0% found this document useful (0 votes)
196 views4 pages

Sludge Thickener Pump Head Calculation

This document calculates the pump head for 4 sludge thickener pumps that transport sludge through piping to a dry bed. It finds that the total dynamic head required is 11.770 meters, which exceeds the designed head of 10 meters. Specifically: 1) It calculates friction and fitting losses for the suction, discharge, and yard piping systems. 2) The suction and discharge systems service 2 pumps each, while the yard piping services all 4 pumps. 3) When summed, the total losses are greater than the pump's designed operating head.

Uploaded by

gawtom
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
196 views4 pages

Sludge Thickener Pump Head Calculation

This document calculates the pump head for 4 sludge thickener pumps that transport sludge through piping to a dry bed. It finds that the total dynamic head required is 11.770 meters, which exceeds the designed head of 10 meters. Specifically: 1) It calculates friction and fitting losses for the suction, discharge, and yard piping systems. 2) The suction and discharge systems service 2 pumps each, while the yard piping services all 4 pumps. 3) When summed, the total losses are greater than the pump's designed operating head.

Uploaded by

gawtom
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

SLUDGE THICKENER PUMP HEAD CALCULATION

Total Number of Pumps= 4 (11SP01 TO 11SP04)


Total Running Pumps= 2
Total Standby Pumps= 2
LWL= N/A
Suction Pipe Center Level= +4.350
Highest Discharge Level= +7.700
Pump TDH= 10.000 m
Pump Discharge Flow Rate= 1.600 m3/min = 0.02667 m3/sec
Longest Path: From Pump no. 11SP04 to Sludge Dry Bed no.01
Pumps Running Considered: 11SP03 & 11SP04
Pipe Materials: Ductile Iron

SUCTION LINE
Pipe Loss:
Items DN Qty C Q hf
Pipe 200 16.000 LM 120 0.027 0.075 m
Pipe (Suction Header) 250 2.100 LM 120 0.053 0.012 m
Pipe 125 1.800 LM 120 0.027 0.084 m
Total Pipe Friction Loss 0.171 m

Fitting Loss:
Items DN Qty K V hv
22.50 Bend 200 1 Nos 0.045 0.849 0.002 m
Butterfly Valve 200 3 Nos 0.16 0.849 0.018 m
Line Flow Tee (200x80) 200 1 Nos 0.30 0.849 0.011 m
Branch Flow Tee (Equal) 200 1 Nos 0.75 1.698 0.110 m
Conc Taper (200x250) 200 1 Nos 0.25 1.698 0.037 m
Butterfly Valve 250 2 Nos 0.16 1.086 0.019 m
Branch Flow Tee (250x125) 250 1 Nos 0.75 1.086 0.045 m
Butterfly Valve 125 1 Nos 0.75 2.173 0.181 m
Total Fittings Friction Loss 0.422 m

DISCHARGE LINE
Pipe Head Loss:
Items DN Qty C Q hf
Pipe 100 2.5 LM 120 0.027 0.345 m
Pipe (Header) 200 0.68 LM 120 0.027 0.003 m
Pipe (Header) 200 3.1 LM 120 0.053 0.053 m
Total Pipe Friction Loss 0.401 m

Fittings Head Loss:


Items DN Qty K V hv
900 Bend 100 1 Nos 0.18 3.395 0.106 m
Check Valve 100 1 Nos 2.2 3.395 1.293 m
Butterfly Valve 100 1 Nos 0.16 3.395 0.094 m
Branch Flow Tee (200x100) 100 1 Nos 0.75 3.395 0.441 m
Branch Flow Tee (200x100) 200 1 Nos 0.75 1.698 0.110 m
Line Flow Tee (200x100) 200 2 Nos 0.3 1.698 0.088 m
900 Bend 200 2 Nos 0.18 1.698 0.053 m
Total Fittings Friction Loss 2.184 m

YARD PIPE: THICKENER TO SDB NO.01


Pipe Head Loss:
Items DN Qty C Q hf
Pipe 200 250 LM 120 0.053 4.250 m
Total Pipe Friction Loss 4.250 m

Fittings Head Loss:


Items DN Qty K V hv
22.50 Bend 200 4 Nos 0.045 1.698 0.026 m
450 Bend 200 6 Nos 0.09 1.698 0.079 m
900 Bend 200 1 Nos 0.18 1.698 0.026 m
Branch Flow Tee (Equal) 200 3 Nos 0.75 1.698 0.331 m
Line Flow Tee (Equal) 200 12 Nos 0.3 1.698 0.529 m
Total Fittings Friction Loss 0.992 m

Result:
H= 3.350 m
h f= 4.822 m
h V = 3.598 m
TDH= 11.770 m
Design TDH= 10.000 m
Net Available Head= -1.770 DESIGNED HEAD NOT OK
ER PUMP HEAD CALCULATION

UCTION LINE

Remarks
Q for 1 pump
Q for 2 pumps
Q for 1 pump

Remarks
v for 1 pump
v for 1 pump
v for 1 pump
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 1 pump

SCHARGE LINE

Remarks
Q for 1 pump
Q for 1 pump
Q for 2 pumps

Remarks
v for 1 pump
v for 1 pump
v for 1 pump
v for 1 pump
v for 2 pumps
v for 2 pumps
v for 2 pumps

HICKENER TO SDB NO.01

Remarks
Q for 2 pumps

Remarks
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 2 pumps
v for 2 pumps

You might also like