formulas that other transformers are, but the key
element is that they convert voltages to higher volumes while reducing amperage and
effects of resistance. This makes Step-Up Transformers ideal in long-distance power
transmission use. By stepping up voltage and reducing amperage little energy is lost to
resistance.
A transformer is made from two coils, one on each side of a soft iron core. Step- up
transformer increases the voltage
A Step-down transformer is one whose secondary voltage is less than its primary
voltage. The step down transformer is designed to reduce the voltage from the primary
winding to the secondary winding. They often range in voltage sizes from 0.5kva to
500kva.
with minimum distortion. The transformers are judged on their ability to reproduce
sound-wave frequencies (from 20 Hz to 25 kHz) with minimal distortion over the full
sound power level.
Three phase transformers were designed because three phase electricity is used
for power distribution systems to step up or step down voltage. A single phase
transformers are able to perform better with less material requirements, less size, and less
36 KV , 2000 MVA
xxxi
Circuit breaker consists of fixed and moving contact. C.T Trip coil and relay are
connected with moving contacts. Under normal condition these contact remain close.
When fault occurs on any part of the system, the secondary current of C.T will increase
and the trip coil of the circuit breaker get energized and the moving contact is pulled
apart by relay mechanism, thus opening the circuit.
7.5 Fuse
In electronics and electrical engineering a fuse (from the Latin "fusus" meaning to
melt) is a type of sacrificial over current protection device. It’s essential component is a
metal wire or strip that melts when too much current flows, which interrupts the circuit
in which it is connected. Short circuit, overload or device failure is often the reason for
excessive current.
xxxii
A fuse interrupts excessive current (blows) so that further damage by overheating
or fire is prevented. Over current protection devices are essential in electrical systems
to limit threats to human life and property damage. Fuses are selected to allow passage
of normal current and of excessive current only for short periods.
A fuse unit essentially consists of a metal fuse element or link, a set of contacts
between which it is fixed and a body to support and isolate them. Many types of fuses
also have some means for extinguishing the arc which appears when the fuse element
melts. In general, there are two categories of fuses-
xxxiii
1. Induction type over current relay. 5. Instantaneous relay.
2. Induction type over voltage relay. 6. Differential Relay
3. Earth Fault relay. 7. Distance relay
4. Numerical relay. 8. Lock out relay.
7.6.1 Induction Type over Current Relay
xxxiv
differential current flowing through the relay circuit will clear the breaker on both
sides of transformers. The protected zone is limited to the C.T.s on the low voltage
side & C.T.s on the high voltage side of the transformer. This scheme also provides
protection for short circuits between turns of the same phase winding. During a short
circuit, the turn ratio of power transformer is altered & cause unbalance in the
system which cause there lay to operate. However, such sorts are better taken care
by Buchholz relay. The differential protection used for transformers is based on the
principle of current circulation. This type of protection is mostly used for
transformers as this responds not only to inter turn fault but also provides protection
against phase to phase fault.
A relay is a automatic protective device which detects the fault and initiates the
operation of the circuit breaker. Primary winding of C.T is connected in series with the
line to be protected. Secondary winding of C.T is connected with relay coil. Trip coil
and relay coil is connected with supply. If fault occur any point of the transmission
line. The current flowing in the line increase. So the heavy Current flow through the
relay coil. Causing the relay operate by closing its contact.
xxxv
Over current (inverse type) relay
Current setting 2.5 -10 A
Frequency 50Hz
Plug setting multiplier 1-20.0-2.2 sec
xxxvi
Fig 7.8: Operation of Buchholz Relay
xxxvii
Arrangement Scheme among others-
Simplicity of system
Easy maintenance of different equipment.
Minimizing the outage during maintenance.
