Mukut Feq 1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 54

Curriculumvitae

M.L.Sharma

PositionintheProject CoPrincipalInvestigator(India)
PersonalData
Name: M.L.Sharma
Born: Dec.09,1962,UttarPradesh,India
Nationality: Indian
Address: DepartmentofEarthquakeEngineering,IITRoorkee,
Roorkee247667,India
Professionalaffiliation: Professor,DepartmentofEarthquakeEngineering
IndianInstituteofTechnologyRoorkee,Roorkee,India
Phonenumber(s): (+91)1332285536(Landline)
(+91)9412075062(Mobile)
(+91)1332276899(Fax)
Email: [email protected]

Education
1992 PhD,inEarthquakeEngineering,UniversityofRoorkee,India
1985 M.Tech.,inAppliedGeophysics,,UniversityofRoorkee,India
1982 BachelorofSciencefromMeerutUniversity,India

EmploymentRecord
since2008 Professor,DepartmentofEarthquakeEngineering,IndianInstituteof
TechnologyRoorkee,India
20042008 AssociateProfessor,DepartmentofEarthquakeEngineering,IndianInstituteof
TechnologyRoorkee,India
19962004 AssistantProfessor,DepartmentofEarthquakeEngineering,IndianInstituteof
TechnologyRoorkee,India
19861996 AssistantProfessor,DepartmentofEarthquakeEngineering,IndianInstituteof
TechnologyRoorkee,India
19851986 ScientistB,DepartmentofEarthquakeEngineeringUniversityofRoorkee,
India

ResearchInterests
EngineeringSeismology,SeismicMicrozonation,SeismicHazardAssessment,StrongGround
MotionPrediction
Languages
Hindimothertongue,Englishfluent.

MembershipinProfessionalAssociations:
Fellow:IndianGeophysicalUnion,Hyderabad
LifeMember:AssociationofExplorationGeophysicists,Hyderabad
OrganizingSecretary:12SEE,13SEE,14SEEandIndoNorwegianWorkshop
Fellow:IndianSocietyofEarthquakeTechnology
Fellow:IGS
ChiefAdvisor:Sports,IITRoorkee(20102011)
ViceChairman:JEE2011and2012,IITRoorkee
Secretary:LocalChapter,IndianSocietyofEarthquakeTechnology
AssociateEditor:ISETJournalofIndianSocietyofEarthquakeTechnology
VicePresident:IndianSocietyofEarthquakeTechnology,Roorkee

AcademicandIndustryActivities(relatedtotheproject)

ResearchProjects

19941995 : Study of Shallow earthquakes in Indian region using Differential SAR


Interferometry,(PI),AICTE,NewDelhi
19951996 : SAR interferometry for mapping land subsidence due to mining in Jharia
CoalField,Jharkhand,(CoPI),DSTNewDelhi
19961998 : Broadband Seismograph Network for Modelling of earthquake source &
uppercrustintheGarhwalKumaonHimalayaregion.(PI),DSTNewDelhi
19971999 : Application of DIFSAR to investigate critical deformation regimes in
GarhwalKumaonHimalayarelatedtoearthquakesandlandslide(PI),DSTNewDelhi
19982001:SeismologicalnetworkaroundTehriregion(CoPI),THDC,Rishikesh
20012004:SeismologicalnetworkaroundTehriregion(CoPI),THDC,Rishikesh
20042006 : Indo Norwegian Program of institutional Corporation on Earthquake
Engineering(CoPI),NORSARNorway
20042007:SeismologicalnetworkaroundTehriregion(CoPI),THDC,Rishikesh
20062011 : Indo Norwegian programme on earthquake engineering (CoPI), NORSAR,
Norway
20092011 : Shear Wave Velocity profiling in NCT, Delhi using MASW technique (PI),
ERECNewDelhi
20102013:EstimationofsiteeffectsandgroundmotioninDelhiandMexicocityusing
strong ground motion data and preparation of near real time shake map (CoPI), DST,
NewDelhi
20112013 : Probabilistic seismic hazard assessment and estimation of strong ground
motionforDelhiregion(PI),EREC,NewDelhi
20112013:Sourcemodelingandgenerationofstrongmotion:AcasestudyofSumatra
earthquakeofDec26,2004(CoPI),DAE,BRNS
20112014:StrongmotionnetworkinNCTregion(CoPI),DSTNewDelhi
20112015 : Indo Norwegian programme on earthquake engineering (CoPI), NORSAR,
Norway

Scientificactivities

AwardedA.S.AryaIITRoorkeeDisasterPreventionAward2012,IITRoorkee

Best paper award for the year 201112, Wadia Institute of Himalayan Geology,
Dehradun
AssociateEditor,ISETJournalofIndianSocietyofEarthquakeTechnology,20092011
Member, International Editorial Review Board, International Journal of Geotechnical
EarthquakeEngineering(IJGEE),DOI:10.4018/IJGEE,ISSN:19478488,EISSN:19478496
Alternate Member, CED39 Earthquake Engineering Sectional Committee, Bureau of
IndianStandard,NewDelhi
Member,Nationalcommitteeonsitespecificdesignearthquakeparameters,CWC,New
Delhi
Member,HPSDMA,Govt.ofHimachalPradesh,DisasterManagementCell,Shimla.
Member,CommitteeonIndiraSagarPolavaramProject,Irrigation&CADDepartment,
Govt.ofAndhraPradesh.
Member,KoynaTremorSubCommittee(KTSC),DamSafetyOrganization,Nashik.
Member,Advisorygroupforpreparationofupgradedearthquakehazardmaps,NDMA,
NewDelhi.
Member,ProjectAdvisoryCommitteeonSeismicityandEarthquakePrecursors,Ministry
ofEarthSciences,NewDelhi.
CoauthoroftheGuidelinesforpreparationandsubmissionofsitespecificseismicstudy
report of river valley project to national committee on seismic design parameters,
CentralWaterCommission,GovernmentofIndia.
Reviewer,manynationalandinternationaljournals

Teachingandguidance
PhDguided
Completed12
R.Kumar,EarthquakeoccurrenceinIndiaanditsuseinseismichazardestimationusing
probabilisticmethods,2007
AnupamTyagi,Understandingthephysicsoftheearthquakesourcesanddevelopment
ofexpertsystemforearthquake,2007
JavedAhemedNaqash,Microzonationofmegacities,2008
NavinPareek,LandslidestudiesinGarhwalHimalayausingremotesensingtechniques,
2008
ShipraMalik,CrustalstructuremodellingofGarhwalHimalayas,2009
GirishC.Joshi,Estimationofuncertaintiesinprobabilisticseismichazardanalysis,2009
AtanuB,Seismicdisplacementtheoryandpractice,2013
AshishHerbendoo,Probabilisticseismichazardanalysis,2013
RanjitDas,ProbabilisticseismichazardanalysisusingGIS,2013
PushpaChaudhary,Stronggroundmotionsynthesis,2014
RakhiBhardwaj,AlgorithmforEarthquakeEarlyWarningSystem,2014
Col.A.K.Srivastava,SeismicmicrozonationofRoorkeecity,2014
Ongoing05
RajeevSachdeva,PredictionofStrongmotionparametersusingANN
Narsihma,Seismicriskassessmentduetoslopefailures
Chavi,SeismicHazardAssessmentusingextremeevents
Neha,PredictionofStrongGroundMotion
ManojKuri,HazardZonationusingSARInterferometry

M.Tech
Completed43
Ongoing03

ProjectSupervision:
Abhishek,IntegratedGeoexplorationoverSolaniKneeband,NWHimalaya
Venu Gopal, Comparison of site specific PGA using neural networks and regression
models
A.Panchal,Determinationofdesigngroundmotionparametersfordisplacementbased
design
MansiKulkarni,SeismicHazardAssessmentusingNonPoissonianModels
JainishKotadia,DevelopmentofspectralattenuationrelationshipforIndianregion
Shiva Kumar, Application of artificial Neural Network for prediction of spectral
accelerationinsitespecific
RavindraGolia,EstimationofcumulativeandconditionalprobabilitiesinHimalayas
AnshulKumar,Seismicmicrozonationofruralareas
Prashant Ambulkar, Development of methodology for insurance tariff against
earthquakes
NameetaTripathi,EstimationofMmaxfromPHSA
MurugavelRaja,AutomaticPhasePickingofSeismicSignalsusingANN
SonalGupta,DemgenerationfromSARinterferometry
A.Ahemad,DevelopmentofAutomaticPhasepickersforearthquakes
A.Bhattacharya,EstimationofstronggroundmotioninHimalayasusingstrongground
motionandSRRdata
J.Niwas,DevelopmentofworldwideGISearthquakebasedsystem
PratimSil,SARinterferrometrystudiesinJhariaCoalfields
G.C.Joshi,Seismichazardanalysisandriskcomputation
K.SambaSRao,SeismicmicrozonationofDelhi
Satendra Saini, Development of attenuation relationship for Himalayan region using
IndianStrongmotionarraydata
S.K.Gupta,Remotesensingapplicationinseismichazardstudies
M.Khan,SeismichazardAnalysisusingGIS
R.G.K.Nath,DevelopmentofAttenuationrelationshipforIndianRegion
VenkataRaju,SeismichazardAnalysisusingArtificialNeuralnetwork
S.Panda,S.Sarkar,Y.S.Kumar,Designofan10storyedbuildinginNEIndiaatlocation
C,Maharashtra
R.G.K.Nath,N.Mishra,SanjayGupta,Designofan10storyedbuildinginNEIndiaat
locationB,Mehghalaya
Amit Sahu, G. C. Mishra, P. V. P. Rao, Design of an 10storyed building in NE India at
locationA,Assam
UmakantSingh,Designofan8storyedreinforcedconcreteofficebuildinginNEIndia
C. R. Gautam, Background noise characteristics of ground using broad band
seismometer
KiranPal,Fabricationofinterfaceunitbetweenseismometerandrecorder
Kh.IbophisakSingh,SeismologicalstudiesanddesignofEarthandRockfilldam
R.Verma,Determinationofcodamagnitudeoflocalearthquakes
AGhosh,NGangwar,ARamaswamy,Automaticearthquakerecognition
PraveshGupta,AlkaVerma,VimalShyam,DesignandFabricationofaninstrumentfor
themeasurementofgroundconductivity

ConferenceOrganised
15thSymposiumonEarthquakeEngineering,2014
14thSymposiumonEarthquakeEngineering,2010
13thSymposiumonEarthquakeEngineering,2006
IndoNorwegianWorkshoponseismichazardandrisk,2006
12thSymposiumonEarthquakeEngineering,2004

Collaboration:
IndoMexicanprojectonsitecharacterizationinNewDelhi,20092011.
IndoNorwegianProjectonseismicRiskAssessment,20062010
Indo Norwegian Programme on Institutional Cooperation on Earthquake Engineering,
20032006
SeismicHazardestimationofKGDVIsite,NGI,Norway
SeismicHazardestimationofKGDIIIsite,NGI,Norway
ConductedUNESCOCourseonSeismologyandSeismicRiskAssessment,Nov04toDec
06,1993;30participantsfrom23countriesandfacultyfrom3countriesparticipated

BooksAuthored:
15thSymposiumonEarthquakeEngineering15SEE,2014,PublishedbyDepartmentof
EarthquakeEngineering,IITRoorkee.
14thSymposiumonEarthquake Engineering14SEE,VolII,2010,6911459,Published
byDepartmentofEarthquakeEngineering,IITRoorkee
S. Gupta, M. K. Arora, M. L. Sharma (2006). Surface displacement studies using
differential SAR interferometry: an overview, Disaster forewarning diagnostic methods
and management, Kogan, Felix; Habib, Shahid ;Hegde, V. S.;Matsuoka, Masashi, SPIE,
ISBN0819465194
13thSymposiumonEarthquakeEngineering13SEE,VolI,2006,pp1616,Publishedby
DepartmentofEarthquakeEngineering,IITRoorkee.
13thSymposiumonEarthquake Engineering13SEE,VolII,2006,6171468,Published
byDepartmentofEarthquakeEngineering,IITRoorkee
12thSymposiumonEarthquakeEngineering12SEE,2004,VolI,pp1713,Publishedby
DepartmentofEarthquakeEngineering,IITRoorkee.
12thSymposiumonEarthquake Engineering12SEE,2004,VolII,7141587,Published
byDepartmentofEarthquakeEngineering,IITRoorkee.
AreportonChamoliEarthquakeofMarch29,1999,2000,PublishedbyDepartmentof
EarthquakeEngineering,UniversityofRoorkee.

