100% found this document useful (1 vote)
494 views110 pages

MLML

This document provides information about RCW Construction & Development Corporation, an interior finishing contractor based in the Philippines. It discusses RCW's philosophy of partnership in completing projects effectively and with integrity. It also includes RCW's company profile, equipment listings, and summaries of several completed commercial projects involving call centers.

Uploaded by

Joshua Espiritu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
494 views110 pages

MLML

This document provides information about RCW Construction & Development Corporation, an interior finishing contractor based in the Philippines. It discusses RCW's philosophy of partnership in completing projects effectively and with integrity. It also includes RCW's company profile, equipment listings, and summaries of several completed commercial projects involving call centers.

Uploaded by

Joshua Espiritu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 110

RCW CONSTRUCTION

& DEVELOPMENT
CORPORATION
www.rcw.com.ph

INTERIOR FINISHING CONTRACTORS

Rm 508 Jovan
Condominium
Shaw Blvd cor
Samat St
Mandaluyong City
Metro Manila
Philippines

Tel (63 2) 5337020


Fax (63 2) 5333438

E-mail [email protected]
INTRODUCTION

From vision to reality...


Designers Perspective (courtesy of
Steven J. Leach, Jr. + Associates
Manila) and completed view of the
Main Banking Hall, Philippine Bank
of Communications Head Office in
Manila.

In this diverse and dynamic industry, we specialize in problem solving. The complexity of the
building process often derails the integrity of the conceptualized design. Through our part-
nership with the Designer, the Architect, Suppliers, Product and Equipment Manufacturers,
and the Customer, we continually strive to develop effective solutions to these otherwise in-
tractable problems. The idea of partnership lies at the very heart of RCW CONSTRUC-
TIONs corporate philosophy.

Each component in the building process, from the Customer to our engineers to the various
trade specialists to the Designer and Architect, is a two-, three or four-way partnership in
building a cost effective, technically competent and aesthetically enduring structure.

In a broad range of applications, from elegant corporate interiors to industrial buildings to


humble residences, we unceasingly stress value engineering, innovation, and above all, in-
tegritycornerstones in any successful project delivery.

In the light of this underlying philosophy, we eagerly look forward to continuing this partner-
ship through the coming years.
COMPANY PROFILE
COMPANY NAME : RCW CONSTRUCTION & DEVELOPMENT CORP.

ADDRESS : Rm. 508 5/F Jovan condominium, Shaw Blvd. cor Samat
St., Mandaluyong City

TELEPHONES : 533-7020 Trunkline


533-3438 Fax No.

DATE ESTABLISHED : April 29, 1987

SEC REGISTRATION NO. : 140302

TAX ACCT NO. : 041-000-060-411-000

SSS REGISTRATION NO. : 03-8786073-0

PCAB CONSTRUCTORS
LICENSE : Constructors License No. 11737
Issued April 24, 1989

: Category B
Classification
General Building (Principal)
General Engineering
Sp-Electrical Works

PRINCIPALS : MICHAEL A.T. CHUA, Architect

CARLOS N. ROXAS, Civil Engineer

MANAGING OFFICERS : Michael A.T. Chua - President


Carlos N. Roxas - Vice_President Operation

BANK REFERENCES : METROBANK & TRUST CO.


Greenhills Crossroad Branch
Greenhills Commercial Center
San Juan, Metro Manila

: PHILIPPINE BANK OF COMMUNICATION


San Miguel Avenue Branch
G101 OMM CITRA Condominium, San Miguel Ave.
Pasig City
ENGINEERING/SPECIALTY
CONSULTANTS

: ENGR. HENRY FERNANDEZ / ENGR. LORENZO S.DY


Structural Engineer

: ERLINDA G. MENDOZA
Sanitary Engineer

: MANOLET ALCANTARA
Electrical Engineer

: GODOFREDO LIMBO
Geodetic Engineer
: Advance Geotechnical Engg. Services/

:RICHARD C. TAN
Soil/Geotechnical Investigations

: EFREN S. CARLOS, JR.


Electrical Engineer
Certified Fire and Explosions Investigators (USA)
Certified Safety Practitioner Dept. of Labor & Employment
Director Phil. Society of Safety Engineers

: LYNDON MAGSINO
Safety Engineer
EQUIPMENT LISTING
1. PUMPS :
a. 1 Unit Submersible Pump/Electric Motor 1 Hp
b. 1 unit Waterpump/Gasoline Engine, 3 Hp/Briggs & Straton
c. 1 unit Hydrostatic Pump

2. CONCRETE MIXERS/VIBRATORS :
a. 1 unit Concrete Mixer/1-Bagger/Gasoline Engine BRIGGS & STRATON
b. 1 unit Concrete Mixer/1-Bagger/Gasoline Engine HONDA 7Hp
c. 2 units 8 Hp Gasoline Engine/BRIGGS & STRATON
d. 1 unit Concrete Mixer/1-Bagger/3 Hp Electric Motor
e. 1 unit Electric Concrete Vibrator w/ 1-1/4 x 20 Vibrating Head/FURIKI
f. 1 unit Concrete Vibrator/Gasoline Engine/MIKASA

3. STEEL BAR CUTTERS :


a. 2 units Bar Cutters 28mm diameter/MUBEA

4. DEMOLITION HAMMER :
a. 1 unit MAKITA HM 1201/2000 BPM/1130 watts

5. POWER PLANER :
a. 2 units MAKITA 1900B

6. ELECTRIC SAW :
a. 1 unit CIRCULAR SAW MAKITA 5601N
b. 1 unit CIRCULAR SAW MAKITA 5800N
c. 1 unit CIRCULAR SAW 13 5103N
d. 1 unit MITER SAW LS1030 (10)
e. 1 unit JIG SAW 43008V
f. 1 unit STEEL CUTTER SAW PORTABLE CUT
g. 1 unit RADIAL ARM SAW 250M

7. POWER DRILLS :
a. 2 units MAKITA 6301

8. ORBITAL SANDERS :
a. 2 units MAKITA 9035 Finishing Sander

9. CONCRETE MIXER :

a. 1 unit Concrete Mixer/1-Bagger/Gasoline Engine


ROBIN EY28-B #1325572

10. POWER DRILLS :

a. 3 units AEG SB2-10


b. 1 unit AEG SB2-16N
c. 1 unit MAKITA 5800N
d. 3 units MAKITA SCREW DRIVER 6821
e. 3 units MAKITA POLISHER 9218PB2
11. TILE CUTTER :

a. 3 units TILE CUTTER

12. ELECTRIC BREAKER :

a. 1 unit ELECTRIC BREAKER HM1400

13. PISTON TOOL :

a. 1 unit TS750 PISTON TOOL 90MM X 9MM BARREL (RAMSET)

14. ROUTER :

a. 1 unit MAKITA
b. 2 units MAKITA ROUTER 3601B
c. 1 unit ROUTER 3600H

15. GRINDER :

a. 1 unit MAKITA 4

16. WELDING MACHINE :

a. 1 unit YAMATO 200mA

17. TRUCK :

1 unit ISUZU Elf 4-wheeler truck 3800 Gross Weight

18. CONCRETE MIXER & GASOLINE ENGINES :

a. 3 units ROBIN Gasoline Engine EY28-B

b. 2 units Concrete Mixer/1-Bagger Capacity/ROBIN


gasoline engine EY28-B

19. WATER PUMPS & MOTORS :

a. 2 units TSURUMI water pump : 3 suction capacity driven by EY20 ROBIN


gasoline engine complete with 20 suction/discharge hose with 3 dia.
flexible discharge hose.

b. 2 units Centrifugal water pump 3dia. driven by ROBIN EY20 gasoline engine
complete with 20 suction hose.

20. BAR CUTTER :

a. 1 unit MUBEA 28mm bar cutter

21. CHEMICAL/PESTICIDE SPRAYER :

a. 2 units B&G Sprayer (1-gal. capacity)


OTHER EQUIPMENTS & TOOLS

1 unit Vita Multi-Boring Machine


Model ALFA 21R Italy 220V 60Hz Single Face

1 unit Panel Saw Z3200

1 unit Edge Bonding Machine Model EP 9

1 unit Tinth Roller Model 0100

1 unit Shipping Machine Model T-120

2 units Press Drill Taiwan

3 units Stud Crimper for Stud & Track Fastening

39 units Makita Drill Gun 6307


7 units Laser leveller

2 units Blum minidrilhinge drill art m51n105150


A PORTFOLIO OF
COMPLETED PROJECTS

RCW CONSTRUCTION
RCW CONSTRUCTION SC Reservations Philippines Inc.

SC Reservations Philippines
Inc. is the call center for the Inter-
Continental Hotels Group, a lead-
ing global hospitality group, with
over 3,300 hotels across nearly
100 countries and territories. The
call center primarily services its
hotel reservations system and oc-
cupies about 2,000 square meters
at their new offices located at the
28 and 29th floors of Tower 2 of
the RCBC Plaza located along Ay-
ala Avenue.

The project is designed and proj-


ect managed by the firm of Del
Rosario Design Group.
RCW CONSTRUCTION SITEL (Philippines), Inc.

SITEL is a global call center company with offices in


Omaha, Canada, India and the Philippines. The facility in
the Philippines occupies the 25th and 26th floors of the
Cyber One Bldg. Located Eastwood Cyberpark, Quezon
City. With a total floor area of 2,400 square meters, the
project was completed in 2 phases beginning in April to
May 2004 for the 25/F and August to October 2004 for
the 26/F with a combined project cost of P 40M. The pro-
ject was designed by Adrianse Group Philippines, Inc.
RCW CONSTRUCTION Ambergris Solutions @ Market! Market!

Located at the 5/F of the Market! Market!


Mall in Bonifacio Global City, this call
center facility has a total floor area of
3,300 square meters and accommodates
726 call agent seats. The project was
completed in 2 phases from August-
November 2004 (Phase 1) and January
to March 2005 (Phase 2) The combined
project cost amounted to P 40.16M.
RCW CONSTRUCTION Ambergris Solutions, Inc.

Ambergris Solutions is a
call center located 7, 18,
and 30th floors of the Raf-
fles Corporate Center
on Emerald Avenue, Orti-
gas Center, Pasig City.

With a combined floor


area of 3,600 square me-
ters, the facility houses
750 seats. Combined
project cost is about P
31.7M and was completed
in phases from October
2003 to May 2004.
RCW CONSTRUCTION GT Tower Penthouse

The GT Tower Pent-


house was envisioned to
service high profile func-
tions of the MetroBank
Group. Located at the
penthouse level of the GT
Tower along Ayala Ave-
nue in Makati City, the
project was designed by
WV Coscolluela & Asso-
ciates and project man-
aged by Federal Land.
RCW CONSTRUCTION Ogilvy & Mather Philippines

Designed by Davenport Campbell


Philipppines, the new offices of re-
nowned advertising multinational Ogilvy
& Mather which in turn is part of the
WPP group, occupies the fifteenth floor of
the Philamlife Tower.. Noted for its play-
ful colors and striking design elements,
the fit-out aims to achieve an informal yet
creative environment.
RCW CONSTRUCTION Ogilvy & Mather Philippines
RCW CONSTRUCTION Regus Centres, Inc.

Occupying the 18th floor


of the Philamlife Tower,
Regus opened its 23rd
business center in the
Asia Pacific region, offer-
ing fully furnished, staffed
and equipped offices in a
professionally designed
working environment.

Design and project man-


agement was commis-
sioned to the firm of
Goudie Associates. The
design is characterized by
the designers use of
stainless steel and filmed
glass accented with natu-
rally stained maple ve-
neers.
RCW CONSTRUCTION Chase Manhattan Bank

Designed by Group 3
Design Studio,
headed by Architect
Edwin Gumila, the
new offices of Chase
Manhattan Bank oc-
cupies the thirty first
floor of the Philamlife
Tower located at the
Makati Business Dis-
trict. The design uti-
tlized plasma filled
glass for the meeting
rooms and chief ex-
ecutive office which
can be switched from
clear to opaque. Proj-
ect management was
by GSPM Hong
Kong, headed by Mr.
Gerry Shirley.
RCW CONSTRUCTION Chase Manhattan Bank
RCW CONSTRUCTION Marsman Drysdale

The corporate head offices of


Marsman Drysdale is located
at the 45/f of the Philamlife
Tower along Paseo de Roxas
in Makati City. The project was
ompleted in November 2002
and project cost amounted to P
8M. Design by ADD+ Consor-
tium.
RCW CONSTRUCTION J. Walter Thompson Company, Inc.

J. Walter Thompson is a major multinational advertising


firm which is part of the WPP Group (UK), occupying the
29th and 30th floors of the Enterprise Center. The inte-
rior architecture is by BDG McColl (HK) headed by John
Scade and Judith Rainford and project management is by
Jones Lang LaSalle (HK). The design is characterized
by its use of colored glass, stainless steel, cherry veneers
and refreshing forms that highlight the companys crea-
tive role.
RCW CONSTRUCTION J. Walter Thompson Company, Inc.
ANZ Bank
Telus
Telus
JPMorgan
JPMorgan
Baxter
ANZ Banking Group Limited
LIST OF ON GOING PROJECTS 2015

ARVATO CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(July 15-August 31, 2015)
Project Cost : P 24,700,438.40
($ 546,867.71 )
Location : 6F E Plaza, Northgate, Cyberzone, Filinvest City, Alabang
Design By : Team Asterisk
Contact Person : Aeroin Dayo
Area : 1,500 Sqm

FIRST IMEX
PROPOSED OFFICE FIT-OUT PROJECT
(July 13-August 30, 2015)
Project Cost : P 5,000,000.00
($110,700.00 )
Location : Unit 1607, One World Place Corporate Offices, 32nd St., Bonifacio Global City
Design By : Maximus Built Solutions Inc.
Contact Person : Mr. Jommel Macabagdal
Area : 200 Sqm

LIZARDBEAR TASKING INC.


PROPOSED OFFICE FIT-OUT PROJECT
(June 15-July 31, 2015)
Project Cost : P 14,000,000.00
($309,960.00 )
Location : 19F Twenty Four Seven Mckinley Bldg., 7th Ave. Cor. 24th St. BGC Taguig
Design By : Mr. Francis Arollado
Contact Person : Mr. Marvin Hernandez
Area : 980 Sqm

PRU LIFE U.K


PROPOSED OFFICE FIT-OUT PROJECT
(April 23-June 05, 2015 )
Project Cost : P 3,300,000.00
($73,062.00 )
Location : 5F Kingston Tower Block 2, Lot 1, Acacia Ave., Ayala Alabang Muntinlupa
Design By : Aeroin Dayo
Contact Person : Beneleo Parumog
Area : 105 Sqm

PRU LIFE U.K


PROPOSED OFFICE FIT-OUT PROJECT
(June 01-July 31, 2015)
Project Cost : P 5,000,000.00
($110,700.00 )
Location : 2F Sterling Bank Barangay Uno, Crossing, Calamba City, Laguna
Design By : Aeroin Dayo
Contact Person : Simoni Cruz
Area : 150 Sqm
VIKINGS
PROPOSED OFFICE FIT-OUT PROJECT
(June 29-October 26, 2015)
Project Cost : P 11,222,221.49
($248,459.98 )
Location : Bldg. A, SM By The Bay, Seaside Blvd. SM Mall of Asia Complex, Pasay City
Design By Aranda & Dalid Associates, Inc.
Contact Person : Mr. Joel Aranda
Area : 1,373.13 Sqm

BRITISH EDUCTION INC.


PROPOSED OFFICE FIT-OUT PROJECT
(June 22-August 07, 2015)
Project Cost : P 16,000,000.00
($354,240.00 )
Location : 36th St. University Park, Bonifacio Global City, Taguig
Design By : Rchitects
Contact Person : Jose Pedro C. Recio
Area : 1585.82 Sqm
LIST OF COMPLETED PROJECTS 2015

DELTEK SYSTEMS ( PHILIPPINES ) LTD.


PROPOSED OFFICE FIT-OUT PROJECT
(May 11- June 30,2015)
Project Cost : P 9,728,713.68
($221,107.12)
Location : 16F The Enterprise Center Ayala Ave., cor. Paseo de Roxas, Makati City
Design By : Work Architecture
Contact Person : Mr. Joseph Infante/Ms. Dezzie Isaac
Area : 1,052 Sqm

PROCTER & GAMBLE INTERNATIONAL OPERATIONS SA-ROHQ


PROPOSED OFFICE FIT-OUT PROJECT
( March 15 June 30, 2015)
Project Cost : P 93,000,000.00
($ 320,519.18 )
Location : 10F & 15F Net Park Plaza, Net One Crescent Park, BGC, Taguig City
Design By : Orbit/Design Idea
Contact Person : Mr. Bomer Macaranas
Area : 3,240 Sqm

CHINA ONLINE INNOVATIONS, INC.


PROPOSED OFFICE FIT-OUT PROJECT
( January 24 March 15, 2015)
Project Cost : P 14,199,000.00
($ 320,519.18 )
Location : 8F Robinson Cyberscape Alpha Garnet & Sapphire Rd., Ortigas Ctr. Pasig City
Design By : Arollado & Partners Inc.
Contact Person : Mr. Nelson Tan
Area : 1,700 Sqm

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(February 22 April 20, 2015 )
Project Cost : P 48,100,000.00
($ 2,130,830.00 )
Location : 20th & 21st Flr. MDC100 Bldg., Eastwood Bagumbayan, Quezon City
Design By : Adrianse Group
Contact Person : Arch. Karen Palma
Area : 3,464 Sqm

SOPHOS COMPUTER SECURITY PTE. LTD.


PROPOSED OFFICE FIT-OUT PROJECT
( April 27 July 12,2015 )
Project Cost : P 10,000,000.00
($ 225,733.63 )
Location : Unit 1-2 17F Zuellig Bldg. Makati Ave. cor. Paseo de Roxas, Makati City
Design By : DB&B Phils.
Contact Person : Mr. Ronald Bacal
Area : 532 Sqm
TASKUS COM LTD. INC.
PROPOSED OFFICE FIT-OUT PROJECT
( March 6 May 15, 2015 )
Project Cost : P 44,000,000.00
($ 993,227.99 )
Location : 17F & 18F Twenty Four Seven Mckinley Bldg. BGC Taguig CIty
Design By : Mr. Francis Arollado
Contact Person : Mr. George G. Hayes
Area : 1,940 Sqm

QBE GROUP SHARED SERVICES LTD. PHIL. BRANCH


PROPOSED OFFICE FIT-OUT PROJECT
(February 15 March 03, 2015 )
Project Cost : P 13,467,221.45
($304,000.48 )
Location : Level A Skyrise Alpha Bldg. Samar Loop, Ayala Business Park, Cebu City
Design By : HBO + EMTB
Contact Person : Mr. Jommel Macapagal
Area : 1,600 Sqm

EXLService Philippines Inc.


PROPOSED OFFICE FIT-OUT PROJECT
(March 15,2015-April 30,2015 )
Project Cost : P 16,558,000.00
($ 373,769.75 )
Location : 11F 2 Quad Bldg. Cardianl Rosales Ave., cor. Sumilon Road, 600 Philippines
Design By : Interics
Contact Person : Ms. Marilou Comia
Area : 1,800 Sqm

Regus Philippines Fort Bonifacio, Inc.


