0% found this document useful (0 votes)
145 views1 page

New Product Development Plan - Iym 21C: Activities Nov. 17 Dec ' 17

This document outlines the planned development timeline for a new product called IYM 21C from November to December 2017. It includes 9 key activities: 1) wheel inspection quality assurance, 2) sample making and valve hole drilling, 3) sample making CNC machining, 4) sample layout and cut section inspection quality assurance, 5) painting, 6) performance testing, 7) paint testing, 8) ICAT testing, and 9) sample submission to N30. The timeline shows the planned dates for each activity compared to the actual completion dates.

Uploaded by

Sumeet Rathee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views1 page

New Product Development Plan - Iym 21C: Activities Nov. 17 Dec ' 17

This document outlines the planned development timeline for a new product called IYM 21C from November to December 2017. It includes 9 key activities: 1) wheel inspection quality assurance, 2) sample making and valve hole drilling, 3) sample making CNC machining, 4) sample layout and cut section inspection quality assurance, 5) painting, 6) performance testing, 7) paint testing, 8) ICAT testing, and 9) sample submission to N30. The timeline shows the planned dates for each activity compared to the actual completion dates.

Uploaded by

Sumeet Rathee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

NEW PRODUCT DEVELOPMENT PLAN - IYM 21C

S. Plan / Nov. 17 Dec ' 17


No. Activities Actual
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10

Casting(Blank) Plan Already in mass production

1 wheel inspection -
QA Actual

Plan
Sample making -
2
Valve Hole Drilling
Actual

Plan
Sample making -
3
CNC Machining
Actual

Sample Layout & Plan


4 cut section
Inspection - QA Actual

Plan
5 Painting
Actual

Plan
Performance
6
Testing
Actual

Plan
7 Paint Testing
Actual

Plan
8 ICAT Testing
Actual

Plan
Sample
9
submission - N30
Actual

PLAN

Legands
ACTUAL