100% found this document useful (1 vote)
702 views6 pages

QA-QC Inspector Questioner

This document provides answers to frequently asked questions about QA/QC instrumentation inspection. It defines key terms like Schedule Q, QA/QC, ITP, and redlining. It describes the basic responsibilities of QA/QC inspectors to ensure works comply with approved specifications. It also explains important documentation like ITP, WP, P&ID, and differences between inspection, witness, and hold points.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
702 views6 pages

QA-QC Inspector Questioner

This document provides answers to frequently asked questions about QA/QC instrumentation inspection. It defines key terms like Schedule Q, QA/QC, ITP, and redlining. It describes the basic responsibilities of QA/QC inspectors to ensure works comply with approved specifications. It also explains important documentation like ITP, WP, P&ID, and differences between inspection, witness, and hold points.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

QA/QCInstrumentationInspectorQuestioner

1. WhatisScheduleQ?
Answer:ScheduleQisanattachmentinthecontract,whichistheprovisionofQualityAssurance
andControl,InspectionandTestPlan.
2. WhatisQA/QC?
Answer:QA/QCmeansQualityAssurance/QualityControlthepurposeofQA/QCistoestablish
thesequenceofrequirementforthequalityofmaterial,qualityofworks,itsinspection,and
records.
3. WhatarethebasicresponsibilitiesofQA/QCinspector?
Answer:Toensureexecutionofworksandcomplyfullyasperstandardandapprovedspecs.
4. WhatarethebasicrequireddocumentsforQC/QCinspector?
Answer:ThebasicrequireddocumentsforQA/QCinspectorarethefollowing:
ITP:(InspectionTestPlan)
WP:(WorkProcedure)Standardproceduretoexecutetheworks/task.
P&ID:(Piping&InstrumentDiagram/Drawing)asareferencetoensurethattheworkisasper
standarddrawing.
MTC:(MaterialTestCertificate)toensurethatmaterialscompliesthePES(ProjectEngineering
Standards)specs.
CalibrationReport:ToensureparametersarecorrectandcheckedasperIDS.
PP:(PlotPlan)toensurethattheinsetsareinstalledasperP&IDandPPasperconvenience.
Hookup:Toensurethattheremoteconnectionofpneumaticisdonecorrectly.
Wiringdiagrams:Toensurethatthewiringisdonecorrectly
5. WhatareQA/QCsITPsandQCP?Giveabriefdescription.
Answer:ITPmeansinspectionandTestPlan,adocumentthatcontainsthedetailsofworkscope
andtherequiredtypesofinspections,(surveillance,inspection,witnessorholdpoints)toensure
thatqualityofworkisbeingdoneinpropersequencesasrequired.
QCP(QualityControlProcedure),thisprocedureaddressestheactivitiesandrequirementsin
details.
6. WhatisNCR?WhyaQA/QCinspectorneedsit?
Answer:NCRmeansNonComplianceReport,QA/QCinspectorhavereservationandtherightsto
issueawarningifthecontractordoesntcomplyorviolatewiththerequiredstandardand
specification.
7. WhatisgeneralWorkProcedure(WP)?
Answer:Thegeneralsequenceofactivitieswillbeasfollows:
Receivingthedrawinganddocuments
Reproductionofdrawings
Issuingdrawingtosite
Newissuingnewrevision
Shreddingofdrawings
Redliningdrawings
Transmittalofredlinestoclient(asbuilt)
RestrictedaccesstoDCO
Workpermitpriortostartwork
Records

8. Wh hatisredlininng?Whatisittscolorcodee?
Answer:Incasseofanychan ngesneededtothestandaardapproveddrawingwhiiletheprojecttis
beingconstrucctedortested dtherelevanttdrawingwil lberedlined d,thecolorccodingareREED(if
annyadditionreequiredintheedrawing)GR REEN(ifanyddeletionisreqquiredinthed drawing)Bluee(ifany
coommentsisadded).

9. Wh hatisthediffferencebetw weeninspection,witnessaandholdpoin nt?
Answer:
Inspection nworkcanbe eexecutedwiithoutclientssQA/QCand somepartso ofworkcanbbe
inspectedifrequired.
Witnessw workcanbeexxecutedwithoutclientsQ QA/QCanditcanbeinspeccteduponthee
completionofwork.
Holdpointtworkcanno otbeexecutedwithoutclieentsinspectiion.
10. Whhatisdifferencebetween nhazardousaandnonhazaardousareas??
Answer:Ahazardouslocatiionisdefined dasanareaw
wherepotentiialforfireorexplosionexistdue
toothepresencceofflammab blegases,liqu
uidsorvaporss.Anonhazaardousareaissalocationw where
thhereisnoriskkofanykindo
ofexplosionss.
11. WhhatisISO?
Answer:ISOm meansInternaationalStandaardOrganizattion,someexxamplesofitsstandardsarreISO:
90001ISO:9002 2ISO:9003etc.
12. Whhatisthestandardheightttoinstallthe einstrumentts?
Answer:Thesttandardheighttoinstallth heinstrumenntsis1.4meteers,butitcan nvarylessormoreas
perlocationsconvenience..
Additionalnottes:Fieldinsttruments(Tra ansmitters,inndicators,I/PS,etc.)shallb
beinstalledin
nan
acccessiblelocaationwithcennterline1.4m(nominal)abbovegradeorrplatform.
13. Whhatarethesttandardnozzzlesorientatio onsforproceesscontrolsyystem?

