1. The document provides information on two facility layout problems, including processing sequences and production volumes for multiple products being manufactured on machines served by an AGV. 2. The second problem provides department area information and processing sequences for 5 major air conditioner products, asking to develop a block layout using the graph-based construction method. 3. The third problem provides a from-to chart and initial layout for 6 departments, asking to use the CRAFT method considering only two-way exchanges to determine the final layout.

Uploaded by

Srinivas Share
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
437 views

Assignment 6

1. The document provides information on two facility layout problems, including processing sequences and production volumes for multiple products being manufactured on machines served by an AGV. 2. The second problem provides department area information and processing sequences for 5 major air conditioner products, asking to develop a block layout using the graph-based construction method. 3. The third problem provides a from-to chart and initial layout for 6 departments, asking to use the CRAFT method considering only two-way exchanges to determine the final layout.

Uploaded by

Srinivas Share
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Fall 2013

INDU 421: Facilities Design and Material Handling Systems


Assignment 6
1- Four equal-sized machines are served by an automated guided vehicle (AGV) on a linear
bidirectional track, as shown in the figure below. Each machine block is 30’× 30’. The
product routine information and required production rate are given in the table below.
Determine a layout arrangement based on the pairwise exchange method. Assume that the
pickup/delivery stations are located at the midpoint of the machine edge along the AGV
track.

A B C D

Product Processing Sequences Weekly Production


1 BDCAC 300 units
2 BDAC 700 units
3 DBDCAC 900 units
4 ABCA 200 units

2- The ABC Cooling and Heating Company manufactures several different types of air
conditioners. Five departments are involved in the processing required for the products. A
summary of the processing sequences required for the five major products and the weekly
production volumes for the products are shown in the tables below along with the
department area. Based on the graph-based construction method, develop a block layout.
Product Process Sequence Weekly Production
1 ABC 150
2 ABED 200
3 ACE 50
4 ACBE 200
5 ADE 250
Fall 2013

Department Area (ft2)

A 1500

B 1500

C 1000

D 2000

E 2000

3- Explain the steps CRAFT would take with the following problem and determine the final
layout. Only two-way exchanges are to be considered.
From-To Chart

From To A B C D E

A - 3 2 1

B - 1 3

C 1 - 4

D -

E -

Initial Layout

A A A B B B

A A A C C C

A A A C C C

D D D E E E

D D D E E E