PROPOSED OFFICE FIT-OUT PROJECT
(March 26 - April 30, 2015 )
Project Cost : P 29,515,067.16
($ 666,028.60 )
Location : 35/F & 36F Penthouse Unit 1,2 and 4 ECO Tower Bldg. 32nd St., cor. 9th Ave.,
BGC, Taguig City
Design By : Desimat
Contact Person : Arch. Leonardo Sioco
Area : 1,342.19 Sqm
LIST OF COMPLETED PROJECTS 2014

TXvia PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(August 1, 2014 October 31, 2014 )
Project Cost : P 7,287,250.00
($ 163,758.43 )
Location : 26F Picadilly Star Bldg. 4th Avenue cor. 27th Street, BGC Taguig City
Design By : M Moser Associates
Contact Person : Mr. Jayson Guerero
Area : 1,800 Sqm

ATLASSIAN PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
(September 22 November 30, 2014)
Project Cost : P 21,500,000.00
($ 488,636.36 )
Location : 2F B3 Bonifacio High Street Central East, 9th Ave. BGC, Taguig City
Design By : Jones Lang LaSalle Phils., Inc.
Contact Person : Mr. Kiko Abarquez / Mr. rey Agustin
Area : 882 Sqm

QBE SHARED SERVICES


PROPOSED OFFICE FIT-OUT PROJECT
(August 1, 2014 October 31, 2014)
Project Cost : P 15,000,000.00
($ 337,078.65 )
Location : Level 14 W Fifth Bldg. 32nd St. cor 5th Ave. BGC Taguig City
Design By : HBO + EMTB
Contact Person : Mr. Douglas Coote
Area : 1,480 Sqm

FWD LIFE INSURANCE CORP.


PROPOSED OFFICE FIT-OUT PROJECT
(August 1, 2014 September 24, 2014 )
Project Cost : P 7,769,188.00
($ 174,588.50 )
Location : GF/Mezzanine Floors W-Fifth Ave. Bldg. BGC Taguig City
Design By : PDM International
Contact Person : Ms. Jenny San Diego
Area : 200 Sqm

BRITISH EDUCATION, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(July 30, 2014 August 11, 2014 )
Project Cost : P 8,290,000.00
($ 186,292.14)
Location : Lot 1 Block 21 36th St., University Park, BGC Taguig City
Design By : R Chitects, Inc.
Contact Person : Ms. Maita Borromeo
Area : 1,165 Sqm
MSCI HONGKONG LIMITED (PHASE 2)
PROPOSED OFFICE FIT-OUT PROJECT
(September 01, 2014 October 31, 2014)
Project Cost : P 3,635,069,13
($ 81,686.95)
Location : 29F Zuellig Bldg., Makati Ave. cor. Paseo de Roxas, Makati City
Design By : Goudie Associates
Contact Person : Ms. Sally Magalang
Area : 600 Sqm

H&M HENNES & MAURITZ (SHANGHAI) COMMERCIAL CO. LTD.


PROPOSED OFFICE FIT-OUT PROJECT
(May 10 August 30, 2014 )
Project Cost : P 103,992,984.00
($ 2,363,476.91 )
Location : GF-3F Bldg. A SM Megamall, Ortigas Center, Mandaluyong City
Design By : Goudie Associates
Contact Person : Arch. Carlos De Castro
Area : 3,900 Sqm

MADRIGAL BAYOT DEVELOPMENT CORP.


PROPOSED OFFICE FIT-OUT PROJECT
(March 1 June 30, 2014)
Project Cost : P 4,235,000.00
($ 96,250.00)
Location : Unit 30A0, The Address at Wack Wack, Mandaluyong City
Design By : ICC Interior Design Consultancy
Contact Person : Ms. Ivy C. Crisostomo
Area : 230 Sqm

MADRIGAL BAYOT DEVELOPMENT CORP.


PROPOSED OFFICE FIT-OUT PROJECT
(May 26 July 31, 2014)
Project Cost : P 4,000,000.00
($ 90,909.09)
Location : Unit Penthouse D, The Address at Wack Wack, Mandaluyong City
Design By : ICC Interior Design Consultancy
Contact Person : Ms. Ivy C. Crisostomo
Area : 200 Sqm

ORACLE (PHILIPPINES) CORPORATION


PROPOSED OFFICE FIT-OUT PROJECT
(June 16 July 30, 2014)
Project Cost : P 20,500,000.00
($ 465,909.91)
Location : 32F & 33F Zuellig Bldg., Makati Ave. cor. Paseo de Roxas, Makati City
Design By : Work Architecture
Contact Person : Arch. Joseph Infante
Area : 1,300 Sqm

ARVATO CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(June 6 July 28, 2014)
Project Cost : P 54,359,876.73
($ 1,235,451.74)
Location : GF & 5F Plaza E Building, Northgate Cyberzone, Filinvest City, Alabang
Design By : Asterisk
Contact Person : Mr. Aeroin Dayo
Area : 2,400 Sqm
PHL CENTRE NO. 12 (REGUS)
PROPOSED OFFICE FIT-OUT PROJECT
(March 15 May 20, 2014)
Project Cost : P 14,600,000.00
($ 331,818.18 )
Location : 4F Unit 2C One E-Com Ctr., Ocean Drive Mall Of Asia Complex, Pasay City
Design By : FVA International Ltd.
Contact Person : Mr. Romain Duval
Area : 850 Sqm.

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(March 04 April 28, 2014)
Project Cost : P 26,600,000.00
($ 604,545.45)
Location : 25F MDC100 Building, Eastwood Bagumbayan, Quezon City
Design By : Adrianse Group Philippines, Inc.
Contact Person : Ms. Karen Palma
Area : 1,700 Sqm.

VIVENTES SEARCH ASIA, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(March 01 May 01, 2014)
Project Cost : P 13,000,000.00
($ 295,454.54 )
Location : 6F The Mercure Hotel Bldg. 45, San Miguel Ave., Ortigas Center, Pasig City
Design By : 3D Design
Contact Person : Yu Ming Chin
Area : 580 Sqm.

PRULIFE UK ( Phase 1)
PROPOSED OFFICE FIT-OUT PROJECT
(March 05 April 30, 2014)
Project Cost : P 3,004,808.80
($ 68,291.10)
Location : 2F B3 Bonifacio High St., Bonifacio Global City, Taguig City
Design By : Team Asterisk
Contact Person : BJ Paromog
Area : 824 Sqm.

PRULIFE UK ( Phase 2)
PROPOSED OFFICE FIT-OUT PROJECT
(December 15, 2013 February 15, 2014)
Project Cost : P 4,141,235.73
($ 94,118.99 )
Location : 14F B3 SSHG Building, Paseo de Roxas, Makati City
Design By : Team Asterisk
Contact Person : BJ Paromog
Area : 832 Sqm.

QBE GROUP SHARED SERVICES LIMITED


PROPOSED OFFICE FIT-OUT PROJECT
(March 07 December 31, 2014)
Project Cost : P 50,000,000.00
($1,136,363.64)
Location : Level 10,11 & 12F, Skyrise, Alpha Building, Samar Loop Cebu Businesss Park
Cebu City
Design By : HBO + EMTB
Contact Person : Mr. Douglas Coote
Area : 5,700 Sqm.
EXL SERVICES PHILIPPINES, INC.
PROPOSED OFFICE FIT-OUT PROJECT
(March 07 May 15, 2014)
Project Cost : P 16,800,000.00
($ 381,818.18 )
Location : 10F 2Quad Bldg., Cardinal Rosales Ave., Sumilon Rd, Cebu City Business
Park, Cebu City
Design By : Interics
Contact Person : Ms. Malou Comia
Area : 2,100 Sqm.

MCE LEISURE (PHILIPPINES)CORPORATION


PROPOSED OFFICE FIT-OUT PROJECT
(November 23, 2013 February 28, 2014)
Project Cost : P 110,000,000.00
($ 2,500,000.00 )
Location : 9F SM MAAX Arena Annex Bldg. Coral Way, JW Diokno Blvd. Pasay City
Design By : Arollado Partner Inc.
Contact Person : Ms. Anne Lao
Area : 4,000 Sqm.

MCKINSEY & COMPANY


PROPOSED OFFICE FIT-OUT PROJECT
(January 20 March 20, 2014)
Project Cost : P 42,000,000.00
($ 954,545.45)
Location : 7F Zuellig Bldg., Paseo de Roxas, Makati City, Philippines
Design By : Adrianse Group Philippines
Contact Person : Ms. Tina Capillo
Area : 1,850 Sqm.

MSCI HONGKONG LIMITED


PROPOSED OFFICE FIT-OUT PROJECT
(January 07 March 14, 2014 )
Project Cost : P 17,472,000.00
($ 397,091.00)
Location : 29F Zuellig Bldg., Paseo de Roxas, Makati City, Philippines
Design By : Goudie Associates
Contact Person : Ms. Tina Capillo
Area : 900 Sqm.

ARVATO CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(October 1, 2013 January 20, 2014 )
Project Cost : P 43,396,915.68
($ 986,293.53)
Location : 5F SM City Clark, BPO Building 4 M.A. Roxas Avenue, Angeles City
Design By : Team Asterisk
Contact Person : Mr. Norbito Trinidad
Area : 2,900 Sqm.

CWC DEVELOPMENT INC.


PROPOSED OFFICE FIT-OUT PROJECT
(September 02, 2013 January 30, 2014 )
Project Cost : P 7,158,077.02
($ 162,683.57)
Location : No. 2 Zaragosa St. cor. Palanza St., Brgy. Dona Imelda, Quezon City
Design By : Oyek Design
Contact Person : Mr. John David Oyek
Area : 1,283 Sqm.
JTKC LAND INC./DISCOVERY PRIMEA PUBLIC AREAS
PROPOSED OFFICE FIT-OUT PROJECT
(July 15 December 30, 2013)
Project Cost : P 14,500,000.00
($ 332,950.00)
Location : GF Level 6749 Ayala Avenue, Makati City
Design By : Design Coordinates Inc.
Contact Person : Ms. Badjie Guinto
Area : 1,500 Sqm.

JTKC LAND INC./DISCOVERY PRIMEA BASEMENT GLAZING WORKS


PROPOSED OFFICE FIT-OUT PROJECT
(October 13, 2013 January 30, 2014 )
Project Cost : P 2,700,000.00
($ 61,363.64 )
Location : 6749 Ayala Avenue, Makati City
Design By : Design Coordinates Inc.
Contact Person : Ms. Badjie Guinto
Area : 120 Sqm.

JTKC LAND INC./DISCOVERY PRIMEA 2ND FLOOR


PROPOSED OFFICE FIT-OUT PROJECT
(October 04, 2013 January 30, 2014)
Project Cost : P 13,000,000.00
($ 295,454.55)
Location : 2nd Floor 6749 Ayala Avenue, Makati City
Design By : Design Coordinates Inc.
Contact Person : Ms. Badjie Guinto
Area : 1,200 Sqm.

JTKC LAND INC./DISCOVERY PRIMEA 3RD LEVEL


PROPOSED OFFICE FIT-OUT PROJECT
(October 14, 2013 March 30, 2014)
Project Cost : P 24,404,269.76
($ 554,642.50 )
Location : 3rd Level 6749 Ayala Avenue, Makati City
Design By : Design Coordinates Inc.
Contact Person : Ms. Badjie Guinto
Area : 1,000 Sqm.

INFOR PHILIPPINE SOLUTIONS & SERVICE CENTER INC.


PROPOSED OFFICE FIT-OUT PROJECT
(October 15- November 15, 2013)
Project Cost : P 5,000,000.00
($ 113,636.36)
Location : 14F Net Square Bldg. Taguig City
Design By : Adrianse
Contact Person : Ms. Karen Palma
Area : 1,300 Sqm.

MCE LEISURE (PHILIPPINES) CORPORATION (SM MAAX)


PROPOSED OFFICE FIT-OUT PROJECT
(November 27, 2013 February 28, 2014)
Project Cost : P 110,000,000.00
($ 2,500,000.00 )
Location : 9F SM Maax Arena Annex Building, Coral Way JW Diokno Blvd.
Pasay City, Philippines
Design By : Arallado Partners Inc.
Contact Person : Ms. Anne Kristine Lao
Area : 3,900 Sqm.
PARAMOUNT LIFE GENERAL INSURANCE CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(September 7 December 31, 2013)
Project Cost : P 3,500,000.00
($ 79,545.45)
Location : 8F Sage House, VA Rufino Tower, Legaspi Village, Makati City
Design By : Arch. Jun V. Bros
Contact Person : Ms. Sheila Sabado
Area : 300 Sqm.

PHILIPPINE SCIENCE HIGH SCHOOL


PROPOSED OFFICE FIT-OUT PROJECT
(November 25- December 25, 2013 )
Project Cost : P 2,963,732.80
($ 67,357.56)
Location : Agham Road, Diliman Quezon City
Design By : Team Asterisk
Contact Person : Aeroin Dayo
Area : 100 Sqm.

PRU LIFE INSURANCE CORPORATION OF U.K.


PROPOSED OFFICE FIT-OUT PROJECT
(November 05- December 15, 2013 )
Project Cost : P 3,004,808.80
($ 68,291.11)
Location : 14F All Asia Capital Centre, 105 Paseo de Roxas, Makati City
Design By : DB & B Philippines
Contact Person : Mr. Rey Agustin / Jones Lang La Salle
Area : 700 Sqm.

QBE GROUP SHARED SERVICES LIMITED


PROPOSED OFFICE FIT-OUT PROJECT
(December 1-13, 2013)
Project Cost : P 1,205,901.00
($ 27,406.84)
Location : L2, 20, 21, 22, 23 & 24 QBE Net Cube, 30th St. cor 3rd Avenue
Crescent Park West, Bonifacio Globa City, Taguig City
Design By : CBRE Philippines
Contact Person : Mr. Jommel Macabagdal
Area : 700 Sqm.

SAMSUNG ELECTRONICS PHILIPPINES CORPORATION


PROPOSED OFFICE FIT-OUT PROJECT
(October 21 December 31, 2013)
Project Cost : P 108,673,000.00
($ 2,469,840.91)
Location : 7F 10F Hanjin Phil. Bldg. No. 1128 University Parkway, North Bonifacio
Global City, Taguig City
Design By : Goudie Associates
Contact Person : Ms. Susan Mistica
Area : 8,000 Sqm.

FAMOUS CITY HOLDINGS LIMITED (STARCRUISE)


PROPOSED OFFICE FIT-OUT PROJECT
(November 20 December 20, 2013)
Project Cost : P 6,586,606.40
($ 149,695.60)
Location : 3F & 4F Starcruises Centre, 100 Andrews Avenue, Newport City, Pasay City
Design By : AddPlus Solution
Contact Person : Ms. Lanie Gomos
Area : 464 Sqm.
PMFTC INC. BEETLE PROOFING
(January - July 2012 )
Project Cost : P 21,889,051.52
($ 509,047.71)
Location : Mira Hills, Vigan City, Ilocos Sur
Design By : Adriane T. Chua & Associates
Contact Person : Mr. Alex Manalig / Arch. Adriane Chua
Area : 60,690 Sqm.

PMFTC INC. PRINTSHOP BUILDING UPGRADE


(Septermber 2011 April 2012)
Project Cost : P 60,434,976.21
($ 1,405,464.60)
Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City
Design By : Adriane T. Chua & Associates
Contact Person : Arch. Adriane T. Chua
Area :

PMFTC INC. NTM/FG AREA IMPROVEMENT & DOCKING


(November 2011 March 2012)
Project Cost : P 18,400,000.00
($ 427,906.98 )
Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City
Design By : Adriane T. Chua & Associates
Contact Person : Arch. Adriane Chua
Area : 1,200Sqm.

PMFTC INC. FLOOR AND WALL IMPROVEMENT IN VIGAN


PROPOSED OFFICE FIT-OUT PROJECT
(January April 2012 )
Project Cost : P 48,110,948.48
($ 1,118,859.50 )
Location : Mira Hills, Vigan City, Ilocos Sur
Design By : Adriane T. Chua & Associates
Contact Person : Mr. Alex Manalang
Area : Sqm.
LIST OF COMPLETED PROJECTS 2013
TELSTRA PHILIPPINES INC.
PROPOSED OFFICE FIT-OUT PROJECT
(October 07 November 20, 2013)
Project Cost : P 7,033,434.00
($ 159,850.77)
Location : 22F PBCOM Tower I 6819 Ayala Avenue, Makati City
Design By : AddPlus Solution
Contact Person : Mr. Alex Jueno
Area : 180 Sqm.

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(July 20, 2013 September 18, 2013)
Project Cost : P 24,316,610.34
($ 565,502.56 )
Location : 26F MDC100 Bldg. E. Rodrigues Jr. Ave., cor. Eastwood Libis, Q.C.
Design By : Adrianse Group Philippines, Inc.
Contact Person : Ms. Karen Palma
Area : 1,685 Sqm.

ABBOTT LABORATORIES PHILIPPINES


PROPOSED OFFICE FIT-OUT PROJECT
(September 01 November 30, 2013 )
Project Cost : P 85,000,000.00
($ 1,976,744.19)
Location : 8F & 9F Venice Corporate Center, Turin St., Mckinley Hill Cyberpark, Taguig
Design By : Cushman & Wakefield
Contact Person : Engr. Gerald Datario
Area : 4,314.58 Sqm.

CASTROL PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(September 02 October 31, 2013 )
Project Cost : P 11,000,000.00
($ 255,813.95)
Location : 32F LKG Tower, Ayala Avenue, Makati City
Design By : Spacematrix Design Consultant Pte. Ltd.
Contact Person : Mr. Gary Taylor
Area : 403.37 Sqm.

APEX8 STUDIOS, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(October 10 November 20, 2013)
Project Cost : P 4,100,000.00
($93,181.81)
Location : 37F PBCOM Tower, Ayala Avenue cor. Rufino St., Makati City
Design By : DPC
Contact Person : Mr. Jun Vergara
Area : 600 Sqm.

VISA WORLDWIDE SINGAPORE PTE. LTD.


PROPOSED OFFICE FIT-OUT PROJECT
(August 02 September 08, 2013 )
Project Cost : P 15,486,000.00
($ 360,139.53)
Location : 5F, 6F, 23F, The Zuellig Building, Makati City
Design By : 3 Design Asia Incorporated
Contact Person : Mr. Jairus Requillo
Area : 409.68 Sqm.
CITISECURITIES, INC.
PROPOSED OFFICE FIT-OUT PROJECT
(June 1 August 30, 2013 )
Project Cost : P 12,085,915.13
($ 277,518.14)
Location : 23rd Floor Tektite Tower PSE Ortigas, Pasig City
Design By : Oyek Design
Contact Person : Mr. Edward Lee
Area : 650 Sqm.

MCE LEISURE (PHILIPPINES) CORP.


PROPOSED OFFICE FIT-OUT PROJECT
(June 14 November 30, 2013)
Project Cost : P 108,568,587.00
($ 2,492,964.11)
Location : Aseana Ave. cor. Roxas Blvd. Brgy. Tambo, Paranaque City
Design By : AnD Associates
Contact Person : Mr. Joel Aranda
Area : 4,500 Sqm.

ECOTECHLAND, INC.
PROPOSED OFFICE FIT-OUT PROJECT
(July 1 August 30, 2013)
Project Cost : P 2,800,000.00
($ 64,293.91)
Location : 2305 Chino Roces Avenue, Extension, Makati City
Design By : Superprime Holdings, Inc.
Contact Person : Mr. Ramon Tiu
Area : 1,000 Sqm.

