Process Flow Chart Basics
Process Flow Chart Basics
Module 6
FLOWCHART
FLOWCHART 1
Basic Tools for Process Improvement
What is a Flowchart?
A Flowchart is a diagram that uses graphic symbols to depict the nature and flow of
the steps in a process (Viewgraph 1). Another name for this tool is "flow diagram."
! Provide a tool for training employees. Because of the way they visually
lay out the sequence of process steps, Flowcharts can be very helpful in
training employees to perform the process according to standardized
procedures.
2 FLOWCHART
Basic Tools for Process Improvement
What Is a Flowchart?
process.
FLOWCHART VIEWGRAPH 1
FLOWCHART VIEWGRAPH 2
FLOWCHART 3
Basic Tools for Process Improvement
The symbols that are commonly used in Flowcharts (Viewgraph 3) have specific
meanings and are connected by arrows indicating the flow from one step to
another:
Oval. Ovals indicate both the starting point and the ending point of the
process steps.
Macro level. The top leadership may not need the amount of detail required by the
workers in a process. A "big picture," or macro-level, view of the process may be
enough for their purposes. Generally, a macro-level Flowchart has fewer than six
steps. Think of it as a view of the ground from an airplane flying at 30,000 feet.
Mini level. The term "mini" or "midi" is used for a Flowchart that falls between the
big picture of the macro level and the fine detail of the micro level. Typically, it
focuses on only a part of the macro-level Flowchart. Using the airplane analogy,
you see the level of detail as if looking at the ground from 10,000 feet.
Micro level. People trying to improve the way a job is done need a detailed
depiction of process steps. The micro-level, or ground-level, view provides a very
detailed picture of a specific portion of the process by documenting every action
and decision. It is commonly used to chart how a particular task is performed.
4 FLOWCHART
Basic Tools for Process Improvement
Process Step
No
Decision
Yes
Connector
Measurement M
FLOWCHART VIEWGRAPH 3
Levels of Flowcharts
MACRO MINI MICRO
Turn on
Start Start computer
Start word
proc. applic.
Draft Get rough
POD draft of POD
Is
rough in No Type
word proc. rough POD
Type applic.
POD Is it No Get ?
approved approval Yes
?
Edit POD
Distribute
POD Yes
Are
Type there any Yes Make
smooth corrections corrections
End ?
No
End
Print POD
FLOWCHART VIEWGRAPH 4
FLOWCHART 5
Basic Tools for Process Improvement
The label used is not important. What matters is that the people constructing a
Flowchart understand how the information is going to be used and the people
interpreting the chart understand the level of detail it presents.
A word about boundaries. These are the starting and ending points for your
Flowchart. For example, process boundaries for a repair shop overhauling a pump
might be when the pump enters the shop and when it passes final testing. The
boundaries determine the number of activities to be studied and the number of
people involved in the process, functionally and cross-functionally.
At first, many teams struggle with the Flowchart tool. Team members may be unsure
about process boundaries or disagree on the level of detail needed. The first few
drawings quickly become a tangled mess of lines as steps are added, moved, and
reconnected. And most discouraging of all, workers may question the value of the
Flowchart and fail to use it in their daily work.
! Start with the big picture. It is best to draw a macro-level Flowchart first.
After you’ve depicted this big picture of the process, you can develop other
diagrams with increased levels of detail.
6 FLOWCHART
Basic Tools for Process Improvement
Keys to Success
FLOWCHART VIEWGRAPH 5
FLOWCHART 7
Basic Tools for Process Improvement
! Record the process steps you observed. Record the steps as they
actually occur in the process as it is. Write the steps on index cards or post-
itTM notes. You can use a different color to represent each individual or group
involved if that will help you to understand and depict the flow more accurately.
! Arrange the sequence of steps. Now arrange the cards or post-itTM notes
exactly as you observed the steps. Using cards lets you rearrange the steps
without erasing and redrawing and prevents ideas from being discarded simply
because it’s too much work to redraw the diagram.
! Draw the Flowchart. Depict the process exactly as you observed, recorded,
and arranged the sequence of steps.
The viewgraphs that accompany the explanation below show how one process,
Producing the Plan of the Day (POD), might be depicted using each of the three
Flowchart types.
This tool can help identify rework and redundant or unnecessary steps within a
process.
