A new town is separated by a riverbed and needs a bridge to connect the two sides by car. The client, Big Bridge Brand, has tasked Ryan Ethridge with designing a truss bridge carrying a two-lane highway across the riverbed using engineering and material science principles. The bridge must not exceed $400,000, support a 480 kN truck load, have 50 or fewer joints and 120 or fewer members, and span at an elevation between high-water and 24 meters above the riverbed.

Uploaded by

api-352334977
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views1 page

Bridge Brief

A new town is separated by a riverbed and needs a bridge to connect the two sides by car. The client, Big Bridge Brand, has tasked Ryan Ethridge with designing a truss bridge carrying a two-lane highway across the riverbed using engineering and material science principles. The bridge must not exceed $400,000, support a 480 kN truck load, have 50 or fewer joints and 120 or fewer members, and span at an elevation between high-water and 24 meters above the riverbed.

Uploaded by

api-352334977
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Design Brief

Big Bridge Brand


Client Company:

Designers: Ryan Ethridge

Problem Statement: A new town has begun, and there is a riverbed separating it
Us. A bridge is needed for cars to get over.

Apply engineering design, material science, and statics to


Design Statement: the
Design of a truss bridge carrying a two-lane highway that
Spans a riverbed

Constraints: Bridge shouldnt cost more than $400,000


Must hold the load of passing truck. 480 kN
Maximum of 50 joints and 120 members
The bridge may cross the valley at any elevation from
High-water level to 24 meters above