Recentpublicationsrelevantfortheproposedproject
1. Das, Ranjit, H, R, Wason and M. L. Sharma (2014) Unbiased estimation of moment
magnitudefrombodyandsurfacewavemagnitude,Bull.Seis.Soc.America,(Accepted).
2. Das,Ranjit,H,R,WasonandM.L.Sharma(2014)ReplytocommentsonGeneralorthogonal
regression relations between body wave and moment magnitudes by Das, Ranjit, H, R,
Wason and M. L. Sharma, by Paolo Gasperini and Barbara Lolli, Seismological Research
letters,Vol.85,No.2,352353(Impactfactor:1.826).
3. Bhattacharya, A., M. K. Arora and M. L. Sharma, M. Voge and R. Bhasin (2014) Surface
displacement estimation using space born SAR interferometry in a small portion along
HimalayanFrontalFault,OpticsandLasersinEngineering,53,164178.
4. Das, Ranjit, H, R, Wason and M. L. Sharma (2014) Reply to Comment on Magnitude
conversion problem using general orthogonal regression, by Paolo Gasperini and Barbara
Lolli,GeophysicalJournalInternational196(1),628631.
5. Bhattacharya, A., Malte Vge, M. K. Arora, M. L. Sharma and R. K. Bhasin (2013), Surface
displacement estimation using multitemporal SAR Interferometry in a seismically active
region of the Himalaya, Georisk: Assessment and Management of Risk for Engineered
SystemsandGeohazards,http://dx.doi.org/10.1080/17499518.2013.798185,Vol7,Issue3,
184197.
6. Pareek, N., S. Pal, M. L. Sharma, and M. K. Arora (2013) Study of effect of seismic
displacements on landslide. susceptibility zonation (LSZ) in Garhwal Himalayan region of
IndiausingGISandremotesensingtechniquesComputers&Geosciences,61,5063.
7. Maheshwari, B. K., M. L. Sharma, Y. Singh and A. Sinhval (2013) Geotechnical aspects of
Sikkim earthquake of September 18, 2011, Indian Geotechnical Journal, AprilJune2013,
43(2),170179.
8. Maheshwari,B.K.A.K.Mahajan,M.L.Sharma,D.K.Paul,A.M.KayniaandConradLindholm
(2013)RelationshipbetweenShearVelocityandSPTResistanceforSandySoilsintheGanga
basin,IntJournalofGeotechnicalEngineering,Vol7,No63,6370.
9. Das, Ranjit,H, R, Wasonand M. L. Sharma (2013) General orthogonal regression relations
betweenbodywaveandmomentmagnitudes,SeismologicalResearchletters,Vol.84,No.
2,219224(Impactfactor:1.826).
10. Sharma,M,L.,A.Sinvhal,Y.SinghandB.K.Maheshwari(2013)"Damagesurveyreportfor
Sikkim earthquake of September 18, 201, Seismological Research Letters, Volume 84,
Number1,4956(Impactfactor:1.826).
11. Pareek, N., M. L. Sharma, M. K. Arora and S. Pal (2013) Inclusion of earthquake strong
groundmotioninaGeographicInformationSystembasedLandslideSusceptibilityZonation
inGarhwalHimalayas,NaturalHazard,65:739765.
12. Joshi,A,P.Kumari,S.SinghandM.L.Sharma(2012)Nearfieldandfarfieldsimulation
of accelerograms of Sikkim earthquake of September 18, 2011 using modified semi
empiricalapproach,NaturalHazards,64:10291054.
13. Bhattacharya,A.,M.K.AroraandM.L.Sharma(2012)Surfacedisplacementmeasurements
along Himalayan frontal fault using differential SAR interferometry, Natural Hazards, 64,
11051123.
14. Joshi,A.,P.Kumari,M.L.Sharma,A.K.Ghosh,M.K.Agrawal,R.Ravikiran(2012)Astrong
motion model of the 2004 great Sumatra earthquake: simulation using a modified semi
empiricalmethod,JournalofEarthquakeandTsunamiVol.6,No.4,12500231125002329.
15. Sharma, M. L. and C. Lindolhm (2012) Earthquake hazard assessment for Dehradun,
Uttarakhand,India,includingacharacteristicearthquakerecurrencemodelfortheHimalaya
FrontalFault(HFF),PureandAppliedGeophysics(PAGEOPH),169,16011617.
16. Herbindu, A., Kamal and M. L. Sharma (2012) Site amplification and frequencydependent
attenuation coefficient at rock sites of Himachal region in NW Himalaya, India, Bull. Seis.
Soc.Am.Vol102,No.4,14971504.
17. Wason, H. R, R. Das, and M. L. Sharma (2012), Magnitude Conversion Problem Using
General Orthogonal Regression, Geophysical Journal International, 190(2), 10911096.
(Impactfactor2.42)
18. Joshi, A., P. Kumari, Sushil Kumar, M. L. Sharma, A. K. Ghosh, M. K. Agrawal, R. Ravikiran
(2012) Estimation of model parameter of Sumatra earthquake using Empirical Greens
Function technique and generation of hypothetical earthquake scenario for Andaman
Island,India,NaturalHazards,Vol62,10811108.
19. Bhattacharya,A.,M.K.AroraandM.L.Sharma(2012)UsefulnessofSARInterferometryfor
DEM Generation and Estimation of Land Surface Displacement in Jharia Coal Field Area,
GeocartoInternational,Volume27,Issue1,February2012,pages5777.
20. Herbindu, A, M. L. Sharma and Kamal (2012) Stochastic groundmotion simulation of two
Himalayanearthquakes:seismichazardassessmentperspectives,JournalofSeismology,Vol
16,345369.
21. Das Ranjit, H, R, Wason and M. L. Sharma (2012), Temporal and spatial variations in the
magnitude of completeness for homogenized moment magnitude catalog for Northeast
India,JournalofEarthSciencesSystem(JESS),121(1),1928.(Impactfactor0.82)
22. DasRanjit,H,R,WasonandM.L.Sharma(2012),Magnitudeconversiontounifiedmoment
magnitude using orthogonal regression relation Journal of Asian Earth Sciences(JAES),
Volume50(2),4451.(Impactfactor2.152)
23. DasRanjit,H.R.WasonandM.L.Sharma(2012),Homoginisationofearthquakecatalogue
forNorthEastIndiaandadjoiningregion,Jour.ofPureandApp.Geophysics(PAGEOPH),V.
169,725731.(Impactfactor1.787)
24. Joshi, A., Pushpa Kumari, and M. L. Sharma (2012) Synthesis of Strong Ground Motion
UsingModifiedSemiEmpiricalTechnique,IACSITInternationalJournalofEngineeringand
Technology,Vol.4,No.4,424426.
25. Tripathi,J.N,P.SinghandM.L.Sharma(2012)VariationofSeismiccodawaveattenuation
in the Garhwal region, north western Himalaya, Jour. of Pure and App. Geophysics
(PAGEOPH),Vol.169,No.12,7188.
26. Paul, A and M. L. Sharma (2011) Recent earthquake swarms in Garhwal Himalaya: a
precursor to moderate to great earthquakes in the region, Journal of Asian Earth
Sciences(JAES),42,11791186
27. Bhattacharya, A., M. K. Arora and M. L. Sharma (2011) Landslides Monitoring using Small
Baseline SAR Interferometry technique, International Journal of Earth Sciences and
Engineering,Volume04,No06SPL,pp309314.
28. Joshi, G. C. and M. L. Sharma(2011) Estimation of Peak Ground Acceleration and Its
Uncertainty for Northern Indian Region, International Journal of Geotechnical Earthquake
Engineering,2(1),119.
29. Joshi, G. C., and M. L. Sharma(2011) Strong Ground Motion Prediction and Uncertainties
EstimationforDelhi,India,NaturalHazard,Vol59,No2,617637.
30. Das,Ranjit,H,R,WasonandM.L.Sharma(2011),Globalregressionrelationsforconversion
of surface wave and body wave magnitudes to Moment Magnitude, Natural Hazards, Vol
59(2),801810.(Impactfactor1.529)
31. Sharma,M.L.andA.Tyagi(2010)CyclicbehaviourofseismogenicsourcesinIndiaanduse
ofANNforitsprediction,NaturalHazard,Vol55,389404.

32. Bhargava,N.,V.K.Katiyar,M.L.SharmaandP.Pradhan(2010)ElectricChargeDeveloped
bySeismicStressonEarthquakeSourcesandItsEffectonAnimals,JournalofInternational
AcademyofPhysicalSciences,Vol14No.2.pp205214

33. DAS.R.,H.R.WasonandM.L.Sharma(2010)Variationsinthemagnitudeofcompleteness
andbvaluefortheIndianHimalayaregionduringthecatalogperiod19642007,Journalof
NepalGeologicalSociety,2010,Vol.41(Sp.Issue)

34. Mahajan, A. K., V. C. Thakur, M. L. Sharma and M. Chauhan (2010) Probabilistic Seismic
HazardMapofNWHimalayaanditsadjoiningarea,India,NaturalHazards,53:443457.

35. Pareek, N., M. L. Sharma and Manoj Aroa (2010) Impact of seismic factors on Landslide
SusceptibilityZonation:AcasestudyinpartofIndianHimalayas,Landslides7,191201

36. Sharma, M. L. J. Douglas, H. Bungum and J. Kotadia (2009) Ground motion predicting
equations on data from the Himalayan and Zagros regions, Jour. Earthquake Engineering,
13:8,11911210.

37. Joshi, G. C. and M. L. Sharma (2008) Uncertainties in estimation of Mmax, Jour. Earth
SciencesSystems,Vol.117,S2,671682.