EXL SERVICES PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(June 1 July 15, 2013)
Project Cost : P 7,168,793.57
($ 164,610.64)
Location : 16th Floor The Link J.M. del Mar Ave., cor. Salinas Drive, Cebu IT Park
Design By : Goudie Associates
Contact Person : Arch. Carlos de Castro
Area : 1,200 Sqm.

JTKC LAND INC./DISCOVERY PRIMEA RESIDENTIAL AREAS


PROPOSED OFFICE FIT-OUT PROJECT
(January 19 - August 31, 2013)
Project Cost : P 5,148,059.00
($ 118,210.30)
Location : GF Level 6749 Ayala Avenue, Makati City
Design By : Design Coordinates Inc.
Contact Person : Ms. Badjie Guinto
Area : 760 Sqm.

MACQUARIE OFFSHORE SERVICES PTY. LTD PHILIPPINE BRANCH


PROPOSED OFFICE FIT-OUT PROJECT
(August 6, 2013 October 01, 2013)
Project Cost : P 19,170,000.00
($ 440,183.70)
Location : L32 & 33rd Floor The Enterprise Center, Tower 1, Paseo de Roxas, Makati
Design By : Goudie Associates
Contact Person : Mr. Jairus Requillo
Area : 2,400 Sqm.
WIDUS TOWER 2 ARCHITECTURAL WORKS
PROPOSED OFFICE FIT-OUT PROJECT
(April 1 August 17, 2013)
Project Cost : P 61,000,000.00
($ 1,487,804.88)
Location : M.A Roxas Avenue, Freeport Zone, Clark, Pampanga
Design By : RMDA/JCL
Contact Person : Engr. James Leido
Area : 5,605 Sqm.

WYNSUM LEISURE HOTELIERS, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(April 22 October 31, 2013 )
Project Cost : P 21,500,000.00
($ 524,390.24)
Location : Mercure Hotel,45 San Miguel Avenue, Pasig City
Contact Person : Mr. Darryl Lewington
Area : 3,879 Sqm

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(June 15 - July 15, 2013)
Project Cost : P 2,527,896.60
($ 58,045.85)
Location : 30th and 31st Floor MDC 100 Building E. Rodriguez Jr., Libis, Q.C.
Design By : Adrianse Group
Contact Person : Ms. Karen Palma
Area : 500 Sqm.

ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(February 15 March 15, 2013 )
Project Cost : P 4,943,347.90
($ 113,509.71)
Location : 27th and 30th Floor MDC 100 Building E. Rodriguez Jr., Libis, Q.C.
Design By : Adrianse Group
Contact Person : Ms. Karen Palma
Area : 1,800 Sqm.

ECO TOWER
PROPOSED OFFICE FIT-OUT PROJECT
(February June 30, 2013)
Project Cost : P 24,700,000.00
($ 602,439.00)
Location : Lot 5 Blk. 2, 32nd St., cor. 9th Ave., Fort Bonifacio, Global City, Taguig City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Bob Sanchez
Area : 4,250 Sqm

SEAOIL PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(February May 30, 2013)
Project Cost : P 12,800,000.00
($ 312,195.12 )
Location : 19F, The Taipan Place F. Ortigas Jr., Road, Ortigas Center, Pasig City
Design By : Team Asterisk
Contact Person : Arch. Aeroin Dayo
Area : 1,025.48
REGUS PHILIPPINES CENTRE THREE INC. - CEBU
PROPOSED OFFICE FIT-OUT PROJECT
(March 15 May 31, 2013)
Project Cost : P 23,000,000.00
($ 560,975.61)
Location : 10F Apple One Condominium Ayala, Cebu Business Park, Cebu City
Design By : FVA International
Contact Person : Mr. Romain Duval
Area : 920 Sqm

QBE GROUP SHARED SERVICES LTD. (PHILIPPINE BRANCH)


PROPOSED OFFICE FIT-OUT PROJECT
(March 18 - May 30, 2013)
Project Cost : P 43,431,655.02
($ 1,059,308.66)
Location : Level 19 to 24, QBE Net Cube, 30th St., cor. 3rd Ave., Cresent Park West, Bonifacio Global City
Design By : HBO
Contact Person : Mr. Jommel Macapagal
Area : 7,400 Sqm

THE BANK OF NEW YORK


PROPOSED OFFICE FIT-OUT PROJECT
(April 12 May 30, 2013 )
Project Cost : P 2,268,718.03
($ 55,334.59)
Location : 10th Floor Philamlife Tower, Paseo de Roxas Avenue, Makati City
Design By : Adrianse Group
Contact Person : Ms. Cris Trinidad
Area : 150 Sqm

PARAMOUNT LIFE AND GENERAL INSURANCE CORPORATION


PROPOSED OFFICE FIT-OUT PROJECT
(May 15 July 15, 2013)
Project Cost : P 5,300,000.00
($ 129,268.29)
Location : Unit E&F 5th Floor, W Global Center, 30th Street, corner 9th Ave., Bonifacio Global City, Taguig City
Design By : Team Asterisk
Contact Person : Arch . Aeroin Dayo
Area : 621 Sqm

STEEL ASIA
PROPOSED OFFICE FIT-OUT PROJECT
(April 18 May 30, 2013)
Project Cost : P 1,774,886.40
($ 43,289.91)
Location : 2F, B2 Bonifacio High Street, the Fort, Taguig City
Design By : Engr. Lyra Santos
Contact Person : Ms. Tina Y. Yu
Area : 130 Sqm

CITIBANK N.A PHILIPPINE BRANCH


PROPOSED OFFICE FIT-OUT PROJECT
(February 04 March 14, 2013)
Project Cost : P 2,000,000.00
($ 48,780.49)
Location : 22F Net Lima Building, Bonifacio Global City, Taguig City
Design By :
Contact Person :
Area : 1,200 Sqm
WIDUS TOWER 2 STRUCTURAL WORKS
PROPOSED OFFICE FIT-OUT PROJECT
(December 2012 April 28, 2013)
Project Cost : P 46,000,000.00
($ 1,121,951.22)
Location : M.A Roxas Avenue, Freeport Zone, Clark, Pampanga
Design By : RMDA/JCL
Contact Person : Engr. James Leido
Area : 5,605 Sqm.

SMB PRESTIGE CORPORATION


PROPOSED OFFICE FIT-OUT PROJECT
(July 02, 2012 April 26, 2013)
Project Cost : P 53,000,000.00
($ 1,292,682.93 )
Location : #13 Buenaventura St.,Bagong Ilog, Pasig City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Bob Sanchez
Area : 4,000.00

ANZ MDC PHASE 2


PROPOSED OFFICE FIT-OUT PROJECT
(January 15 March 30, 2013)
Project Cost : P 25,000,000.00
($ 609,756.10)
Location : Level 31v MDC100 Building E. Rodriguez Jr., Libis Quezon City
Design By : Adrianse Group
Contact Person : Arch. Karen Palma
Area : 1,610 Sqm

EXL SERVICE PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(February 14 - April 14, 2013)
Project Cost : P 2,200,000.00
($ 53,658,000.54 )
Location : 17th Floor The Link J.M. del Mar Ave., cor. Salinas Drive, Cebu IT Park, Apas 6000 Phils.
Design By : Goudie Associates
Contact Person : Mr. Owen Dizon
Area : 100 Sqm

AU BEAU BLANC (SUAVIS INC.)


PROPOSED OFFICE FIT-OUT PROJECT
(April 20 May 20, 2013)
Project Cost : P 1,666,506.80
($ 40,646.50)
Location : Unit B-11 Basement 1 SM Aura Premier, Fort Bonifacio, Taguig City
Design By : Magi Nation
Contact Person : Ms. Suzette Cocuaco
Area : 36 Sqm

EXL SERVICE PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(March 01 May 15, 2013)
Project Cost : P 14,836,056.70
($ 361,855.04 )
Location : 11th Floor Two E-com Center., Harbor Drive, Pasay City Philippines
Design By : Goudie Associates
Contact Person : Mr. Owen Dizon
Area : 3,000 Sqm
SONY GLOBAL BUSINESS SERVICES, INC.
PROPOSED OFFICE FIT-OUT PROJECT
(December 2012 February 2013)
Project Cost : P 14,748,675.00
($ 379,723.78 )
Location : Net Lima Bldg. 5th Avenue cor. 26th St., Bonifacio Global City, Pasig City
Design By : DPC
Contact Person : Mr. JhonVergara
Area : 1,200Sqm.

WIDUS TOWER 2
PROPOSED FIVE (5) STOREY BUILDING
(December 2012 April 26, 2013 )
Project Cost : P 46,000,000.00
($ 1,121,951.22 )
Location : M.A. Roxas Avenue, Freeport Zone, Clark, Pampanga
Design By : RMDA
Contact Person : Mr. James Leido (JCL)
Area : 6,000 Sqm.

PLATFORM 3 INC.
PROPOSED OFFICE FIT-OUT PROJECT
(December 2012 - January 2013 )
Project Cost : P 2,477,867.50
($ 60,435.79)
Location : Unit 7, 21st Floor Zuellig Building, Makati City
Design By : Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 188.55Sqm.

PRU LIFE U.K.


PROPOSED OFFICE FIT-OUT PROJECT
(September 27, 2012 January 2013 )
Project Cost : P 2,000,000.00
($48,780.48 )
Location : SQA Corporate Center, National Highway, Crossing, Calamba Laguna
Design By : Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 156.45 Sqm.

PRU LIFE U.K.


PROPOSED OFFICE FIT-OUT PROJECT
(November 12, 2012 February 15, 2013)
Project Cost : P 9,879,000.00
($ 240,951.22)
Location : G/F SSHG 105 Paseo de Roxas, Makati City
Design By : DB&B
Contact Person : Mr. LitoAriola/CBRE
Area : 600 Sqm.

REGUS PHILIPPINES CENTRE TWO, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(November 2012 January 2013)
Project Cost : P 24,846,858.00
($ 606,020.00)
Location : 27F BPI Centre, Makati City
Design By : FVA International, Ltd.
Contact Person : Mr. Tony Yu
Area : 1,174.38 Sqm.
LIST OF COMPLETEDPROJECTS 2012
REGUS ZB GROUP INC.
PROPOSED OFFICE FIT-OUT PROJECT
(November December 2012)
Project Cost : P 32,041,428.57
($ 781,498.25 )
Location : 20F Zuellig Bldg., Makati Ave. cor. Paseo de Roxas, Makati City
Design By : FVA International, Ltd.
Contact Person : Mr. Tony Yu
Area : 1,174.38 Sqm.

MANILA GOLF AND COUNTRY CLUB


PROPOSED OFFICE FIT-OUT PROJECT
(October December 2012)
Project Cost : P 1,250,000.00
($ 30,487.80)
Location : Harvard Road, Forbes Park, Makati City
Design By : Mr. Rene Orosa
Contact Person : Mr. Rene Orosa / Mr. Al Alvina
Area : 120 Sqm.

MACQUARIE OFFSHORE SERVICES PTY. LTD.


PROPOSED OFFICE FIT-OUT PROJECT
(October November 2012 )
Project Cost : P 16,000,000.00
($ 390,243.90)
Location : 14th& 15F The Enterprize Center Tower 2, Ayala cor. Paseo de Roxas, Makati
Design By : Jones Lang Lasalle
Contact Person : Mr. BomerMacaranas
Area : 2,200 Sqm.

WIDUS RESTAURANT
PROPOSED RESTAURANT
(September December 2012)
Project Cost : P 9,300,000.00
($ 226,829.00)
Location : M.A. RoxasAvc., Freeport Zone, Clark, Pampanga
Design By : RMDA Architects
Contact Person : Mr. James Leido
Area : 6000 Sqm.

REED ELSIEVER SHARED SERVICES


PROPOSED OFFICE FIT-OUT PROJECT
(October November 2012)
Project Cost : P 13,000,000.00
($ 317,073.17 )
Location : 4F Building UP Technohub, Quezon City
Design By : Adrianse Group
Contact Person : Mr. Nelson Samson / DTSI
Area : 2,454.91 Sqm.
BRUMMER AND PARTNERS
PROPOSED OFFICE FIT-OUT PROJECT
(October - November 2012 )
Project Cost : P 4,750,000.00
($ 115,853.66 )
Location : 5F Zuellig Building, Makati City
Design By : GSNP
Contact Person : Ms. Ivy
Area : 188.55 Sqm.

DELTEX SYSTEMS (PHILIPPINES) INC.


PROPOSED OFFICE FIT-OUT PROJECT
(October November 2012)
Project Cost : P 10,000,000.00
($ 243,902.44 )
Location : 11F The Enterprise Center Building, Makati City
Design By : Work Group
Contact Person : Mr. Nigel Gayares
Area : 1,100 Sqm

SUAVIS, INC. / AU BEAU BLANC


PROPOSED OFFICE FIT-OUT PROJECT
(May June 2012)
Project Cost : P 1,215,233.60
($ 29,639.84 )
Location : 2F One Kennedy Plaza, Club Filipino Ave., Greenhills, San Juan City
Design By : Magi Nation
Contact Person : Ms. Suzette Cocuaco
Area : 50 Sqm.

JP MORGAN CHASE BANK N.A. - PGSC


PROPOSED OFFICE FIT-OUT
( August 01 - November, 2012 )
Project Cost : P3,515,048.008
($ 83,691.62)
Location : 16F & 19F Net Plaza Building, Bonifacio Global City
Design By : Adrianse Group Philippines, Inc.
Contact Person : Mr. FudjieEsquadra
Area : 2,000 Sqm.

PMFTC, Inc- Primary Building and Envelope


PROPOSED OFFICE FIT-OUT AND GLASS WORK AT PEREMITER WALL
( July 30, 2012 January 2013 )
Project Cost : P24,500,000.00
($ 583,333.33)
Location : Plant C & D Champaca St., Brgy. Fortune Marikina City
Design By : Adriane T. Chua & Associates
Contact Person : Mr. Marjorie Chua
Area : 1,400 Sqm.

ORACLE PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
( July 13 - September, 2012 )
Project Cost : P3,450,000.00
($ 82,142.86)
Location : 15F Net Square Center, Bonifacio Global City, Taguig City
Design By : Work Architecture
Contact Person : Mr. Joseph Infante
Area : 600 Sqm.
ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.
PROPOSED OFFICE FIT-OUT PROJECT
(June 07 July, 2012)
Project Cost : P 24,483,830.60
($ 569,391.31 )
Location : 27F MDC100 Building, E. Rodriguez Ave. cor. Eastwood Ave. Libis Q.C.
Design By : Ms. Karen Palma
Contact Person : Adrianse Group Philippines, Inc.
Area : 1,715 Sqm.

WIDUS INTERNATIONAL LEISURE, INC.


PROPOSED CONVENTION CENTRE
(May 4 August, 2012)
Project Cost : P 56,000,000.00
($ 1,302,325.60 )
Location : M. A. Roxas Ave., Freeport Zone, Clark Pampanga
Design By : Club 3 Asia Project
Contact Person : Mr. James Leido
Area : 2,200 Sqm.

STEEL ASIA
PROPOSED OFFICE FIT-OUT PROJECT
(April November, 2012)
Project Cost : P 3,652,812.80
($ 84,949.13)
Location : 2F B2 Bonifacio High St., The Fort, Taguig City
Design By : AnD Design Associates
Contact Person : Ms. Tina Yu
Area : 320 Sqm.

TRANSCOM
PROPOSED OFFICE FIT-OUT PROJECT
(May 2012 July 2012)
Project Cost : P 19,500,000.00
($ 453,488.37 )
Location : Transcom City Lopes South Square Bldg. 4, Brgy. Tangub, Bacolod City
Design By : Mr. Nigel Gayares
Contact Person : Vanguard Interiors Pte. Ltd.
Area : 2,400 Sqm.

NORASIAN ENERGY PHILS.INC.


PROPOSED OFFICE FIT-OUT PROJECT
(June 30, 2012 August 02,2012)
Project Cost : P 8,771,379.00
($ 203,985.56 )
Location : 32F Philamlife Tower, Paseo de Roxas, Makati City
Design By : HBO + EMTB
Contact Person : Mr. Pete Magtibay
Area : 300 Sqm.

BEN LINE AGENCIES PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(February May 2012 )
Project Cost : P 9,983,000.00
($232,162.79 )
Location : 7F Tower A2 ECOM Central Mall of Asia Complex, Pasay City
Design By : Adrianse Group Philippines, Inc.
Contact Person : Ms. Karen Palma / Mr. Robert Chua
Area : 778.88 Sqm.
SEMA GROUP PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
(February- March 2012)
Project Cost : P 2,406,700.00
($55,969.76 )
Location : 7F Net 2 Bldg. Bonifacio Global City, Taguig City
Design By : Team Asterisk
Contact Person : Mr. Bong Mendoza
Area : 500 Sqm.

BA CONTINUUM PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(January 24 -May 15, 2012)
Project Cost : P 31,982,376.40
($ 743,776.20 )
Location : 25th , 26th& 27F Bonifacio One Technology Tower E-Square IT Park,
Global City
Design By : Adrianse Group Philippines
Contact Person : Mr. Mark Abu
Area : 4,767Sqm.

HARTE HANKS PHILS., INC.


PROPOSED OFFICE FIT-OUT PROJECT
(December2011 May 2012)
Project Cost : P 2,011,702.50
($ 46,783.80 )
Location : 4F market Market Mall, Fort Bonifacio Global City, Taguig City
Design By : Goudie Associates
Contact Person : Mr. Raymond Tuazon
Area : 350 Sqm.

ONE GLOBAL SERVICES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(December 2011 February 2012)
Project Cost : P 3,179,000.00
($ 73,930.23 )
Location : 10F One Global Place Fort Bonifacio, Global City, Taguig City
Design By : DB & B
Contact Person : Ms. Victoria Capote Salenga
Area : 120 Sqm.

PMFTC INC. CANTEEN PARK UPGRADE


PROPOSED OFFICE FIT-OUT PROJECT
(February May 15, 2012 )
Project Cost : P 5,855,000.00
($ 136,162.7)
Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City
Design By : Adriane T. Chua & Associates
Contact Person : Arch. Adriane Chua
Area : 320 Sqm.

PMFTC INC. ADDITIONAL DOCK STATION


PROPOSED OFFICE FIT-OUT PROJECT
(January February 2012)
Project Cost : P 700,000.00
($ 16,279.07 )
Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City
Design By : Adriane T. Chua & Associates
Contact Person : Arch. Adriane Chua
Area : 20 Sqm.
PMFTC INC. SECONDARY ENVELOPE BUILDING
PROPOSED OFFICE FIT-OUT PROJECT
(November 2011 February 2012)
Project Cost : P 9,000,000.00
($ 209,302.33)
Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City
Design By : Adriane T. Chua & Associates
Contact Person : Arch. Adriane Chua
Area : 1,000 Sqm.
LIST OF COMPLETED PROJECTS 2011

PMFTC INC. CONSTRUCTION OF OFFICE LOBBY PLANT C & D


PROPOSED OFFICE FIT-OUT PROJECT
(November December 2011)
Project Cost : P 4,800,000.00
($ 111,627.91 )
Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City
Design By : Adriane T. Chua & Associates
Contact Person : Arch. Adriane Chua
Area : 60 Sqm.