This type of chart shows where the people or groups fit into the process
sequence, and how they relate to one another throughout the process.
8 FLOWCHART
Basic Tools for Process Improvement
Collect Type
inputs smooth
Draft POD
Sign POD
Type rough
Make copies
Retype POD
Submit to XO
Distribute
No
OK ?
Yes End
A
FLOWCHART VIEWGRAPH 6
Collect
input
Type rough
Draft POD
Submit to XO
Make copies
Sign POD
Distribute
FLOWCHART VIEWGRAPH 7
FLOWCHART 9
Basic Tools for Process Improvement
> Value-added steps (VA) are essential for producing the required product
or service. In other words, the output cannot be produced without them.
> Cost-added-only steps (CAO) are not essential for producing the required
product or service. They may be added to a process in anticipation of
something that might go wrong, or because of something that has gone
wrong. For example, end-of-process inspection might be instituted
because of defects, errors, or omissions that occurred in the past. Other
CAO steps may depend on actions in supplier processes—waiting for
approvals or the availability of equipment, for example.
Now let's look at the steps for constructing the three different kinds of Flowcharts.
! Define the process to be flowcharted, and the purpose for flowcharting it.
> Identify the major activities or subprocesses that are included in the
process.
> Determine what is not included in the scope of the process to remove any
doubt or confusion about the boundaries. This may also help establish the
scope of related processes.
! List the steps, activities, and decisions to be charted. If your team is not
sure about a step, mark it to be investigated later.
10 FLOWCHART
Basic Tools for Process Improvement
YN type
YN smooth
type rough
XO
sign POD YN
YN retype
submit rough
to XO
YN copy and
distribute POD
A
FLOWCHART VIEWGRAPH 8
Assemble the
right people
Establish
process boundaries
Are
steps in No
Put steps in sequence
sequence
?
Yes
Review and
label Flowchart
FLOWCHART VIEWGRAPH 9
FLOWCHART 11
Basic Tools for Process Improvement
! List the major steps of the process vertically on the left side of a sheet
of paper.
! List the responsible process workers across the top, each in a separate
column.
! Place each step in the appropriate column under the responsible process
worker's name.
! Connect the steps in the order in which they relate to each other.
Starting with your Linear Flowchart, evaluate each step before placing it in the
Opportunity format.
! Divide your paper into two columns headed Value Added (VA) and Cost
Added Only (CAO).
! List the steps in the process in these columns vertically, all VA steps in
one column and all CAO steps in the other.
12 FLOWCHART
Basic Tools for Process Improvement
Oil &
Shut off engine filter on hand
No ?
Buy oil & filter
Yes
Change oil
& filter
Clean up &
put tools away
FLOWCHART VIEWGRAPH 10
Warm up engine
Yes
Change oil & filter
Clean up
& put tools away
FLOWCHART VIEWGRAPH 11
FLOWCHART 13
Basic Tools for Process Improvement
Below is a sequence of steps that will help you through an orderly analysis of your
Flowchart (Viewgraph 13).
Step 1 - Examine each process step for the following conditions that indicate a
need to improve the process:
! Bottlenecks. These points in the process where it slows down may be caused
by redundant or unnecessary steps, rework, lack of capacity, or other factors.
In the Fire Drill Preparation example depicted in Viewgraph 15, the "Monitors
go to Logroom to get red hats. . ." step indicates a potential bottleneck. The
rework loop identified as connector "B" is one of several in this diagram.
! Weak links. These are steps where problems occur because of inadequate
training of process workers, equipment that needs to be repaired or replaced,
or insufficient technical documentation. "Inform the drill leader and improvise"
is one of the weak links depicted in Viewgraph 15.
! Poorly defined steps. Steps which are not well-defined may be interpreted and
performed in a different way by each person involved, leading to process
variation. "Improvise" is a poorly defined step in the weak link cited above.
! Cost-added-only steps. Such steps add no value to the output of the process
and should be earmarked for elimination. If the Fire Drill Preparation process
in Viewgraph 15 were depicted as an Opportunity Flowchart, "Search the boat
for red hats" would be one of many cost-added-only steps.
Step 2 - Examine each decision symbol. You may want to collect data on how
often there is a "yes" or "no" answer at decision points marked by a diamond-
shaped symbol. If most decisions go one way rather than the other, you may be
able to remove this decision point.