38. Ahmed A., M. L. Sharma and A. Sharma (2007) Wavelet based Automatic Phase Picking
Algorithmfor3ComponentBroadbandSeismologicalData,J.SeismologyandEarthquake
Engineering,1524.
39. MaheshwariB.K.,SharmaM.L.andNarayanJ.P.(2006),Geotechnicalandstructural
Damages on the Indian Coast due to Tsunami caused by December 26, 2004
SumatraEarthquake,EarthquakeSpectra,Vol22,IssueS3,S475S493.
40. Narayan, J. P., M. L. Sharma and B. K. Mahashwari (2006) Tsunami intensity
mapping along the coast of Tamilnadu (India) during the deadliest Indian Ocean
TsunamiofDecember26,2004,Jour.ofPureandApp.Geophysics,(PAGEOPH),Vol.
163,No.7,12791304.
41. Narayan,J.P.M.L.SharmaandB.K.Maheshwari(2005)Runupandinundationpatterns
developed during the Indian Ocean Tsunami of December 26, 2004 along the coast of
Tamilnadu,India,GondwanaResearch,Vol8,No.4,October2005
42. Narayan, J. P. M. L. Sharma and B. K. Maheshwari (2005) Effects of Medu and Coastal
topographyonthedamagepatternduringtherecentIndianOceanTsunamialongthecoast
ofTamilnadu,ScienceofTsunamiHazard,Vol.23,No.2,918.
43. Sharma.M.L.andM.Arora(2005)PredictionofseismicitycyclesinHimalayasusingANN,
ActaGeophysicaPolonicaVol53,No.3,299309.
44. Ameer, A. S., M. L. Sharma, H. R. Wason and S. A. Alsinawi, (2005) Preliminary seismic
hazard assessment for Iraq using complete earthquake catalogue files, Jour. of Pure and
App.Geophysics(PAGEOPH),Vol.162,951966.
45. Sharma, M. L. and R. Dimri, (2003) Seismic hazard estimation and zonation of northern
Indian region for bed rock ground motion, Journal of Seismology and Earthquake
Engineering,Vol5,No.2,2334
46. Sharma, M. L., H. R. Wason and R. Dimri, (2003) Seismic zonation of Delhi for bed rock
stronggroundmotion,Jour.ofPureandApp.Geophysics,(PAGEOPH)Vol.160,23812398.
47. Sharma,M.L.(2003)SeismichazardinNorthernIndiaregionSeismologicalResearchLetters,
Vol.74,Number2,March/April2003,140146.(Impactfactor:1.826).
48. Narayan, J. P., M. L. Sharma and Ashwani Kumar (2002) A seismological report on the
January26,2001Bhuj,Indiaearthquake,SeismologicalResearchLetters,Vol.73,Number3,
May/June2002,343355.(Impactfactor:1.826).
49. Shanker, D. and M. L. Sharma (1998) Estimation of seismic hazard parameters for the
Himalayasanditsvicinityfromcompletedatafiles,JournalofPureandAppliedGeophysics
(PAGEOPH),Vol.152,No.2,pp267279.
50. Sharma, M. L. (1998) Attenuation relationship for estimation of peak ground horizontal
accelerationusingdatafromstrongmotionarraysinIndia,Bull.Seism.Soc.Am.Vol88,pp
10631069.
51. Sharma, M. L. and H. R. Wason. (1994) Occurrence of low stress drop earthquakes in
GarhwalHimalayaregion,PhysicsoftheEarthandPlanetaryInterior,85,pp265272.

Nationaljournals21published
52. Bhattacharya,A.,M.K.AroraandM.L.Sharma(2013),UsefulnessofAdaptiveFilteringfor
Improved Digital Elevation Model Generation, Journal of the Geological Society of India,
Vol.82,153161.
53. Bhardwaj R, A. Kumar and M. L. Sharma (2013) Inclusion of Qvalue in parameters for
EarthquakeEarlyWarningSystems,DisasterAdvances,Vol6(5),5460.
54. BhardwajR,A.KumarandM.L.Sharma(2013)RootSumofSquaresCumulativeVelocity:
AnAttributeforEarthquakeEarlyWarning,DisasterAdvances,Vol6(3),2431.
55. BhardwajR.,SharmaM.L.andKumarA.(2012),Earthquakemagnitudepredictionforreal
time EEW system: An automization from Pwave time window analysis, Himalayan
Geology,Vol.34(1),2013,pp.8491.
56. Bhattacharya, A., M. K. Arora and M. L. Sharma (2012) Improved Digital Elevation Model
creationusingSARInterferometryinplaneandundulatingterrains,HimalayanGeology,Vol.
33(1),2012,pp.2944.

57. Kumar,R.andM.L.Sharma(2011)Estimationofconditionalprobabilitiesofoccurrenceof
moderate earthquakes in India using nonPoissonian distributions and their implications,
HimalayanGeology,Vol(32(1),8192.

58. Singh S. K. , A. Kumar, G. Suresh, M. Ordaz, J.F. Pacheco, M.L. Sharma, B.K. Bansal, R.S.
Dattatrayam, and E. Reinoso (2010) A study of Delhi earthquake of November 25, 2007
(Mw4.1):Implicationsforseismichazard,CurrentScience,Vol.99,No.7,939947.
59. Sharma,M.L.andR.Kumar(2010),Estimationandimplicationsofconditionalprobabilities
ofoccurrenceofmoderateearthquakesinIndia,Ind.Jour..ScienceandTech.,Vol.3,No.7,
808817.

60. Bhargava, N, V. K. Katiyar, M. L. Sharma and P. Pradhan (2009) Earthquake prediction


through animal behaviour A review, Indian Journal of Biomechanics, March 2009 Issue,
159165.

61. Shambashiva Rao, M. L. Sharma and J. P. Narayan(2006), Scenario of ground motion


amplificationinDelhi,GeologicalSocietyofIndia,Vol.68,9931002.

62. Maheshwari, B.K., M.L. Sharma and J. P. Narayan (2005), Structural Damages on the
Coastline of Tamil Nadu due to Tsunamis caused by December 26, 2004 Sumatra
Earthquake,Jour.IndianSoc.EarthquakeTech.,Vol.42(23),6378.
63. Sharma, M. L. (2005) A new empirical attenuation relationship for peak ground horizontal
acceleration for Himalayan region using Indian and world wide data, Jour. of Geophysics ,
Vol26,No.3,151158.
64. Paul, A., H. R. Wason, M. L. Sharma, C. C. Pant, A. Nirwan and H. B. Tripathi(2004)
Seismotectonic implications of data recorded by DTSN in the Kumaun region of Himalaya,
Jour.Geol.SocietyofIndia,Vol.64,4351.
65. Wason,H.R.,M.L.Sharma,P.K.Khan,K,Kapoor,D.NandiniandV.Kara(2002)Analysisof
initialaftershocksofChamolliearthquakeofMarch29,1999usingbroadbanddata,
HimalayanGeology,Vol.23,No.1&2,pp718.
66. Arora,M,V.K.M.PatelandM.L.Sharma(2002),SARinterferrometryforDEMgeneration,
GISdevelopment,June2002,VolVI,Issue6,2628.
67. Sharma, M. L. and D. Shanker (2001), Estimation of seismic hazard parameters for the
Himalayasanditsvicinityfrommixdatafiles,ISETJournalofEarthquakeTechnologyVol.38,
No.24,93102
68. Arora, M and M. L. Sharma (1998) Seismic hazard analysis An Artificial Neural Network
Approach,CurrentScience,Vol.75,No.1,pp5459
69. Paul,A.,M.L.SharmaandV.N.Singh(1998)EstimationoffocalparametersforUttarkashi
earthquake using peak ground horizontal accelerations, ISET Journal of Earthquake
Technology.,Vol.35,No.13,pp18.
70. Shanker,D.andM.L.Sharma(1997)Statisticalanalysisofcompletenessofseismicitydata
oftheHimalayasanditseffectonearthquakehazarddetermination,Bull.Ind.Soc.Earthq.
Tech.,Vol.34,No.3,pp159170.
71. Sharma, M. L. and H. R. Wason, (1995) Seismic momentmagnitude relationship for the
GarhwalHimalayaRegion,Bull.Ind.Soc.Earthq.Tech.,Vol.32,No.3,pp8595
72. Sharma, M. L. (1992) Sample telemetered digital seismic array in Garhwal Himalaya
Softwareanddatamanagement,HimalayanSeismicityMemoirNo.23,Geo.Soc.ofIndia,
pp6780.