Notes:

Forliquid,steamandh heattransfermediaservicces,pressurettapsshallbelocatedonth he
horizontallsideofthep
pipingor45ddegreesdownnfromhorizo ontal.Thepreessuretapsen nsing
lines(impu
ulseline)shalllbeslopeddo
owntothetrransmitter(m
minimumof1perfoot).
Forgasanndvaporservvices,pressureetapsshallbeelocatedonttheverticalfrromtopofthepiping,
horizontallor45degreeesfromverticcal.Thepresssuretapsensiinglines(imppulseline)sha
allbe
slopeduptothetransm mitter(minimumof1perffoot).

Note2:

Instrumentsingasandvaporsserviccearelocateddabovetheirrprocessconttrolconnectio onpoint.
Instrumentsinliquidorrcondensing serviceareloocatedbelow wtheirprocessscontrolconnnection
point.

14. WhhatisLoopteest?
Answer:toenssurethatthesystemwirin ngfromfieldttocontrolcon
nsoleisfuncttioningasreq
quired.

15. Whhatisthediffferencebetw
weenOpenLo oopandCloseeLoop?
Answer:
OpenLoop pAloopsysstemwhichoperatesdirecctwithoutanyyfeedbackan nditgenerateesthe
outputinrresponsetotheinputsignal.
CloseLoop pAloopsysstemwhichusesameasurrementoftheeoutputsignaalthroughfeeedback
andacomparisonwiththedesiredo outputtogennerateanerroorsignalthatisappliedtothe
actuator.

hatisfeedfo
16. Wh orwardandfe
eedbackwardcontrolsysstem?
Answer:


17. WhhatisLogicG
Gate?
Answer:Adigiitalcircuitwitthoneormoreinputvoltaagebutonlyo
oneoutputvooltage.
18. WhhatisFoundaationFieldbussystem?
Answer:Afullyydigitalcontrolsystemiscalledfoundaationfieldbusssystem.
19. WhhatismeantbyFAT,SAT,RAT?
Answer:FATFactoryAccep ptanceTest//SATSiteAccceptanceTestt/RATRunA
AcceptanceTeest



20. WhatisMicroprocessorcontrolsystem?GiveabriefdescriptionofPLC,DCSandSCADA.
Answer:AcomputerbasecontrolprocesssystemiscalledMicroprocessorcontrolsystem.
PLC:ProgrammableLogicControlsystems,PLCsareusedinpracticewiththeaimofachievinga
higherdegreeofavailabilityorfaulttolerance.Thetypesare:FaultTolerant:1outof2system
objective,reducetheprobabilityoflossesofproductionbyswitchingtoastandbysystemand
FailSafe:2outof2systemobjective,protectlife,theenvironmentandinvestmentbysafely
disconnectingtoasecureoffposition.
DCS:DistributeControlSystem,referstoacontrolsystem,processoranykindofdynamic
system,inwhichthecontrollerelementsarenotcentralinlocation(likethebrain)butare
distributedthroughoutthesystemwitheachcomponentsubsystemcontrolledbyoneormore
controllers.
SCADA:standsforSupervisoryControlAndDataAcquisition.Asthenameindicates,itisnota
fullcontrolsystem,butratherfocusesonthesupervisorylevel.Assuch,itisapurelysoftware
packagethatispositionedontopofhardwaretowhichitisinterfaced,ingeneralvia
ProgrammableLogicControllers(PLCs),orothercommercialhardwaremodules.

21. Whataretheinspectionpointsforcabletrayinstallations?
Answer:Materialcheckasperapprovedspecification,materialtypesandsize,trayshookup,
properdistancestructure,traytotrayi.e.power/control/signal/lowandhighvoltage,supportand
fixedstronglynotshaking.
22. Whataretheinspectionpointsforcablelaying?
Answer:Materialcheckasperapprovedmaterialspecification,typesandsize,meggering,cable
routingdrawing,completionofcableroute(tray,conduitortrenchetc.),andcablenumbering
(tags),cablebending,useofpropertoolsandequipmentforcablepulling,degreeofprotection.
23. Whataretheinspectionpointsforfieldinstrumentswithimpulsetubing?
Answer:Materialcheckasperapprovedmaterialspecification,typesandsize,installationasper
hookup,checklineroutetoavoidanyobstruction,checktubebending,andchecktubesupport,
compressionfittingofferrules,andthenpressuretest(hydrostatictest)shallbedone.
24. WhataretheinspectionpointsforJunctionBoxandMarshalingcabinets?
Answer:Materialinspection,typesandsizeasperapprovedspecification,installationhookupfor
frame,bracketorstands,fixedproperly,nameplateandtagnumbers.
25. WhatisthestandardofinstallingaDP(DifferentialPressure)transmitteringasserviceandwhy?
Answer:InstallationofDPtransmitteringasserviceshallbeabovetheprocesstoavoidthe
malfunctioningandliquiddrain(condensate)intotheprocesslineeasily.
26. Howdoyoudeterminethecorrectinstallationoffloworifice?
Answer:Theorificedate(tag)shallbepunchedintheupstreamoftheorifice;thedata(tag)side
shallbeintheupstreamofflowdirection.
27. Explainwhytheshieldofthesignalcableisnotearthedonbothsides?
Answer:Toavoidcurrentnoise(resonance).
28. WhatisFinalRFI?Whenitshallberaisedup?
Answer:WhentheQA/QCdepartmentofthecontractorissatisfiedthattheworkdetailedinthe
constructionRFIiscompleted,thentherequestshallbesubmittedforinspectiontotheclients
QA/QCdepartment.