PMFTC INC. CENTRAL OFFICE ADDITIONAL WORKS


PROPOSED OFFICE FIT-OUT PROJECT
(November December 2011)
Project Cost : P 4,400,000.00
($ 102,325.58 )
Location : Champaca St., Fortune Avenue, Brgy. Fortune, Parang Marikina City
Design By : Adriane T. Chua & Associates
Contact Person : Arch. Adriane Chua
Area : 200 Sqm.

MANILA GOLF AND COUNTRY CLUB


PROPOSED OFFICE FIT-OUT PROJECT
(December 2011 February 2012)
Project Cost : P 5,400,000.00
($ 125,581.40 )
Location : Harvard Road, Forbes Park, Makati City
Design By : SLA Design / Rene Orosa Design
Contact Person : Mr. Nigel Gayares
Area : 350 Sqm.

PMFTC INC.
PROPOSED OFFICE FIT-OUT PROJECT
(May December 2011)
Project Cost : P83,540,000.00
($1,898,636.40 )
Location : Champaca St., Fortune Ave. Brgy. Fortune, Marikina City
Design By : Adrian T. Chua & Associates
Contact Person : Mr. Adrian Chua
Area : 7,200 Sqm.

EXL SERVICE PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(October December 2011)
Project Cost : P 10,700,000.00
($ 248,837.21 )
Location : 12th Floor, Two E-com Center, Harbor Drive SM iCity 2, Pasay City
Design By : Asterisk
Contact Person : AeroinDayo
Area : 1,800 Sqm.
ABACUS SECURITIES CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(July December 2011)
Project Cost : P 5,580,000.00
($ 129,767.44 )
Location : 29F East Tower, Tektite Tower, Exchange Road, Ortigas Centre, Pasig City
Design By : Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 600 Sqm.

BLUM SHOWROOM MANILA


PROPOSED OFFICE FIT-OUT PROJECT
(November December 2011)
Project Cost : P 1,600,000.00
($ 37,209.30 )
Location : G/F Shangri-la Makati, Ayala Avenue, Makati City
Design By : Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 100 Sqm.

ANZ MDC100
PROPOSED OFFICE FIT-OUT PROJECT
(October December 2011)
Project Cost : P 52,196,920.00
($ 1,213,881.00 )
Location : Level 12 Solaris One Bldg., 130 Dela Rosa St., Makati City
Design By : Adrianse Group
Contact Person : Ms. Karen Palma
Area : 4,500 Sqm.

DIVERSIFIED TECHNOLOGY SOLUTIONS INTL., INC REED ELSEVIER


PROPOSED OFFICE FIT-OUT PROJECT
(October November 2011)
Project Cost : P 2,200,000.00
($ 51,162.80 )
Location : 39F PBCom Tower 1226 , Makati City
Design By : Adrianse Group
Contact Person : Ms. Karen Palma / Mr. Mark Abu
Area : 350 Sqm.

INSTITUTIONAL SHAREHOLDERS SERVICES, INC. (ISSI)


PROPOSED OFFICE FIT-OUT PROJECT
(October December 2011)
Project Cost : P 11,300,000.00
($ 262,790.70 )
Location : 15F Solaris One Bldg. 130 Dela Rosa St., Makati City
Design By : Goudie Associates
Contact Person :
Area : 668.83 Sqm.
PERFETTI VAN MELLE PHILS, INC.
PROPOSED OFFICE FIT-OUT PROJECT
( October December 2011)
Project Cost : P 12,728,541.79
($ 296,012.60 )
Location : 16F Octagon Centre, San Miguel Ave., Ortigas Centre, Pasig City
Design By : E.S. Calma
Contact Person : Ms. Teresa Hong / Mr. HermieHermanos
Area : 980 Sqm.

MACQUARIE OFFSHORE SERVICE PTY. LTD MANILA BRANCH


PROPOSED OFFICE FIT-OUT PROJECT
(October December 2011 )
Project Cost : P5,300,000.00
($ 123,255.81 )
Location : 33F, 6766 The Enterprise Center, Tower 1 Ayala cor. Paseo de Roxas, Makati
Design By : Jones Lang LasalleLeechiu
Contact Person : Mr. BomerMacaranas
Area : 500 Sqm.

Y & R PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(May July 2011)
Project Cost : P5,013,000.00
($113,931.82 )
Location : 7F Equitable Bak Tower, 8751 Paseo de Roxas, Makati City
Design By : The Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 500 Sqm.

ABACUS SECURITIES CORPORATION


PROPOSED OFFICE FIT-OUT PROJECT
(April May 2011 )
Project Cost : P5,580,000.00
($126,818.80 )
Location : 29F East Tower, Tektite Building, Exchange Road, Ortigas Center, Pasig City
Design By : The Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 360 Sqm.

LAFARGE CEMENT SERVICES (PHILIPPINES), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(April 25 - August 2011)
Project Cost : P7,500,000.00
($170,454.55 )
Location : 20F Salcedo Tower, 169 HV dela Costa St., SalcedoVilalge, Makati City
Design By : ANCJ Architects
Contact Person : Mr. Dodgie Reyes
Area : 800 Sqm.

WPP MARKETING COMMUNICATIONS MILLWARD BROWN PHILS, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(March 17 - May 2011)
Project Cost : P8,246,000.00
($187,409.09 )
Location : 8F Bank Tower 8751 Paseo de Roxas, Salcedo Village, Makati City
Design By : The Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 280 Sqm.
YEW TREE SERVICES INC.
PROPOSED OFFICE FIT-OUT PROJECT
(June August 2011)
Project Cost : P13,000,000.00
($295,454.55)
Location : 20F Tower 2, RCBC Plaza, 6819 Ayala Ave., cor. Gil Puyat Ave., Makati City
Design By : DPC, Inc.
Contact Person : Mr. JhonVergara
Area : 1,500 Sqm.

WPP MARKETING COMMUNICATIONS - JWT


PROPOSED OFFICE FIT-OUT PROJECT
(April - June 2011)
Project Cost : P6,804,000.00
($154,636.36 )
Location : 7F Bank Tower 8751 Paseo de Roxas, Salcedo Village, Makati City
Design By : The Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 500 Sqm.

ANZ GLOBAL SERVICES PHILIPPINES INC. 10TH& 14TH FLOOR


PROPOSED OFFICE FIT-OUT PROJECT
(January May 2011 )
Project Cost : P40,222,582.00
($914,149.59 )
Location : Solaris One Building, Dela Rosa St., Makati City
Design By : Adrianse Group Philippines, Inc.
Contact Person : Arch. Karen Palma
Area : 3,807 Sqm.

SC RESERVATION (PHILIPPINES) INC.


PROPOSED OFFICE FIT-OUT PROJECT
(February March 2011)
Project Cost : P7,100,000.00
($161,363.64 )
Location : 27F RCBC Plaza Tower 2 cor. Sen. Gil Puyat Ave., Makati City
Design By : Del Rosario Design Group
Contact Person : Arch. Fernando Del Rosario
Area : 1,500 Sqm.

YAHOO! PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
(MARCH 01 31, 2011 )
Project Cost : P16,148,000.00
($367,000.00)
Location : 20F Accralaw Tower, Bonifacio Global City, Taguig City
Design By : Goudie Associates
Contact Person : Arch. Fernando Del Rosario
Area : 560 Sqm.

MACQUARIE OFFSHORE SERVICE PTY. LTD MANILA BRANCH


PROPOSED OFFICE FIT-OUT PROJECT
(FEBRUARY 21 APRIL 2011)
Project Cost : P7,900,000.00
($179,545.45)
Location : 25F, 6766 The Enterprise Center, Tower 1 Ayala cor. Paseo de Roxas, Makati
Design By : Jones Lang LasalleLeechiu
Contact Person : Mr. BomerMacaranas
Area : 1,100 Sqm.
GOLDEN SPOON
PROPOSED OFFICE FIT-OUT PROJECT
(January March 2011)
Project Cost : P2,240,477.00
($50,920.00 )
Location : Alabang Town Center Expansion, Alabang, Muntinlupa City
Design By : Sylvia Heras Lopez
Contact Person : Mr. Enrique Lopez
Area : 42 Sqm.

CHEVRON PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(January March 2011 )
Project Cost : P4,685,100.00
($106,479.55 )
Location : 6th& 7th Floor, 6750 Bldg. Ayala Avenue, Makati City
Design By : The Team Asterisk
Contact Person : Mr. Patrich Gonzales
Area : 600 Sqm.

QUINTILES
PROPOSED OFFICE FIT-OUT PROJECT
(March May 2011 )
Project Cost : P6,500,000.00
($147,727.00)
Location : 41st Floor Union Bank Bldg. Meralco Ave., Pasig City
Design By : ADD+ Consortium
Contact Person : Mr. Art Corbito
Area : 700 Sqm.

PRU-LIFE UK
PROPOSED OFFICE FIT-OUT PROJECT
(January February 2011)
Project Cost : P2,575,497.14
($58,534.00 )
Location : GF Marajo Tower, Fort Bonifacio Global City, Taguig City
Design By : ADD+Consortium
Contact Person : Mr. Art Corbito
Area : 70 Sqm.

ASCENDAS WARMSHELL VARIOUS FLOORS


PROPOSED OFFICE FIT-OUT PROJECT
(January March 2011 )
Project Cost : P31,500,000.00
($715,909.00 )
Location : 8,9,10,11,12,14,15,16,17,18& 20th Floors Accralaw Fort Bonifacio, Taguig
Design By : Ascendas Properties Management Corp.
Contact Person : Mr. Orlando Yu
Area : 7,785 Sqm.

BRITISH EMBASSY
PROPOSED OFFICE FIT-OUT PROJECT
(February April 2011 )
Project Cost : P2,568,410.00
($58,373.00)
Location : 120 Upper Mckinley Hills, Taguig City, Philippines
Design By : The Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 300 Sqm.
VISTA PHARMA
PROPOSED OFFICE FIT-OUT PROJECT
(March April 2011)
Project Cost : P3,500,000.00
($79,546.00)
Location : Unit 1206 One Global Place Bldg. 5th Ave., cor. 25th St., BGC Bldg. Taguig
Design By : Rchitects Inc.
Contact Person : Ms. Angelita Lim
Area : 120 Sqm.

PLDT BUSINESS CENTER


PROPOSED OFFICE FIT-OUT PROJECT
(MAY JUNE 2011)
Project Cost : P8,648,070.29
($196,501.60)
Location : GF 2nd Ave., cor. 30th St., Sapphire, Bonifacio Global City, Taguig
Design By : Steven J. Leach + Associates
Contact Person : Mr. Bob Sanchez
Area : 200 Sqm.

LIST OF COMPLETED PROJECTS 2010


PRU LIFE U.K.
PROPOSED OFFICE FIT-OUT PROJECT
(August October 2010)
Project Cost : P 25,400,000.00
($ 590,697.67 )
Location : 19F, 20F & 20F Marajo Tower, 26th St. Bonifacio Global City, Taguig City
Design By : CB Richard Ellis
Contact Person : Mr. LitoIraola
Area : 2,400 Sqm.

ANCHORLAND SHOWROOM
PROPOSED OFFICE FIT-OUT PROJECT
(October 2010 February 2011)
Project Cost : P 15,000,000.00
($ 348,837.21 )
Location : Salazar St., Binondo, Manila
Design By : AnD Associates
Area : 700 Sqm.

ASCENDAS E-SQUARE PROPERTIES CORP. 16TH, 17TH, 18TH& 20TH FLOORS


PROPOSED OFFICE FIT-OUT PROJECT
(September - November 2010)
Project Cost : P 12,000,000.00
($ 279,069.77 )
Location : ACCRALAW Tower, E-Square Properties Corp, Global City, Taguig City
Design By : Ascendas Properties Management Corp.
Contact Person : Mr. Orlando Yu
Area : 3,320 Sqm.

CHEVRON 42
PROPOSED OFFICE FIT-OUT PROJECT
(September - December 2010)
Project Cost : P 33,203,059
($ 772,164.16 )
Location : 42F Yuchengco Tower, RCBC Plaza, Makati City
Design By : Syndicated Architects
Contact Person : Cesar Rizaldy V. de los Reyes
Area : 2,300 Sqm.
CHEVRON EXPANSION
PROPOSED OFFICE FIT-OUT PROJECT
(September 2010 June 2011)
Project Cost : P 12,768,000.00
($ 296,930.23 )
Location : 5F, 23F, 32F & 39 Yuchengco Tower, RCBC Plaza, Makati City
Design By : Syndicated Architects
Contact Person : Cesar Rizaldy V. de los Reyes
Area : 20,700 Sqm.

GREENCROSS INCORPORATED
PROPOSED OFFICE FIT-OUT PROJECT
(August - December 2010)
Project Cost : P 10,000,000.00
($ 232,558.14 )
Location : 16F & 17F Common Goal Tower, Ayala Alabang, Muntinlupa City
Design By : Goudie Associates
Contact Person : Arch. Joey Jiminez
Area : 750 Sqm.

SEAOIL PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(October - December 2010)
Project Cost : P 10,816,000.00
($ 251,534.88)
Location : 7F Raffles Bldg. Emerald Ave., Pasig City
Design By : Team Asterisk
Contact Person : Arch. AeroinDayo
Area : 1,200 Sqm.

SMARTMATIC
PROPOSED OFFICE FIT-OUT PROJECT
(October December 2010)
Project Cost : P 3,750,000.00
($ 87,209.30 )
Location : 16F Ascendas Tower, 2nd Ave. cor. 30th St., Bonifacio Global City, Taguig City
Design By : ADD + Consortium
Contact Person : Mr. Art Corbito
Area : 450 Sqm.

TOTAL INFORMATION MANAGEMENT


PROPOSED OFFICE FIT-OUT PROJECT
(September 2009 March 2010 )
Project Cost : P 14,000,000.00
($ 325,581.40 )
Location : 3F & 5F TIM Bldg. 5600 S. Osmena S. Superhighway
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Mina De Leon
Area : 1,210 Sqm.

MACQUARIE OFFSHORE SERVICE PTY LTD MANILA BRANCH 30F


PROPOSED OFFICE FIT-OUT PROJECT
(January - March 2010 )
Project Cost : P 5,500,000.00
($127,906.00 )
Location : 29F, 30f & 31F, The Enterprise Ctr. Tower, Ayala Ave., LegaspiVill. Makati
City
Design By : DB & B Philippines, Inc.
Contact Person : Ms. Rosario Gomez
Area : 1,400 Sqm.
ING ASIA PRIVATE BANK LTD.
PROPOSED OFFICE FIT-OUT PROJECT
(February March 2010 )
Project Cost : P 4,245,000.00
($98,720.93 )
Location : 22F Tower 1, Ayala Triangle, Makati City
Design By : Goudie Associates
Contact Person : Arch. Carlos De Castro
Area : 800 Sqm.

ANZ GLOBAL SERVICES & OPERATIONS (MANILA) INC.


PROPOSED OFFICE FIT-OUT PROJECT
(May September 2010)
Project Cost : P 31,144,438.00
($724,289.26 )
Location : 12F Solaris One, 130 Dela Rosa St. Makati City
Design By : Adrianse Group Philippines, Inc.
Contact Person : Ms. Karen Palma
Area : 2,800Sqm.

MERIDIAN INTERNATIONAL OFFICE


PROPOSED OFFICE FIT-OUT PROJECT
(May July 2010)
Project Cost : P 11,511,479.00
($267,708.81 )
Location : 2F Commerce & Industry Plaza, Mckinley Hill, Taguig City
Design By : Team Asterisk
Contact Person : Arch. AeroinDayo
Area : 1,200Sqm.

SUNGARD SYSTEMS PHILIPPINES INC.


PROPOSED OFFICE FIT-OUT PROJECT
( July September 2010 )
Project Cost : P 18,918,163.00
($ 439,957.28 )
Location : 10F Solaris One Bldg. Dela Rosa St. LegaspiVill. Makati City
Design By : PDM International HK Limited
Contact Person : Mr. Roan Hamman
Area : 1,029 Sqm.

WPP ASIA PACIFIC - GroupM


PROPOSED OFFICE FIT-OUT PROJECT
( August September 2010 )
Project Cost : P 27,500,000.00
($639,534.88 )
Location : 21F, 22F & 23F Picadilly Star Bldg. Fort Bonifacio Global City, Taguig City
Design By : DB & B Philippines
Contact Person : Arch. Ma. Rosario R. Gomez
Area : 2,674.90Sqm.

WPP SIA PACIFIC OGILVY & MATHER PHILIPPINES


PROPOSED OFFICE FIT-OUT PROJECT
(August September 2010)
Project Cost : P 26,000,000,00
($ 604,651.16)
Location : 24F & 25F Picadilly Star Bldg. Fort Bonifacio Global City, Taguig City
Design By : DB & B Philippines
Contact Person : Arch. Ma. Rosario R. Gomez
Area : 1,499.74Sqm.
WPP ASIA PACIFIC BATES 141
PROPOSED OFFICE FIT-OUT PROJECT
(August September 2010 )
Project Cost : P 8,500,000.00
($197,674.42 )
Location : 21F Picadilly Star Bldg. Fort Bonifacio Global City, Taguig City
Design By : DB & B Philippines
Contact Person : Arch. Ma. Rosario R. Gomez
Area : 510.66 Sqm.

NCO
PROPOSED OFFICE FIT-OUT PROJECT
(March - May 2010)
Project Cost : P 8,102,180.00
($176,134.35)
Location : 2F Bldg. 2, Berthaphil 3, Clark Economic Zone, Pampanga
Design By : Goudie Associates / JCL International
Contact Person : Mr. James Leido
Area : 1,260 Sqm.

ABACUS SECURITIES CORPORATION


PROPOSED OFFICE FIT-OUT PROJECT
(January March 2010 )
Project Cost : P 5,000,000.00
($ 111,111.11 )
Location : 29F Tektite Tower, Pasig City
Design By : Team Asterisk
Contact Person : Ms. Sheila Aguilar
Area : 219 Sqm.

ALABANG RESIDENCE
PROPOSED OFFICE FIT-OUT PROJECT
(August 2009 July 2010 )
Project Cost : P 27,000,000.00
($600,000.00 )
Location : San Bartolome St, Ayala Alabang, Muntinlupa City
Design By : Isla + Isaac
Contact Person : Arch. Dezzie Isla
Area : 1,600 Sqm.

ACCRA LAW OFFICE


PROPOSED OFFICE FIT-OUT PROJECT
(January - April 2010)
Project Cost : P 74,000,000.00
($1,608,695.70 )
Location : 22F 26F Accra Law Tower, 2nd Ave., cor. 30th St., Bonifacio Global
City, Taguig
Design By : Add+ Consortium
Contact Person : Atty. Regina Geralde
Area : 4,250Sqm.

TELUS INTERNATIONAL PHILS. INC


PROPOSED OFFICE FIT-OUT PROJECT
(February 15, - April 2010)
Project Cost : P 55,000,000.00
($1,145,833.30)
Location : 4F Telus House, Araneta Center, Quezon City
Design By : Goudie Associates
Contact Person : Mr. Fernan Amor
Area : 4,000 Sqm.
ANZ BANKING GROUP LIMITED
PROPOSED OFFICE FIT-OUT PROJECT
(January - March 2010)
Project Cost : P 11,700,000.00
($254,347.83 )
Location : 8F Metrobank Card Center, 6788 Ayala, Makati City
Design By : Adrianse Group
Contact Person : Arch. Karen Palma, Ms. Paula McKeon
Area : 580 Sqm.