Future provision of extension with growth of demand
Every bus-bur can’t bear same ampere. This ampere measurement by the following –
I=p*d*t
Where, I=Ampere
p=copper resistivity
=1.79
t=thickness=20mm
d=wide=76mm
I=76*20*1.79
= 2720A bus-bar
xxxviii
bus bar system is that if repair is to be done on the bus-bar or a fault occurs on the bus,
there is a complete interruption of the supply. This arrangement is not used for voltages
exceeding 33kv. The indoor 11kv substation often uses single bus-bar arrangement.
xxxix
This system consists of two bus bars, a main bus bar and an auxiliary bus
bar. Each bus bar has the capacity to take up the entire substation load. The incoming
and outgoing lines can be connected to either bus bar with the help of a bus bar coupler
which consists of a circuit breaker and isolators. Ordinary, the incoming and outgoing
lines remain connected to the main bus bar. However, in case of repair of main bus bar
or fault occurring on it, the continuity of supply to the circuit can be maintained by
transferring it to the auxiliary bus bar. For voltages exceeding 33kv, duplicate bus bar
system is frequently used.
7.8 Isolator
xl
Circuit breaker always trip the circuit but open contacts of breaker cannot
be visible physically from outside of the breaker and that is why it is recommended not
to touch any electrical circuit just by switching off the circuit breaker. Isolator is a
mechanical switch which isolates a part of circuit from system as when required.
Electrical isolators separate a part of the system from rest for safe maintenance works.
So definition of isolator can be rewritten as Isolator is a manually operated mechanical
switch which separates a part of the electrical power system normally at off load
condition.
These have three stacks of post insulators as shown in the figure. The central
post insulator carries a tubular or flat male contact which can be rotated horizontally
with rotation of central post insulator. This rod type contact is also called moving
contact. The female type contacts are fixed on the top of the other post insulators which
fitted at both side of the central post insulator. The female contacts are generally in the
form of spring loaded figure contacts. The rotational movement of male contact causes
to come itself into female contacts and isolators becomes closed. The rotation of male
contact in opposite direction make to it out from female contacts and isolators becomes
open. Rotation of the central post insulator is done by a driving lever mechanism at the
xlii
base of the post insulator and it connected to operating handle (in case of hand
operation) or motor (in case of motorized operation) of the isolator through a
mechanical tie rod.
Neutral grounding resistance (NGR) are used to restrict the earth fault
current during fault condition below a certain value. This is done for high voltage side
because due to high voltage & low winding resistance fault current is very high and the
windings are not designed to carry such a large current so it is the place where NGR
comes to play. NGR used in 11KV generating station is to limit the fault current within
the specified limit. Generator is connected with grid (Synchronized Condition) heavy
fault current may occurred in line, that fault current may damage winding insulation
that is why NGR is used to protect the generator from heavy fault current.
xliii
on operation, these earthing arms rotate and move to vertical position and make contact
with earth female contacts fitted at the top of the post insulator stack of isolator at its
outgoing side. The erarthing arms are so interlocked with main isolator moving
contacts that it can be closed only when the main contacts of isolator are in open
position. Similarly the main isolator contacts can be closed only when the earthing
arms are in open position.
Earth Screen.
Lightning Arrestor.
The power stations & the substations are generally having much expensive
equipment’s. These stations can be protected from direct lightning strikes by
providing earthing screens. It consists of a network of Copper conductors mounted
all over the electrical equipment’s in the substation or Power station. The screen is
xliv
properly connected to earth on at least two points through low impedance. On the
occurrence of direct stroke on the station the screen provides a low resistance path
by which lightning surges are connected to the ground. In this way station
equipment’s are protected against lightning.
Lightning arresters are protective devices for limiting surge voltages due to
lightning strikes. A lightning arrester is a device used on electrical power systems to
protect the insulation and conductors of the system from the damaging effects of
lightning. The typical lightning arrester has a high-voltage terminal and a ground
terminal. When a lightning surge (or switching surge, which is very similar) travels
along the power line to the arrester, the current from the surge is diverted through
the arrestor, in most cases to the ground.
xlv
Fig 7.15: Lightning arrester
The fire protection device should be kept in store yard for safety of
equipment’s during storage. It can be useful in the time of danger. This includes fire
extinguishers, constant supply of water etc.
xlvi
Chapter -08
Power factor improvement
8.1 Introduction
Consider an inductive circuit taking a lagging current I from sup- ply voltage V; the angle
of lag being . The circuit Current I can be resolved into two perpendicular
components, namely:
(a) I cos in phase with V
(b) I sin 90o out of phase with V
The component I cosis known as active component. Whereas component I sinis
called the reactive or watt less component. The reactive component is a measure of the
power factor. If the reactive component is small, the phase angle is small and hence
xlvii
power factor coswill be high. Therefore, a circuit having small reactive current will
have high power factor and vice-versa.
active power 𝐾𝑊
2. Power factor, cos
apparent power 𝐾𝑉𝐴
Thus the power factor of a circuit may also be defined as the ratio of active power to
the apparent power.