29. Whataretherequireddocumentsforaninspection?
Answer:Thefollowingaretherequireddocumentsforaninspection:
RFI(RequestForInspection)
P&ID(PipingandInstrumentationDiagram)forlineverification
PPforlocation
Wiringdiagramforwiringdetails
Datasheetforcalibrationandpressuretest
Hookupetc.forremotetubing/airline
QR(QualityRecord),formaintainingrecords
WP(WorkProcedure)tocheckeachandeverystepsasperspecifications
QCO,(QualityControlObservation)forissuingincaseofminorviolation
NCR,(NonConformityReport)forissuingincaseofmajorviolation
30. WhataretherequireddocumentsforaRemoteLoopfolder?
Answer:ThefollowingaretherequireddocumentsforaRemoteLoopfolder:
Looppackagechecklist
ILD(InstrumentLoopDiagram)
Instrumentloopacceptancerecord(TR/TestRecord)
P&ID(PipingandInstrumentationDiagram)
ISS/IDS(InstrumentSpecificationSheet/InstrumentDataSheet)
Alarmlist
CalibrationRecord(TR)
CableMeggerreport(primarypriortopulling)
CableMeggerreport(secondaryafterpulling)
PressureTestRecord(TR)
MCCheckRecord(Remoteloop)(Greencolor)
MCPunchlist
Looppunchlist
31. WhataretherequireddocumentsforaLocalLoopfolder?
Answer:ThefollowingaretherequireddocumentsforaRemoteLoopfolder:
Looppackagechecklist
ILD(InstrumentLoopDiagram)(ifnotmechanicalloop)
CableMeggerreport(primarypriortopulling)(ifnotmechanicalloop)
CableMeggerreport(secondaryafterpulling)(ifnotmechanicalloop)
Alarmlist
P&ID(PipingandInstrumentationDiagram)
ISS/IDS(InstrumentSpecificationSheet/InstrumentDataSheet)
CalibrationRecord(TR)
PressureTestRecord(TR)ifrequired
MCCheckRecord(Remoteloop)(Greencolor)
MCPunchlist
Visualcheckpunchlist/Loopcheckpunchlist


32. Whatarethevariouslevelsofinspection?
Answer:Thelevelsofinspectionarefollowing:
LevelofInspectionforMaterials:
a) Level0Documentsrequirementsonly,noinspection
b) Level1Inspectionpriortoshipping
c) Level2minimumrequirements,preinspectionmeetings,oneormoreunspecifiedin
progresssurveillancevisits.
d) Level3Sameaslevel2,exceptthatinprogresssurveillanceinspectionshallbeinregular
basis.
e) Level4ResidentInspectorcontinuouslymonitortheworkprogress.
LevelofInspectionforConstructionphase:
a) HoldPoints[H]:Theinspectionactivitywillnotproceedwithoutthepresenceofinspector.
b) WitnessPoints[W]:TheinspectionactivitiescanbeproceedingafterissuingRFI.
c) Review[R]:Verificationofdocumentation(NMR)onitscorrectnessasperspecificationand
drawings.
d) Surveillance[S]:Theinspectorhastherighttoconductrandominspectionofwork.
e) Inspect[I]/Perform[P]/Test[T]:constructioncanproceedtonextphasewithoutclient
QA/QC.

33. WhatisITP?WhatisHoldandWitnesspoints?
Answer:ITPmeansinspectionandTestPlan,adocumentthatcontainsthedetailsofworkscope
andtherequiredtypesofinspections,HoldPoint[H]isthelevelofinspectionthattheclient
QA/QCmustberequiredthroughRFIandcannotproceeduntilinspectionisdonebytheclient.
WitnessPoint[W]isthelevelofinspectionwhichtheinspectionactivitycanproceedwithoutthe
clientsQA/QCorifclientisnotavailableasperRFIschedule.

34. WhatisRFI?WhenanRFIwillberaised?
Answer:TheRequestforInspectionshallberaisedonlywhenthestatusofthepreliminary/internal
inspectionissatisfactory,andthework(items)areHoldorWitnesspoints.