LIST OF COMPLETED PROJECTS 2009

JP MORGAN CHASE BANK NATIONAL ASSOCIATION


PROPOSED OFFICE FIT-OUT PROJECT
(February October 2009)
Project Cost : P 468,000,000.00
($10,173,913.00)
Location : G/F 23rd Net Plaza, Building, Global City, Taguig
Design By : Adrianse Group Inc.
Contact Person : Arch. Rafael Santos
Area : 50,000 Sqm.

TELUS INTERNATIONAL PHILS., INC. (CUBAO)


PROPOSED OFFICE FIT-OUT PROJECT
(April June 2009)
Project Cost : P 62,000,000.00
($1,377,777.80)
Location : L2 Cyber Park, Gen. McArthur Ave., cor. Gen. Araneta Center, Quezon City
Design By : Goudie Associates
Contact Person : Arch. Allan Lim
Area : 2,000 Sqm.

LEGISPRO CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(March - June 2009)
Project Cost : P 10,342,378.00
($224,843.30)
Location : 4th Floor One E-Com Center Harbor Drive cor. Sunset Ave., Pasay City
Design By : Team Asterisk
Contact Person : Arch. AeroinDayo
Area : 555 Sqm.

JAPAN TOBACCO INTERNATIONAL (PHILIPPINES), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(February - April 2009)
Project Cost : P 8,200,000.00
($178,260.87)
Location : 29F Discovery Centre 25 ADB Ave., Ortigas Center, Pasig City
Design By : Team Asterisk
Contact Person : Arch. AeroinDayo
Area : 700 Sqm.
RISKMETRICS GROUPS
PROPOSED OFFICE FIT-OUT PROJECT
(January - April2009)
Project Cost : P 25,695,000.00
($ 494,134.00)
Location : 15F Solaris One Bldg., Dela Rosa St., Makati City
Design By : .Goudie Associates
Contact Person : Atty. Tom Tuazon
Area : 2,100 Sqm.

ANZ BANKING GROUP LIMITED


PROPOSED OFFICE FIT-OUT PROJECT
(January - March 2009)
Project Cost : P 9,760,000.00
($ 187,692.00)
Location : Ground, 5th& 9thFlrs. Metrobank Card Corp. Center, Ayala Ave., Makati City
Design By : Dewey & Felix Architects
Contact Person : Mr. BonieMacaranas
Area : 1,000 Sqm.

ENDERUN COLLEGES
PROPOSED OFFICE FIT-OUT PROJECT
(January March 2009 )
Project Cost : P 6,700,000.00
($ 128,846.00)
Location : Mckinley Hills, Fort Bonifacio, Taguig City
Design By : LC Studio Design
Contact Person : Mr. Fernan Amor
Area : 2,000 Sqm

MORE TBA 6/F


PROPOSED OFFICE FIT-OUT PROJECT
(January - February 2009)
Project Cost : P 1,350,000.00
($25,961.00)
Location : 6F TBA Building 1411 Benavidez St. LegaspiVill. Makati City
Design By : Adrianse Group
Contact Person : Mr. Paul Hamoy
Area : 150 Sqm.

PFIZER PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
(January March 2009)
Project Cost : P 1,500,000.00
($28,846.00)
Location : 24F Ayala GFU Center, Ayala Ave., Makati City
Design By : Ms. Belle Barredo
Contact Person : Ms. Con Barcala
Area : 120 Sqm.
LIST OF COMPLETED PROJECTS 2008
SPANISH EMBASSY - MANILA
PROPOSED OFFICE FIT-OUT PROJECT
(July September 2008)
Project Cost : P 18,080,000.00
($ 347,692.00)
Location : Level 27, PCI Tower, Paseo de Roxas, Makati City
Design By : Add + Consortium
Contact Person : Engr. Art Corbito
Area : 1,200 Sqm.

CAMDEN INDUSTRIES INC.


PROPOSED OFFICE FIT-OUT PROJECT
(April May 2008)
Project Cost : P 2,360,000.00
($ 55,379.56)
Location : Unit 801-802 Atlanta Centre, Annapolis St., Greenhills San Juan
Design By : Magi Nation Inc.
Contact Person : Ms. Suzette F. Cocuaco
Area : 375 Sqm.

ADMEREX SOLUTIONS, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(May July 2008)
Project Cost : P 5,637,00.00
($ 132,277.36)
Location : 15F The Peak Tower, 107 LP Leviste St., Salcedo Village, Makati City
Design By : Adrianse Group Philippines, Inc.
Contact Person : Ms. MalouMolano
Area : 525 Sqm.

JP MORGAN CHASE BANK N.A. (PHILIPPINES COSTUMER CARE CENTER)


PROPOSED OFFICE FIT-OUT PROJECT
(April August 2008 )
Project Cost : P 56,700,000.00
($ 1,330,517.42 )
Location : L7 to L10 Net One Bldg. Fort Bonifacio, Taguig City
Design By : Adrianse Group Philippines Inc.
Contact Person : Ms. Alice Irene Caedo
Area : 8,000 Sqm

SN ABOITIZ POWER HYDRO INC. BAGUIO CITY


PROPOSED OFFICE FIT-OUT PROJECT
(March - April 2008)
Project Cost : P 1,390,046.00
($ 32,618.70)
Location : Palermo St. South Drive Baguio City
Design By : Adrianse Group Philippines, Inc.
Contact Person : Mr. Paul Hanoy
Area : 150 Sqm.

MANILA OSLO REMOVABLE ENTERPRISE EXTENSION OFFICE


PROPOSED OFFICE FIT-OUT PROJECT
(April June 2008)
Project Cost : P 9,577,000.00
($ 184,173.00 )
Location : 6th Flr. TBA Center Benavidez St., Makati City
Design By : Adrianse Group Philippines, Inc.
Contact Person : Mr. Paul Hanoy
Area : 250 Sqm.
SAFEWAY PHIILTECH INC. OFFICE EXPANSION
PROPOSED OFFICE FIT-OUT PROJECT
(April June 2008)
Project Cost : P 4,250,000.00
($ 99,730.00)
Location : 21stFlr. Tower 1, RCBC Plaza, Ayala Ave., cor. Sen. Gil Puyat Ave. Makati
Design By : Work Group Inc.
Contact Person : Mr. Nigel Gayares
Area : 800 Sqm.

SAFEWAY PHIILTECH INC. - OFFICE EXPANSION


PROPOSED OFFICE FIT-OUT PROJECT
(April - July 2008 )
Project Cost : P 39,750,000.00
($ 932,770.15)
Location : 2 World Sq. & 3 World Sq., Upper Mckinley Road Fort Bonifacio, Taguig City
Design By : Work Group Inc.
Contact Person : Mr. Nigel Gayares
Area : 2,000 Sqm.

SEAOIL PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(March - April 2008)
Project Cost : P 10,500,000.00
($252,707.58)
Location : 22F Taipan Place Building, Emerald Ave., Pasig City
Design By : Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 600 Sqm

FAIRWAYS TOWER
PROPOSED OFFICE FIT-OUT PROJECT
(February - April 2008 On-going)
Project Cost : P 19,442,834.84
($ 468,389.17)
Location : G/F & 29th Floors Fairways Tower, Mckinley Road, cor. Fort Bonifacio
Global City, Taguig City
Design By : Periquet Galicia, Inc.
Contact Person : Arch. Paul Ricafort, Arch. Mendell Martinez
Area : 1,000 Sqm.

ENDERUN COLLEGES
PROPOSED OFFICE FIT-OUT PROJECT
(February - April 2008)
Project Cost : P 60,000,000.00
($ 1,153,846.00)
Location : Mckinley Hills, Fort Bonifacio, Taguig City
Design By : DB & B
Contact Person : Mr. Fernan Amor
Area : 2,000 Sqm.

ENDERUN COLLEGES MUSEUM BUILDING


PROPOSED OFFICE FIT-OUT PROJECT
(February - April 2008)
Project Cost : P 10,000,000.00
($ 240,905.80)
Location : Mckinley Hills, Fort Bonifacio, Taguig City
Design By : DB & B
Contact Person : Mr. Fernan Amor
Area : 600 Sqm.
FIESTA MARKET PAY LOUNGE
PROPOSED OFFICE FIT-OUT PROJECT
(March April 2008)
Project Cost : P 1,400,000.00
($ 33,726.81)
Location : G/F Market Market Fort Bonifacio, Taguig City
Design By : A+D Design
Contact P0erson : Mr. Eric De Jesus
Area : 50 Sqm.

TRANSNATIONAL E-BUSINESS SOLUTIONS, INC.


PROPOSED OFFICE FIT-OUT PROJECT
( July August 2008)
Project Cost : P 23,292,000.00
($ 447,923.00)
Location : Penthouse Floor, NET Quad Bldg., Fort Bonifacio Global City, Taguig
Design By : Adrianse Group
Contact Person : Antonio R. Tiu
Area : 1,678 Sqm.
LIST OF COMPLETED PROJECTS 2007

CBR ASIA INSURANCE BROKERS, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(December 2007 January 2008)
Project Cost : P 1,892,857.14
($46,167.24)
Location : 3F Cacho Gonzales Building, 101 Aguirre St. Legaspi Village, Makati City
Contact Person : Ms. Shirley Tan
Area : 300 Sqm.

LUNDBECK PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
(May July 2007)
Project Cost : P 3,300,000.00
($ 80,487.80)
Location : 6th Floor Electra House Blg., Esteban St., Makati City
Design By : Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 195 Sqm.

ING BANK
PROPOSED OFFICE FIT-OUT PROJECT
(May November 2007)
Project Cost : P 36,800,000.00
($ 45,600.00)
Location : 20th, 21st& 22nd Floors, Ayala Triangle Tower 1, Makati City
Design By : Goudie Associates
Contact Person : Ms. Mary Ann Chee
Area : 3,600 Sqm.

CITISEC-ONLINE.COM
PROPOSED OFFICE FIT-OUT PROJECT
(October December 2007)
Project Cost : P 5,500,000.00
($127,906.97)
Location : 24F Tektite East Tower, Ortigas Center, Pasig City
Design By : Ms. ValenAng
Contact Person : Ms. Kathy Ong
Area : 600 Sqm

GWI BUSINESS SOLUTIONS, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(November - December 2007)
Project Cost : P 1,505,882.00
($35,020.55)
Location : 17F Yuchengco Tower, RCBC Plaza, 6819 Ayala Avenue, Makati City
Design By : Adrianse Group Philippines, Inc.
Contact Person : Mr. Abdullah Daud
Area : 120.16 Sqm

SANOFI-AVENTIS PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(October December 2007)
Project Cost : P 8,281,000.00
($192,581.39)
Location : 22F Feliza Bldg., 108 V.A. Rufino St. LegaspiVill., Makati City
Design By : Syndicated Architect
Contact Person : Mr. Tom Reblora
Area : 800 Sqm
ORACLE PHILIPPINES, CORP.
PROPOSED OFFICE FIT-OUT PROJECT
(November December 2007)
Project Cost : P8,300,000.00
($193,023.25)
Location : 15F Net 2 Building, Fort BonifacioTaguig City
Design By : Work Architecture
Contact Person : Ms. Indira Fugen
Area : 1,100 Sqm

SUPPLY CHAIN CONSULTING, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(October - November 2007)
Project Cost : P 8,200,000.00
($190,697.24)
Location : Paseo de Magallanes Commercial Ctr. Lot 8 Blk 4 Phase 1, EDSA cor. Osmena
Highway, Makati City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Ms. Elsie Dela Rosa
Area : 938 Sqm

ETIHAD AIRWAYS
PROPOSED OFFICE FIT-OUT PROJECT
(October November 2007)
Project Cost : P 5,640,000.00
($131,162.79)
Location : 22F The Enterprise Center Tower 1, 6766 Ayala Avenue, Makati City
Design By : Binswanger, Phils.
Contact Person : Mr. Keith Elliot
Area : 367.80 Sqm

APL CO. PTE. LIMITED


PROPOSED OFFICE FIT-OUT PROJECT
(May July 2007)
Project Cost : P 9,5000,000.00
($ 219,399.53)
Location : Velco Centre, cor. R. Oca& A. Delgado Streets, Port Area, Manila 1018
Design By : Steven J. Leach, Jr. + Associated
Contact Person : Mr. Mark Matthew Parco
Area : 650 Sqm

STEEL ASIA MANUFACTURING CORP.


PROPOSED OFFICE FIT-OUT PROJECT
(July August 2007)
Project Cost : P 6,400,000.00
($ 147,806.00)
Location : 6th Floor, 8101 Pearl Plaza Building, #Pearl Drive, Ortigas Center, Pasig City
Design By : HBO + EMTB Philippines, Inc.
Contact Person : Mr. Neil Cardona
Area : 400 Sqm

ADVANCE CONTACT SOLUTIONS, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(April 11 June 10, 2007)
Project Cost : P 4,000,000.00
($ 83,857.45)
Location : 10th Floor Citibank Center, Paseo de Roxas, cor. Villar St., Makati City
Design By : DionedaVirata Design
Contact Person : Mr. Ramon De la Isla
Area : 600 Sqm.
KUMON PHILIPPINES, INC.
PROPOSED OFFICE FIT-OUT PROJECT
(March 01 May 30, 2007)
Project Cost : P 3,350,000.00
($70,157.07)
Location : 17F & 19F, Philamlife Tower, Paseo de Roxas, Makati City, Philippines
Design By : Adrianse Group
Contact Person : Ms. Tess Austria
Area : 800 Sqm.

JP MORGAN CHASE BANK


PROPOSED OFFICE FIT-OUT PROJECT
( March 06 May 07, 2007)
Project Cost : P 9,500,000.00
($ 198,952.88 )
Location : L32 Philamlife Tower, Paseo de Roxas St., Makati City, Philippines
Design By : Goudie Associates
Contact Person : Arch. Joey Jimenez
Area : 470 Sqm.

MANILA OSLO RENEWABLE ENTERPRISE OFFICE


PROPOSED OFFICE FIT-OUT PROJECT
(February - April 2007 )
Project Cost : P 5,900,000.00
($ 123,560.21)
Location : 2F Herco Building, Buenavides St., Makati City, Philippines
Design By : Adrianse Group
Contact Person : Mr. FudjiEscuadra
Area : 345 Sqm.

LA FARGE CEMENT SERVICES (PHILS.), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(April 02 May 10, 2007)
Project Cost : P 4,099,000.00
($ 85,842.94)
Location : 25F & 26F Salcedo Tower, H.V. Dela Costa St., Makati City, Philippines
Design By : DB&B
Contact Person : Arch. Gina R. Gomez
Area : 1,037 Sqm.

ASTRA ZENECA PHARMACEUTICALS (PHILS.)INC.


PROPOSED OFFICE FIT-OUT PROJECT
(June August 2007)
Project Cost : P 15,900,000.00
($ 387,804.87)
Location : 25th & 26thSalcedo Tower 169 H.V. De La Costa St., Makati City
Design By : ADB+
Contact Person : Mr. Juan Miraflor
Area : 1,300 Sqm.

EMERSON ELECTRIC (ASIA) LTD.


PROPOSED OFFICE FIT-OUT PROJECT
(November - December 2007)
Project Cost : P 19,500,000.00
($ 475,609.00)
Location : Part of 23rd Floor San Miguel Properties Centre, Ortigas Centre, Pasig City
Design By : Goudie Associates
Contact Person : Mr. Nigel Gayares
Area : 2,000 Sqm.
EMERSON NETWORK POWER
PROPOSED OFFICE FIT-OUT PROJECT
(April 13 May 21, 2007)
Project Cost : P 8,450,000.00
($ 176,963.35)
Location : 18F Orient Square Bldg., Emerald Ave., Ortigas Avenue, Pasig City
Design By : Goudie Associates
Contact Person : Ms. Romina Santiago
Area : 520 Sqm.

EMERSON NETWORK POWER (PHASE 2)


PROPOSED OFFICE FIT-OUT PROJECT
(September October 2007)
Project Cost : P 29,000,000.00
($ 707,317.00)
Location : 23rd Floor San Miguel Properties Centre, Ortigas Centre, Pasig City
Design By : Goudie Associates
Contact Person : Ms. Imelda Lim
Area : 3,013 Sqm.

CEO SUITES
PROPOSED OFFICE FIT-OUT PROJECT
(April May, 2007)
Project Cost : P 7,800,000.00
($ 151,664.93)
Location : 37F Penthouse Level LKG Bldg., Ayala Ave., Makati City, Philippines
Design By : DB&BContact Person: Ms. Gina R. Gomez
Area : 1,500 Sqm.

CASPO ON LINE GAMING


PROPOSED OFFICE FIT-OUT PROJECT
(April 04-30, 2007)
Project Cost : P 2,838,080.00
($ 59,436.23)
Location : 20F Tower I, RCBC Plaza, Ayala Ave., cor. Gil Puyat Ave., Makati City
Design By : DB&B
Contact Person : Mr. Roldan Tamayo
Area : 120 Sqm.

ASTEC POWER
PROPOSED OFFICE FIT-OUT PROJECT
(January 29 March 16, 2007)
Project Cost : P 24,000,000.00
($ 502,617.81)
Location : 10th,11th, & 12th Floors 1800 Eastwood Ave. Bldg., Eastwood City, Libis Q.C.
Design By : Goudie Associates
Contact Person : Mr. Gary Guiang
Area : 1,800 Sqm.

PACIFIC HEALTHCARE (PHILS.), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(March 20 April 15, 2007)
Project Cost : P 3,800,000.00
($ 81,675.40)
Location : Penthouse B, Prince Building, 117 Roda St., Legaspi Village, Makati City
Design By : Steven J. Leach + Associates
Contact Person : Mr. AvelinoLugtu
Area : 200 Sqm.
GAMING WEB, INC.
PROPOSED OFFICE FIT-OUT PROJECT
(February 12, 2007 April 04, 2007)
Project Cost : P 3,212,000.00
($ 67,267.02)
Location : 17F Yuchengco tower, RCBC Plaza, Makati City, Philippines
Design By : Binswanger Philippines
Contact Person : Mr. Bobby Fernan
Area : 1,200 Sqm.

PACIFIC HARBOR INVESTMENTS HOLDINGS PHILS., INC.


PROPOSED OFFICE FIT-OUT PROJECT
(February 27- March 13, 2007)
Project Cost : P 2,100,000.00
($43,979.06)
Location : 23F Enterprise Center, Ayala Avenue, Makati City, Philippines
Design By : Steven J. Leach + AssociatesContact Person: Mr. AvelinoLugtu
Area : 100 Sqm.
LIST OF COMPLETED PROJECTS 2006

RUFINO TOWER CONDOMINIUM


PROPOSED OFFICE FIT-OUT PROJECT
(February 25, 2006 On-going)
Project Cost : P 9,750,000.00
($ 191,176.47)
Location : Rufino Street, Rufino Tower, Ayala Avenue, Makati City
Design By : Atelier Almario
Contact Person : Ms. Blanca Castro
Area : 900 Sqm.

JWT PHILIPPINES 7TH FLOOR


PROPOSED OFFICE FIT-OUT PROJECT
(February 2006 On-going)
Project Cost : P 12,250,000.00
($ 240,196.07)
Location : 7F Equitable Bank Tower, Paseo de Roxas, Makati City
Design By : Innovation
Contact Person : Ms. Julie de Guzman
Area : 750 Sqm.

