Insulation Inspection Checklist

The document outlines materials and installation requirements for insulation projects. It specifies that materials must be properly stored and undamaged, surfaces must be clean and dry before installation begins, and existing materials must be protected. It also lists several correct installation procedures, including using the proper number of insulation layers, banding, expansion joints, vapor barriers, jackets, overlaps, fasteners, and sealing around penetrations and obstructions.

Uploaded by

Aman Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
538 views1 page

Insulation Inspection Checklist

The document outlines materials and installation requirements for insulation projects. It specifies that materials must be properly stored and undamaged, surfaces must be clean and dry before installation begins, and existing materials must be protected. It also lists several correct installation procedures, including using the proper number of insulation layers, banding, expansion joints, vapor barriers, jackets, overlaps, fasteners, and sealing around penetrations and obstructions.

Uploaded by

Aman Sharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 1

ACTIVITY

MATERIALS
(Insulation, Cladding, Sealant, Fasteners, etc)
Material as per project specification and/or drawings
Materials properly stored
Material free from damage
INSTALLATION
Equipment / Pipe has been released for Insulation
Surfaces are clean and dry
Existing applied materials and end points are properly protected from weather and
damage.
Number of insulation layer correct.
Correct banding space and seal used
Correct use of filler and/or mastic materials
Correct expansion joints installed
Correct application at stiffener rings
Name Plates / Tags left exposed, if appropriate
Vapor barrier installed as required
Correct jacket installed
Correct band spacing and supports used as required.
Correct lapping vertically and horizontally
Joints Staggered (if required) and fit-up
Correct placement of screws/fasteners
Correct use of S slips on vertical runs
Correct overlap of cladding
Penetration & obstructions properly caulked with approved sealant