14 FLOWCHART
Basic Tools for Process Improvement
FLOWCHART VIEWGRAPH 12
Interpretation Steps
Step 1 - Examine each process step
Bottlenecks? Weak links? Poorly defined
steps? Cost-added-only steps?
FLOWCHART VIEWGRAPH 13
FLOWCHART 15
Basic Tools for Process Improvement
Step 3 - Examine each rework loop. Processes with numerous checks generate
rework and waste. Examine the activities preceding the rework loop and identify
those that need to be improved. Look for ways to shorten or eliminate the loop.
Step 4 - Examine each activity symbol. Does the step help build a key quality
characteristic into the end product? If not, consider eliminating it. (See the Data
Collection module for a discussion of key quality characteristics.)
> Those developing the Flowchart may have drawn it to represent the
process as they envision it, not as it is.
> People may be reluctant to depict the obviously illogical parts of the
process for fear they will be called upon to explain why they allowed it to be
that way.
> Rework loops are either not seen or not documented because people
assume rework is small and inevitable.
> People drawing the Flowchart truly do not know how the process works.
You need to avoid these pitfalls when developing your Flowchart and take measures
to correct them when they are revealed through Flowchart interpretation.
16 FLOWCHART
Basic Tools for Process Improvement
! Decision points
FLOWCHART 17
Basic Tools for Process Improvement
EXERCISE 1
Flowchart for Cut Grass Process
Spouse says Prepare to cut Put mower away
Cut the grass
“Cut the grass.” the grass
Spouse says
“Cut grass”
Start
lawnmower Does Yes
Open garage lawnmower Wash
need to be Get hose
door mower
washed
Mow the yard ?
No
Pull lawnmower
to driveway
Turn lawnmower Return mower
off to garage
Check gas
and oil
Close garage
door
Need Put in gas
gas or Get gas & oil
and oil
oil from garage
Yes as needed
?
No
FLOWCHART VIEWGRAPH 14
18 FLOWCHART
Basic Tools for Process Improvement
Step 3 - Who should be involved? Discuss who should be on the team that
develops the Flowchart.
Step 4 - What are the process boundaries? Establish the starting and ending
points of the process.
Step 6 - What is the sequence of steps? Determine the order in which process
activities occur.
Step 7 - What symbols should we use and how do we connect them? Assign
the appropriate symbols for the steps and connect them with arrows.
FLOWCHART 19
Basic Tools for Process Improvement
20 FLOWCHART
Basic Tools for Process Improvement
EXERCISE 3
Fire Drill Preparation Flowchart
Complete the
M Put simulation
Drill Brief
Time 1 A Drill monitors on the
test the radios appropriate
First drill gages
Verify initial
in set? No conditions set
Yes
Monitors go to Logroom to get red
hats, radios, and drill props Drill leaders walk
around to ensure Initial No
all monitors are conditions B
Props No Search on station set?
available? Torpedo Room Props?
Yes
Yes No
Yes
Find the CO
FLOWCHART VIEWGRAPH 15
FLOWCHART 21
Basic Tools for Process Improvement
REFERENCES:
1. Brassard, M. (1988). The Memory Jogger, A Pocket Guide of Tools for
Continuous Improvement, pp. 9 - 13. Methuen, MA: GOAL/QPC.
22 FLOWCHART
What Is a Flowchart?
A diagram that uses graphic
symbols to depict the nature
and flow of the steps in a
process.
FLOWCHART VIEWGRAPH 1
Benefits of Using Flowcharts
• Promote process understanding
• Provide tool for training
• Identify problem areas and improvement
opportunities
• Depict customer-supplier relationships
FLOWCHART VIEWGRAPH 2
Symbols Used in Flowcharts
Start / End
Process Step
No
Decision
Yes
Connector
Measurement M
FLOWCHART VIEWGRAPH 3
Levels of Flowcharts
MACRO MINI MICRO
Turn on
Start Start computer
Start word
proc. applic.
Draft Get rough
POD draft of POD
Is
rough in No Type
word proc. rough POD
Type applic.
POD Is it No Get ?
approved approval Yes
?
Edit POD
Distribute
POD Yes
Are
Type there any Yes Make
smooth corrections corrections
End ?
