Scaffolding Collapse (Z) : Moved To Another Location Inadequate Design of Scaffold Breakdown of Support

The scaffolding collapsed due to a combination of factors including: inadequate design of the scaffold which was not properly tied to the structure and used tubes of different sizes; failure to wear personal fall arrest systems; and excessive impact loading on the platform from materials placed on it. The collapse resulted in the worker being injured when they fell after the platform gave way.

Uploaded by

MDR PRAPHU
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

Scaffolding Collapse (Z) : Moved To Another Location Inadequate Design of Scaffold Breakdown of Support

The scaffolding collapsed due to a combination of factors including: inadequate design of the scaffold which was not properly tied to the structure and used tubes of different sizes; failure to wear personal fall arrest systems; and excessive impact loading on the platform from materials placed on it. The collapse resulted in the worker being injured when they fell after the platform gave way.

Uploaded by

MDR PRAPHU
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

a

SCAFFOLDING COLLAPSE TOP EVENT

(Z)

Breakdown of support Moved to another location Inadequate design of scaffold


(A+F+C)

C (A+B) +

C IMMEDIATE CAUSE

Forgotten to
+ wear PFAS
+ (AB+D)
C + (E+F)
+
Mechanical A
F
breakdown
A
Unguarded platform Failure of PFAS
(Midrail missing/No D
Soil washed away
Safety net.) F
Excessive load
B &collapse
Impact loading on
platform
Vehicle plying & hitting
from below B
A E

Different size scaffold


Not tied to Inadequately lashed
tubes structure wooden planks
Z = C (A+B) / (A+F+C) / (AB+D) X (E+F) used
BASIC EVENT