MILLWARD BROWN
PROPOSED OFFICE FIT-OUT PROJECT
(February 2006 On-going)
Project Cost : P 2,967,000.00
($ 58,176.47)
Location : 8F Equitable Bank Tower, Paseo de Roxas, Makati City
Design By : Innovation
Contact Person : Mr. Allan Red
Area : 290 Sqm.

UNILEVER PHILIPPINES (FOOD FOR LIFE)


PROPOSED OFFICE FIT-OUT PROJECT
(March 2006 On-going )
Project Cost : P 650,000.00
($ 12,745.00)
Location : U.N. Avenue, Manila
Design By : Unilever Engineering Group
Contact Person : Nips Poblete
Area : 100 Sqm.
LIST OF PROJECTS
CALL CENTER PROJECTS

LIST OF COMPLETED CALL CENTER PROJECTS

CONVERGYS PHILIPPINES SERVICES


PROPOSED OFFICE FIT-OUT PROJECT
(October December 2008)
Project Cost : P 15,000,000.00
($348,837.20)
Location : 9F Robinson Equitable Tower, Ortigas Center, Pasig City
Design By : Goudie Associates
Contact Person : Mr. Frank Millare
Area : 2,000 Sqm

CONVERGYS PHILIPPINES SERVICES - COMMONWEALTH


PROPOSED OFFICE FIT-OUT PROJECT
(September December 2008)
Project Cost : P 16,000,000.00
($ 307,692 )
Location : Diliman Commercial Center, Commonwealth Ave., Diliman Quezon City
Design By : Goudie Associates
Contact Person : Mr. Frank Millare
Area : 1,000 Sqm

SITEL CUSTOMER CARE (PHILS.), INC.


PROPOSED FIT-OUT WORKS
(July2007 September 2007)
Project Cost : P 22,507,262.50
($ 548,957.62)
Location : 24th Floor Cyber One Builing, Eastwood Libis Quezon City
Design By : DTSI
Contact Person : Mt. JpsephIric Mina
Area : 1,320 Sqm.

SC RESERVATION (PHILIPPINES), INC.


PROPOSED OFFICE FIT-OUT PROJECT
(March 01 June 30, 2007)
Project Cost : P 21,000,000.00
($ 439,790.58)
Location : JHMC Building, Club Camp John Hay 1Loakan Rd., Baguio City
Design By : Del Rosario Design Group
Contact Person : Arch. Fernando Del Rosario
Area : 2,100 Sqm.
TELUS INTERNATIONAL PHILS. INC
PROPOSED OFFICE FIT-OUT PROJECT
(April - June 2009)
Project Cost : P 60,000,000.00
($ 1,304,347.80)
Location : L2 Cyber Park, Gen, McArthur Ave., Araneta Center, Quezon City
Design By : Goudie Associates
Contact Person : Mr. Fernan Amor
Area : 2,000 Sqm.

TELUS INTERNATIONAL PHILS. INC


PROPOSED OFFICE FIT-OUT PROJECT
(March - June 2008)
Project Cost : P 15,180,825.00
($ 365,714.88)
Location : 23F Discovery Centre, ADB Avenue, Pasig City
Design By : Goudie Associates
Contact Person : Mr. Fernan Amor
Area : 800 Sqm.

TELUS INTERNATIONAL PHILS. INC


PROPOSED OFFICE FIT-OUT PROJECT
(July September 2008)
Project Cost : P 21,428,571.42
($ 412,087.00)
Location : 31F Discovery Centre, ADB Avenue, Pasig City
Design By : Goudie Associates
Contact Person : Mr. Fernan Amor
Area : 1,000 Sqm.

SITEL (PHILIPPINES) INC.


PROPOSED SITEL CALL CENTER AND OFFICE FIT-OUT PROJECT
(April May 2004)
Phase 1 20th Floor
Project Cost : P 20,500,000.00
($ 372,727.27)
Phase 2 26th Floor
Project Cost : P 19,500,000.00
($ 353,545.45)
Location : Cyber One Bldg., Eastwood Cyberpark, Quezon City
Design By : Adrianse Group Phils.,Inc/
Contact Person : Mr. Joseph Iric Mina
Area : 1,200 Sqm.

AMBERGRIS SOLUTIONS
PROPOSED FIT-OUT WORKS (30TH FLOOR)
(April May 2004)
Project Cost : 9,100,000.00
($ 165,545.55)
Location : 30th Floor, Raffles Corporate Center
Design By : Asterisk, Inc.
Contact Person : Mr. Fernando Amor
Area : 1,200 Sqm.
AMBERGRIS SOLUTIONS
PROPOSED FIT-OUT WORKS (7TH& 18TH FLOORS)
7th Floor
(January February 2004)
Project Cost : P 12,060,677.41
($ 219,285.04)
Area : 1,200 Sqm.
18th Floor
(October December 2003)
Project Cost : 10,615,992.80
($ 193,018.05)
Area : 1,200 Sqm.
Location : 7th& 18th Floor, Raffles Corporate Center
Design By : Asterisk, Inc.
Contact Person : Mr. Fernando Amor

HARTE HANKS INTERNATIONAL STRATEGIES (PHASE 1)


PROPOSED OFFICE FIT-OUT PROJECT
(November 2005 February 2006)
Project Cost : P 31,485,000.00
($ 583,055.55)
Location : 4th Floor, Market Market, Fort Bonifacio Global City, Taguig City
Design By : Goudie Associates
Contact Person : Mr. Fernan Amor
Area : 2,400 Sqm.

HARTE HANKS INTERNATIONAL STRATEGIES (PHASE 2)


PROPOSED OFFICE FIT-OUT PROJECT
(November 2005 2007)
Project Cost : P 32,125,000.00
($ 741,916.85)
Location : 4th Floor, Market Market, Fort Bonifacio Global City, Taguig City
Design By : Goudie Associates
Contact Person : Mr. Fernan Amor
Area : 2,200 Sqm.

HARTE HANKS INTERNATIONAL STRATEGIES (PHASE 3)


PROPOSED OFFICE FIT-OUT PROJECT
( February 2006 - 2007)
Project Cost : P 11,000,000.00
($ 254,041.57)
Location : 4th Floor, Market Market, Fort Bonifacio Global City, Taguig City
Design By : Goudie Associates
Contact Person : Mr. Fernan Amor
Area : 400 Sqm.

SIX CONTINENTS (SC RESERVATION PHILIPPINES, INC.)


PROPOSED FIT-OUT WORKS
(June 30 October 2003)
Project Cost : P 18,805,094.68
($ 341,910.81)
Location : 28th& 29th Floors Tower 2 RCBC Plaza, Ayala Avenue, Makati City
Design By : Del Rosario Design Group
Contact Person : Arch. Fernando del Rosario
Area : 2,000 Sqm.

INFONXX PHILIPPINES, INC.


PROPOSED OFFICE FIT-OUT PROJECT
(February 01 March 16, 2007)
Project Cost : P 1,940,000.00
($ 40,628.28)
Location : 11F RCBC Plaza Tower II, Ayala Avenue, Makati City, Philippines
Design By : Del Rosario Design Group
Contact Person : Arch. Fernando Del Rosario
Area : Sqm.
INFONXX CALL CENTER
PROPOSED OFFICE FIT-OUT WORKS
(July September 2004)
Project Cost : P 10,878,892.60
($ 197,798.05)
Location : 14th Floor, RCBC Plaza, Tower 2, Ayala Avenue, Makati City
Design By : Del Rosario Design Group
Contact Person : Arch. Ronald Angeles
Area : 2,480 Sqm.
LIST OF COMPLETED PROJECTS 2005

NOKIA PHILIPPINES GATEWAY


PROPOSED OFFICE FIT-OUT PROJECT
(September - October 2005)
Project Cost : P 1,540,000.00
($ 30,800.00)
Location : 4th Floor Gateway Mall, Cubao, Quezon City
Design By : Kingsmen
Contact Person : Mr. Francis Teo
Area : 80 Sqm.

NOKIA PHILIPPINES ROBINSONS MANILA


PROPOSED OFFICE FIT-OUT PROJECT
(July - August 2005)
Project Cost : P 1,040,000.00
($ 20,800.00)
Location : 2nd Floor Robinsons Mall, Manila
Design By : Kingsmen
Contact Person : Mr. Francis Teo
Area : 54 Sqm.

SAFEWAY PHILTECH, INC.


PROPOSED OFFICE EXPANSION
(May 30 June 31, 2005)
Project Cost : P 10,452,000.00
($ 190,036.36)
Location : 22/F Yuchengco Tower, RCBC Plaza, Ayala Ave., Makati City
Design By : Team Asterisk Inc.
Contact Person : Ms. Cherrie Racelis
Area : 800 Sqm.

ING OFFICE RESTACKING


PROPOSED FIT-OUT WORKS
(May 27 Aug. 21, 2005)
Project Cost : P 8,900,000.00
($ 161,818.18)
Location : 20/F & 21/F Tower One, Ayala Triangle, Makati City
Design By : Goudie Associates Manila Ltd Co.
Contact Person : Ms. Marie Ann Chee
Area : 3,000 Sqm.

ENDERUM COLLEGES / HOTEL SCHOOL


PROPOSED FIT-OUT WORKS
(May 18 Sept.. 30, 2005)
Project Cost : P 9,000,000.00
($ 163,636.36)
Location : 2nd Floor, Wynsum Tower, Emerald Ave., Ortigas Center, Pasig City
Design By : Goudie Associates Manila Ltd Co.
Contact Person : Mr. Fernan Amor
Area : 8,000 Sqm.
INVENT ASIA
PROPOSED FIT-OUT WORKS
(May 30 June. 03, 2005)
Project Cost : P 1,375,000.00
($ 25,000.00)
Location : 1208 Orient Square Bldg., Emerald Ave., Ortigas Center, Pasig City
Contact Person : Mr. Allan Stevens
Area : 168 Sqm.

KUMON PHILIPPINES, INC.


PROPOSED FIT-OUT WORKS
(May 30 - June 30, 2005)
Project Cost : P 1,700,000.00
($ 30,909.09)
Location : 19F PhilamLife Tower, Ayala Ave., Makati City
Design By : Goudie Associates Manila Ltd Co.
Contact Person : Ms. Marie Anne Chee
Area : 384 Sqm.

UNILEVER PHILIPPINES, INC. LEARNING CENTER


PROPOSED FIT-OUT WORKS
(June 14 July 2005)
Project Cost : P 3,200,000.00
($ 58,181.81)
Location : U.N. Avenue, Manila
Design By : HBO + EMTB
Contact Person : Engr. Nelson Delos Reyes
Area : 300 Sqm.

WIRELESS SERVICE ASIA


PROPOSED RENOVATION WORKS
(March April 2005)
Project Cost : P 7,362,329.25
($ 133,860.53)
Location : 53/F PBCOM Tower, Ayala Ave. cor Hererra St., Makati City
Design By : Team Asterisk Inc.
Contact Person : Arch. Mia Mangahas
Area : 800 Sqm.

MINDSHARE AND MAXXUS


PROPOSED OFFICE EXPANSION PROJECT
(April May 2005)
Project Cost : P 3,979,862.00
($ 72,361.13)
Location : 17/F & 25/F Philamlife Tower, Paseo de Roxas, Makati City
Design By : Goudie Associates Manila Ltd Co.
Contact Person : Mr. Carlos de Castro
MCI WORLDCOM PHILIPPINES, INC.
PROPOSED OFFICE RENOVATION WORKS
(April - May 2005)
Project Cost : P 2,632,681.68
($ 47,866.94)
Location : 17th Floor, The Enterprise Center, Ayala Ave., Makati City
Design By : Team Asterisk Inc.
Contact Person : Arch. Mia Mangahas
Area : 300 Sqm.

TIM MAKATI
PROPOSED TIM MAKATI OFFICE
(March - April 2005)
Project Cost : P 6,400,000.00
($ 116,363.64)
Location : 5th Floor Kings Court II Bldg., Pasong Tamo, Makati City
Contact Person : Arch. Leonardo G. Sioco Jr.
Area : 693 Sqm.
LIST OF COMPLETED PROJECTS 2004

APAC
PROPOSED FIT-OUT WORKS
(December 2003 January 2004)
Project Cost : P 7,775,000.00
($ 141,363.63)
Location : 3F Bldg. C Northgate Cyberzone, Filinvest Corporate City, Alabang
Design By : Del Rosario Design Group
Contact Person : Arch. Allan Joseph Lim
Area : 1,000 Sqm.

ON DEMAND SOLUTIONS
PROPOSED FIT-OUT WORKS
(July October 2004)
Project Cost : P 4,500,000.00
($ 81,818.18)
Location : 17/F B.A. Lepanto Bldg. 8747 Paseo de Roxas, Makati City
Design By : Binswanger Phils., Inc.
Contact Person : Mr. Jin Pischer
Area : 1,200 Sqm.

GENERAL MOTORS AUTOMOBILES PHILS. INC.


PROPOSED FIT-OUT WORKS
(March April 2004)
Project Cost : P 3,117,000.00
($ 56,672.72)
Location : 30th Floor, Philamlife Tower, Paseo de Roxas, Makati City
Design By : Asterisk, Inc.
Contact Person : Mr. Fernan Amor
Area : 450 Sqm.

UNILEVER PHILIPPINES, INC.


PROPOSED FIT-OUT WORKS
(March April 2004)
Project Cost : P 3,051,887.27
($ 55,488.85)
Location : 1351 United Nations Avenue, Manila
Design By : HBO+EMTB
Contact Person : Engr. Nelson Delos Reyes
Area : 280 Sqm.
CARRIER INC. TENANCY
PROPOSED OFFICE FIT-OUT
(April May 2004)
Project Cost : P 1,450,000.00
($ 26,363.00)
Location : 3F Concepcion Building, Sen. Gil Puyat., Makati City
Design By : Team Asterisk, Inc.
Contact Person : Arch. Mia Mangahas
Area : 340 Sqm.

ISS INC.
PROPOSED OFFICE FIT-OUT
(may june 2004)
Project Cost : P 2,050,000.00
($ 37,272.72)
Location : 15th Floor Philamlife Tower, Paseo de Roxas, Makati City
Design By : Goudie Associates
Contact Person : Mr. Tom Tuazon
Area : 100 Sqm.

MONDE NISSIN - SHERIDAN


PROPOSED OFFICE FIT-OUT
(June 2004 January 2005) )
Project Cost : P 7,456,000.00
($ 135,563.63)
Location : Sheridan St., Pioneer Ave., Mandaluyong City
Design By : ADD + Consortium
Contact Person : Arch. Zaldy delos Reyes
Area : 1,500 Sqm.
LIST OF COMPLETED PROJECTS 2003
JAPANESE RESTAURANT
PROPOSED JAPANESE RESTAURANT
(June October 2003)
Project Cost : P 1,300,000.00
Location : Unit 103 Gateway Center, Magallanes Village, Makati City
Design By : New Success Design
Contact Person : Mrs. Sylvia H. Lopez
Area : 160 Sqm.

THOMSON FINANCIAL 17TH, 18TH & 20TH FLOORS


PROPOSED FIT-OUT WORKS
(Sept. 05, 2003 Oct. 28, 2003)
Project Cost : P 1,400,000.00
Location : 17th, 18th & 20th Floors Ayala Life FGU Bldg., Ayala Ave, Makati City
Design By : Goudie Associates
Contact Person : Mr. Freddie Galves
Area : 200 Sqm.

SUPERIUS (CORPORATION) TENANCY


PROPOSED FIT-OUT WORKS
(July 21 - October 2003)
Project Cost : P 3,785,040.00
Location : Unit 805 Asian Star Building, Asean Drive, Filinvest Corporate City
Alabang, Muntinlupa City
Design By : Asterisk, Inc.
Contact Person : Arch. Mia Mangahas
Area : 250 Sqm.

PFIZER
PROPOSED PFIZER FIT-OUT WORKS
(June 30 August 2003)
Project Cost : P 25,839,262.61
Location : 32nd Floor Ayala Life-FGU Center, Ayala Avenue, Makati City
Design By : HBO+EMTB
Contact Person : Ms. Belle Custodio
Area : 956 Sqm.

MTV PHILIPPINES TENANCY


PROPOSED FIT-OUT WORKS
(May August 2003)
Project Cost : P 8,300,000.00
Location : Unit C The Fort, Bonifacio Global City, Taguig, Metro Manila
Design By : DNA Design Group Philippines
Contact Person : Ms. Mia Mangahas
Area : 800 Sqm.

ANZ BANK
PROPOSED FIT-OUT WORKS
(June August 2003)
Project Cost : P 7,383,000.00
Location : 23rd Floor, GT Tower, Ayala Avenue, Makati City
Design By : HBO + EMTB
Contact Person : Mr. Kim Chan
Area : 1,200 Sqm.
WORLD BANK
PROPOSED WORLD BANK OFFICE EXPANSION
(May - July 2003)
Project Cost : P 6,500,000.00
Location : 20th Floor Taipan Building, Ortigas Center, Pasig City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Leonardo G. Sioco
Area : 400 Sq.m

KUMON PHILIPPINES, INC.


PROPOSED KUMON PHILS. OFFICE EXPANSION
(June August 2003)
Project Cost : P 1,007,464.00
Location : 19/F Philamlife Tower, Paseo de Roxas, Makati City
Design By : Goudie Associates
Contact Person : Ms. Marie Ann Chee
Area : 180 Sq.m

ASIA GLOBAL CROSSING


PROPOSED FIT-OUT WORKS
(June - August 2003)
Project Cost : P 890,000.00
Location : 18/F Tower I The Enterprise Center 6766 Ayala Ave., Makati City
Design By : ADD + Consortium
Contact Person : Arch. Zaldy delos Reyes
Area : 200 Sq.m

SAFEWAY PHILTECH, INC.


PROPOSED FIT-OUT WORKS
(May August 2003)
Project Cost : P 15,445,694.05
Location : 21/F & 22/F Yuchengco Tower, RCBC Plaza, Ayala Avenue, Makati City
Design By : DNA Design Group Phils., Inc.
Contact Person : Ms. Mia Mangahas
Area : 1,954 Sq.m

DHL WORLDWIDE EXPRESS (PHILS.) CORPORATION (DHL GATEWAY)


PROPOSED DHL GATEWAY
(March - August 2003)
Project Cost : P 22,300,000.00
Location : R5 Maintenance
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Leonardo G. Sioco

SPL OFFICE
PROPOSED FIT-OUT WORKS
(February March 2003)
Project Cost : P 3,676,235.00
Location : 23/F Yuchengco Tower, RCBC Plaza, Ayala Avenue, Makati City
Project Manager : Mr. Brian Parsons
Ms. Mandy Benosa
Area : 465 Sq.m
LUNDBECK MANILA
PROPOSED FIT-OUT WORKS
(March April 2003)
Project Cost : P 900,900.00
Location : 3/F Ace Building Rada St., cor. Dela Rosa St., Makati City
Design By : Innovation HK
Contact Person : Mr. John Scade
Area : 98 Sq.m
LIST OF COMPLETED PROJECTS 2002
MARSMAN DRYSDALE
PROPOSED FIT-OUT WORKS
(September November 2002)
Project Cost : P 8,000,000.00
Location : 45 Level Philamlife Tower, Paseo de Roxas, Makati City
Design By : ADD + Consortium, Inc.
Contact Person : Arch. Bong Libo

MICROSOFT PHILS., INC.


