Calculation of Inlet Bell Diameter

The document provides calculations to determine the dimensions of a sump used for pumping water. It calculates the inlet bell diameter as 1.95 meters. It then determines various clearance dimensions for the sump floor, walls, pump bay, submergence, and straight length based on percentages of the inlet diameter. The diameter of the pressure main is calculated as 3.15 meters to accommodate the total discharge flow of 18.92 cubic meters per second.

Uploaded by

Vardhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
479 views6 pages

Calculation of Inlet Bell Diameter

The document provides calculations to determine the dimensions of a sump used for pumping water. It calculates the inlet bell diameter as 1.95 meters. It then determines various clearance dimensions for the sump floor, walls, pump bay, submergence, and straight length based on percentages of the inlet diameter. The diameter of the pressure main is calculated as 3.15 meters to accommodate the total discharge flow of 18.92 cubic meters per second.

Uploaded by

Vardhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

Calculation of Sump Dimensions:

Design Data:
Total Discharge = 18.920 m3/sec
No. of Pumps = 5
Discharge through each pump = 3.7840 m3/sec

1. Calculation of Inlet Bell Diameter :

Permissible Inlet bell Velocity (V ) = 1.3 m/sec

Q = AxV
* D2
3.7840 = x 1.30
4
Inlet Bell Diametre ( D ) = 1.93 m
or say = 1.95 m

2. Calculation of Sump Dimensions :


a. Floor Clearance = 0.5 * D
= 0.5 x 1.95
= 0.975 m

b. Side Wall Clearance = 0.33 * D to 0. 5 * D


= 0.5 x 1.95
= 0.975 m

c. Back Wall Clearance = 0.25 * D to 0.33 * D


= 0.33 x 1.95
= 0.6435 m

d.Width of Pump Bay = 2.0 * D


= 2.0 x 1.95
= 3.9 m

e. Minimum Submergence = 1.5 * D


= 1.5 x 1.95
= 2.925 m

f. Straight Length = 6.0 * D


= 6.0 x 1.95
= 11.7 m
3. Calculation of Diameter of Pressure main :
Discharge through main = 18.920 m3/sec
Permissilbe velocity = 2.43 m/sec
* D2
18.920 = x 2.43
4
Diameter of Pressure Main ( D ) = 3.15 m
or say 3.150 m

Motor Floor
+ 428.000

Earth Dan

Trash rack

G.L. + 427.000

SECTION

C.L.of Pump
Trash rack
2.00

3.00

PLAN
Design of Pumps :

1. Design Data:
Total Discharge = 18.9200 Cumecs or 668.10 Cusecs
MDDL = + 413.000 m
FTL of dam = + 426.000 m
Delivery level = + 470.000 m
Pump Platform level = + 428.000 m
Sump floor level = + 409.100 m
Length of delivery pipe = 25.00 m or 82.025 feets
No. of Pumps = 6.0 no's
No. of rows of pressure main = 1.0 no.
Dia. of pressure main = 3.150 m or 10.34 feets
Length of pressure main = 12234.00 m or 40139.75 feets
Hazen William's Co-efficient ( C) = 130.00 (Steel Pipe)
Hazen William's Co-efficient ( C) = 130.00 (HDPE Pipe)
Efficiency of pump = 80.0 %
Pump speed = 740.0 rpm

2.Calculations:
Diacharge through Pressure main = 18.9200 Cumecs or 668.103 Cusecs
Diacharge through each pump = 3.1533 Cumecs or 111.351 Cusecs
or ### ussgpm

i. Static Pumping head


Head (H) = 470.000 - 413.000
= 57.000 m or 187.017 feets I

ii. Losses in Delivey pipe and column assembly


a. Delivey pipe dia. and losses
Diameter of delivery pipe (D) = 1.800 m
Area = 2.545 m2
Velocity (V) = 1.239 m/sec
Permissible Velocity = 3.650 m/sec
Hence OK
Losses due to fittings :
i. Due to bell mouth = 0.500 x V2
2g

