0% found this document useful (0 votes)
456 views8 pages

Access Scaffolding - Leader Fort

The document provides a calculation sheet for the design of an access scaffolding system for a construction project that is 14 meters high. It includes: 1) Code references and design parameters for the scaffolding. 2) Consideration of loads on the scaffolding from self-weight, live loads, and formwork loads. 3) Technical details of the cuplock scaffolding system with waler and aluminum components to be used, along with material properties. 4) Calculations checking that the wooden planks, aluminum secondary beams, waler primary beams, and vertical standards can safely support the expected loads.

Uploaded by

Muhammad Zuhayr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
456 views8 pages

Access Scaffolding - Leader Fort

The document provides a calculation sheet for the design of an access scaffolding system for a construction project that is 14 meters high. It includes: 1) Code references and design parameters for the scaffolding. 2) Consideration of loads on the scaffolding from self-weight, live loads, and formwork loads. 3) Technical details of the cuplock scaffolding system with waler and aluminum components to be used, along with material properties. 4) Calculations checking that the wooden planks, aluminum secondary beams, waler primary beams, and vertical standards can safely support the expected loads.

Uploaded by

Muhammad Zuhayr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

MANAR ALOMRAN

FORMWORK & SCAFFOLDING

CALCULATION SHEET

CUPLOCK SYSTEM
(With Waler and
Aluminum)

DATE : 11/4/2017

SUBJECT : DESIGN CALCULATION FOR THE ACCESS SCAFFOLDING

PROJECT : ACCESS SCAFFOLDING FOR 14M

CONTRACTOR: LEADERS FORT CONT

STRUCTURAL ELEMENT: ACCESS PLATFORM.

PREPARED BY: Engr. MUHAMMED ZOHAIR

CHECKED BY: Engr. MUHAMMED SHAHID


MANAR ALOMRAN ENGINEERING
DEPARTMENT
FORMWORK & SCAFFOLDING

C A L C U L A T I O N S H E E T 11/4/2017

PROJECT : ACCESS SCAFFOLDING FOR 14M CLIENT : LEADER FORT CONT

Table of contents:

1) Codes References and Design Parameters

2) Loads Consideration

3) Relevant Standards, Material and Technical data

4) Checking Scaffolding Components

Page 2 of 8
MANAR ALOMRAN ENGINEERING
DEPARTMENT
FORMWORK & SCAFFOLDING

C A L C U L A T I O N S H E E T 11/4/2017

PROJECT : ACCESS SCAFFOLDING FOR 14M CLIENT : LEADER FORT CONT

1) Code Reference

BS 5975:1996 -Code of practice for false work

BS 5268-2:1991 -Structural use of timber

2) Load Consideration
Dead Load : self-weight of slab
Live Load : 1.5 kN/
Formwork Load : 0.5 KN/ as per BS 5975

Page 3 of 8
MANAR ALOMRAN ENGINEERING
DEPARTMENT
FORMWORK & SCAFFOLDING

C A L C U L A T I O N S H E E T 11/4/2017

PROJECT : ACCESS SCAFFOLDING FOR 14M CLIENT : LEADER FORT CONT

3) TECHNICAL DETAILS:

System Used: Cup lock with waler and Aluminum

Load Intensity : 25 KN/M2

Maximum Grid Size Adopted : 1.2x1.6m

MATERIAL TECHNICAL DATA:

Wooden plank:
Weight of Board (38mm Thick) = 6.00Kg/m or 0.25KN/M2
Allowable Bending Moment = 0.48 KN-m

Aluminum Beam:
Allowable Bending Moment = 8.75 KN-m
Allowable Shear Force = 45.11 K

Vertical Standard:
Safe working Load = 35KN

Page 4 of 8
MANAR ALOMRAN ENGINEERING
DEPARTMENT
FORMWORK & SCAFFOLDING

C A L C U L A T I O N S H E E T 11/4/2017

PROJECT : ACCESS SCAFFOLDING FOR 14M CLIENT : LEADER FORT CONT

1) Wooden plank :

DESIGN OF PLYWOOD SHEATING:

Width of wooden plank = 0.2 m

Span of wooden plank (B/w Secondary beam) = 0.2m

Loading Intensity 0.225 KN/M run:

Load intensity = 25 x 0.225 (width of strip) = 2.5KN/M

Live Load = 1.50 x 0.10 = 0.15KN/M

Wt of wooden plank = 0.25 x0.225 = 0.05 KN/M

Total load =2.7 KN/M


Check for planks:
Self-weight of plank = .25 kN/m2

Live load = 1.5 kN/m2

Load on plank W = (W * L2)/8

= (2.7 * 0.22)/8

= 0.0135 KN-M

Max allowable BM for 38mm thick plank as per TG 20:08 table 18 =.48 kNm

BM permissible = 0.48 kNm > 0.0135 kNm (Safe)

Page 5 of 8
MANAR ALOMRAN ENGINEERING
DEPARTMENT
FORMWORK & SCAFFOLDING

C A L C U L A T I O N S H E E T 11/4/2017

PROJECT : ACCESS SCAFFOLDING FOR 14M CLIENT : LEADER FORT CONT

4) Checking Scaffolding Components:

Calculation of loading intensity (per M2)

Intensity loading = 25 KN/M2

Weight of the formwork = 0.5 KN/M2

Live Load = 1.5 KN/M2

TOTAL w = 27 KN/M2

2) SECONDARY BEAM (ALUMINIUM) :

UDL on secondary beam W = spacing x w W


= 0.2 x 27
L
= 5.4 KN/M
W = 5.4 KN/M, L=1.0M

. .
Maximum Bending Moment = = = 0.675KNM

0.675<8.75 KNM ------------------------ (SAFE)

. .
Maximum Shear Force = = = 2.7KN

2.7 < 45.11KN ------------------------ (SAFE)

.
Maximum Deflection max = = = 0.21mm

Page 6 of 8
MANAR ALOMRAN ENGINEERING
DEPARTMENT
FORMWORK & SCAFFOLDING

C A L C U L A T I O N S H E E T 11/4/2017

PROJECT : ACCESS SCAFFOLDING FOR 14M CLIENT : LEADER FORT CONT


Allowable deflection = = 2.77 mm

0.21<2.77mm ------------------------ (SAFE)

3) PRIMARY BEAM (WALER):


UDL on Primary beam W = spacing x w W
= 1 x27
= 27 KN/M L

W=27 KN/M, L=1.0M

.
Maximum Bending Moment = = = 3.375KNM

3.375<11 KNM ------------------------ (SAFE)

.
Maximum Shear Force = = = 13.5KN

13.5 < 100KN ------------------------ (SAFE)


Maximum Deflection max = = = 0.4mm


Allowable deflection = = 2.77 mm

0.4< 2.77 mm ------------------------ (SAFE)

Page 7 of 8
MANAR ALOMRAN ENGINEERING
DEPARTMENT
FORMWORK & SCAFFOLDING

C A L C U L A T I O N S H E E T 11/4/2017

PROJECT : ACCESS SCAFFOLDING FOR 14M CLIENT : LEADER FORT CONT

4) Vertical Standard:
Load intensity = 27 KN/M2
Maximum Grid size = 1.0 x 1.0 m
THEREFORE LOAD ON ONE VERTICAL STANDARD = 27 x 1.0 x 1.0
= 27KN
Allowable load on one leg = 35 KN (Standard)

27 < 35KN ------------------------ (SAFE)