0% found this document useful (0 votes)
266 views13 pages

CT Prim Injection

This document records the results of primary injection tests on current transformers (CTs) at a substation. It provides details of the test setup including the CT being tested, the panel terminals used, and the test equipment. Tables show the secondary current readings in milliamps observed at the panel terminals for different primary phase current values and phase relationships injected during the tests. The tests were performed and witnessed by engineers whose signatures are provided.

Uploaded by

karimi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
266 views13 pages

CT Prim Injection

This document records the results of primary injection tests on current transformers (CTs) at a substation. It provides details of the test setup including the CT being tested, the panel terminals used, and the test equipment. Tables show the secondary current readings in milliamps observed at the panel terminals for different primary phase current values and phase relationships injected during the tests. The tests were performed and witnessed by engineers whose signatures are provided.

Uploaded by

karimi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 13

SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 1 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-1 : ( CABLE DIFF. PROTECTION )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : D0 PANEL NO. : R0 PANEL NO. : R0


PHASE CURRENT
CT TERMINALS : X26A CT TERMINALS : X01 TEST SOCKET : TS1
(A)
R Y B N R Y B N R Y B N

2 4 6 7 1 3 5 7 1 3 5 7

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 2 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-1 : ( CABLE DIFF. PROTECTION )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : R0


PHASE CURRENT
FMP - CT TERMINALS
(A)
R Y B N

C3 C6 C9 C14

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 3 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-2 : ( DISTANCE PROTECTION )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : D0 PANEL NO. : R0 PANEL NO. : R0


PHASE CURRENT
CT TERMINALS : X26A CT TERMINALS : X01 TEST SOCKET : TS1
(A)
R Y B N R Y B N R Y B N

19 21 23 24 1 3 5 7 1 3 5 7

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 4 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-2 : ( DISTANCE PROTECTION )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : R0


PHASE CURRENT
SMP - CT TERMINALS
(A)
R Y B N

Q1 Q3 Q5 Q7

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 5 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-3 : ( MEASUREMENT )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : D0 PANEL NO. : D0 PANEL NO. : D0


PHASE CURRENT
CT TERMINALS : X26A CT TERMINALS : WMTD CT TERMINALS : VARTD
(A)
R Y B N R Y B N R Y B N

35 37 39 41 1S 2S 3S X26C:13 1S 2S 3S X26C:13

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 6 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-3 : ( MEASUREMENT )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : D0 PANEL NO. : D0 PANEL NO. : D0


PHASE CURRENT
AMMETER TERMINALS : AM CT TERMINALS : X26A CT TERMINALS: X26C
(A)
R Y B N R Y B N R Y B N

9 11 13 X26C:13 35A 37A 39A X26C:13 1 5 9 13

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 7 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-3 : ( MEASUREMENT )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : D0 PANEL NO. : D0 PANEL NO. : D0


PHASE CURRENT
TEST SOCKET : TS1 BCU TERMINALS : TMU-Q CT TERMINALS: X26C
(A)
R Y B N R Y B N R Y B N

1 5 9 13 15 11 7 3 3 7 11 15

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 8 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-3 : ( MEASUREMENT )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : IFC PANEL NO. : IFC


PHASE CURRENT
CT TERMINALS : X TEST SOCKET : TTS
(A)
R Y B N R Y B N

5 7 9 11 12 16 20 18

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 9 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-4 : ( BUSBAR CHECK ZONE )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : D0 PANEL NO. : R0 PANEL NO. : R0


PHASE CURRENT
CT TERMINALS : X26A CT TERMINALS : X01 TEST SOCKET : TS3
(A)
R Y B N R Y B N R Y B N

61 59 57 56 20 22 24 26 1 3 5 7

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 10 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-4 : ( BUS BAR CHECK ZONE )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : R0


PHASE CURRENT
PU-C - CT TERMINALS
(A)
R Y B N

B3 B6 B9 B11

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 11 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-5 : ( BUSBAR / CBF PROTECTION )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : D0 PANEL NO. : R0 PANEL NO. : R0


PHASE CURRENT
CT TERMINALS : X26A CT TERMINALS : X01 TEST SOCKET : TS2
(A)
R Y B N R Y B N R Y B N

72 70 68 67 11 13 15 17 1 3 5 7

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 12 of 13
Contractor : Contract no.: Substation No :

- PRIMARY INJECTION TEST : CT1-5 : ( BUSBAR / CBF PROTECTION )

SECONDARY CURRENT IN (mA)

PRIMARY PANEL NO. : R0


PHASE CURRENT
PU - CT TERMINALS
(A)
R Y B N

B3 B6 B9 B11

RE
YE
BE
RY
YB
BR

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :


SITE INSPECTION AND TEST RECORD

Commissioning Service Department


Commissioning Standard Test Formats

Description: CT PRIMARY INJECTION TEST Record No. :


Equip. No. Drawing ref.: Sheet : 13 of 13
Contractor : Contract no.: Substation No :

Item Description Checked


1. Inspect for any physical damage or defects.
2. Check nameplate information for correctness.
3. Check tightness of all bolted connections.
4. Check all grounding cables are securely connected.

Shorting & Isolating Facility checked [ ]

Core Identification checked [ ]

Test Plugs Function Checked [ ]

TESTED BY : ENG. WITNESSED BY: ENG.

SIGNATURE & DATE : SIGNATURE & DATE :