Project name:
Customer representative:
Commissioning
Address:
Technician
QA Inspection date:
QA Technician:
Source Circuit Fused combiner Box 1 thru x Location/Name Pass Fail Fixed
Box securely fastened and sealed against the weather
Field wiring routed neatly within
Field wiring terminations are tight.
Field wiring is properly marked with colored tape or jacket color for polarity
Wire identified with permanent labels. (String# one side.)
Ground wire is securely attached
Verify fuse combiner type and rating conforms to one line
Conduit connections are tight and bushings used if applicable (Myers)
Drip loop incorporated into wiring as it enters box
Box cover is secure and tight
locations marked on roof layout or conduit drawing
Combiner Labeled to show which inverter or switch it goes to. Conforms to 3 line
Warning label (do not remove fuses under load. DC Voltages present.) label 11
Page 1 of 5
Commissioning Checklist V6.0.xls
Page 2 of 5
Commissioning Checklist V6.0.xls
Electrical Checkout
Meg Ohm from Utility interconnection disconnect to external Utility disconnect. Record 1 min value.
Must be > 20M ohm in 1 min. Pass Fail Fixed
L1
L2
L3
Meg Ohm reading from external Utility disconnect to Inverter service disconnect. Record 1 min value.
Must be > 20M ohm in 1 min. Pass Fail Fixed
L1
L2
L3
Meg Ohm reading from inverter DC service disconnect to array disconnect. Record 1 min value.
Ungrounded conductor
Grounded conductor if you can easily lift both ends.
Meg Ohm reading from array disconnect to Fused combiner. Record 1 min value.
Ungrounded conductor
Grounded conductor if you can easily lift both ends.
+/- 8% of nominal is OK, nominal is 117 VAC for single phase (108 to 126 VAC ok).
Page 3 of 5
Commissioning Checklist V6.0.xls
The Following tests require that the system has been turned on.
Weather
Temperature
Sky Conditions
Wind Speed
horizontal Irradiance
DC Source Circuits
Step 1: Record open circuit voltages at combiner. Look for opens and reverse voltages.
Step 2: Record Max Power Point Current at fused combiner. Look for balanced output.
String Voc DC Imp DC Voc DC Imp DC Voc DC Imp DC Voc DC Imp DC
1 21 41 61
2 22 42 62
3 23 43 63
4 24 44 64
5 25 45 65
6 26 46 66
7 27 47 67
8 28 48 68
9 29 49 69
10 30 50 70
11 31 51 71
12 32 52 72
13 33 53 73
14 34 54 74
15 35 55 75
16 36 56 76
17 37 57 77
18 38 58 78
19 39 59 79
20 40 60 80
Temp Conversion
Residential Expected Array Performance 10 F -12 C
Array power at STC form electrical drawing (1 or 3 line) Watts 20 F -7 C
Plane of array Irradance now. W/m2 30 F -1 C
Module cell temp now. deg C 40 F 4C
800-1000W/m2 = 25C above ambient 50 F 10 C
400-799W/m2 = 15C above ambient 60 F 16 C
200-399W/m2 = 5C above ambient 70 F 21 C
Temp Correction = .005 * (cell temp now - 25C) 80 F 27 C
(Pe) Expected AC output = System Size * .89 * (Irradiance now /1000) * (1-temp correction) 90 F 32 C
System Size * .89 * (Irradiance now /1000) * (1-temp correction) Watts 100 F 38 C
Inverter output reading (Watts) Pinv Watts 110 F 43 C
Pass Fail Fixed 120 F 49 C
Variation predicted vs inverter within 10% Pinv/Pe 130 F 54 C
140 F 60 C
C= (F-32) * 5/9
Page 4 of 5
Commissioning Checklist V6.0.xls
Commercial Array Expected Performance Example with formula Inv 1 Inv 2 Inv 3 Inv 4 Inv 5
Array power @ STC Pstc (Watts) 70760
Module Temp Coeff Power Ct (%/Deg C) -0.28%
Module Cell Temp now Tc (deg C) 35
Efficiency after cell temp derate Kt= 1 + (Ct x (Tc - 25)) 0.972
Irradiance now I (W/m2) 250
Shading loss Percentage 3%
Irradiance as a fraction of STC irradiance ki = I / Istc 0.250
DC to AC efficiency* Ks (Typically .89 * (1-shading loss)) 86%
Power Expected Pe=Pstc x Ki x Kt x Ks 14,776 W
Inverter output reading (Watts) Pinv 14,500 W