International/NationalConferences/Symposia/Workshop
1. Sharma, M. L. and A. Harbindu (2014), Ground motion prediction in Himalayas using
observedandsimulated datasets,10thNationalConferenceonEarthquake Engineering
(10NCEE),Alaska(accepted)
2. Bhardwaj,R.,M.L.SharmaandAshokKumar(2014),MultiparametersbasedEarthquake
EarlyWarningAlgorithm,10thNationalConferenceonEarthquakeEngineering(10NCEE),
Alaska(accepted)
3. Sharma, M. L. (2014), Developments in earthquake engineering, One day workshop on
Advances in Earth sciences and Earthquake Engineering, April 25th, 2014, CBIT,
Hyderabad.
4. Sharma, M. L. (2014) Effect of deep soil on strong ground motion estimation, One day
workshoponEngineeringoffoundationsforNPPstructuresinalluvialsoils"January24,
2014,NPCIL,Bombay.
5. Sharma, M. L. (2013) Reduction in seismic vulnerability in new buildings and existing
structures in Uttarakahand, Workshop on Sustainable rehabilitation in Uttarakhand in
lightoftherecentdisaster,InstitutionofEngineersIndia,Dehradun,July27,2013.
6. Sharma, M. L. (2013) Seismic hazard in Northern India A review, IndoTaiwanese
workshop on Earthquake Early warning system, Jan 1819, 2013, Prithbhi Bhawan,
MinistryofEarthSciences,NewDelhi.
7. Sharma,M.L.,AshwaniKumar,S.C.Gupta,S.K.Jain,A.K.Jindal(2013)Seismological
telemeteredarrayinGarhwalHimalayaaroundTehridam,IndoTaiwaneseworkshopon
Earthquake Early warning system, Jan 1819, 2013, Prithbhi Bhawan, Ministry of Earth
Sciences,NewDelhi.
8. Das, R., H. R. Wason, and M. L. Sharma (2012) General orthogonal regression in
magnitude conversion for Dehradun and adjoining region, ISET Golden Jubilee
Symposium,Oct2021,2012,Roorkee.
9. Sinvhal,A.,M.L.Sharma,Y.SinghandB.K.Maheshwari(2012)Abriefreportondamage
surveyofSikkimearthquakeofSept18,2011,ISETGoldenJubileeSymposium,Oct2021,
2012,Roorkee.
10. BhardwajR.,SharmaM.L.andKumarA.(2012),PwavetimewindowapproachforEEW
systems,NationalWorkshoponEngineering GeophysicsforCivilEngineeringand Geo
hazards(EGCEG),CSIRCentralBuildingResearchInstitute,Roorkee.
11. Bhardwaj R, A. Kumar and M. L. Sharma (2012) Effect of Medium Characteristics in
Magnitude Estimation for Earthquake early Warning Systems, ISET Golden Jubilee
Symposium,Oct2021,2012,Roorkee.
12. BhardwajR.,KumarA.andSharmaM.L.(2012),AnalysisofTauc(c)andPdattributes
for Earthquake Early warning in India. 15th World Conference on Earthquake
Engineering,Lisbon.Paperno.0696,18.
13. Sharma,M.L.,B.K.Maheshwari,A.SinhvalandYogindraSingh(2012)DamagePattern
duringSikkim,IndiaEarthquakeofSeptember18,2011,15WCEE,15thWorldConference
onEarthquakeEngineering,Lisbon,Purtgal,paper4087,Sept2328,2012.
14. Sharma, M. L., A. Herbindoo and Kamal (2012) Strong Ground Motion Prediction
equationfor NorthwestHimalayanregionbasedonstochasticapproach,15WCEE,15th
World Conference on Earthquake Engineering , Lisbon, Purtgal, paper1378, Sept2328,
2012.
15. Das,R.,H.R.Wason,andM.L.Sharma(2012).Homogenizationofearthquakecatalogin
terms of unified moment magnitude using orthogonal regression relations. 15th World
ConferenceonEarthquakeEngineering,24to28September,2012,Lisbon,Portugal.
16. Srinivasan, C. M. Willey, A. Herbindoo and M. L. Sharma (2012) Strong Ground Motion
PredictionEquationforlowmagnitudeandnearfieldearthquakedataforshieldregion
inIndia,15WCEE,Lisbon,Purtgal,paper1382,Sept2328,2012.
17. Sachdeva,R,A.KumarandSharma,M.L.,(2012)Estimationofpeakgroundacceleration
using artificial neural network approach, 15WCEE, Lisbon, Purtgal, paper1847, Sept23
28,2012.
18. Arora,M.,K.,Bhattacharya,A.,andSharma,M.L.(2012).Applicationofmultitemporal
SARinterferometryinlandslideinvestigation,Geomatrics2012.
19. Sharma,M.L.,Arora,M.K.,andBhattacharya,A.(2012).Convergencerateestimationof
Indianplateusingadvancedremotesensingtechnique,Geometrics2012.
20. BhattacharyaA,AroraMK,SharmaML.(2012)Astudyofsurfacedisplacementestimation
using Differential SAR Interferometry in the Himalayan Region. National Seminar on
Geospatial Solutions for Resource Conservation and Management on 1820 January,
2012.
21. Bhattacharya, A., Arora, M. K., and Sharma, M. L. (2011). Detection of active landslide
areas using Small Baseline subset Interferometry. National Conference on Recent
Advances in Civil engineering, RACE. Varanasi, Oct 1416 ISBN 9788192112107, pp.
336342.
22. Bhattacharya, A., Arora, M. K., and Sharma, M. L. (2011). Landslides monitoring using
Small Baseline SAR Interferometry technique. International Conference on Advances in
Civilengineering.Vijayawara,AP,Oct2123.
23. Joshi, A., Pushpa Kumari, Sharma, M.L., Ghosh, A.K., Agarwal, M.K. and Ravikiran, A.,
(2011)Amodifiedtechniqueforsimulationofgreatearthquake:AcasestudyofSumatra
earthquake,Transactions,SMiRT21,611November,2011,NewDelhi(paperID835).
24. Kumar, A., R. Bhardwaj, H. Mittal and M. L. Sharma (2011),"Earthquake Early Warning
System", Workshop on Disaster Mitigation and Management: Great Honshu, Japan
Earthquake Mw = 9.0 of March 11, 2011, Earthquake, Tsunami, Fire and Nuclear
Radiation,(2627March2011),COE_DMM,Roorkee.
25. Herbindoo,A.,M.L. Sharmaand Kamal(2011),"Strongmotionsynthetics using Greens
functionapproach",WorkshoponDisasterMitigationandManagement:GreatHonshu,
Japan Earthquake Mw = 9.0 of March 11, 2011, Earthquake, Tsunami, Fire and Nuclear
Radiation,(2627March2011),COE_DMM,Roorkee.
26. Bhattacharya,A.,M.AroraandM.L.Sharma(2011),"UseofSyntheticApertureRadarin
Disastermitigation",WorkshoponDisasterMitigationandManagement:GreatHonshu,
Japan Earthquake Mw = 9.0 of March 11, 2011, Earthquake, Tsunami, Fire and Nuclear
Radiation,(2627March2011),COE_DMM,Roorkee.
27. Bhattacharya, A., Arora, M. K., and Sharma, M. L. (2010). Application of SAR
Interferometry for DEM generation: case studies in two regions with varied terrain
conditions.ConferenceinRemoteSensingandGISforEnvironmentalManagement.New
Delhi,August10,116.
28. Singh, Abhishek, Kamal, M.L. Sharma and Sri Niwas (2010) Integrated geoexploration
over Solani kneebend, NW Himalaya, 14 Symp. Earthquake Engineering, Roorkee, Dec
1719,2010,6271
29. Das, Ranjit, H.R. Wason and M.L. Sharma (2010) Regression relations towards unified
moment magnitude earthquake catalogs for NorthEast India Region, 14 Symp.
EarthquakeEngineering,Roorkee,Dec1719,2010,7279
30. Kumar,Ashwani,S.C.Gupta,1M.L.Sharma,A.D.Pandey,A.K.Jindal,SanjayKr.Jain,Arup
Sen, Arun Kumar and Neetu Goswami1 (2010) Attributes of local seismicity of The
GarhwalHimalaya,14Symp.EarthquakeEngineering,Roorkee,Dec1719,2010,9099
31. Sachdeva,Rajiv,AshokKumar,andM.L.Sharma(2010)Predictionofaverageshearwave
velocity of site using strong ground motion records and ANN, 14 Symp. Earthquake
Engineering,Roorkee,Dec1719,2010,126137
32. Harbindu, Ashish, M.L. Sharma, Kamal (2010) Sitespecific ground motion simulation
using stochastic method, 14 Symp. Earthquake Engineering, Roorkee, Dec 1719, 2010,
157166
33. Venugopal, S., Ashok Kumar and M.L. Sharma (2010) Comparison of site specific PGA
using neural networks and regression models, 14 Symp. Earthquake Engineering,
Roorkee,Dec1719,2010,233252
34. Joshi,G.C.andM.L.Sharma(2010)Probabilisticseismic hazardassessmentofDelhi,14
Symp.EarthquakeEngineering,Roorkee,Dec1719,2010,253259
35. Bhardwaj, Rakhi, Ashok Kumar and M.L. Sharma (2010) An algorithm for automatic
detection of primary wave onset for early warning system, 14 Symp. Earthquake
Engineering,Roorkee,Dec1719,2010,373380
36. Bhasin, R., E. Erduran, J.J. GalianaMerino, A.M. Kaynia, D.H. Lang,A.K. Mahajan, B.K.
Maheshwari, A.K. Mundepi, D.K. Paul, M.L. Sharma and Y. Singh (2010) The Indo
NorwegianInstitutionalCooperationonearthquakeriskreduction,14Symp.Earthquake
Engineering,Roorkee,Dec1719,2010,13061322
37. Sharma, M. L. and C. Lindholm (2010) Use of characteristic earthquake recurrence
modelling for Himalaya Frontal Fault (HFF) in estimating the Earthquake hazard
assessment for Dehradun, Uttarakhand, India, 14 Symp. Earthquake Engineering,
Roorkee,Dec1719,2010,13231334
38. Bhargava, N., M. L. Sharma, V. K. Katiyar, and P. Pradhan (2010), Unusual animal
behaviour due to acoustic waves generated by an earthquake, CONAPS XII, 12th
Conference of the International Academy of Physical Sciences, Dec 2224, 2010,
UniversityofRajasthan,Jaipur.
39. Bhargava, N., M. L. Sharma, V. K. Katiyar, and P. Pradhan (2010), Electric Charge
