Dr Youssef Hamida

-1 -

-2

-3

-4

-5

2
A - Strengthening isolating footing
1- jacket to the existing footings.

2- Combined footing
3- transfer isolating footingto continous
strap

4- transfer isolating footingto mat raft


3
5- Strengthening footing by piles- micro piles

B - Strengthening strap footing

1- jacket to the existing footings.

Columns foundations need strengthening in


the case of applying additional loads.
Widening and strengthening of existing
foundations may be carried out by constructing a
concrete jacket to the existing footings.

The new jacket should be properly anchored to the


existing footing and column neck in order to
guarantee proper transfer of loads

4
5
This can be accomplished by drilling holes into
existing concrete of footing and epoxy
grouting the longitudinal reinforcement of
jacket.

When the bearing area of footing is not sufficient,


the size of the footing should be increased.

If the column is also being jacketed, the transfer


of load from column to footing becomes easy

6
An isolated footing is strengthened by increasing the
size of the footing and the reinforcement steel
bars as follows:

1. Excavating around the footing

2. Cleaning and roughening the concrete surface.

3. Installing dowels at 25-30cm spacing in both


directions using an appropriate epoxy material.

4. Fastening the new steel bars with the dowels


using steel wires. The diameter and number of
steel bars should be according to the design.

7
5. Coating the footing surface with a bonding
agent in order to achieve the required bond
between old and new concrete.

6. Pouring the new concrete before the bonding


agent dries. The new concrete should contain a
non-shrinkage material.

8
-1 50

-2

-3 30 20

50

-4

30

50

20-15-

10
In all ways of strengthening the foundation should be
linked to the old with the new base d owels iron no less

depth within the old base of 30 cm with cement mortar

and 50 once diameter they emerge outside the base

length can be reduced -15-20sm according to strength

of cohesion epoxy used and the instructions of the


manufacturer

11

12
Strengthening strap footing

13
14
Combined footing

15
2- transfer isolating footingto
continous strap

16
3-transfer isolating footing
to mat raft

17
-3

18
19
20
4- Strengthening footing by
piles- micro piles

21
-4 -

22
23
24


25
26
27
28
29
30
31
32
33
34
35
36