PROPOSED FIT-OUT WORKS
(November December 2002)
Project Cost : P 1,163,000.00
Location : 22/F Tower II The Enterprise Center 6766 Ayala Ave., Makati City
Design By : HBO + EMTB Philippines, Inc.
Contact Person : Ms. Belle Costudio

MONDE NISSIN CORP., INC.


PROPOSED FIT-OUT WORKS
(June 27 October 2002)
Project Cost : P 7,000,000.00
Location : 22nd & 23rd Floor 6750 Office Tower, Ayala Ave., Makati City
Design By : ADD + Consortium
Contact Person : Arch. Bong Libo

SARA LEE PHILIPPINES


PROPOSED FIT-OUT WORKS
(October December 2002)
Project Cost : P 11,589,435.00
Location : 24th & 25th Floor Insular Building, Alabang, Metro Manila
Design By : DNA Design Group Phils., Inc.
Contact Person : Ms. Mia Mangahas

BANGKO SENTRAL NG PILIPINAS - CAFETERIA


PROPOSED FIT-OUT WORKS
(November 2002 February 2003)
Project Cost : P 25,607,804.66
Location : 2/F Cafetorium Bldg. BSP Complex, P. Ocampo cor. A. Mabini, Malate, Manila
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Leonardo G. Sioco

DHL WORLDWIDE EXPRESS (PHILS.) CORPORATION (DHL TIMOG)


PROPOSED DHL WAREHOUSE
(June August 2002)
Project Cost : P 12,000,000.00
Location : 99 Timog Avenue, Diliman, Quezon City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Leonardo G. Sioco
CORMANT TECHNOLOGY
PROPOSED FIT-OUT WORKS
(March April 2002)
Project Cost : P 1,575,000.00
Location : 10F Net One Bldg. Fort Bonifacio Global City, Taguig, Metro Manila
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Mr. Paul Goodison
Area : 150 Sqm.

FIRMENICH
PROPOSED FIT-OUT WORKS
(March April 2002)
Project Cost : P 2,640,000.00
Location : 2/F UPRC III Pasong Tamo Extension, Makati City
Design By : Davenport Campbell, Inc.
Contact Person : Ms. Belle Costudio
Area : 500 Sqm.

LINK2SUPPORT, INC.
PROPOSED FIT-OUT WORKS
(March May 2002)
Project Cost : P 10,000,000.00
Location : 5/F Techno Plaza One, Eastwood City, Libis, Quezon City
Design By : Goudie Associates
Contact Person : Arch. Reynan Cumpas
Area : 1,300 Sqm.

FRASER PLACE
PROPOSED FIT-OUT WORKS
(March April 2002)
Project Cost : P 3,924,050.85
Location : The Forbes Tower, Valero Street, Makati City
Design By : Tema International
Contact Person : Arch. Ruby Socorro O. Bucoy-Soh
Area : 750 Sqm.

HERBALIFE
PROPOSED FIT-OUT WORKS
(March May 2002)
Project Cost : P 5,950,000.00
Location : G/F Royal Match Building, 6780 Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Leonardo G. Sioco
Area : 500 Sqm.
LIST OF COMPLETED PROJECT 2001
THOMSON FINANCIAL
PROPOSED FIT-OUT WORKS
(October November 2001)
Project Cost : P 6,821,600.00
Location : 17th Floor Ayala Life FGU Bldg., Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Mr.Freddie Galves (Thomson), Ms. Mina de Leon (SLA)
Area : 500 Sqm.

DHL WORLDWIDE EXPRESS (PHILS) CORP.


PROPOSED DHL PHILIPPINES WAREHOUSE
(October - December 2001)
Project Cost : P 10,200,000.00
Location : M & N Square Building, C. Raymundo Ave., Pasig City
Project Management : Bovis Lend Lease Projects Pte. Ltd.
Design By : Steven J. Leach, Jr. + Associates (Consultants) Inc.
Contact Person : Mr. Mike Fitspatrick / Chris Williams
Area : 1,330 Sqm.

ATR PROFESSIONAL ASSURANCE CORPORATION


PROPOSED INTERIOR RENOVATION WORKS
(October - December 2001)
Project Cost : P 4,324,060.00
Location : The Professional Tower, Boni Cor. EDSA, Mandaluyong City
Design By : New Success Designs, Inc.
Contact Person : Ms. Sylvia Heras Lopes (NSDI), Mr. Eulogio A. Mendoza (ATR)
Area : 300 Sqm.

ALDEX REALTY CORP.


PROPOSED FIT-OUT WORKS
(October - December 2001)
Project Cost : P 2,850,000.00
Location : 41/F Discovery Centre 25 ADB Avenue, Ortigas Centre, Pasig City
Design By : Goudie Associates Manila Ltd. Co.
Contact Person : Mr. Herman Son / Ms. Mary Ann Chee (Goudie)
Area : 180 Sqm.
SPL WORLDGROUP
PROPOSED FIT OUT WORKS
(August October 2001)
Project Cost : P 7,100,000.00
Location : Level 23 Yuchengco Tower, Ayala Ave. cor. Gil Puyat Ave., Makati City
Project Management By : Hailey Construction (Consultants) Corporation / DNA Consulting
(HK) Ltd.
Design By : SPACE (US)
Contact Person : Mr. Brian Parsons
Area : 650 Sqm.

REGUS BUSINESS CENTRE


PROPOSED FIT OUT WORKS
(August September 2001)
Project Cost : P 14,321,272.48
Location : 18F Philamlife Tower 8767 Paseo de Roxas, Makati City
Design By : Goudie Associates
Contact Person : Mr. Reynan Cumpas
Area : 2,000 Sqm.

PRA SOLUTION / NAVITAIRE, INC.


PROPOSED NAVITAIRE OFFICE EXPANSION
(July August 2001)
Project Cost : P 2,954,000
Location : 16/F Philamlife Paseo de Roxas, Makati City
Design By : Davenport Campbell, Inc.
Contact Person : Mr.Tony Villarino, Jr.
Area : 550 Sqm.

GREEN CROSS INC.


PROPOSED OFFICE RELOCATION
(May - August 2001 )
Project Cost : P 8,800,000.00
Location : 14 & 15/F Common Goal Tower, Industry St., Alabang-Zapote Rd., Muntinlupa
Design By : Goudie Associates, Ltd.
Contact Person : Ms. Joanna Co
Area : 740 Sqm.

PLANTERS DEVELOPMENT BANK


PROPOSED EXTERIOR RENOVATION WORKS OF FRONT & BACK AREAS
(June August 2001)
Project Cost : P 1,305,212.50
Location : No. 314 Sen.Gil Puyat Avenue, Makati City
Design By : New Success Design
Contact Person : Ms.Sylvia Heras Lopez (NSDI), Mr.Leo Katigbak (Planters Bank)
Area : 200 Sqm.

ABS-CBN BANTAY BATA


PROPOSED ABS-CBN BANTAY BATA OFFICE
(July August 2001)
Project Cost : P 640,000.00
Location : 2nd Floor ABS-CBN Building Mother Ignacia, Quezon City
Design By : New Success Design
Contact Person : Ms. Sylvia Heras Lopez
Area : 53 Sqm
XIC GLOBAL OFFICE
PROPOSED FIT-OUT WORKS
(March 01-30, 2001)
Project Cost : P 4,467,643.00
Location : 22nd Floor IBM Plaza,Eastwood City, Libis, Quezon City
Design By : DNA Consulting (HK) Ltd.
Contact Person : Ms. Grace Frias (XIC), Mr. Nick Torres (DGD)
Area : 1,200 Sqm.

PHILIPPINE FOUNDATION FOR GLOBAL CONCERN


PROPOSED FIT-OUT WORKS
(June 01-30, 2001)
Project Cost : P 2,000,000.00
Location : 43/F Philamlife Tower 8767 Paseo de Roxas, Makati City
Design By : Imagination, Inc.
Contact Person : Ms. Suzette Cocuaco
Area : 380 Sqm

MARUBENI ENERGY SERVICES CORP.


PROPOSED FIT-OUT WORKS
(February May, 2001)
Project Cost : P 4,500,000.00
Location : 36/F The Enterprise Center, Paseo de Roxas, Makati City
Design By : Steven J.Leach, Jr. + Associates
Contact Person : Engr. Romy Canlobo (Marubeni), Ms.Mina de Leon (SLA)
Area : 330 Sqm.

SAN MIGUEL PACKAGING


PROPOSED FIT-OUT WORKS
(May 15 June 15, 2001)
Project Cost : P 3,2000,000.00
Location : 9th & 10th Floor San Miguel Bldg., Saint Francis Ave., Mandaluyong City
Contact Person : Mr. Oliver Gorospe
Area : 1,200 Sqm.

KAWASAKI GROUP OF COMPANIES


PROPOSED FIT-OUT WORKS
(February 25 - May 2001)
Project Cost : P 5,710,000.00
Location : Makati Sky Plaza, Ayala Avenue, Makati City
Design By : Goudie Associates
Contact Person : Mr.Yasuhiza Nagata / Ms. Dezzie Isla
Area : 948.39 Sqm.

JARDINE LLOYD THOMSON


PROPOSED OFFICE RELOCATION
(March - April 2001)
Project Cost : P 5,070,503.34
Location : 25/F Philamlife Tower, 8767 Paseo de Roxas, Makati City
Design By : Davenport Campbell, Inc.
Contact Person : Mr. Kevin Norman
Area : 650 Sqm.
PLANTERS BANK
PROPOSED FIT-OUT WORKS
1. G/F BANKING HALL INTERIOR & FRONT EXTERIOR AREA RENOVATION
(November December 2000)
2. SIDE & BACK AREAS EXTERIOR, ELEVATOR LOBBY & 3/F INTERIOR RENOVATION
(January March, 2001)
Project Cost : P 2,567,900.00
4,630,585.00
Location : Planters Bank Building, Gil Puyat Avenue, Makati City
Design By : New Success Design
Contact Person : Ms. Sylvia Lopez (NSDI), Mr. Leo Katigbak (Planters)
Area : 230 Sqm. / 820 Sqm.

PBCOM CORPORATE BUSINESS CENTER (2ND FLOOR)


PROPOSED FIT-OUT WORKS
(April June 2001)
Project Cost : P 3,186,880.00
Location : 2nd Floor PBCOM Tower, Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. & Associates
Contact Person : Arch. Lamberto G. Mercado
Area : 200 Sqm.

PBCOM CORPORATE BUSINESS CENTER (3RD FLOOR)


PROPOSED FIT-OUT WORKS
(April June 2001)
Project Cost : P 6,250,000.00
Location : 3rd Floor PBCOM Tower, Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. & Associates
Contact Person : Arch. Lamberto G. Mercado
Area : 600 Sqm.

PBCOM CORPORATE BUSINESS CENTER (4TH FLOOR)


PROPOSED FIT-OUT WORKS
(April June 2001)
Project Cost : P 4,920,000.00
Location : 3rd Floor PBCOM Tower, Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. & Associates
Contact Person : Arch. Lamberto G. Mercado
Area : 600 Sqm.

PBCOM CORPORATE BUSINESS CENTER (5TH FLOOR)


PROPOSED FIT-OUT WORKS
(April June 2001)
Project Cost : P 9,999,000.00
Location : 5th Floor PBCOM Tower, Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. & Associates
Contact Person : Arch. Lamberto G. Mercado
Area : 800 Sqm.

MR. EDWARD GO
PROPOSED INTERIOR RENOVATION WORK
(June 15 - July 15, 2001)
Project Cost : P 1,616,488.00
Location : Unit 16-A Pacific Plaza Tower South, Fort Bonifacio, Makati City
Design By : New Success Design
Contact Person : Ms. Sylvia Heras Lopez
Area : 250 Sqm
MR.& MRS. BUTCH ALBERT
PROPOSED INTERIOR RENOVATION WORK
(May 25 July 31, 2001)
Project Cost : P 3,260,185.00
Location : Unit 21-B Pacific Plaza Tower South, Fort Bonifacio, Makati City
Design By : New Success Design
Contact Person : Ms. Sylvia Heras Lopez
Area : 250 Sqm

LIST OF COMPLETED PROJECT 2000


THOMSON ASIA PTE. LTD.
PROPOSED FIT-OUT WORKS
(September - December 2000)
Project Cost : P 8,722,530.00
Location : 18th Floor Ayala Life FGU Bldg., Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Mr.Freddie Galves (Thomson), Ms. Mina de Leon (SLA)
Area : 1,100 Sqm.

PBCOM CORPORATE BUSINESS CENTER


PROPOSED FIT-OUT WORKS
(November 2000 January 2001)
Project Cost : P 9,729,700.00
Location : Ground Floor PBCOM Tower, Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. & Associates
Contact Person : Arch. Lamberto G. Mercado
Area : 750 Sqm.

ATLAS RESOURCES
PROPOSED FIT-OUT WORKS
(Nov. 2000 January 2001)
Project Cost : P 6,780,000.00
Location : 19th Floor PCI Equitable Tower, ADB Avenue, Pasig City
Contact Person : Mrs. Janice Sua
Area : 660 Sqm.

GLOBAL LINK HOLDINGS CORP.


PROPOSED FIT-OUT WORKS
(November 2000 January 2001)
Project Cost : P5,500,000.00
Location : 14th Floor Ayala Life FGU Center, Alabang Zapote Road, Muntinlupa City
Contact Person : Mr. Alfredo Matta
Area : 1,128 Sqm.

UCPB GENERAL INSURANCE


PROPOSED FIT-OUT WORKS
(Oct. December 2000)
Project Cost : P 3,884,000.00
Location : 24th & 25th Floor LKG Tower, Ayala Avenue, Makati City
Design By : Group 3 Design Studio
Contact Person : Arch. Edwin M. Gumila (Group 3)
Area : 1,600 Sqm.
J. WALTER THOMPSON (JWT)
PROPOSED FIT-OUT WORKS
(Oct. December 2000)
Project Cost : P 21,790,528.00
Location : Level 29 & 30 Tower 1, The Enterprise Center, 6766 Ayala Ave., Makati City
Design By : BDG Mccoll (Hongkong)
Contact Person : Mr. Randi Lorica (JWT), Mr. John Scade (BDG Mccoll)
Area : 1,679 Sqm.

KUMON PHILIPPINES, INC.


PROPOSED FIT-OUT WORKS
(July October 2000)
Project Cost : P 2,000,000.00
Location : 19th Floor Philamlife Tower, Paseo de Roxas, Makati City
Design By : Goudie Associates
Contact Person : Mr. Joseph Infante
Area : 290 Sqm.

PRA SOLUTION
PROPOSED PRA SOLUTION FIT-OUT WORKS
(August October 2000)
Project Cost : P 7,395,000.00
Location : 16th Floor Philamlife Tower, Paseo de Roxas, Makati City
Design By : Davenport Campbell
Contact Person : Ms. Joy Alejandro (DC)

QUEZON CITY HALL 14TH & 15TH FLOOR


PROPOSED INTERIOR FIT-OUT WORKS
(April - October 2000)
Project Cost : P 2,712,386.91
Location : Quezon City Hall, Quezon City
Design By : New Success Design
Contact Person : Ms. Sylvia Lopez (NSD)
Area : 2,040 Sqm.

FPD-SAVILLS
PROPOSED FITTING-OUT WORKS
(July October 2000)
Project Cost : P 2,700,000.00
Location : 37/F Philamlife Tower, Paseo de Roxas, Makati City
Design By : Davenport Campbell
Contact Person : Arch. Joy Alejandro (DC), Mr. David Leechiu (FPD)
Area : 310 Sqm.
PBCOM T. ALONZO BRANCH
PROPOSED OFFICE RENOVATION WORKS
(July September 2000)
Project Cost : P 1,550,000.00
Location : T. Alonzo St., cor. Soler St., Sta. Cruz, Manila
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Lamberto G. Mercado
Area : 300 Sqm.

DISCOVERY CENTER 22ND FLOOR


PROPOSED OFFICE RENOVATION
(March June 2000)
Project Cost : P 13,500,000.00
Location : ADB Avenue, Ortigas Center, Pasig City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Eng. Edwin Bolanos (Jose Aliling, Inc.), Arch. Ricci Uy (SLA)
Area : 1,100 Sqm.

PRIMARK PHILIPPINES, INC.


PROPOSED OFFICE RELOCATION
(June July 2000)
Project Cost : P 15,116,000.00
Location : 20/F Ayala FGU Center, Ayala Avenue, Makati City
Design By : Goudie Associates
Contact Person : Ms. Dinah Snowden, Ms. Dezzie Isla (GA)
Area : 1,154 Sqm.

TEXACO PHILIPPINES, INC.


PROPOSED FIT-OUT WORKS
(June July 2000)
Project Cost : P 7,915,000.00
Location : 8th Floor Asian Star Building, Asean Drive, Filinvest Corporate City, Alabang
Design By : Goudie Associates
Contact Person : Mr. James Le Jeune
Area : 503 Sqm.

SSA US VETERANS (US EMBASSY)


PROPOSED FIT-OUT WORKS
(June November 2000)
Project Cost : P 2,350,000.00
Location : G/F US Embassy Roxas Boulevard, Manila
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Agripino Agor
Area : 326 Sqm..
ABN-AMRO SAVINGS BANK BRANCHES
PROPOSED FIT-OUT WORKS
1. ABN-AMRO SAVINGS BANK TEKTITE BRANCH
Strata 100 Emerald Ave., Ortigas Center, Pasig City
(March May 2000)
2. ABN-AMRO SAVINGS BANK LIBIS BRANCH
IBM Plaza Eastwood Center, Libis, Quezon City
(March May 2000)
3. ABN-AMRO SAVINGS BANK SHELL HOUSE BRANCH
Shellhouse Bldg. Valero cor. Villar St., Makati City
(March May 2000)
Project Cost : P 3,949,000.00 Tektite Branch
4,075,000.00 Libis Branch
5,310,000.00 Shell House Branch
Design By : Davenport Campbell
Contact Person : Arch. Letlet Reyes (DC), Mr.
Area : 175 Sqm. Tektite Branch
191Sqm. Libis Branch
235 Sqm. Shell House Branch

UNITED OVERSEAS BANK PHILIPPINES


INTERIOR DESIGN FITTING-OUT WORKS
(August September 2000)
Project Cost : P 5,599,193.80
Location : Ground Floor IBP Bldg., Dona Juliana Vargas Ave., Ortigas Center, Pasig City
Design By : Tema International Philippines
Contact Person : Mr. Vince Au Yoong

OGILVY & MATHER PHILIPPINES, INC.


PROPOSED FITTING-OUT WORKS
(April June 2000)
Project Cost : P 12,935,452.00
Location : 15/F Philamlife Tower, Paseo de Roxas, Makati City
Design By : Davenport Campbell
Contact Person : Ms. Mariel Catacutan (DC), Ms. Nympha Salazar (Ogilvy)
Area : 710 Sqm.

ABN AMRO SAVINGS BANK


PROPOSED BANKING HALL, GROUND FLOOR AND BASEMENT
(February April 2000)
Project Cost : P 15,250,000.00
Location : LKG Tower 68013 Ayala Avenue, Makati City
Design By : Davenport Campbell
Project Management by : Jones Lang LaSalle (HK)
Contact Person : Ms. Caroline Cruz (Davenport) Mr. Kenneth Chan (JLL HK)
Area : 754 Sqm.

MINDSHARE MANILA
PROPOSED FITTING-OUT WORKS
(February March 2000)
Project Cost : P 7,500,000.00
Location : 17th Floor Philamlife Tower, Paseo de Roxas, Makati City
Design By : BDG McColl
Project Management By : Jones Lang LaSalle (HK)
Contact Person : Mr. Kenneth Chan (JLL HK), Mr. Gene Torcal (Mindshare),
Mr. John Scade (BDG McColl) Area : 440 Sqm.
ABN AMRO SAVINGS BANK 16TH, 17TH, 18TH & 19TH FLOOR
PROPOSED ABN AMRO SAVINGS BANK FIT OUT WORKS
(January 2000 March 2000 )
Project Cost : P 62,186,000.00
Location : LKG Tower 68013 Ayala Avenue, Makati City
Design By : Davenport Campbell
Project Management by : Jones Lang LaSalle (HK)
Contact Person : Ms. Caroline Cruz (Davenport) Mr. Kenneth Chan (JLL HK)
Area : 5,200 Sqm.

AVENTIS PHARMACEUTICALS
PROPOSED OFFICE INTERIOR FITTING OUT WORKS
(February 2000 - March 2000)
Project Cost : P 3,795,000.00
Location : 12/F Orient Square, Emerald Avenue, Ortigas Center, Pasig City
Design By : Group 3 Design
Contact Person : Mr. Manolito Co (Aventis), Arch Jesselyn Gumila (Group 3)
Area : 700 Sqm.

BAXTER HEALTH CARE PHILIPPINES, INC.


PROPOSED OFFICE INTERIOR FITTING OUT WORKS
(February 2000 - March 2000)
Project Cost : P 2,800,000.00
Location : 19/F Wynsum Corporate Plaza, Emerald Avenue, Ortigas Center, Pasig city
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Ms. Amie V. Enriquez (Baxter) Arch. Boy Sioco (SLA)
Area : 600 Sqm.

JOSE MARI CHANS RESIDENCE


PROPOSED INTERIOR RENOVATION (MASTERS BEDROOM, DRESSER & T & B)
(April - May 2000)
Project Cost : P 885,000.00
Location : #09 Dapdap, North Forbes Park, Makati City
Design By : New Success Design
Contact Person : Ms. Sylvia Lopez
Area : 55 Sqm.
LIST OF COMPLETED PROJECT 1999
CHASE MANHATTAN BANK
PROPOSED CHASE MANHATTAN BANK INTERIOR FITTING OUT WORKS
(December 1999 March 2000)
Project Cost : P 20,300,000.00
Location : 31/F Philamlife Tower, Paseo de Roxas, Makati City
Design By : Group 3 Design
Contact Person : Mr. Gerry Shirley, Mr. Mert Natividad (Chase), Arch. Edwin Gumila (Group 3)
Area : 1,500 Sqm.

PBCOM BINONDO 2ND FLOOR


PROPOSED OFFICE RENOVATION WORKS
(November 1999 March 2000)
Project Cost : P 2,575,000.00
Location : #214 PBCOM Building, Juan Luna St., Binondo, Manila
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Lamberto G. Mercado
Area : 459 Sqm.

PHILIP MORRIS PHILIPPINES, INC.


PROPOSED OFFICE RENOVATION
(October 1999 December 1999)
Project Cost : P 12,572,000.00
Location : 27/F Tower 1 Enterprises Center, Ayala Ave., cor. Paseo de Roxas, Makati City
Design By : Goudie Associates Manila
Contact Person : Mr. Logan Vijayaratnam, (Philip Morris) Ms. Dinah L. Snowden, (Goudie)
Area : 1,175 Sqm.

DISCOVERY CENTRE 4TH FLOOR


PROPOSED SUPPLY AND INSTALLATION OF HEALTH CLUB FINISHES AT 4TH FLOOR
(June 1999 March 2000)
Project Cost : P 4,500,000.00
Location : ADB Avenue, Ortigas Center, Pasig City
Design By : Steven J. Leach Jr. + Associates
Contact Person : Engr. Edwin Bolaos (Jose Aliling, Inc.) Arch. Ricci Uy (SLA)
Area : 1,340 Sqm.

DISCOVERY CENTRE GROUND FLOOR


PROPOSED SUPPLY AND INSTALLATION OF G/F LOBBIES/HALLWAYS AND ELEVATOR
LOBBIES
(May 1999 March 2000)
Project Cost : P 3,900,000.00
Location : ADB Avenue, Ortigas Center, Pasig City
Design By : Steven J. Leach Jr. + Associates
Contact Person : Engr. Edwin Bolaos (Jose Aliling, Inc.) Arch. Ricci Uy (SLA)
Area : 1,128 Sqm.

LA TONDEA DISTILLERS, INC.


PROPOSED OFFICE RENOVATION
(June - October 1999)
Project Cost : P 3,360,000.00
Location : 3rd and 6th Floor San Miguel Building, Pasig City
Design By : New Success Design
Contact Person : Ms. Sylvia Herras - Lopez
Area : 1,100 Sqm.
PROCTER & GAMBLE PHILS.
PROPOSED RECEPTION LOBBY
(June September 1999)
Project Cost : P 1,033,878.00
Location : 14/F 6750 Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Leonardo Sioco (SLA)
Area : 95 Sqm

INTERNATIONAL FINANCE CORPORATION


PROPOSED MAIN FITTING OUT WORKS
(June August 1999)
Project Cost : P 2,978,447.00
Location : 11/F Tower 1, Ayala Triangle, Ayala Ave., Makati City
Design By : Goudie Associates Manila Ltd. Co.
Contact Person : Arch. Carlos de Castro, (GA) Erwein John M. Catoto, (IFC)
Area : 275 Sqm.

MICROSOFT PHILIPPINES
PROPOSED OFFICE RENOVATION
(July October 1999)
Project Cost : P 3,900,000.00
Location : 22/F Tower 2, The Enterprise Centre, Ayala Ave., Makati City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Ricci Uy, (SLA) Miss Borge Gaerlan, (Microsoft)
Area : 1,070 Sqm.

DBS BANK PHILIPPINES, INC. LEVELS 1, 2, B-1, 6TH & 7TH


PROPOSED DBS BANK PHILS., INC. OFFICE RENOVATION
(February June 1999)
Project Cost : P 5,146,773.00 ( Levels 1, 2, & B-1)
P 5,649,264.00 (Level 6th & 7th)
Location : Levels B-1, 1, 2, 6 & 7, The Enterprise Center, Ayala Ave., Makati City
Design By : Design Programmers, Inc.
Contact Person : Mr. Leslie Seow
Area : 5,126 Sqm

DBS BANK PHILIPPINES, INC. - WILSON BRANCH


PROPOSED FAADE & PARKING RENOVATION
(May June 1999)
Project Cost : P 282,000.00
Location : #214 Wilson Street, Greenills, San Juan, M.M.
Design By : Design Programmers, Inc.
Contact Person : Mr. Leslie Seow

CALATAGAN GOLF CLUBHOUSE


PROPOSED CALATAGAN GOLF CLUBHOUSE INTERIOR FINISHING WORKS
(Oct. 1998 July 1999)
Project Cost : P 11,300,000.00
Location : Barrio Balintoc, Calatagan, Batangas
Contact Person : Arch. Bob Sanches, (SLA) / Mr. Alfred C. Moraleja, (GHT)
Design By : Steven Leach, Jr. + Associates
Area : 2,608 Sqm.
PHILIPPINE BANK OF COMMUNICATIONS - GILMORE BRANCH
PROPOSED CIVIL WORKS CONSTRUCTION
(January July 1999)
Project Cost : P 1,575,000.00
Location : Gilmore Street cor. Aurora Blvd., Quezon City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Mr. Rommel O. Echon, (PBCOM)
Area : 203 Sqm

PHILIPPINE BANK OF COMMUNICATIONS - PACO BRANCH


PROPOSED CIVIL WORKS CONSTRUCTION
(January July 1999)
Project Cost : P 1,595,000.00
Location : Pedro Gil Street, Paco, Manila
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Mr. Rommel O. Echon, (PBCOM)
Area : 110 Sqm

AETNA LIFE INSURANCE SAN FERNANDO


PROPOSED OFFICE INTERIOR RENOVATION
(May - June 1999)
Project Cost : P 515,000.000
Location : LK Building San Fernando, Pampanga
Contact Person : Arch. Ramon Torres, (SLA) / Mr. Nolan Yambao, (Aetna)
Design By : Steven J. Leach Jr. + Associates

PARIBAS ASIA EQUITY (PHILS.)


PROPOSED OFFICE INTERIOR RENOVATION WORKS
(January March 1999)
Project Cost : P 860,000.00
Location : 25th Flr., Pacific Star Bldg., Buendia cor. Makati Ave., Makati City
Contact Person : Ms. Anne Bautista, Ms. Mariel Catacutan (Davenport)
Design By : Davenport Campbell
Area : 317.35 Sqm.

THE WORLD BANK


PROPOSED OFFICE INTERIOR FIT-OUT WORKS
(January - March 1999)
Project Cost : P 5,700,000.00
Location : 20th Floor Taipan Place, Garnet St., Ortigas Center, Pasig City
Contact Person : Ms. Zeny Uson, (World Bank)
Design By : Steven J. Leach, Jr. + Associates
Area : 650 Sqm.
SAN PASCUAL COGENERATION COMPANY (PHILS.) LIMITED
PROPOSED SAN PASCUAL COGENERATION COMPANY NEW OFFICE
(Jan. Feb. 1999)
Project Cost : P 1,312,000.00
Location : 1610/11 Tower One, Ayala Triangle, Ayala Avenue, Makati City
Contact Person : Ms. Cristy C. Villanueva, Mr. Jong Guangco (Goudie)
Design By : Goudie Associates
Area : 525 Sqm.

JONES LANG WOOTTON


PROPOSED OFFICE INTERIOR RENOVATION WORKS
(Jan. Feb. 1999)
Project Cost : P 1,387,000.00
Location : 8th Floor The Enterprise Center, Ayala Avenue, Makati City
Contact Person : Mr. Peter M. Small, Managing Director
Design By : Goudie Associates
Area : 220 Sqm.
LIST OF PROJECTS 1998
PHILIPPINE BANK OF COMMUNICATIONS - NOVALICHES BRANCH
PROPOSED CIVIL WORKS CONSTRUCTION
(June 1998 January 1999)
Project Cost : P 1,800,000.00
Location : Quirino Highway, Novaliches, Quezon City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Engr. Antonio Victor R. Antonio, (PBCOM)
Area : 311 Sqm

UNITED STATES INFORMATION SERVICES


PROPOSED OFFICE INTERIOR FINISHING WORKS
(June Dec. 1998)
Project Cost : P 1,069,561.00
Location : US Embassy 1020 Roxas Blvd., Annex Office Bldg. (1st Floor West)
Contact Person : Ron Walton - Senior Project Manager - NATI Const. Division
Design By : Karn Charuhas Chapman & Twohey
Area : 1,132 Sqm.

XAVIER SPORTS & COUNTRY CLUB


PROPOSED XAVIER SPORTS & COUNTRY CLUB
INTERIOR FINISHING WORKS PACKAGE #006
(July Dec. 1998)
Project Cost : P 1,903,733.02
Location : Km. 5 Upper Balulang, Carmen, Cagayan De Oro City
Design By : Alfredo B. Alfonso, Architects & Associates
Contact Person : Arch. Wilfredo Avilla

MANDARIN ORIENTAL HOTEL


PROPOSED SHOPFITTING AND BUILDING WORKS AT 3RD FLOOR BALLROOM,
FUNCTION ROOMS & CORRIDOR
(June Sept. 1998)
Project Cost : P 9,200,000.00
Location : 3rd Floor Mandarin Oriental Hotel, Makati Avenue, Makati City
Design By : Hirsch Bedner Associates
Contact Person : Mr. Lloyd Adrukow - Project Manager , (Mandarin Oriental)
Ms. Gillian Lane / Mr. Andrew Healey, (Quantity Surveyor : WT Partnership)
Area : 1,200 Sqm.

AYALA AON RISK SERVICES, INC.


PROPOSED OFFICE INTERIOR FIT-OUT WORKS
(July Sept. 1998)
Project Cost : P 7,074,054.00
Location : 4/F Ayala Triangle, Ayala Tower 1, Ayala Ave., Makati City
Contact Person : Mr. Peter Gebbie / Ms. Teresita TQ Quianson, (Ayala Aon)
Mr. Andrew Gay / Arch. Reynan Cumpas (Davenport)
Design By : Davenport Campbell
Area : 1,093 Sqm.
ABN AMRO (HG ASIA SECURITIES) FINANCE MANAGER
PROPOSED FINANCE MANAGER ROOM OFFICE INTERIOR RENOVATION
(September 1998 On going)
Project Cost : P 636,000.00
Location : 3/F Pacific Star Building, Gil Puyat Ave. cor. Makati Ave., Makati City
Contact Person : Ms. Mina de Leon, (SLA)
Design By : Steven J. Leach Jr. + Associates
Area : 70 Sqm.

RAYTHEON INTERNATIONAL
PROPOSED OFFICE INTERIOR FIT-OUT WORKS
(September - October 1998)
Project Cost : P 895,500.00
Location : 1404 TOEP Ayala Triangle, Ayala Avenue, Makati City
Contact Person : Ms. Mina de Leon, (SLA)
Design By : Steven J. Leach Jr. + Associates
Area : 74 Sqm.

AETNA LIFE - HERRERA


PROPOSED OFFICE INTERIOR FIT-OUT WORKS
(July Sept. 1998)
Project Cost : P 2,300,000.00
Location : 8th Floor Herrera St., Legaspi Village, Makati City
Contact Person : Arch. Ramon Torres, (SLA) / Mr. Nolan Yambao, (Aetna)
Design By : Steven J. Leach Jr. + Associates
Area : 420 Sqm.

AETNA LIFE - ALABANG


PROPOSED OFFICE INTERIOR FIT-OUT WORKS
(July August 1998)
Project Cost : P 920,000.00
Location : 459 DMR Building, Almanza, Zapote -Alabang Road, Las Pinas City
Contact Person : Arch. Ramon Torres, (SLA) / Mr. Nolan Yambao, (Aetna)
Design By : Steven J. Leach Jr. + Associates
Area : 220 Sqm.

APMC HEAD OFFICE


PROPOSED FINISHING OF INTERIOR WORKS PROJECT
(April - June 1998)
Project Cost : P 1,550,000.00
Location : 5th Floor Glorietta 4, Ayala Center, Ayala Avenue, Makati City
Contact Person : Engr. Bong Robles, (APMC)
Area : 500 Sqm.

PHILIPPINE BANK OF COMMUNICATIONS - ARANETA BRANCH


PROPOSED ONE STOREY WITH MEZZANINE PBCOM BUILDING
1. STRUCTURAL WORKS
(February - June 1998 )
2. INTERIOR FINISHING WORKS
(June 1998 - On-going)
Project Cost : P 4,475,000.00 - Structural Works
1,839,800.00 - Interior Finishing Works
Location : Araneta Avenue cor. Bayani Street, Quezon City
Contact Person : Engr. Antonio Victor R. Antonio AVP, (PBCom)
Design By : Arch. Francisco Y. Lim - Erwin S. Lim
Interior Design By : Steven J. Leach, Jr. + Associates Area : 350 Sqm.
PHILIPPINE BANK OF COMMUNICATIONS
PROPOSED HEAD OFFICE BLDG. RENOVATION PROJECT
(GROUND & MEZZANINE FLOOR)
Project Schedule :
Phase 1 March 1997 - September 1997
Phase 2 October 1997 - December 1997
Phase 3 February 1998 - April 1998
Phase 4 May - July 1998
Project Cost : P 14,350,000.00
Location : #214 PBCOM Bldg., Juan Luna St., Binondo, Manila
Design By : Steven J. Leach Jr. + Associates
Contact Person : Mr. Boyet Echon / Engr. Antonio Victor R. Antonio, (PBCom)
Area : 2,150 Sq.m.

XAVIER SPORTS & COUNTRY CLUB


PROPOSED XAVIER SPORTS & COUNTRY CLUB
(October 1996 - On-Going)
Project Cost : P 3,390,000.00 - Ceiling Main Hall - Main & Lower Level - Oct. 1996 / Completed
2,750,000.00 - Exterior CHB Walls for Masonry Works -Dec. 1996 / Completed
425,960.00 - Built-Up Trellis Columns at Sports Hall - Oct. 1996 / Completed
2,896,137.00 - Interior Finishing Work Package # 001 - Feb. 10, 1997 / Completed
450,000.00 - Plenum Barrier for FCU - March 1997 / Completed
8,000,000.00 - Interior Finishing Works Package # 002 - March 1997 / Completed
5,000,000.00 - Interior Finishing Works Package # 003 - May 16, 1997 / Jan. 1998
2,250,000.00 - Interior Finishing Works Package # 004 - July 25, 1997 / Feb. 1998
9,350,000.00 - Interior Finishing Works Package #005 - Nov. 1997 / July 1998
Location : Km. 5 Upper Balulang, Carmen, Cagayan De Oro City
Design By : Arch. Alfredo B. Alfonso
Contact Person : Arch. Alfredo B. Alfonso

AETNA LIFE - CAGAYAN DE ORO CITY


PROPOSED OFFICE INTERIOR FIT-OUT WORKS
(February - April 1998)
Project Cost : P 1,400,000.00
Location : 3rd Floor Jofelmar Building, Montola St., Cagayan de Oro City
Contact Person : Arch. Leonardo Sioco - (SLA) / Mr. Nolan Yambao, (Aetna)
Design By : Steven J. Leach Jr. + Associates

NOL TRAINING CENTER


PROPOSED INTERIOR FIT-OUT WORKS
(January - February 1998)
Project Cost : P 1,319,510.00
Location : 2nd Floor NOL Tower, Madrigal Business Park, Alabang
Contact Person : Mr. Sydney Salvo, Mr. Philip Low, (NOL)
Area : 273 Sqm.

GLAXO WELLCOME PHILIPPINES INC.


PROPOSED OFFICE EXPANSION - GLAXO WELLCOME BUILDING
(September 1997 - May 1998)
Project Cost : P 9,500,000.00
Location : Don Chino Roces Avenue, Makati City
Contact Person : Ms. Pamela Gomez , (Glaxo) / Mary Ann Chee (Goudie)
Design By : Goudie Associates
Area : 4,109 Sqm.
BOULEVARD MANSION
PROPOSED HOTEL LOBBY
(February - May 1998)
Project Cost : P 3,000,000.00
Location : 1440 Roxas Boulevard, Manila
Design By : Chai Hilgendorf Sy, Inc.
Contact Person : Mr. Marcelo Co, (Mansion Group)
Area : 250 Sqm.

MABINI MANSION
PROPOSED HOTEL LOBBY & COFFEE SHOP RENOVATION PROJECT
(October 1997 - May 1998)
Project Cost : P 5,500,000.00
Location : No. 1611 A. Mabini Street, Malate, Manila
Design By : Wilma R. Dee
Contact Person : Mr. Marcelo Co
Area : 200 Sq.m. (SLA)

RESIDENTIAL PROJECTS

PETER LIM
PROPOSED FINISHING OF INTERIOR WORKS PROJECT
(August 1996 - July 1998)
Project Cost : P 4,700,000.00
Location : Blk 2 Lot 2 Bautista St., cor. Gajo St., Corinthian Gardens,
Quezon City
Design By : Steven J. Leach Jr. + Associates
Contact Person : Arch. Leopoldo Cruz / Arch. Leonardo Sioco

You might also like