Guidelines :
General
Page 1 of 4
2.0 Intake of Students
2.1 Requisition for imparting Vocational/Project Training for a
student shall come from the Head of the Institution one month in
advance from the date of commencement of training to
GM(HRD), BSP.
2.3 HRDC shall scrutinize the application received and finalise the
list of students to be imparted training on first come first served
basis considering the no. of seats available in each discipline.
2.4 HRDC shall send letter of acceptance indicating the details viz.
title, contact person time schedule and charges payable (in case
of Project Training), to the Head of the Institution, copies shall
be endorsed to the concerned Deptt.Head/Project guide.
2.5 The trainees shall report for training on the day scheduled,
alongwith the confirmation letter from HRDC, two photographs,
D.D. of required amount (if applicable) and Institute’s Identity
Card.
2.6 HRDC shall scrutinize the documents and arrange for issue of
necessary Gate Pass through CISF. The training schedule,
shall start after issue of Gate Pass. CISF will ensure issue of
Gate Pass by the following day from the date of receipt of
requisition.
2.8 At the end of the Project Training, a copy of the Project Report
shall also be submitted by the trainees and certificates shall be
issued to the trainees on the following day.
Page 2 of 4
3.0 Duration of the Training :
Page 3 of 4
6.0 Others
6.2 The amount collected as fee for imparting Project Training shall
be paid as honorarium to the designated guide. Guide shall
provide the data required for the Project to the Trainees after
ensuring that the information being provided in not
codified/secret in nature.
6.3 In case of any misconduct by the student BSP shall reserve the
right to discontinue the training and simultaneously inform the
Principal/Head of the Institute to take disciplinary action.