Developed by Seismic Stress on Earthquake Sources and Its Effect on Animals, 11th
Conference of the International Academy of Physical Sciences, February 20 22, 2010,
Allahabad.
40. Sharma,M.L.andC.Lindolhm(2010)Seismologicalissues,IndoNorwegianWorkshopon
Earthquake hazard and risk reduction on the Indian subcontinent towards an
earthquakesafeenvironment,August18,2010,ISC,NewDelhi
41. Das, R., H. R. Wason and M. L. Sharma (2009) Analysis of temporal variation in the
magnitudeofcompletenessanditsuncertaintyforNorthEastIndiaregion,2ndScience
Congress,NewDelhi,Nov35,2009.
42. Das, R., H. R. Wason and M. L. Sharma (2009) Temporal variation in the magnitude of
completeness and its uncertainty for North East India and adjoining region, Civil
Engineering Conference Innovation without limits (CEC2009), Sept 1819, NIT
Hamirpur.
43. Bhargava, N., V. K. Katiyar, M. L. Sharma and P. Pradhan (2009) Earthquake prediction
throughanimalbehavior,NationalConferenceon"Biomechanics"(NCBM2009),March
78,2009,Roorkee
44. Tripathi, JN, P Singh, ML Sharma(2009) Variation of seismic coda attenuation
characteristics in the Garhwal, northwestern Himalayas, IASPEI 2009, 1016 Jan, 2009,
Capetown,SouthAfrica
45. Sharma,M.L.andR.Kumar(2008),Conditionalprobabilitiesofoccurrenceofmoderate
earthquakesinIndianregion,14thWorldConferenceonEarthquakeEngineering,Beijing,
China.
46. Srinivasan,C.,M.L.Sharma,J.KotadiaandY.A.Willy(2008),Peakgroundacceleration
attenuation relationship for low magnitudes at short distances in south Indian region,
14thWorldConferenceonEarthquakeEngineering,Beijing,China.
47. Tripathi, J. N., Priyamvada Singh, M. L. Sharma (2008) Seismic attenuation
characteristics of coda wave in the Garhwal, northwestern Himalayas, D3207, 7th
GeneralAssemblyofAsianSeismologicalCommissionandSeismologicalSocietyofJapan
48. Pareek, N. and M. L. Sharma (2008) Some issues related to Differential Interferometric
SyntheticApertureRadar(DInSAR)techniqueforlandslidestudiesinGarhwalHimalayas,
LANDSLIDE MANAGEMENT Present Scenario & Future Directions, Feb 1012, 2008,
C.B.R.I.,Roorkee.
49. Bhattacharya, A., Pisal, Y., Kumar, A., and Sharma, M.L., (2007), "Development of Site
Specific Response Spectrum for Roorkee Region", Proc. of the International Conference
on Civil Engineering in the New Millennium: Opportunities and Challenges" (CENeM
2007),BESU,Shibpur,Howrah,Vol.I,pp.410416.
50. Ahmed,A.,M.L.SharmaandA.Sharma(2007)AICbasedAutomaticPhasePickingfor
Broadband Seismological Data using Wavelet theory, 8th Pacific Conference on
earthquakeEngineering,Singapore,Dec57,2007
51. Pareek,N.andM.L.Sharma(2007)StudyofdisplacementpatterninGarhwalKumaoun
Himalaya due to Chamolli earthquake of March 29, 1999, 8th Pacific Conference on
earthquakeEngineering,Singapore,Dec57,2007
52. Srinivasan, C., M. L. Sharma and Y. A. Willy (2007) Attenuation Relationship for
Estimation of Peak Ground Horizontal Acceleration of Short Distances for Low
Magnitudes,8thPacificConferenceonearthquakeEngineering,Singapore,Dec57,2007
53. Joshi, G. C. and M. L. Sharma (2006) Magnitude scale conversion relationships for
Northern Indian region using bivariate analysis, 13 Symp. Earthquake Engineering,
Roorkee,Dec1820,2006,307314
54. Mahashwari,B.K.,M.L.SharmaandJ.P.Narayan(2006)Damagetoportsandlifelinesin
TamilnaduduetoIndianoceantsunamiofDecember2004,IndiaDisasterManagement
Congress2006,A1/20.
55. PareekN,M.L.SharmaandM.Arora(2006)DifferentialSARinterferometryforlandslide
studiesAnoverview,UttaranchalScienceCongress,Nov1011,Dehradun,2006
56. Malik,S.,Sharma,M.L.andD.D.Khandelwal(2006)Estimationofspectralstrongground
motionfornortheastIndiausingPSHA,13Symp.EarthquakeEngineering,Roorkee,Dec
1820,2006,137147
57. Kumar,R,B.P.Tyagi,S.P.SharmaandM.L.Sharma(2006)Seismichazardassessmentin
terms of conditional probabilities of occurrence of moderate earthquakes in Indian
regionusingWeibullDistribution,13Symp.EarthquakeEngineering,Roorkee,Dec1820,
2006,326334
58. AhemedA.,M.L.SharmaandAmbalikaSharma(2006),WaveletbasedAutomaticPhase
Picking Algorithm for 3Component Broadband Seismological Data, Workshop on
HimalayanEarthquake:Afreshappraisal,HIMEQ2006,Oct78,2006,Dehradun.
59. Lindholm, C., M. L. Sharma and S. Malik (2006) Seismic hazard estimation in Dehradun
city,FirstEuropeanConferenceonEarthquakeEngineeringandSeismology,Geneva,Sept
38,2006
60. Sharma, M. L. and Shipra Malik (2006) Probabilistic seismic hazard analysis and
estimation of spectral strong ground motion on Bed rock in North East India, 4th Int.
Conf.EarthquakeEngineering,Taipei,Taiwan,Oct1213,2006.
61. Sharma,M.L.andH.Bungum(2006)Newstrongmotionspectralaccelerationrelations
for the Himalayan region, First European Conference on earthquake Engineering and
Seismology,Geneva,Sept38,2006
62. Sharma,M.L.andH.Bungum(2006)Strongmotionattenuationrelationshipforspectral
acceleration for the Himalayan region, Indo Norwegian Workshop on Seismic hazard
andriskAssessment,IHC,NewDelhi,March1718,2006.
63. Sharma,M.L.,Lindholm,C.,S.MalikH.Bungum,A.KayniaandA.Kumar(2006)Seismic
Microzonation of Dehradun city, Indo Norwegian Workshop on Seismic hazard and risk
Assessment,IHC,NewDelhi,March1718,2006.
64. Sharma, M. L., A. Bhattacharya, H. Bungum and Ashok Kumar (2006) Definition of
horizontal component of strong ground motion using Indian region data set, Indo
NorwegianWorkshoponSeismichazardandriskAssessment,IHC,NewDelhi,March17
18,2006
65. Kumar, R, B. P. Tyagi, S. P. Sharma and M. L. Sharma (2006) Estimation of conditional
probabilities for earthquake occurrence in India, Int. Workshop on Electromagnetic
StudiesrelatedtoEarthquakesandVolcanoes,IWEMSEV2006,Agra
66. Tyagi, A., P. P. Pathak and M. L. Sharma (2006) Prediction of seismicity cycles using
Artificial Neural Network, Int. Workshop on Electromagnetic Studies related to
EarthquakesandVolcanoes,IWEMSEV2006,Agra.
67. Maheshwari, B. K., M. L. Sharma and J. P. Narayan (2006) Geotechnical aspects of
damage due to Tsunami from December 26, 2004 Sumatra Earthquake, US National
ConferenceonEarthquakeEngineering,March,2006.
68. S.Gupta,Sajhit,V.K.,M.K.AroraandM.L.Sharma,(2006)Surfacedisplacementstudies
usingdifferentialSARinterferometry:anoverview,Proc.SPIE6412,DisasterForewarning
Diagnostic Methods and Management, 64120N (December 12, 2006);
doi:10.1117/12.693801
69. Ambulkar,PandM.L.Sharma(2005)EarthquakeinsuranceanditsimportancetoIndian
subcontinent,Worldconf.ondisasterreduction,IITBombay,Nov.1618,2005,214222.
70. Sharma, M. L, J. P. Narayan, Shipra Malik and D. D. Khandelwal (2005) Estimation of
sourceparametersusingbroadbandseismometryinGarhwalKumaounHimalaya,India,
IZIIS40,ConferenceonEarthquakeEngineeringin21stCentury,Skopje
71. Sharma,M.L,andShipraMalik,(2005)EstimationofprobabilisticseismichazardinNorth
EastIndia,IZIIS40,ConferenceonEarthquakeEngineeringin21stCentury,Skopje
72. NarayanJ.P.,M.L.SharmaandB.K.Maheshwari,(2005)Estimationofinundationand
runup on Tamilnadu coast in India during December 26, 2004 Sumatra Earthquake,
IZIIS40,ConferenceonEarthquakeEngineeringin21stCentury,Skopje
73. Ameer,A.S.,M.L.Sharma,H.R.Wason,A.Alsinawi(2005)Markovmodelforearthquake
occurrenceasimplicationinPSHAfromrevisedIraqseismicitycatalogueProc.Symp.On
SeismicHazardanalysisandMicrozonation,Sept.2324,Roorkee,167179.
74. Ameer,A.S.,M.L.Sharma,H.R.Wason,A.Alsinawi(2005)Conversionofmagnitudesfor
assessment of recurrence time in revised Iraq seismicity catalogue, Proc. Symp. On
SeismicHazardanalysisandMicrozonation,Sept.2324,Roorkee,201211.
75. Mahashwari,B.K.,M.L.SharmaandJ.P.Narayan(2005)DamagesontheIndiancoast
duetoTsunamicausedbytheSumatraearthquake:Geotechnicalaspects,Proc.Symp.
OnSeismicHazardanalysisandMicrozonation,Sept.2324,Roorkee,421434.
76. Sharma,M.L.J.P.NarayanandB.K.Maheshwari(2005)EffectsoftsunamiontheIndian
coastalregionofTamilNadu,ChapterinreportonSumatraEarthquakeofDecember26,
2004,DepartmentofEarthquakeEngineering,IITR,Roorkee,(unpublished)
77. Javed,A,M.L.SharmaandD.K.Paul(2005)SeismichazardestimationinNorthernmost
regionofIndia,Proc.Symp.OnSeismicHazardanalysisandMicrozonation,Sept.2324,
Roorkee,359367.
78. Ameer,A.S.,M.L.Sharma,H.R.Wason,A.Alsinawi(2005)ComparativePSHAandrisk
evaluationusingAsymptoticExtremeTheory(GIandGIII)andGRformulaforIraq,Gulf