3. The power factor of a circuit can be defined in one of the following three
ways:
a. Power factor = cos = cosine of angle between V and I
xlviii
R 𝑅𝑒𝑠𝑖𝑠𝑡𝑎𝑛𝑐𝑒
b. Power factor, Z 𝐼𝑚𝑝𝑒𝑑𝑎𝑛𝑐𝑒
VIcosФ active power
c. Power factor, apparent power
VI
Low power factor is undesirable from economic point of view. Normally , the
power factor of the whole load on the supply system in lower than 0·8. The following
are the causes of low power factor:
Normally, the power factor of the whole load on a large generating station is in the
region of 0·8 to 0·9. However, sometimes it is lower and in such cases it is generally
desirable to take special steps to improve the power factor. This can be achieved by three
xlix
Method. These are given below :-
Static capacitors
Synchronous condenser
Phase advancers
l
They are easily damaged if the voltage exceeds the rated value.
Once the capacitors are damaged, their repair is uneconomical
The 3 load takes current IL at low lagging power factor cos L. The synchronous
condenser takes a current Im which leads the voltage by an angle m. The resultant
current I is the phasor sum of Im and IL and lags behind the voltage by an angle . It is
clear that is less than L so that cos is greater than cos L. Thus the power factor is
increased from cos L to cos . Synchronous condensers are generally used at major bulk
supply substations for power factor improvement.
li
lip frequency. By providing more ampere turns than required, the induction motor can
be made to operate on leading power factor like an over-excited synchronous motor.
Phase advancers have two principal advantages. Firstly, as the exciting ampere turns are
supplied at slip frequency, therefore, lagging kVAR drawn by the motor are considerably
reduced. Secondly, phase advancer can be conveniently used where the use of synchronous
motors is unadmissible.
An inductive load taking a lagging current I at a power factor cos φ1. In order to
improve the power factor of this circuit, the way is to connect such an equipment in parallel with
the load which takes a leading reactive component and partly cancels the lagging reactive
component of the load.
Suppose, a 3-phase, 50 Hz, 400 V motor develops 100 KW . the power factor being vary
0·70 to 0.90 lagging and efficiency 95%. A bank of capacitors is connected in delta across
the supply terminals and power factor is rise to 0·95 lagging. We determine how much the
total capacitance should add.
Initial Fina Eff. motor Motor Φ1 tanφ1 Φ2 tanφ2 KVAR KVAR Total
P.F l output Input (deg) (deg) (deg (deg) taken Taken By Capacitance
(lag) P.F (KW) (KW) ) by each of 3 (μF)
(lag Capacit- set
) or bank
0.70 0.95 95% 100 105.2 45.5 1.02 18.2 0.33 72.7915 24.263 482.9589
6 7
0.75 0.95 95% 100 105.2 41.4 0.88 18.2 0.33 58.2350 19.411 386.3790
6 1
0.80 0.95 95% 100 105.2 36.8 0.75 18.2 0.33 44.3490 14.783 294.2478
6 7
‘
0.85 0.95 95% 100 105.2 31.7 0.62 18.2 0.33 30.6379 10.212 203.27706
6 9
0.90 0.95 95% 100 105.2 25.8 0.48 18.2 0.33 16.3829 5.460 108.6978
6 4
lii
Total Capacitance(μF) Vs Pf Improving
600
0.7
500
400
Total capacitance (μF)
0.75
300
0.8
Total Capacitance(μF)
200
0.85
100
0.9
0
0 0.2 0.4 0.6 0.8 1
P.F (lagging)