Gantt Chart: Activities WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 11 WK 12 WK 13 WK 14

This Gantt chart outlines the key activities and timeline for a research project. It shows that identifying the topic will occur in weeks 4-5, presenting a proposal in week 6, designing the research instrument in weeks 7-8, collecting data in weeks 9-10, analyzing data in weeks 11-12, and drafting the report in weeks 13-14.

Uploaded by

Khairul Nidzam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views1 page

Gantt Chart: Activities WK 4 WK 5 WK 6 WK 7 WK 8 WK 9 WK 10 WK 11 WK 12 WK 13 WK 14

This Gantt chart outlines the key activities and timeline for a research project. It shows that identifying the topic will occur in weeks 4-5, presenting a proposal in week 6, designing the research instrument in weeks 7-8, collecting data in weeks 9-10, analyzing data in weeks 11-12, and drafting the report in weeks 13-14.

Uploaded by

Khairul Nidzam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

GANTT CHART

Activities Wk Wk Wk Wk Wk Wk Wk Wk Wk Wk Wk
10 11 12 13 14
4 5 6 7 8 9

Identifying topic

Preparing and presenting proposal of research

Designing research instrument

Collecting data

Analyzing data

Drafting report