Seismic Forum2005, Seismology and Earthquake Studies in the Eastern Arabian Plate
region,2023Feb,2005,AlAin,UAE
79. Prabu,I,S.Bannerji,A.Maji,M.L.Sharma,J.P.NarayanandD.K.Paul(2004)Application
of GIS and GPS techniques for microzonation of IITRoorkee campus using Nakamuras
H/Vtechnique,7thAnnualESRI,IndiaConference,December23,2004.
80. Ghosh, S. K, J. Niwas and M. L. Sharma (2004) Development of interface for seismicity
data and preliminary seismic hazard assessment, 7th Annual ESRI, India Conference,
December23,2004.
81. SharmaM.L.,andH.R.Wason(2004),Estimationofseismichazardandseismiczonation
at bed rock level for Delhi region, India, 13WCEE, Vancouver, Aug. 1 6, 2004, paper
2043,p113.
82. SharmaM.L.,J.P.NarayanandK.S.Rao(2004),SeismicmicrozonationofDelhiregionin
India,,13WCEE,Vancouver,Aug.16,2004,paper2046,p113.
83. Ameer, A. S., M. L. Sharma, H. R. Wason and S. A. Alsinawi(2004), Seismic hazard
characterizationandriskevaluationusingGumbelsmethodofextremes(g1andg3)and
grformulaforIraq,13WCEE,Vancouver,Aug.16,2004,paper2898,p113.
84. Narayan, J. P. and M. L. Sharma (2004), Effects of local geology on damage severity
duringBhujearthquakeofJanuary26,2001,India,13WCEE,Vancouver,Aug.16,2004,
paper3333,p113.
85. Sharma,M.L.,(2003),Estimationofspectralstronggroundmotionusingstrongmotion
datafromtheHimalayas,HIMPROB_2003,8283.
86. Narayan,J.P.,M.L.SharmaandAshwaniKumar(2003)LocalSiteeffectsobservedduring
Bhujearthquake,WorkshoponBhujEarthquake,IITKanpur,January2729.
87. Ameer, A. S., M. L. Sharma and H. R. Wason (2002) Completeness of earthquake
catalogueanditsimplicationsinearthquakehazardestimationacasestudyforIraq.12
SymposiumonEarthquakeEngineering,Roorkee,Dec.1618,2002,VolI,342349
88. Ameer,A.S.,M.L.SharmaandH.R.Wason(2002)Maximumlikelihoodestimationof
seismic hazard for Iraq from complete data files, 12 Symposium on Earthquake
Engineering,,Roorkee,Dec.1618,2002,VolI,306310.
89. Narayan, J. P., M. L. Sharma and Ashwani Kumar (2002) Damage survey report: Bhuj
earthquake,January26,2001,12SymposiumonEarthquakeEngineering,Roorkee,Dec.
1618,2002,VolII,727736.
90. Saini S., M. L. Sharma and S. Mukhopadhyay (2002) Strong ground motion empirical
attenuationrelationshipforseismichazardestimationinHimalayaregion,12Symposium
onEarthquakeEngineering,Roorkee,Dec.1618,VolI,143150.
91. Sharma,M.L.,M.KhanandM.K.Arora(2002)AGISbasedapproachforseismichazard
assessment, Asian Seismological commission 2002, Symp. On Seismology, earthquake
hazardassessmentandriskmanagement,2426Nov,2002,kathmandu,Nepal,p43
92. Sharma,M.L.andM.Arora(2002)CyclicbehaviorofseismicityintheHimalayasandits
prediction using ANN, Asian Seismological commission 2002, Symp. On Seismology,
earthquake hazard assessment and risk management, 2426 Nov, 2002, kathmandu,
Nepal,p158159.
93. Sharma,M.L.(2002)SeismicMicrozonationofMegacities,IndoChinajointworkshopon
Naturaldisasters,Jan.2123,2002,NewDelhi.
94. Wason, H. R., M. L. Sharma and D. Nandini (2001) Aftershock activity of the Chamoli
earthquake of march 29, 1999 recorded by broadband seismograph stations, Proc.
WorkshoponrecentearthquakesofChamoliandBhuj,May2426,Roorkee,Vol.I,pp29
39.
95. Sharma, M. L. (2001) The Bhuj Earthquake of January 26, 2001 Seismotectonic
Implications, Proc. Workshop on recent earthquakes of Chamoli and Bhuj, May 2426,
Roorkee,VolII,pp353358.
96. Sharma, M. L. (2001) Seismotectonic implications of Chamoli earthquake of March 29,
1999,Proc.WorkshoponrecentearthquakesofChamoliandBhuj,May2426,Roorkee,
VolII,pp359368.
97. Sharma.M.L.,M.AroraandY.V.Raju(2001),SeismichazardanalysisoftheHimalayan
regionusingArtificialNeuralNetwork,InternationalConferenceonSeismicHazardwith
particular reference to Bhuj earthquake of January 26, 2001, New Delhi, Abstract Vol.,
pp.280282.
98. Narayan, J. P., A. Kumar and M. L. Sharma (2001) Seismological aspects of Bhuj
earthquakeofJanuary26,2001,Chapter1,inreportonBhujearthquakeofJan.26,2001,
DepartmentofEarthquakeEngineering,IITRoorkee.
99. Sharma, M. L. and R. G. K. Nath (2001), Attenuation relationship for peak ground
horizontal acceleration for Indian region, International Conference on Seismic Hazard
with particular reference to Bhuj earthquake of January 26, 2001, New Delhi, Abstract
Vol.,pp333335.
100. Narayan,J.P.,M.L.Sharma,A.Kumar(2001)DamagescenarioofBhujearthquake,Jan.
26,2001,NewsLetter,IndianSoc.EarthquakeTech.,AprilOct.,2001,pp2729.
101. Sharma, M. L. (2000) Attenuation relationship for estimation of peak ground vertical
acceleration using data from strong motion arrays in India, 12th World conference on
EarthquakeEngineering,NewZealand,1964/4/A,pp18.
102. Wason,H.R.andSharma,M.L.(2000)Sourceparameterstudiesoflocalearthquakesin
the Garhwal Himalaya region based on the digital broad band data, 12th World
conferenceonEarthquakeEngineering,NewZealand,1776/4/A,pp18.
103. Wason,H.R.,M.L.Sharma,P.K.Khan,KamalKapoor,D.NandiniandV.Kara(2000)A
preliminaryanalysisofbroadbandseismicdataofChamolliearthquakeanditsaftershock
sequence, Lessons learnt from Chamolli earthquake, Abstract Vol. WIHG, Dehradun, pp
37
104. Kumar, A., A. D. Pandey, M. L. Sharma, S. C. Gupta, A. K. Jindal and S. K. Jain (1998)
Pattern of two earthquake swarms in the Garhwal Himalaya, XIth Symposium on
EarthquakeEngineering,Roorkee,pp6774.
105. Wason,H.R.,M.L.Sharma,A.K.GuptaandKamalKapoor(1998)Apreliminaryanalysis
of broad band data in the Garhwal Himalaya region, XIth Symposium on Earthquake
Engineering,Roorkee,pp85100.
106. Shanker,D.andM.L.Sharma(1998)MaximumLikelihoodestimationofseismichazard
parametersintheHimalayaanditsvicinityfrommixeddata,Geosciences98,University
ofKeel,UK,April1418.
107. Shanker, D. and M. L. Sharma (1997) Estimation of seismic hazard parameters for the
North East India and its surrounding region, Proc. Workshop on Earthquake Disaster
Preparedness,Roorkee,Oct1314,1997,pp4958.
108. Shanker, D. and M. L. Sharma (1997) Estimation of seismic hazard parameters for the
Himalayas and its vicinity from complete data files, Workshop, W5 New concepts and
procedures in earthquake hazard estimation, 29th General Assembly of IASPEI,
Thessaloniki,Greece,Aug1828,pp303.
109. Kumar, A., A. D. Pandey, M. L. Sharma, S. C. Gupta, A. K. Jindal and S. K. Jain (1997)
ContemporarylocalseismicityintheGarhwalHimalaya,Proc.WorkshoponEarthquake
DisasterPreparedness,Roorkee,Oct1314,1997,pp3948
110. Sharma, M. L. and P. N. Agrawal (1994) A comparative study of few attenuation
relationships,Proc.XthSymposiumofEarthquakeEngineering,Roorkee,Nov.1618,Vol
I,pp169175.
111. Kumar, A., A. D. Pandey, M. L. Sharma, S. C. Gupta, A. Kumar, B. K. Gupta.(1994)
Preliminary processing and interpretation of digital data obtained from digital seismic
array in Garhwal Himalaya, Proc. Xth Symposium of Earthquake Engineering, Roorkee,
Nov.1618,VolI,pp141152.
112. Sharma, M. L. and H. R. Wason (1994) APP An automatic phase picking algorithm
developedfordigitaltelemeteredseismicarraydata,Proc.XthSymposiumofEarthquake
Engineering,Roorkee,Nov.1618,VolI,pp159168.
113. Sharma, M. L. (1993) Automatic phase pickers, Proc. UNESCO International course on
SeismologyandSeismicriskassessment,Nov.1Dec.4,Roorkee,100110.
114. Sharma,M.L.andL.S.Srivastava(1992)Automationinearthquakemonitoring,National
SeminaronAutomationinMetrology,NationalPhysicalLaboratory,NewDelhi,Feb19
21.
115. Sharma, M. L., S. C. Gupta and H. R. Wason (1990) An automatic phase picker for
earthquakes, Proc. International Conf. on Automatic Robotics and Computer Vision,
Singapore,pp247250
116. Sharma, M. L. and H. R. Wason (1989) Data acquisition aspects of digital telemetered
microearthquakenetworks,presentedinsilverjubileeSymp.ofISET,Roorkee,Feb.25
26.
117. Srivastava, L. S., M. L. Sharma, A. D. Pandey and H. R. Wason, (1989) A digital
telemetered seismic array in the Himalayas, Abstract 25th General Assembly of IASPEI,
Istanbul,Turkey,Aug.21stSept.1st,pp643.
118. Sharma,M.L.,H.R.WasonandL.S.Srivastava(1987)Telemetereddigitalseismicevent
recording system, Proc. VIth Indian Geological Congress, Roorkee, Feb. 2124, pp 127
130.
119. Wason,H.R.,M.L.Sharma,KiratPalandL.S.Srivastava(1986)Digitaltelemeteredarray
inGangaYamunaValley,Proc.8thSymp.ofEarthquakeEngineering,Roorkee,Dec2931,
pp9199.

