Report Karol Ghati
Report Karol Ghati
Report Karol Ghati
DEVELOPMENT OF STADIUMS IN
LAHORE
Table of Contents
1.1 INTRODUCTION............................................................................................................................... 1
1.1 OBJECTIVES OF SOIL INVESTIGATIONS....................................................................................................... 1
1.2 SCOPE OF WORK................................................................................................................................. 1
1.2.1 Field investigations ........................................................................................................................ 1
1.2.2 Laboratory Testing ......................................................................................................................... 2
1.2.3 Analyses of Data & Recommendations ........................................................................................... 2
1.2 MOBILIZATION & COMPLETION ...................................................................................................... 2
2. FIELD INVESTIGATIONS ................................................................................................................... 2
2.1 DRILLING ......................................................................................................................................... 2
2.2 STANDARD PENETRATION TEST ...................................................................................................... 2
2.3 FIELD LOGS ...................................................................................................................................... 3
2.4 SAMPLING ...................................................................................................................................... 3
2.5 GROUNDWATER OBSERVATIONS .................................................................................................... 3
3. LABORATORY TESTING .................................................................................................................... 3
3.1 CLASSIFICATION TESTS .................................................................................................................... 3
3.1.1 GRAIN SIZE ANALYSIS .................................................................................................................. 4
3.1.2 ATTERBERG,S LIMITS ................................................................................................................... 4
3.1.3 NATURAL MOISTURE CONTENT................................................................................................... 4
3.2 STRENGTH TESTS............................................................................................................................. 4
3.2.1 DIRECT SHEAR TEST ..................................................................................................................... 4
3.2.2 UNCONFINED COMPRESSION TESTS ............................................................................................ 4
3.3 BULK DENSITY ................................................................................................................................. 4
3.4 CONSOLIDATION TESTS ................................................................................................................... 5
4. CONSIDERATIONS FOR DESIGN AND CONSTRUCTION OF FOUNDATIONS ....................................... 6
4.1 GENERAL ......................................................................................................................................... 6
4.2 DESIGN CRITERIA ............................................................................................................................ 6
4.3 SOIL PARAMETERS .......................................................................................................................... 6
4.4 FOUNDATION TYPES ....................................................................................................................... 7
4.5 FOUNDATION DEPTH ...................................................................................................................... 7
4.6 PILE ALLOWABLE LOAD AND LENGTH RELATIONSHIPS .................................................................... 7
4.7 DRAINAGE CONTROL ...................................................................................................................... 7
4.8 TYPE OF CEMENT ............................................................................................................................ 7
i
Geotechnical Investigations Report
APPENDICES
FIGURES
TABLES
APPENDIX A: BOREHOLE LOGS
APPENDIX B: LABORATY TEST RESULTS (DATA SHEETS)
ii
Geotechnical Investigations Report
1.1 INTRODUCTION
Punjab sports department, Government of the punjab intends to set up stadium lights in
Karol Ghati stadium, Lahore. The project site is located at Ferozepur Road.
1
Geotechnical Investigations Report
Sieve analysis
Hydrometer analysis
Unconfined Compression
Sulphate Content
Chloride Content
Analyses of field and laboratory test data and recommendations for foundation design is
the ultimate requirement of present investigation job.
2. FIELD INVESTIGATIONS
Field investigations include drilling by rotary method. Logging of boreholes, sample
collection and performing in-situ tests. The locations of boreholes were marked by client
on site.
2.1 Drilling
Drilling of boreholes was the major part of present investigations, through which subsoil
conditions were explored, in-situ testing was carried out and samples were collected for
further testing in the laboratory. Locations of the drilled holes have been shown on the
drawing (Fig-1).
2
Geotechnical Investigations Report
a height of 75 cm. The first 15 cm. is considered as preliminary penetration whereas last
30 cm. Penetration is taken as main penetration. The number of blows for every 15-cm
penetration is recorded in the field logs.
