0% found this document useful (0 votes)
55 views2 pages

Gathering System Case Study

This document presents a case study on selecting a material for a 5km flowline connecting two wellheads to a gathering center. The flowline must traverse valleys, mountains, road and river crossings. Operating conditions include a CO2 content of 6.2%, chloride levels of 120,000 ppm, a pressure of 116-125 bara, and a temperature of 83.93°C. The objective is to elaborate on applicable corrosion mechanisms, calculate corrosion rates, propose materials and a corrosion management philosophy to combat corrosion in the flowline. References include NORSOK M506, De-Waard research papers, and NACE MR0175/ISO 15156 standards.

Uploaded by

rasnowmah2012
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views2 pages

Gathering System Case Study

This document presents a case study on selecting a material for a 5km flowline connecting two wellheads to a gathering center. The flowline must traverse valleys, mountains, road and river crossings. Operating conditions include a CO2 content of 6.2%, chloride levels of 120,000 ppm, a pressure of 116-125 bara, and a temperature of 83.93°C. The objective is to elaborate on applicable corrosion mechanisms, calculate corrosion rates, propose materials and a corrosion management philosophy to combat corrosion in the flowline. References include NORSOK M506, De-Waard research papers, and NACE MR0175/ISO 15156 standards.

Uploaded by

rasnowmah2012
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Case Study Material Selection for Flowline

INTRODUCTION:

Two wellheads are located apart from each other; these wellheads have to be connected to the
gathering center which is 5km away from both well heads. The terrain is having valleys,
mountains; road crossings as well as river crossing also come in the shortest route to the
available location for remote manifold.

WH-1
Flowline 5km 8

Remote Manifold
Trunk line

Flowline 5km 8

WH-2

Dec-2016 Page 1 of 2
Case Study Material Selection for Flowline

Fluid analysis and operating conditions are given below;

Parameter Units Value Remarks

[CO2] mol% 6.2 -

Chlorides Ppm 120,000 -

[HCO3-] mg/l 0 Not reported check the effect if present

Organic Acids mg/l 0 Not reported check the effect if present

BTEX Not reported check the effect if present

Mercury Not reported - check the effect if present

Sand Not reported check the effect if present

Inlet Pressure Bara 116 125 (operating)

o
Inlet Temperature C 83.93 (operating)

Gas Flow MMSm3/d 1 - 3.44

HC Liquids m3/d 6.45 - 20.55

Water m3/d 11.83 - 44.06

Nominal Line Size Inch 8

OBJECTIVE:

Elaborate applicable internal and external corrosion mechanisms


Calculate corrosion rate based on de-Waards research papers.
Devise methodology to combat applicable corrosion mechanism(s)
Propose possible material(s) of construction
Propose Corrosion Management philosophy

REFERENCES:

Consider below given references of international standards.

NORSOK M506
De-Waards research papers
NACE MR0175 / ISO 15156

Dec-2016 Page 2 of 2