TechnicalReports
1. Sharma.M.L.,M.Shrikhande,J.P.Narayan,B.K.Maheshwari,J.DasandR.S.Jakka,EQ:
201446 (2014), Site Specific Design Earthquake Parameters for Jidu HE Project,
ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
2. Sharma.M.L.,M.Shrikhande,J.P.Narayan,B.K.Maheshwari,J.DasandR.S.Jakka,EQ:
201445 (2014), Site Specific Design Earthquake Parameters for Dardu HE Project,
ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
3. Sharma.M.L.,M.Shrikhande,J.P.Narayan,B.K.Maheshwari,J.DasandR.S.Jakka,EQ:
201444 (2014), Site Specific Design Earthquake Parameters for Turu HE Project,
ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
4. Sharma.M.L.,M.Shrikhande,J.P.Narayan,B.K.Maheshwari,J.DasandR.S.Jakka,EQ:
201443 (2014), Site Specific Design Earthquake Parameters for Par HE Project,
ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
5. Sharma.M.L.,M.Shrikhande,J.P.Narayan,B.K.Maheshwari,KiratPal,J.DasandS.C.
Gupta, EQ: 201440 (2014), Site Specific Design Earthquake Parameters for HEO HE
Project,ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
6. Sharma.M.L.,M.Shrikhande,J.P.Narayan,B.K.Maheshwari,KiratPal,J.DasandS.C.
Gupta, EQ: 201439 (2014), Site Specific Design Earthquake Parameters for Pauk HE
Project,ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
7. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201438
(2014),Seismological Network Around Tehri Region, (from April 2014 to June 2014),
DepartmentofEarthquakeEngineering,IITRoorkee
8. Sharma.M.L.,AshokKumar,M.Shrikhande,B.K.MaheshwariandJ.Das,EQ:201435
(2014),SiteSpecificDesignEarthquakeParametersforUmngotHEProject,Meghalaya,
DepartmentofEarthquakeEngineering,IITRoorkee
9. Sharma.M.L.,KiratPal,M.Shrikhande,B.K.MaheshwariandJ.Das,EQ:201434(2014),
SiteSpecificDesignEarthquakeParametersforNayingHEProject(updated),Arunachal
Pradesh,DepartmentofEarthquakeEngineering,IITRoorkee
10. Sharma.M.L.,KiratPal,J.P.Narayan,M.Shrikhande,B.K.MaheshwariandJ.Das,EQ:
201433 (2014), Site Specific Design Earthquake Parameters for Ganol HE Project,
Meghalaya,DepartmentofEarthquakeEngineering,IITRoorkee
11. Sharma.M.L.,J.P.Narayan,M.Shrikhande,B.K.Maheshwari,R.N.DubeyandJ.Das,
EQ:201432(2014),SiteSpecificDesignEarthquakeParametersforBilhaurHEProject,
UttarPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
12. Sharma.M.L.,J.P.Narayan,M.Shrikhande,B.K.Maheshwari,Y.SinghandJ.Das,EQ:
201431(2014),SiteSpecificDesignEarthquakeParametersforSwalkotHEProject,J&
K,DepartmentofEarthquakeEngineering,IITRoorkee
13. Sharma. M.L., Ashwani Kumar, J. P. Narayan, M. Shrikhande, B. K. Maheshwari and J.
Das, EQ: 201430 (2014), Site Specific Design Earthquake Parameters for Luhri HE
Project,HimachalPrardesh,DepartmentofEarthquakeEngineering,IITRoorkee
14. Sharma.M.L.,AmitaSinvhal,J.P.Narayan,M.Shrikhande,B.K.Maheshwari,J.Dasand
S.C.Gupta,EQ:201429(2014),SiteSpecificDesignEarthquakeParametersforRenukaji
DamProject,DepartmentofEarthquakeEngineering,IITRoorkee
15. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201428
(2014),Seismological Network Around Tehri Region, (from Jan 2014 to Mar 2014),
DepartmentofEarthquakeEngineering,IITRoorkee
16. Sharma.M.L.,H.R.Wason,M.Shrikhande,J.P.Narayan,A.D.Pandey,KiratPalandJ.
Das, EQ: 201426 (2014), Site Specific Design Earthquake Parameters for Subansiri
Middle(Kamla)HEProject,ArunachalPrardesh,DepartmentofEarthquakeEngineering,
IITRoorkee
17. Sharma.M.L.,SmtAmitaSinhval,J.P.Narayan,M.Shrikhande,B.KMaheshwari,andJ.
Das,EQ:201425(2014),SiteSpecificDesignEarthquakeParametersforGandarbalHE
Project,JammuandKashmir,DepartmentofEarthquakeEngineering,IITRoorkee
18. Sharma. M.L., H.R. Wason, Ashwani Kumar, Smt Amita Sinhval, M. Shrikhande, Pankaj
AgarwalandJ.Das,EQ:201424(2014),SiteSpecificDesignEarthquakeParametersfor
LowerKopiliHEProject,Assam,DepartmentofEarthquakeEngineering,IITRoorkee
19. Sharma.M.L.,SmtAmitaSinhval,J.P.Narayan,M.Shrikhande,B.KMaheshwari,andJ.
Das, EQ: 201423 (2014), Site Specific Design Earthquake Parameters for Dugar HE
Project,HimachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
20. Sharma. M.L., Ashok Kumar, M. Shrikhande, J.P. Narayan, B.K Maheshwari and J.Das,
EQ:201422 (2014),SiteSpecificDesignEarthquakeParameters forKirthaiHEProject,
Jammu&Kashmir,DepartmentofEarthquakeEngineering,IITRoorkee
21. Sharma.M.L.,J.P.Narayan,M.Shrikhande,B.KMaheshwari,R.N.DubeyandJ.Das,EQ:
201419(2014),SiteSpecificDesignEarthquakeParametersforRourkelaT.P.P.,Orissa,
DepartmentofEarthquakeEngineering,IITRoorkee
22. Sharma. M.L., H.R. Wason, Smt Amita Sinhval, M. Shrikhande, Pankaj Agarwal, B.K
MaheshwariandJ.Das,EQ:201418(2014),SiteSpecificDesignEarthquakeParameters
forKolodyneHEProject,Mizoram,DepartmentofEarthquakeEngineering,IITRoorkee
23. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201417
(2014),Seismological Network Around Tehri Region, (from Oct 2013 to Dec 2013),
DepartmentofEarthquakeEngineering,IITRoorkee
24. Sharma.M.L.,H.R.Wason,SmtAmitaSinhval,KiratPal,M.Shrikhande,PankajAgarwal,
S. Mukherjee and J. Das, EQ: 201416 (2014), Site Specific Design Earthquake
Parameters for Devsari HE Project, Himachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
25. Sharma. M.L., H.R. Wason, Ashok Kumar, Y. Singh, M. Shrikhande, B.K. Maheshwari,
Daya Shankar and J. Das, EQ: 201415 (2014), Site Specific Design Earthquake
Parameters for Seli HE Project, Himachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
26. Sharma.M.L.,H.R.Wason,SmtAmitaSinhval,Y.Singh,M.Shrikhande,PankajAgarwal
andJ.Das,EQ:201414B(2014),SiteSpecificDesignEarthquakeParametersforRihand
Concrete Gravity Dam at Pipri HE Project, Uttar Pradesh, Department of Earthquake
Engineering,IITRoorkee
27. Sharma.M.L.,H.R.Wason,SmtAmitaSinhval,Y.Singh,M.Shrikhande,PankajAgarwal
andJ.Das,EQ:201414A(2014),SiteSpecificDesignEarthquakeParametersforRihand
HEProject,UttarPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
28. Sharma.M.L.,J.P.Narayan,M.Shrikhande,B.KMaheshwari,A.D.PandeyandJ.Das,EQ:
201413 (2014), Site Specific Design Earthquake Parameters for Mawphu HE Project,
Meghalaya,DepartmentofEarthquakeEngineering,IITRoorkee
29. Sharma.M.L.,H.R.Wason,S.Mukerjee,J.PNarayan,M.ShrikhandeandJ.Das,EQ:2014
12 (2014), Site Specific Design Earthquake Parameters for Kyanshi I HE Project,
Meghalaya,DepartmentofEarthquakeEngineering,IITRoorkee
30. Sharma. M.L., H.R. Wason, Smt Amita Sinhval, M. Shrikhande, A. D. Pandey, J.Das and
S.C. Gupta, EQ: 201411 (2014), Site Specific Design Earthquake Parameters for
Dhaulasidh HE Project, Himachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
31. Sharma.M.L.,H.R.Wason,SmtAmitaSinhval,KiratPal,J.P.Narayan,R.N.Dubey,R.S.
Jakka and J.Das, EQ: 201410 (2014), Site Specific Design Earthquake Parameters for
ReoliDugli HE Project, Himachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
32. Sharma.M.L.,H.R.Wason,SmtAmitaSinhval,KiratPal,J.P.Narayan,R.N.Dubey,R.S.
Jakka and J.Das, EQ: 201409 (2014), Site Specific Design Earthquake Parameters for
Sachkhas HE Project, Arunachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
33. Sharma. M.L., D.K. Paul, J.P. Narayan, M. Shrikhande, B.K Maheshwari and J.Das, EQ:
201408 (2014), Site Specific Design Earthquake Parameters for Bhakra HE Project,
HimachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
34. Sharma. M.L., H.R. Wason, Smt Amita Sinhval, M. Shrikhande, B.K Maheshwari, Daya
Shankar, R.N.Dubey and J.Das, EQ: 201407 (2014), Site Specific Design Earthquake
Parameters for Attunli HE Project, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
35. Sharma. M.L., H.R. Wason, Smt Amita Sinhval, M. Shrikhande, B.K Maheshwari, Daya
Shankar, R.N.Dubey and J.Das, EQ: 201406 (2014), Site Specific Design Earthquake
Parameters for Etalin HE Project, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
36. Sharma. M.L., H.R. Wason, Ashwani Kumar, Ashok Kumar, Smt Amita Sinhval, M.
Shrikhande, Y. Singh, R.S. Jakka J.Das, EQ: 201405 (2014), Site Specific Design
Earthquake Parameters for Nakthan HE Project, Himachal Pradesh, Department of
EarthquakeEngineering,IITRoorkee
37. Sharma.M.L.,J.P.Narayan,M.Shrikhande,B.KMaheshwari,A.D.Pandey,andJ.Das,EQ:
201403(2014),SiteSpecificDesignEarthquakeParametersforPhangchungHEProject,
ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
38. Sharma. M.L., H.R. Wason, Ashwani Kumar, Smt Amita Sinhval, M. Shrikhande, B.K
Maheshwari, Y. Singh, S.C. Gupta and J.Das, EQ: 201402 (2014), Site Specific Design
Earthquake Parameters for KalaiII HE Project, Arunachal Pradesh, Department of
EarthquakeEngineering,IITRoorkee
39. Sharma.M.L.,J.P.Narayan,M.Shrikhande,B.KMaheshwari,J.DasandS.C.Gupta,EQ:
201401 (2014), Site Specific Design Earthquake Parameters for Nikachhu HE Project,
Bhutan,DepartmentofEarthquakeEngineering,IITRoorkee
40. Sharma.M.L.,J.P.Narayan,M.Shrikhande,B.KMaheshwari,R.N.DubeyandJ.Das,EQ:
201330 (2013), Site Specific Design Earthquake Parameters for Bilhaur TPP Site, Uttar
Pradesh,DepartmentofEarthquakeEngineering,IITRoorkee
41. Sharma. M.L., Smt Amita Sinhval, J. P. Narayan, M. Shrikhande, B.K Maheshwari, and
J.Das, EQ: 201329 (2013), Site Specific Design Earthquake Parameters for Dugar HE
Project,HimachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
42. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201328
(2013),Seismological Network Around Tehri Region, (from July 2013 to Sept 2013),
DepartmentofEarthquakeEngineering,IITRoorkee
43. Sharma. M.L., J.P. Narayan, M. Shrikhande, B.K Maheshwari, Y. Singh and J.Das, EQ:
201326 (2013), Site Specific Design Earthquake Parameters for Swalkot HE Project,
Jammu&Kashmir,DepartmentofEarthquakeEngineering,IITRoorkee
44. Kumar. Ashwani, M.L. Sharma, J.P. Narayan, M. Shrikhande, N.C. Singhal, B.K
Maheshwari,J.DasandS.C.Gupta,EQ:201324(2013),SiteSpecificDesignEarthquake
Parameters for Naying HE Project, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
45. Sharma. M.L., H.R. Wason, Ashok Kumar, Y. Singh, M. Shrikhande, B.K. Maheshwari,
Daya Shankar and J. Das, EQ: 201323 (2013), Site Specific Design Earthquake
Parameters for Seli HE Project, Himachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
46. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201322
(2013),Seismological Network Around Tehri Region, (from Apr 2013 to June 2013),
DepartmentofEarthquakeEngineering,IITRoorkee
47. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201320
(2013),Seismological Network Around Tehri Region, (from Jan 2013 to Mar 2013),
DepartmentofEarthquakeEngineering,IITRoorkee
48. Sharma. M.L., H.R. Wason, Smt Amita Sinhval, M. Shrikhande, B.K Maheshwari, Daya
Shankar, R.N.Dubey and J.Das, EQ: 201319 (2013), Site Specific Design Earthquake
Parameters for Etalin HE Project, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
49. Sharma. M.L., H.R. Wason, Smt Amita Sinhval, M. Shrikhande, B.K Maheshwari, Daya
Shankar, R.N.Dubey and J.Das, EQ: 201318 (2013), Site Specific Design Earthquake