= 0.500 x 1.239 ^2
2 x 9.81

= 0.039 m ( or ) 0.128 ft

ii. Due to butterfly valve = 0.200 x V2


2g

= 0.200 x 1.239 ^2
2 x 9.81

No's = 1.0

= 0.016 m ( or ) 0.051 ft
iii. Due to 90 deg. bend = 0.900 x V2
2g

= 0.900 x 1.239 ^2
2 x 9.81

= 0.070 m ( or ) 0.231 ft

iv. Due to long radius bend = 0.230 x V2


2g

= 0.230 x 1.239 ^2
2 x 9.81

= 0.018 m ( or ) 0.059 ft

v. Due to friction 1.85


hf = 10.670 x Q xL
D4.87 C
1.85
= 10.670 x 3.1533 x 25.00
1.800 ^4.87 130.00

= 0.016 m ( or ) 0.051 feets

Total loss in delivery pipe = 0.159 m ( or ) 0.521 feets

b. Coumn assembly dia., losses and shaft dia.


Approximate HP required = 62.450 Q x H x 1.3
550.0 x

= 62.450 x 3.1533 x 187.02 x 1.30


550.0 x 0.80

= 108.811 HP
i. Loss in line shaft
Dia. of line shaft = HP x 32100 0.33
7000.0 x Pump speed

= 108.811 x 32100.00 0.33


7000.000 x 740.00

= 0.878 feets

For every 100 feets of line shaft loss is 3.0 feets.


Length of line shaft = 17.925 m or 58.812 feets
100 - 3.000 feets
58.812 - 1.764 feets 0.538 m
ii. Entry loss = 0.500 x V2
2g

= 0.500 x 1.239 ^2
2 x 9.81

= 0.039 m ( or ) 0.128 ft

iii. Strainer loss = 0.110 x V2


2g

= 0.110 x 1.239 ^2
2 x 9.81

= 0.009 m ( or ) 0.028 ft

Total losses = 0.586 m ( or ) 1.921 ft

Total loss in column assembly and delivery pipe upto pressure mains
Total loss = a + b = 0.744 m ( or ) 2.442 ft II
iii. Loss due to friction in pressure main
a) Due to friction
1.85
hf = 10.670 x Q xL
D 4.87
C
1.85
= 10.670 x 18.9200 x 12234.00
3.150 ^4.87 130.00

= 13.819 m ( or ) 45.337 feets

b) Due to bends
Area = 7.793 m2
Velocity (V) = 2.428 m/sec

Bend type No's Loss co-efficient Losses(m)


90 deg. Bends 10 0.085 0.255
45 deg. Bends 10 0.100 0.300
Total 0.556

c) Exit = 1.000 x V2
2g

= 1.000 x 2.428 ^2
2 x 9.81

= 0.300 m ( or ) 0.986 ft
III
Total losses in Pressure main = 14.675 m ( or ) 16.628 ft

Total pumping Head including losses = I + II + III = 72.419 m ( or ) 237.608 ft

Add 10% towards agening of pipes = 7.242 m ( or ) 23.761 ft


Total Puming Head (H) = 79.661 m ( or ) 261.369 ft
Say 79.670 m ( or ) 261.397 ft

HGL at Pump = + 492.670 m (For SAP)

iv. Calculation of Specific Speed


Pump Speed (N) = 740.000 rpm

Specific speed (Ns) = N* Q


H 3/4

In US units = 740.0 x 49981.51


( 261.397 ) 3/4

= 2544.841

In SI units = 740.0 x 3.153 x 3.65


( 79.670 ) 3/4

= 179.862

v. Calculation of HP

HP of each Pump = * Q * H * PF
550 *
where
= Unit weight of water in lb/ft3 62.25
Q = Discharge in cusecs
H = Head in feets
PF = Power factor 1.3

HP = 62.250 x 111.351 x 261.40 x 1.30


550.0 x 0.80

= 5353.321 HP
Add 20% towards cushioning = 1070.664 HP

Total HP Required = 5353.321 + 1070.664


= 6423.985 HP
Say 6423.990 HP
= 4790.369 kW
Say 4790.370 kW