The accumulated blows for main 30-cm penetration are recorded as N-values and given
on the borehole logs.
Visual soil classification noted in the field logs were corrected after completing the
laboratory testing on soil samples. The logs are important part of this report and are
attached as Appendix A.
2.4 Sampling
Geotechnical investigation for any project cannot be completed without collecting good
quality soil and water samples from subsurface strata. A number of samples were
collected during present investigations. These were of following types;
Disturbed Samples: Disturbed samples were extracted from the boreholes while
carrying out SPT through split tube sampler. All the disturbed soil samples were
stored carefully
3. LABORATORY TESTING
Laboratory testing on the soil samples was carried out at Soilcon (Atomic Energy)
Geotechnical Testing Laboratories, Lahore. The laboratory testing was conducted on
disturbed and undisturbed soil samples for classification of soil and determination of,
strength characteristics. The tests are discussed in the following sections and are also
summarized in Table-1. Data sheets have also been attached with this report as
Laboratory Test Data Appendix B.
The cohesive soil encountered at shallow depth in all the boreholes, the undisturbed soil
samples were put to unconfined compression machine for the strength evaluation. The
test results are attached as Appendix B.
4
Geotechnical Investigations Report
sample with known volume of the thin walled shell by tube. The moisture content of the
undisturbed samples was determined by drying a portion of undisturbed soil sample. The
dry density of the soil has been calculated from the bulk density and the moisture content.
The test results are presented in table-1 and Appendix B.
5
Geotechnical Investigations Report
4.1 GENERAL
The considerations for the design and construction of light pole foundation have been
made keeping in mind the topography of the area, limitations of soil investigations,
expected type of structure and the subsoil characteristics.
A safe and an economical design of foundation of the light pole has to be ensured. The
following sections provide broad guidelines regarding the design criteria, soil parameters,
selection of foundation type, depth of placement, foundation size and allowable loads.
i. These should be safe against shear failure of the supporting ground. A factor of
safety of 2.5 is adopted for this purpose.
ii. These should not deflect and settle excessively under the service loads.
The following parameters have been defined for the overburden alluvial soils (below the
upper upto about 2.0 m thick zone of weak fill material) to be loaded with the pole
structure, on the basis of field and laboratory studies, recent literature and sound
engineering judgment:
Design
Angle Of
Layer Dry Bulk SPT N Unconfined Coeff. Of
Cohesion Internal
Material Type thickness Density Density Blows Strength volume compr.
cu (kPa) Friction
(m) b(g/cm3) b(g/cm3) (Per 30 (kPa) mv (cm2/kg)
(Deg.)
cm)
Clayey
1.5 1.45 1.6 4 40 20 0.0 0.030
Silt/Silty Clay
Upto
Silty Sand /
bore 1.65 1.8 10 - - 30.0 -
Fine Sand
bottom
6
Geotechnical Investigations Report
It is therefore recommended to adopt cast in-situ bored R.C. piles of 2000 mm diameter,
to safely transfer the loads of the light pole to the deeper ground.
The allowable lateral load has been evaluated using Broms method. The pile free-
standing length (e) to pile embedded length (L) ratios (e/L) of 1.0 and 2.0 have been
considered in the analysis, for the free head condition of pile.
