Vandana Srivastava Bca Sem-Vi Roll No.1308018146: Prepared by
Vandana Srivastava Bca Sem-Vi Roll No.1308018146: Prepared by
VANDANA SRIVASTAVA
BCA Sem-VI
Roll no.1308018146
I. Student Details:
Name of the program: BCA
Name of the Student: Vandana Srivastava
Roll Number : 1308018146
Session & Year : Fall 2017
Date: 15-04017
ACKNOWLEDGEMENT
3. System Design
3.1. Interface Design
3.1.1. User Interface
3.1.2. Communication Interface
3.2. Detailed System Specification
3.2.1. Detailed System Design
3.2.1.1Functional Flow of System
3.2.1.2Data Flow of System
5. Appendix
5.1. References
Introduction of the Project
1.1. Project Objective
Banks may deploy their own assets in securities with consequent risk
to commercial and savings deposits.
Implementation Preliminary
Investigation
Determination of
System Testing Requirements
Developm ent of
Design of System
System
System development Life cycle consist of two major steps of System
analysis and design. It includes set of activities that analysts, designers and
users carry out to develop and implement an information system.
1. Preliminary Investigation
2. Determination Requirements
3. Design of System
4. Development of System
5. System Testing
6. Implementation
For this, the need arises to understand the viewpoint of two important
entities…
After carrying out these interviews, I drew conclusion about the Top
Management’s requirements and whether users are in support of the new
system.
Issues to be studied are, whether the work for the project will be
done with current equipment, existing S/W technology and available
personnel? If the new technology is required, then what is the
likelihood that it can be developed?
This billing software is technically feasible. The primary
technical requirement includes the availability of Windows 2000 or
higher version of operating systems installed in the network. MS Access
is also required which was already installed. To develop programs VB
6.0 was required which was also available. Reliability, access power
and data security was also available. The system can also be developed
if the new technology is acquired. Thus, through all the ends technical
feasibility was met.
Hardware Requirements
Server Machine:
Client Machine:
Printer:
Software Requirements
APPLICATION : C++,C
MS-Access: Version 2000 and above; Source: Microsoft
The Top Management reviewed the above factors and gave their
ascent. After the consent to request approval, the design was taken up.
Written documents and onsite observation just tell that how the
system should operate. They do not include enough details to allow a
decision to be made about the merits of system proposal, nor do they
present user views about the current system.
Design of System
The design that we have formed for the new system are given
as under:-
DATAFLOW DIAGRAM
Flow chart
Testing & Debugging
Unit Testing:
Integration Testing:
Integration testing is performed after all the software units are combined
together. The objective here is to test the software interfaces. Project team
conducts the integration testing. Before entering integration testing, it
may be ensured that code review and unit testing have been performed on
the individual software modules.
I conducted the unit testing for finding errors and the results of the
unit testing are recorded and action initiated for rectification of the
errors/defects.
VALIDATION
Books: