MLML
MLML
& DEVELOPMENT
CORPORATION
www.rcw.com.ph
Rm 508 Jovan
Condominium
Shaw Blvd cor
Samat St
Mandaluyong City
Metro Manila
Philippines
E-mail [email protected]
INTRODUCTION
In this diverse and dynamic industry, we specialize in problem solving. The complexity of the
building process often derails the integrity of the conceptualized design. Through our part-
nership with the Designer, the Architect, Suppliers, Product and Equipment Manufacturers,
and the Customer, we continually strive to develop effective solutions to these otherwise in-
tractable problems. The idea of partnership lies at the very heart of RCW CONSTRUC-
TIONs corporate philosophy.
Each component in the building process, from the Customer to our engineers to the various
trade specialists to the Designer and Architect, is a two-, three or four-way partnership in
building a cost effective, technically competent and aesthetically enduring structure.
In the light of this underlying philosophy, we eagerly look forward to continuing this partner-
ship through the coming years.
COMPANY PROFILE
COMPANY NAME : RCW CONSTRUCTION & DEVELOPMENT CORP.
ADDRESS : Rm. 508 5/F Jovan condominium, Shaw Blvd. cor Samat
St., Mandaluyong City
PCAB CONSTRUCTORS
LICENSE : Constructors License No. 11737
Issued April 24, 1989
: Category B
Classification
General Building (Principal)
General Engineering
Sp-Electrical Works
: ERLINDA G. MENDOZA
Sanitary Engineer
: MANOLET ALCANTARA
Electrical Engineer
: GODOFREDO LIMBO
Geodetic Engineer
: Advance Geotechnical Engg. Services/
:RICHARD C. TAN
Soil/Geotechnical Investigations
: LYNDON MAGSINO
Safety Engineer
EQUIPMENT LISTING
1. PUMPS :
a. 1 Unit Submersible Pump/Electric Motor 1 Hp
b. 1 unit Waterpump/Gasoline Engine, 3 Hp/Briggs & Straton
c. 1 unit Hydrostatic Pump
2. CONCRETE MIXERS/VIBRATORS :
a. 1 unit Concrete Mixer/1-Bagger/Gasoline Engine BRIGGS & STRATON
b. 1 unit Concrete Mixer/1-Bagger/Gasoline Engine HONDA 7Hp
c. 2 units 8 Hp Gasoline Engine/BRIGGS & STRATON
d. 1 unit Concrete Mixer/1-Bagger/3 Hp Electric Motor
e. 1 unit Electric Concrete Vibrator w/ 1-1/4 x 20 Vibrating Head/FURIKI
f. 1 unit Concrete Vibrator/Gasoline Engine/MIKASA
4. DEMOLITION HAMMER :
a. 1 unit MAKITA HM 1201/2000 BPM/1130 watts
5. POWER PLANER :
a. 2 units MAKITA 1900B
6. ELECTRIC SAW :
a. 1 unit CIRCULAR SAW MAKITA 5601N
b. 1 unit CIRCULAR SAW MAKITA 5800N
c. 1 unit CIRCULAR SAW 13 5103N
d. 1 unit MITER SAW LS1030 (10)
e. 1 unit JIG SAW 43008V
f. 1 unit STEEL CUTTER SAW PORTABLE CUT
g. 1 unit RADIAL ARM SAW 250M
7. POWER DRILLS :
a. 2 units MAKITA 6301
8. ORBITAL SANDERS :
a. 2 units MAKITA 9035 Finishing Sander
9. CONCRETE MIXER :
14. ROUTER :
a. 1 unit MAKITA
b. 2 units MAKITA ROUTER 3601B
c. 1 unit ROUTER 3600H
15. GRINDER :
a. 1 unit MAKITA 4
17. TRUCK :
b. 2 units Centrifugal water pump 3dia. driven by ROBIN EY20 gasoline engine
complete with 20 suction hose.
RCW CONSTRUCTION
RCW CONSTRUCTION SC Reservations Philippines Inc.
SC Reservations Philippines
Inc. is the call center for the Inter-
Continental Hotels Group, a lead-
ing global hospitality group, with
over 3,300 hotels across nearly
100 countries and territories. The
call center primarily services its
hotel reservations system and oc-
cupies about 2,000 square meters
at their new offices located at the
28 and 29th floors of Tower 2 of
the RCBC Plaza located along Ay-
ala Avenue.
Ambergris Solutions is a
call center located 7, 18,
and 30th floors of the Raf-
fles Corporate Center
on Emerald Avenue, Orti-
gas Center, Pasig City.
Designed by Group 3
Design Studio,
headed by Architect
Edwin Gumila, the
new offices of Chase
Manhattan Bank oc-
cupies the thirty first
floor of the Philamlife
Tower located at the
Makati Business Dis-
trict. The design uti-
tlized plasma filled
glass for the meeting
rooms and chief ex-
ecutive office which
can be switched from
clear to opaque. Proj-
ect management was
by GSPM Hong
Kong, headed by Mr.
Gerry Shirley.
RCW CONSTRUCTION Chase Manhattan Bank
RCW CONSTRUCTION Marsman Drysdale
ARVATO CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(July 15-August 31, 2015)
Project Cost : P 24,700,438.40
($ 546,867.71 )
Location : 6F E Plaza, Northgate, Cyberzone, Filinvest City, Alabang
Design By : Team Asterisk
Contact Person : Aeroin Dayo
Area : 1,500 Sqm
FIRST IMEX
PROPOSED OFFICE FIT-OUT PROJECT
(July 13-August 30, 2015)
Project Cost : P 5,000,000.00
($110,700.00 )
Location : Unit 1607, One World Place Corporate Offices, 32nd St., Bonifacio Global City
Design By : Maximus Built Solutions Inc.
Contact Person : Mr. Jommel Macabagdal
Area : 200 Sqm
ATLASSIAN PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
(September 22 November 30, 2014)
Project Cost : P 21,500,000.00
($ 488,636.36 )
Location : 2F B3 Bonifacio High Street Central East, 9th Ave. BGC, Taguig City
Design By : Jones Lang LaSalle Phils., Inc.
Contact Person : Mr. Kiko Abarquez / Mr. rey Agustin
Area : 882 Sqm
ARVATO CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(June 6 July 28, 2014)
Project Cost : P 54,359,876.73
($ 1,235,451.74)
Location : GF & 5F Plaza E Building, Northgate Cyberzone, Filinvest City, Alabang
Design By : Asterisk
Contact Person : Mr. Aeroin Dayo
Area : 2,400 Sqm
PHL CENTRE NO. 12 (REGUS)
PROPOSED OFFICE FIT-OUT PROJECT
(March 15 May 20, 2014)
Project Cost : P 14,600,000.00
($ 331,818.18 )
Location : 4F Unit 2C One E-Com Ctr., Ocean Drive Mall Of Asia Complex, Pasay City
Design By : FVA International Ltd.
Contact Person : Mr. Romain Duval
Area : 850 Sqm.
PRULIFE UK ( Phase 1)
PROPOSED OFFICE FIT-OUT PROJECT
(March 05 April 30, 2014)
Project Cost : P 3,004,808.80
($ 68,291.10)
Location : 2F B3 Bonifacio High St., Bonifacio Global City, Taguig City
Design By : Team Asterisk
Contact Person : BJ Paromog
Area : 824 Sqm.
PRULIFE UK ( Phase 2)
PROPOSED OFFICE FIT-OUT PROJECT
(December 15, 2013 February 15, 2014)
Project Cost : P 4,141,235.73
($ 94,118.99 )
Location : 14F B3 SSHG Building, Paseo de Roxas, Makati City
Design By : Team Asterisk
Contact Person : BJ Paromog
Area : 832 Sqm.
ARVATO CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(October 1, 2013 January 20, 2014 )
Project Cost : P 43,396,915.68
($ 986,293.53)
Location : 5F SM City Clark, BPO Building 4 M.A. Roxas Avenue, Angeles City
Design By : Team Asterisk
Contact Person : Mr. Norbito Trinidad
Area : 2,900 Sqm.
ECOTECHLAND, INC.
PROPOSED OFFICE FIT-OUT PROJECT
(July 1 August 30, 2013)
Project Cost : P 2,800,000.00
($ 64,293.91)
Location : 2305 Chino Roces Avenue, Extension, Makati City
Design By : Superprime Holdings, Inc.
Contact Person : Mr. Ramon Tiu
Area : 1,000 Sqm.
ECO TOWER
PROPOSED OFFICE FIT-OUT PROJECT
(February June 30, 2013)
Project Cost : P 24,700,000.00
($ 602,439.00)
Location : Lot 5 Blk. 2, 32nd St., cor. 9th Ave., Fort Bonifacio, Global City, Taguig City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Bob Sanchez
Area : 4,250 Sqm
STEEL ASIA
PROPOSED OFFICE FIT-OUT PROJECT
(April 18 May 30, 2013)
Project Cost : P 1,774,886.40
($ 43,289.91)
Location : 2F, B2 Bonifacio High Street, the Fort, Taguig City
Design By : Engr. Lyra Santos
Contact Person : Ms. Tina Y. Yu
Area : 130 Sqm
WIDUS TOWER 2
PROPOSED FIVE (5) STOREY BUILDING
(December 2012 April 26, 2013 )
Project Cost : P 46,000,000.00
($ 1,121,951.22 )
Location : M.A. Roxas Avenue, Freeport Zone, Clark, Pampanga
Design By : RMDA
Contact Person : Mr. James Leido (JCL)
Area : 6,000 Sqm.
PLATFORM 3 INC.
PROPOSED OFFICE FIT-OUT PROJECT
(December 2012 - January 2013 )
Project Cost : P 2,477,867.50
($ 60,435.79)
Location : Unit 7, 21st Floor Zuellig Building, Makati City
Design By : Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 188.55Sqm.
WIDUS RESTAURANT
PROPOSED RESTAURANT
(September December 2012)
Project Cost : P 9,300,000.00
($ 226,829.00)
Location : M.A. RoxasAvc., Freeport Zone, Clark, Pampanga
Design By : RMDA Architects
Contact Person : Mr. James Leido
Area : 6000 Sqm.
ORACLE PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
( July 13 - September, 2012 )
Project Cost : P3,450,000.00
($ 82,142.86)
Location : 15F Net Square Center, Bonifacio Global City, Taguig City
Design By : Work Architecture
Contact Person : Mr. Joseph Infante
Area : 600 Sqm.
ANZ GLOBAL SERVICES AND OPERATIONS (MANILA), INC.
PROPOSED OFFICE FIT-OUT PROJECT
(June 07 July, 2012)
Project Cost : P 24,483,830.60
($ 569,391.31 )
Location : 27F MDC100 Building, E. Rodriguez Ave. cor. Eastwood Ave. Libis Q.C.
Design By : Ms. Karen Palma
Contact Person : Adrianse Group Philippines, Inc.
Area : 1,715 Sqm.
STEEL ASIA
PROPOSED OFFICE FIT-OUT PROJECT
(April November, 2012)
Project Cost : P 3,652,812.80
($ 84,949.13)
Location : 2F B2 Bonifacio High St., The Fort, Taguig City
Design By : AnD Design Associates
Contact Person : Ms. Tina Yu
Area : 320 Sqm.
TRANSCOM
PROPOSED OFFICE FIT-OUT PROJECT
(May 2012 July 2012)
Project Cost : P 19,500,000.00
($ 453,488.37 )
Location : Transcom City Lopes South Square Bldg. 4, Brgy. Tangub, Bacolod City
Design By : Mr. Nigel Gayares
Contact Person : Vanguard Interiors Pte. Ltd.
Area : 2,400 Sqm.
PMFTC INC.
PROPOSED OFFICE FIT-OUT PROJECT
(May December 2011)
Project Cost : P83,540,000.00
($1,898,636.40 )
Location : Champaca St., Fortune Ave. Brgy. Fortune, Marikina City
Design By : Adrian T. Chua & Associates
Contact Person : Mr. Adrian Chua
Area : 7,200 Sqm.
ANZ MDC100
PROPOSED OFFICE FIT-OUT PROJECT
(October December 2011)
Project Cost : P 52,196,920.00
($ 1,213,881.00 )
Location : Level 12 Solaris One Bldg., 130 Dela Rosa St., Makati City
Design By : Adrianse Group
Contact Person : Ms. Karen Palma
Area : 4,500 Sqm.
YAHOO! PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
(MARCH 01 31, 2011 )
Project Cost : P16,148,000.00
($367,000.00)
Location : 20F Accralaw Tower, Bonifacio Global City, Taguig City
Design By : Goudie Associates
Contact Person : Arch. Fernando Del Rosario
Area : 560 Sqm.
QUINTILES
PROPOSED OFFICE FIT-OUT PROJECT
(March May 2011 )
Project Cost : P6,500,000.00
($147,727.00)
Location : 41st Floor Union Bank Bldg. Meralco Ave., Pasig City
Design By : ADD+ Consortium
Contact Person : Mr. Art Corbito
Area : 700 Sqm.
PRU-LIFE UK
PROPOSED OFFICE FIT-OUT PROJECT
(January February 2011)
Project Cost : P2,575,497.14
($58,534.00 )
Location : GF Marajo Tower, Fort Bonifacio Global City, Taguig City
Design By : ADD+Consortium
Contact Person : Mr. Art Corbito
Area : 70 Sqm.
BRITISH EMBASSY
PROPOSED OFFICE FIT-OUT PROJECT
(February April 2011 )
Project Cost : P2,568,410.00
($58,373.00)
Location : 120 Upper Mckinley Hills, Taguig City, Philippines
Design By : The Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 300 Sqm.
VISTA PHARMA
PROPOSED OFFICE FIT-OUT PROJECT
(March April 2011)
Project Cost : P3,500,000.00
($79,546.00)
Location : Unit 1206 One Global Place Bldg. 5th Ave., cor. 25th St., BGC Bldg. Taguig
Design By : Rchitects Inc.
Contact Person : Ms. Angelita Lim
Area : 120 Sqm.
ANCHORLAND SHOWROOM
PROPOSED OFFICE FIT-OUT PROJECT
(October 2010 February 2011)
Project Cost : P 15,000,000.00
($ 348,837.21 )
Location : Salazar St., Binondo, Manila
Design By : AnD Associates
Area : 700 Sqm.
CHEVRON 42
PROPOSED OFFICE FIT-OUT PROJECT
(September - December 2010)
Project Cost : P 33,203,059
($ 772,164.16 )
Location : 42F Yuchengco Tower, RCBC Plaza, Makati City
Design By : Syndicated Architects
Contact Person : Cesar Rizaldy V. de los Reyes
Area : 2,300 Sqm.
CHEVRON EXPANSION
PROPOSED OFFICE FIT-OUT PROJECT
(September 2010 June 2011)
Project Cost : P 12,768,000.00
($ 296,930.23 )
Location : 5F, 23F, 32F & 39 Yuchengco Tower, RCBC Plaza, Makati City
Design By : Syndicated Architects
Contact Person : Cesar Rizaldy V. de los Reyes
Area : 20,700 Sqm.
GREENCROSS INCORPORATED
PROPOSED OFFICE FIT-OUT PROJECT
(August - December 2010)
Project Cost : P 10,000,000.00
($ 232,558.14 )
Location : 16F & 17F Common Goal Tower, Ayala Alabang, Muntinlupa City
Design By : Goudie Associates
Contact Person : Arch. Joey Jiminez
Area : 750 Sqm.
SMARTMATIC
PROPOSED OFFICE FIT-OUT PROJECT
(October December 2010)
Project Cost : P 3,750,000.00
($ 87,209.30 )
Location : 16F Ascendas Tower, 2nd Ave. cor. 30th St., Bonifacio Global City, Taguig City
Design By : ADD + Consortium
Contact Person : Mr. Art Corbito
Area : 450 Sqm.
NCO
PROPOSED OFFICE FIT-OUT PROJECT
(March - May 2010)
Project Cost : P 8,102,180.00
($176,134.35)
Location : 2F Bldg. 2, Berthaphil 3, Clark Economic Zone, Pampanga
Design By : Goudie Associates / JCL International
Contact Person : Mr. James Leido
Area : 1,260 Sqm.
ALABANG RESIDENCE
PROPOSED OFFICE FIT-OUT PROJECT
(August 2009 July 2010 )
Project Cost : P 27,000,000.00
($600,000.00 )
Location : San Bartolome St, Ayala Alabang, Muntinlupa City
Design By : Isla + Isaac
Contact Person : Arch. Dezzie Isla
Area : 1,600 Sqm.
LEGISPRO CORPORATION
PROPOSED OFFICE FIT-OUT PROJECT
(March - June 2009)
Project Cost : P 10,342,378.00
($224,843.30)
Location : 4th Floor One E-Com Center Harbor Drive cor. Sunset Ave., Pasay City
Design By : Team Asterisk
Contact Person : Arch. AeroinDayo
Area : 555 Sqm.
ENDERUN COLLEGES
PROPOSED OFFICE FIT-OUT PROJECT
(January March 2009 )
Project Cost : P 6,700,000.00
($ 128,846.00)
Location : Mckinley Hills, Fort Bonifacio, Taguig City
Design By : LC Studio Design
Contact Person : Mr. Fernan Amor
Area : 2,000 Sqm
PFIZER PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
(January March 2009)
Project Cost : P 1,500,000.00
($28,846.00)
Location : 24F Ayala GFU Center, Ayala Ave., Makati City
Design By : Ms. Belle Barredo
Contact Person : Ms. Con Barcala
Area : 120 Sqm.
LIST OF COMPLETED PROJECTS 2008
SPANISH EMBASSY - MANILA
PROPOSED OFFICE FIT-OUT PROJECT
(July September 2008)
Project Cost : P 18,080,000.00
($ 347,692.00)
Location : Level 27, PCI Tower, Paseo de Roxas, Makati City
Design By : Add + Consortium
Contact Person : Engr. Art Corbito
Area : 1,200 Sqm.
FAIRWAYS TOWER
PROPOSED OFFICE FIT-OUT PROJECT
(February - April 2008 On-going)
Project Cost : P 19,442,834.84
($ 468,389.17)
Location : G/F & 29th Floors Fairways Tower, Mckinley Road, cor. Fort Bonifacio
Global City, Taguig City
Design By : Periquet Galicia, Inc.
Contact Person : Arch. Paul Ricafort, Arch. Mendell Martinez
Area : 1,000 Sqm.
ENDERUN COLLEGES
PROPOSED OFFICE FIT-OUT PROJECT
(February - April 2008)
Project Cost : P 60,000,000.00
($ 1,153,846.00)
Location : Mckinley Hills, Fort Bonifacio, Taguig City
Design By : DB & B
Contact Person : Mr. Fernan Amor
Area : 2,000 Sqm.
LUNDBECK PHILIPPINES
PROPOSED OFFICE FIT-OUT PROJECT
(May July 2007)
Project Cost : P 3,300,000.00
($ 80,487.80)
Location : 6th Floor Electra House Blg., Esteban St., Makati City
Design By : Team Asterisk
Contact Person : Mr. AeroinDayo
Area : 195 Sqm.
ING BANK
PROPOSED OFFICE FIT-OUT PROJECT
(May November 2007)
Project Cost : P 36,800,000.00
($ 45,600.00)
Location : 20th, 21st& 22nd Floors, Ayala Triangle Tower 1, Makati City
Design By : Goudie Associates
Contact Person : Ms. Mary Ann Chee
Area : 3,600 Sqm.
CITISEC-ONLINE.COM
PROPOSED OFFICE FIT-OUT PROJECT
(October December 2007)
Project Cost : P 5,500,000.00
($127,906.97)
Location : 24F Tektite East Tower, Ortigas Center, Pasig City
Design By : Ms. ValenAng
Contact Person : Ms. Kathy Ong
Area : 600 Sqm
ETIHAD AIRWAYS
PROPOSED OFFICE FIT-OUT PROJECT
(October November 2007)
Project Cost : P 5,640,000.00
($131,162.79)
Location : 22F The Enterprise Center Tower 1, 6766 Ayala Avenue, Makati City
Design By : Binswanger, Phils.
Contact Person : Mr. Keith Elliot
Area : 367.80 Sqm
CEO SUITES
PROPOSED OFFICE FIT-OUT PROJECT
(April May, 2007)
Project Cost : P 7,800,000.00
($ 151,664.93)
Location : 37F Penthouse Level LKG Bldg., Ayala Ave., Makati City, Philippines
Design By : DB&BContact Person: Ms. Gina R. Gomez
Area : 1,500 Sqm.
ASTEC POWER
PROPOSED OFFICE FIT-OUT PROJECT
(January 29 March 16, 2007)
Project Cost : P 24,000,000.00
($ 502,617.81)
Location : 10th,11th, & 12th Floors 1800 Eastwood Ave. Bldg., Eastwood City, Libis Q.C.
Design By : Goudie Associates
Contact Person : Mr. Gary Guiang
Area : 1,800 Sqm.
MILLWARD BROWN
PROPOSED OFFICE FIT-OUT PROJECT
(February 2006 On-going)
Project Cost : P 2,967,000.00
($ 58,176.47)
Location : 8F Equitable Bank Tower, Paseo de Roxas, Makati City
Design By : Innovation
Contact Person : Mr. Allan Red
Area : 290 Sqm.
AMBERGRIS SOLUTIONS
PROPOSED FIT-OUT WORKS (30TH FLOOR)
(April May 2004)
Project Cost : 9,100,000.00
($ 165,545.55)
Location : 30th Floor, Raffles Corporate Center
Design By : Asterisk, Inc.
Contact Person : Mr. Fernando Amor
Area : 1,200 Sqm.
AMBERGRIS SOLUTIONS
PROPOSED FIT-OUT WORKS (7TH& 18TH FLOORS)
7th Floor
(January February 2004)
Project Cost : P 12,060,677.41
($ 219,285.04)
Area : 1,200 Sqm.
18th Floor
(October December 2003)
Project Cost : 10,615,992.80
($ 193,018.05)
Area : 1,200 Sqm.
Location : 7th& 18th Floor, Raffles Corporate Center
Design By : Asterisk, Inc.
Contact Person : Mr. Fernando Amor
TIM MAKATI
PROPOSED TIM MAKATI OFFICE
(March - April 2005)
Project Cost : P 6,400,000.00
($ 116,363.64)
Location : 5th Floor Kings Court II Bldg., Pasong Tamo, Makati City
Contact Person : Arch. Leonardo G. Sioco Jr.
Area : 693 Sqm.
LIST OF COMPLETED PROJECTS 2004
APAC
PROPOSED FIT-OUT WORKS
(December 2003 January 2004)
Project Cost : P 7,775,000.00
($ 141,363.63)
Location : 3F Bldg. C Northgate Cyberzone, Filinvest Corporate City, Alabang
Design By : Del Rosario Design Group
Contact Person : Arch. Allan Joseph Lim
Area : 1,000 Sqm.
ON DEMAND SOLUTIONS
PROPOSED FIT-OUT WORKS
(July October 2004)
Project Cost : P 4,500,000.00
($ 81,818.18)
Location : 17/F B.A. Lepanto Bldg. 8747 Paseo de Roxas, Makati City
Design By : Binswanger Phils., Inc.
Contact Person : Mr. Jin Pischer
Area : 1,200 Sqm.
ISS INC.
PROPOSED OFFICE FIT-OUT
(may june 2004)
Project Cost : P 2,050,000.00
($ 37,272.72)
Location : 15th Floor Philamlife Tower, Paseo de Roxas, Makati City
Design By : Goudie Associates
Contact Person : Mr. Tom Tuazon
Area : 100 Sqm.
PFIZER
PROPOSED PFIZER FIT-OUT WORKS
(June 30 August 2003)
Project Cost : P 25,839,262.61
Location : 32nd Floor Ayala Life-FGU Center, Ayala Avenue, Makati City
Design By : HBO+EMTB
Contact Person : Ms. Belle Custodio
Area : 956 Sqm.
ANZ BANK
PROPOSED FIT-OUT WORKS
(June August 2003)
Project Cost : P 7,383,000.00
Location : 23rd Floor, GT Tower, Ayala Avenue, Makati City
Design By : HBO + EMTB
Contact Person : Mr. Kim Chan
Area : 1,200 Sqm.
WORLD BANK
PROPOSED WORLD BANK OFFICE EXPANSION
(May - July 2003)
Project Cost : P 6,500,000.00
Location : 20th Floor Taipan Building, Ortigas Center, Pasig City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Leonardo G. Sioco
Area : 400 Sq.m
SPL OFFICE
PROPOSED FIT-OUT WORKS
(February March 2003)
Project Cost : P 3,676,235.00
Location : 23/F Yuchengco Tower, RCBC Plaza, Ayala Avenue, Makati City
Project Manager : Mr. Brian Parsons
Ms. Mandy Benosa
Area : 465 Sq.m
LUNDBECK MANILA
PROPOSED FIT-OUT WORKS
(March April 2003)
Project Cost : P 900,900.00
Location : 3/F Ace Building Rada St., cor. Dela Rosa St., Makati City
Design By : Innovation HK
Contact Person : Mr. John Scade
Area : 98 Sq.m
LIST OF COMPLETED PROJECTS 2002
MARSMAN DRYSDALE
PROPOSED FIT-OUT WORKS
(September November 2002)
Project Cost : P 8,000,000.00
Location : 45 Level Philamlife Tower, Paseo de Roxas, Makati City
Design By : ADD + Consortium, Inc.
Contact Person : Arch. Bong Libo
FIRMENICH
PROPOSED FIT-OUT WORKS
(March April 2002)
Project Cost : P 2,640,000.00
Location : 2/F UPRC III Pasong Tamo Extension, Makati City
Design By : Davenport Campbell, Inc.
Contact Person : Ms. Belle Costudio
Area : 500 Sqm.
LINK2SUPPORT, INC.
PROPOSED FIT-OUT WORKS
(March May 2002)
Project Cost : P 10,000,000.00
Location : 5/F Techno Plaza One, Eastwood City, Libis, Quezon City
Design By : Goudie Associates
Contact Person : Arch. Reynan Cumpas
Area : 1,300 Sqm.
FRASER PLACE
PROPOSED FIT-OUT WORKS
(March April 2002)
Project Cost : P 3,924,050.85
Location : The Forbes Tower, Valero Street, Makati City
Design By : Tema International
Contact Person : Arch. Ruby Socorro O. Bucoy-Soh
Area : 750 Sqm.
HERBALIFE
PROPOSED FIT-OUT WORKS
(March May 2002)
Project Cost : P 5,950,000.00
Location : G/F Royal Match Building, 6780 Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Leonardo G. Sioco
Area : 500 Sqm.
LIST OF COMPLETED PROJECT 2001
THOMSON FINANCIAL
PROPOSED FIT-OUT WORKS
(October November 2001)
Project Cost : P 6,821,600.00
Location : 17th Floor Ayala Life FGU Bldg., Ayala Avenue, Makati City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Mr.Freddie Galves (Thomson), Ms. Mina de Leon (SLA)
Area : 500 Sqm.
MR. EDWARD GO
PROPOSED INTERIOR RENOVATION WORK
(June 15 - July 15, 2001)
Project Cost : P 1,616,488.00
Location : Unit 16-A Pacific Plaza Tower South, Fort Bonifacio, Makati City
Design By : New Success Design
Contact Person : Ms. Sylvia Heras Lopez
Area : 250 Sqm
MR.& MRS. BUTCH ALBERT
PROPOSED INTERIOR RENOVATION WORK
(May 25 July 31, 2001)
Project Cost : P 3,260,185.00
Location : Unit 21-B Pacific Plaza Tower South, Fort Bonifacio, Makati City
Design By : New Success Design
Contact Person : Ms. Sylvia Heras Lopez
Area : 250 Sqm
ATLAS RESOURCES
PROPOSED FIT-OUT WORKS
(Nov. 2000 January 2001)
Project Cost : P 6,780,000.00
Location : 19th Floor PCI Equitable Tower, ADB Avenue, Pasig City
Contact Person : Mrs. Janice Sua
Area : 660 Sqm.
PRA SOLUTION
PROPOSED PRA SOLUTION FIT-OUT WORKS
(August October 2000)
Project Cost : P 7,395,000.00
Location : 16th Floor Philamlife Tower, Paseo de Roxas, Makati City
Design By : Davenport Campbell
Contact Person : Ms. Joy Alejandro (DC)
FPD-SAVILLS
PROPOSED FITTING-OUT WORKS
(July October 2000)
Project Cost : P 2,700,000.00
Location : 37/F Philamlife Tower, Paseo de Roxas, Makati City
Design By : Davenport Campbell
Contact Person : Arch. Joy Alejandro (DC), Mr. David Leechiu (FPD)
Area : 310 Sqm.
PBCOM T. ALONZO BRANCH
PROPOSED OFFICE RENOVATION WORKS
(July September 2000)
Project Cost : P 1,550,000.00
Location : T. Alonzo St., cor. Soler St., Sta. Cruz, Manila
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Lamberto G. Mercado
Area : 300 Sqm.
MINDSHARE MANILA
PROPOSED FITTING-OUT WORKS
(February March 2000)
Project Cost : P 7,500,000.00
Location : 17th Floor Philamlife Tower, Paseo de Roxas, Makati City
Design By : BDG McColl
Project Management By : Jones Lang LaSalle (HK)
Contact Person : Mr. Kenneth Chan (JLL HK), Mr. Gene Torcal (Mindshare),
Mr. John Scade (BDG McColl) Area : 440 Sqm.
ABN AMRO SAVINGS BANK 16TH, 17TH, 18TH & 19TH FLOOR
PROPOSED ABN AMRO SAVINGS BANK FIT OUT WORKS
(January 2000 March 2000 )
Project Cost : P 62,186,000.00
Location : LKG Tower 68013 Ayala Avenue, Makati City
Design By : Davenport Campbell
Project Management by : Jones Lang LaSalle (HK)
Contact Person : Ms. Caroline Cruz (Davenport) Mr. Kenneth Chan (JLL HK)
Area : 5,200 Sqm.
AVENTIS PHARMACEUTICALS
PROPOSED OFFICE INTERIOR FITTING OUT WORKS
(February 2000 - March 2000)
Project Cost : P 3,795,000.00
Location : 12/F Orient Square, Emerald Avenue, Ortigas Center, Pasig City
Design By : Group 3 Design
Contact Person : Mr. Manolito Co (Aventis), Arch Jesselyn Gumila (Group 3)
Area : 700 Sqm.
MICROSOFT PHILIPPINES
PROPOSED OFFICE RENOVATION
(July October 1999)
Project Cost : P 3,900,000.00
Location : 22/F Tower 2, The Enterprise Centre, Ayala Ave., Makati City
Design By : Steven J. Leach, Jr. + Associates
Contact Person : Arch. Ricci Uy, (SLA) Miss Borge Gaerlan, (Microsoft)
Area : 1,070 Sqm.
RAYTHEON INTERNATIONAL
PROPOSED OFFICE INTERIOR FIT-OUT WORKS
(September - October 1998)
Project Cost : P 895,500.00
Location : 1404 TOEP Ayala Triangle, Ayala Avenue, Makati City
Contact Person : Ms. Mina de Leon, (SLA)
Design By : Steven J. Leach Jr. + Associates
Area : 74 Sqm.
MABINI MANSION
PROPOSED HOTEL LOBBY & COFFEE SHOP RENOVATION PROJECT
(October 1997 - May 1998)
Project Cost : P 5,500,000.00
Location : No. 1611 A. Mabini Street, Malate, Manila
Design By : Wilma R. Dee
Contact Person : Mr. Marcelo Co
Area : 200 Sq.m. (SLA)
RESIDENTIAL PROJECTS
PETER LIM
PROPOSED FINISHING OF INTERIOR WORKS PROJECT
(August 1996 - July 1998)
Project Cost : P 4,700,000.00
Location : Blk 2 Lot 2 Bautista St., cor. Gajo St., Corinthian Gardens,
Quezon City
Design By : Steven J. Leach Jr. + Associates
Contact Person : Arch. Leopoldo Cruz / Arch. Leonardo Sioco