No
End
Print POD
FLOWCHART VIEWGRAPH 4
Keys to Success
• Start with the big picture
• Observe the current process
• Record process steps
• Arrange the sequence of steps
• Draw the Flowchart
FLOWCHART VIEWGRAPH 5
Linear Flowchart Example
Producing the POD
Start A
Collect Type
inputs smooth
Draft POD
Sign POD
Type rough
Make copies
Retype POD
Submit to XO
Distribute
No
OK ?
Yes End
A
FLOWCHART VIEWGRAPH 6
Deployment Flowchart Example
Producing the POD
CMC YN XO
Collect
input
Type rough
Draft POD
Submit to XO
Retype POD No Accept
rough
?
Type smooth Yes
Make copies
Sign POD
Distribute
FLOWCHART VIEWGRAPH 7
Opportunity Flowchart Example
Producing the POD
Value Added Cost Added Only
A
CMC collect
input
POD need Yes
CMC retyped ?
draft input
No
YN type
YN smooth
type rough
XO
sign POD YN
YN retype
submit rough
to XO
YN copy and
distribute POD
A
FLOWCHART VIEWGRAPH 8
Constructing a Linear Flowchart
Define the process
and the purpose
Assemble the
right people
Establish
process boundaries
List steps, activities,
and decisions
Are
steps in No
Put steps in sequence
sequence
?
Yes
Assign Flowchart symbols
Review and
label Flowchart
FLOWCHART VIEWGRAPH 9
Constructing a Deployment Flowchart
Changing Oil
CHUCK NANCY BOB
Decide to Get rags & tools
Warm up engine
change oil
Oil &
Shut off engine filter on hand
No ?
Buy oil & filter
Yes
Change oil
& filter
Clean up &
put tools away
FLOWCHART VIEWGRAPH 10
Constructing an Opportunity Flowchart
Changing Oil
VALUE ADDED COST ADDED ONLY
Decide to change oil
Warm up engine
Shut off engine
Get rags and tools
Oil & filter No
on hand? Buy oil & filter
Yes
Change oil & filter
Clean up
& put tools away
FLOWCHART VIEWGRAPH 11
Interpreting Your Flowchart
• Determine who is involved
• Form theories about root causes
• Identify ways to simplify and refine
• Determine how to implement changes
• Locate cost-added-only steps
• Provide training
FLOWCHART VIEWGRAPH 12
Interpretation Steps
Step 1 - Examine each process step
Bottlenecks? Weak links? Poorly defined
steps? Cost-added-only steps?
Step 2 - Examine each decision symbol
Can this step be eliminated?
Step 3 - Examine each rework loop
Can it be shortened or eliminated?
Step 4 - Examine each activity symbol
Does the step add value for the end-user?
FLOWCHART VIEWGRAPH 13
EXERCISE 1
Flowchart for Cut Grass Process
Spouse says Prepare to cut Put mower away
Cut the grass
“Cut the grass.” the grass
Spouse says
“Cut grass”
Start
lawnmower Does Yes
Open garage lawnmower Wash
need to be Get hose
door mower
washed
Mow the yard ?
No
Pull lawnmower
to driveway
Turn lawnmower Return mower
off to garage
Check gas
and oil
Close garage
door
Need Put in gas
gas or Get gas & oil
and oil
oil from garage
Yes as needed
?
No
FLOWCHART VIEWGRAPH 14
EXERCISE 3
Fire Drill Preparation Flowchart
Complete the
M Put simulation
Drill Brief
Time 1 A Drill monitors on the
test the radios appropriate
First drill gages
Verify initial
in set? No conditions set
Yes
Monitors go to Logroom to get red
hats, radios, and drill props Drill leaders walk
around to ensure
Initial No
all monitors are conditions B
Props No Search on station set?
available? Torpedo Room Props?
Yes
Yes No
Yes
Find the CO
Inform the drill All No Find them
leader and improvise personnel
on station and put them
? on station Obtain CO’s
Yes permission
No Radios
Radios Check with still not
available? Radiomen available Correct
? Spot check safety No
Yes No intervention points
Permission discrepancies
Yes to
initiate? for the CO
Borrow from Yes
Quartermasters Yes
Enough No Search the Discrepancy? Correct it
red hats? boat for Initiate
red hats the drill
No
Yes
B Order initial M
Drill monitors conditions set
take station A Time 2
FLOWCHART VIEWGRAPH 15