7
DEVELOPMENT OF STADIUM LIGHTS
KAROL GHATI STADIUM
300
CAST IN-SITU BORED R.C. PILES IN COMPRESSION
250
200
150
100
50
0 5 10 15 20 25
400
350
250
200
150
e/L = 1
100 e/L = 2
50
0
0 5 10 15 20 25
PILELENGTH BELOW GROUND (m)
DEVELOPMENT OF STADIUM LIGHTS
KAROL GHATI STADIUM
250
200
150
100
50
0 5 10 15 20 25
PILE LENGTH BELOW GROUND (m)
FIGURES
Figure 1. Site Location Plan
Figure 2. Drilling activities during execution of work
TABLES
Table-1 Summary of Laboratory Test Results
Density
Consolidation
Atterbergs
Direct shear
+ - -
Particle Size Analysis (%) NMC OM Mg Cl SO4 TDS
Limits (%) UCS
Bore Sample Depth (gm/cm3)
Kg/cm
Hole No. No. (m) 2
Silt
Gravel Sand LL PL PI Bulk Dry (%) ppm ppm ppm ppm ppm
/Clay
BH-1 SPT-2 2 0 5 95 30 20 10
BH-1 SPT-7 7 0 65 35
See
BH-2 UDS-1 1.5 0 29 71 Non-plastic 1.443 1.325 8.90 0.021 0.009 0.013
results
BH-2 SPT-4 5 0 91 9
BH-2 SPT-8 9 12 76 12
Appendix A
Borehole Logs
BOREHOLE LOG BOREHOLE NO. 1
SHEET NO 01 of 01
PROJECT Development of Stadiums in Lahore G.ELEV. G.W.LEVEL Nil
LOCATION Karol Ghati Stadium TYPE OF DRILLING Straight Rotary
COORDINATES N: 31.62966017 E: 74.36876912 BORING DIA (inches) FINAL DEPTH 10 m
DATE 10-06-17 LOGGED BY Ammar CHECKED BY
FIELD TESTS
SAMPLE
LEGEND
PENETRATION
DESCRIPTION OF MATERIAL REMARKS
RESISTENCE
1010 15
2020 253030 3540
40 4550
50 55 60
60 SPT 6''+3''+3''+3''+3''
FILL MATERIAL
Clay, silty and sand with grass roots
1
5
SPT-1
2
SPT-2 4
CLAYEY SILT
Brown, loose, moist, medium plastic
3
SPT-3 8
SILTY SAND
Grey, medium grained, loose to medium
4 dense, moist
9
SPT-4
5
11
SPT-5
6
SPT-6 10
SILTY SAND
Grey, medium dense, medium to coarse
7 grained, moist, 2-3 cm clay lenses 9
SPT-7
SILTY SAND
Grey, medium dense, medium to coarse
8 grained, moist, trace concretion
15
SPT-8
SILTY SAND
Grey, medium dense, medium to coarse
9 grained, wet, trace concretion
22
SPT-9
SILTY SAND
Grey, medium dense, medium grained,
10 trace concretion
23
SPT-10
Bottom of Borehole at 10 m depth
11
12
13
14
15
BOREHOLE LOG BOREHOLE NO. 2
SHEET NO 01 of 01
PROJECT Development of Stadiums in Lahore G.ELEV. G.W.LEVEL Nil
LOCATION Karol Ghati Stadium TYPE OF DRILLING Straight Rotary
COORDINATES N: 31.628589 E: 74.369038 BORING DIA (inches) FINAL DEPTH 10 m
DATE 10-06-17 LOGGED BY Ammar CHECKED BY
FIELD TESTS
SAMPLE
LEGEND
PENETRATION
DESCRIPTION OF MATERIAL REMARKS
RESISTENCE
1010 15
2020 253030 3540
40 4550
50 55 60
60 SPT 6''+3''+3''+3''+3''
FILL MATERIAL
Silty clay, Grass roots, concretion, gravel
1
UDS-1 at 1.5m
2 SILTY CLAY
SPT-1
Brown, low plastic, bottom silty sand 5
CLAYEY SILTY SAND
Brownish grey to grey, firm, slightly moist,
3 fine to medium grained
SPT-2 8
SILTY SAND
Grey, loose, medium grained, dry
4
7
SPT-3
5
10
SPT-4
6
SPT-5 12
SILTY SAND
Grey, medium dense, medium to coarse
7 grained, wet, trace concretions 18
SPT-6
8
23
SPT-7
9
28
SPT-8
10
33
SPT-9
Bottom of Borehole at 10 m depth
11
12
13
14
15
Appendix B
Lab. Test Results