Parameters for Attunli HE Project, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
50. Sharma. M.L., H.R. Wason, M. Shrikhande, S. Mukerjee, Kirat Pal, Daya Shankar and J.
Das, EQ: 201317 (2013), Site Specific Design Earthquake Parameters for Chango
Yangthang HE Project, Arunachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
51. Sharma.M.L.,H.R.Wason,SmtAmitaSinhval,M.Shrikhande,S.Mukerjee,KiratPal,P.
AgarwalandJ.Das,EQ:201316(2013),SiteSpecificDesignEarthquakeParametersfor
DevsariHEProject,Uttarakhand,DepartmentofEarthquakeEngineering,IITRoorkee
52. Sharma. M.L., H.R. Wason, Ashwani Kumar, Smt Amita Sinhval, M. Shrikhande, S.
Mukerjee, R.N.Dubey and J. Das, EQ: 201315 (2013), Site Specific Design Earthquake
Parameters for YamneII HE Project, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
53. Sharma. M.L., H.R. Wason, Ashwani Kumar, Smt Amita Sinhval, M. Shrikhande, S.
Mukerjee, R.N.Dubey and J. Das, EQ: 201314 (2013), Site Specific Design Earthquake
Parameters for YamneI HE Project, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
54. Sharma.M.L.andH.R.Wason,EQ:201313(2013),MEQDataProcessingInterpretation
and report preparation of Earthquake generation for the year 2009, for study of
seismogenicsourcesaroundtheSubansiriLowerHEProject,DepartmentofEarthquake
Engineering,IITRoorkee
55. Sharma.M.L.,H.R.Wason,AshokKumar,M.Shrikhande,Y.Singh,B.KMaheshwari,Daya
ShankarandJ.Das,EQ:201309(2013),SiteSpecificDesignEarthquakeParametersfor
Miyar HE Project, Himachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
56. Sharma. M.L., H.R. Wason, Smt Amita Sinhval, M. Shrikhande, B.K Maheshwari, Daya
Shankar, R.N Dubey and J. Das, EQ: 201308 (2013), Site Specific Design Earthquake
Parameters for Triveni Mahadev HE Project, Himachal Pradesh, Department of
EarthquakeEngineering,IITRoorkee
57. Sharma.M.L.,AshwaniKumar,J.PNarayan,M.Shrikhande,B.KMaheshwariandJ.Das,
EQ: 201307 (2013), Site Specific Design Earthquake Parameters for Shongtong
Karchham HE Project, Himachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
58. Sharma.M.L.,H.R.Wason,S.Mukerjee,J.PNarayan,M.ShrikhandeandJ.Das,EQ:2013
06 (2013), Site Specific Design Earthquake Parameters for Kyanshi HE Project,
Meghalaya,DepartmentofEarthquakeEngineering,IITRoorkee
59. Sharma.M.L.,H.R.Wason,S.Mukerjee,J.PNarayan,M.ShrikhandeandJ.Das,EQ:2013
05 (2013), Site Specific Design Earthquake Parameters for Katwa TPP Project, West
Bengal,DepartmentofEarthquakeEngineering,IITRoorkee
60. Sharma.M.L.,H.R.Wason,J.PNarayan,M.ShrikhandeandJ.Das,EQ:201304(2013),
Site Specific Design Earthquake Parameters for Gadarwara TPP Project, Madhya
Pradesh,DepartmentofEarthquakeEngineering,IITRoorkee
61. Sharma. M.L., H.R. Wason, S.Mukerjee, Smt Amita Sinhval, M. Shrikhande, P. Agarwal
and J. Das, EQ: 201302 (2013), Site Specific Design Earthquake Parameters for
KantangshiriHEProject,ArunachalPradesh,DepartmentofEarthquakeEngineering,IIT
Roorkee
62. Sharma. M.L., H.R. Wason, Smt Amita Sinhval, M. Shrikhande and J. Das, EQ: 201301
(2013),SiteSpecificDesignEarthquakeParametersforSEZMotaLayjaProject,Gujarat,
DepartmentofEarthquakeEngineering,IITRoorkee
63. Sharma.M.L.,H.R.Wason,M.Shrikhande,B.K.Maheshwari,A.DPandey,R.NDubeyand
J. Das, EQ: 201240 (2012), Site Specific Design Earthquake Parameters for Ratle HE
Project,Jammu&Kashmir,DepartmentofEarthquakeEngineering,IITRoorkee
64. Sharma.M.L.,H.R.Wason,J.PNarayan,M.Shrikhande,P.Agarwal,R.S.JakkaandJ.Das,
EQ: 201239 (2012), Site Specific Design Earthquake Parameters for Khurja TP Project,
Uttarpradesh,DepartmentofEarthquakeEngineering,IITRoorkee
65. Sharma.M.L.,H.R.Wason,AmitaSinhval,KiratPal,J.PNarayan,R.N.DubeyR.S.Jakka
and J. Das, EQ: 201238 (2012), Site Specific Design Earthquake Parameters for
Reoli_Dugli HE Project, Himachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
66. Sharma.M.L.,H.R.Wason,AmitaSinhval,KiratPal,J.PNarayan,R.N.DubeyR.S.Jakka
and J. Das, EQ: 201237 (2012), Site Specific Design Earthquake Parameters for
Sach_Khas HE Project, Himachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
67. Wason.H.R.,M.L.SharmaandB.K.Maheshwari,EQ:201236(2012),SoilProfilingusing
MASWatTriveniMahadev,HimachalPradesh,DepartmentofEarthquakeEngineering,
IITRoorkee
68. Sharma. M.L., H.R. Wason, Ashok Kumar, Smt Amita Sinhval, M. Shrikhande, B.K.
MaheshwariandJ.Das,EQ:201235(2012),SiteSpecificDesignEarthquakeParameters
for Nalo HE Project, Arunachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
69. Sharma. M.L., H.R. Wason, Amita Sinhval, M. Shrikhande, A.D. Pandey, J. Das and S. C
Gupta EQ: 201234 (2012), Site Specific Design Earthquake Parameters for Dhaulasidh
HEProject,HimachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
70. Sharma.M.L.,H.R.Wason,AshokKumar,AmitaSinhval,M.Shrikhande,R.S.JakkaandJ.
Das,EQ:201232(2012),SiteSpecificDesignEarthquakeParametersforRongnichuHE
Project,Sikkim,DepartmentofEarthquakeEngineering,IITRoorkee
71. Sharma. M.L., H.R. Wason, S. Mukerjee, M. Shrikhande, J. P Narayan and J. Das, EQ:
201231(2012),SiteSpecificDesignEarthquakeParametersforBopHEProject,Sikkim,
DepartmentofEarthquakeEngineering,IITRoorkee
72. Sharma. M.L., H.R. Wason, S. Mukerjee, M. Shrikhande, J. P Narayan and J. Das, EQ:
201230(2012),SiteSpecificDesignEarthquakeParametersforBhimkiyongHEProject,
Sikkim,DepartmentofEarthquakeEngineering,IITRoorkee
73. Sharma. M.L., H.R. Wason, S. Mukerjee, M. Shrikhande, J. P Narayan and J. Das, EQ:
201229 (2012), Site Specific Design Earthquake Parameters for Lachung HE Project,
Sikkim,DepartmentofEarthquakeEngineering,IITRoorkee
74. Wason. H.R.., M.L. Sharma, M. Shrikhande, Daya Shanker and J. Das, EQ: 201225
(2012), Site Specific Design Earthquake Parameters for Tehri pumped storage Plant,
Uttarakhand,DepartmentofEarthquakeEngineering,IITRoorkee
75. Wason.H.R..,AshwaniKumar,M.L.Sharma,AmitaSinvhal,M.Shrikhande,KiratPal,A.D.
PandeyandJ.Das,EQ:201224(2012),SiteSpecificDesignEarthquakeParametersfor
Gongri HE Project, Arunachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
76. Wason.H.R.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,A.D.Pandey,S.CGuptaand
J.Das,EQ:201223(2012),SiteSpecificDesignEarthquakeParametersforThanaplaun
HEProject,HimachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
77. Sharma.M.L.,H.R.WasonandB.K.Maheshwari,EQ:201221(2012),SoilProfilingusing
MASWatBowalaNandPrayag,HEP,ChamoliUttarakhand,DepartmentofEarthquake
Engineering,IITRoorkee
78. Kumar. Ashwani., M.L. Sharma, H.R. Wason, M. Shrikhande, B.K. Maheshwari, N.C.
Singhal, S.C. Gupta and J. Das, EQ: 201219 (2012), Site Specific Design Earthquake
Parameters for Study for Faridabad TPP , Haryana, Department of Earthquake
Engineering,IITRoorkee
79. Wason.H.R.,AshwaniKumar,M.L.Sharma,AmitaSinvhal,S.Mukerjee,R.N.Dubeyand
J.Das,EQ:201216(2012),SiteSpecificDesignEarthquakeParametersforTiuniplasu,
HEP,Uttarakhand,DepartmentofEarthquakeEngineering,IITRoorkee
80. Wason.H.R.,AshwaniKumar,M.L.Sharma,AmitaSinvhal,A.D.Pandey,M.Shrikhande,
B.K. Maheshwari, S.C. Gupta and J. Das, EQ: 201215 (2012), Site Specific Design
Earthquake Parameters for Marakknam Super Thermal Power Plant, Tamil Nadu,
DepartmentofEarthquakeEngineering,IITRoorkee
81. Wason.H.R.,M.L.Sharma,J.P.Narayan,M.Shrikhande,B.K. MaheshwariandJ.Das,
EQ: 201214 (2012), Site Specific Design Earthquake Parameters for Khargaon TPP ,
MadhyaPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
82. Wason. H.R.., Ashwani Kumar, M.L. Sharma, Ashok Kumar, M. Shrikhande, B.K.
Maheshwari, Daya Shankar, R.N. Dubey and J. Das, EQ: 201213 (2012), Site Specific
Design Earthquake Parameters for Auriya Gas Thermal Power Plant, Uttar Pradesh,
DepartmentofEarthquakeEngineering,IITRoorkee
83. Wason.H.R.,M.L.Sharma,J.P.Narayan,M.Shrikhande,B.K.Maheshwari,Y.SinghandJ.
Das, EQ: 201212 (2012), Site Specific Design Earthquake Parameters for TatoII, HEP,
ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
84. Wason.H.R.,M.L.Sharma,AmitaSinvhal,AshokKumar,M.Shrikhande,Y.singh.S.C.
Gupta and J. Das, EQ: 201211 (2012), Site Specific Design Earthquake Parameters for
DikhuHEP,Nagaland,DepartmentofEarthquakeEngineering,IITRoorkee
85. Wason.H.R.,M.L.Sharma,AmitaSinvhal,M.Shrikhande,DayaShankar,R.N.Dubey,R.S.
Jakka and J. Das, EQ: 201210 (2012), Site Specific Design Earthquake Parameters for
RangitIIHEP,Assam,DepartmentofEarthquakeEngineering,IITRoorkee
86. Wason. H.R., Ashwani Kumar, M.L. Sharma, Amita Sinvhal, M. Shrikhande, Pankaj
AggrwalandJ.Das,EQ:20128(2012),SiteSpecific DesignEarthquakeParametersfor
LowerKopiliHEP,Assam,DepartmentofEarthquakeEngineering,IITRoorkee
87. Sharma.M.L.,H.R.Wason,Y.SinghandJ.Das,EQ:20127(2012),ProbabilisticSeismic
Hazard assessment of the ATC Tower, New Delhi, Department of Earthquake
Engineering,IITRoorkee
88. Wason.H.R.,D.K.Paul,M.L.Sharma,M.Shrikhande,B.K.MaheshwariandJ.Das,EQ:
20126 (2012), Site Specific Design Earthquake Parameters for Barethi TPP Project,
Bundalkhand,M.P,DepartmentofEarthquakeEngineering,IITRoorkee
89. Wason.H.R.,D.K.Paul,M.L.Sharma,M.Shrikhande,B.K.MaheshwariandJ.Das,EQ:
20125 (2012), Site Specific Design Earthquake Parameters for Anta TPP Project,
Rajasthan,DepartmentofEarthquakeEngineering,IITRoorkee
90. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 20123
(2012),Seismological Network Around Tehri Region, (from Oct 2011 to Dec 2011),
DepartmentofEarthquakeEngineering,IITRoorkee
91. Wason. H.R., M.L. Sharma, M. Shrikhande, J.P. Narayan, A.D. Pandey, Kirat Pal and J.
Das,EQ:20122(2012),SiteSpecificDesignEarthquakeParametersforSubansiriMiddle
H.E. Project, HEP, Arunachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
92. Wason.H.R.,M.L.SharmaandB.K.Maheshwari,EQ:20121(2012),SoilProfilingusing
MASW at Thanaplaun H.E. Project, Mandi Himachal Pradesh, Department of
EarthquakeEngineering,IITRoorkee
93. Wason.H.R.andM.L.Sharma,EQ:201135(2011),MEQdateprocessinginterpretation
and report preparation of earthquake generated for the year 2008 for study of
seismogenicsourcesaroundtheSubansirilowerH.E.Project,DepartmentofEarthquake
Engineering,IITRoorkee
94. M.L. Sharma, EQ: 201134 (2011), Shear wave profiling is NCT region using MASW
technique,DepartmentofEarthquakeEngineering,IITRoorkee
95. Wason.H.R.,M.L.SharmaandB.K.Maheshwari,EQ:201133(2011),SiteSpecificDesign
Earthquake Parameters for ThanaPlaun, HEP, Himachal Pradesh, Department of
EarthquakeEngineering,IITRoorkee
96. Wason.H.R.,M.L.Sharma,AmitaSinvhal,M.Shrikhande,S.Mukerjee,S.C.GuptaandJ.
Das, EQ: 201132 (2011), Site Specific Design Earthquake Parameters for Kynshi, HEP,
Meghalaya,DepartmentofEarthquakeEngineering,IITRoorkee
97. Wason. H.R., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, Pankaj Agarwal, Daya
Shankar, R.N. Dubey and J. Das, EQ: 201130 (2011), Site Specific Design Earthquake
Parameters for Magochu, HEP, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
98. Wason. H.R., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, Pankaj Agarwal, Daya
Shankar, R.N. Dubey and J. Das, EQ: 201129 (2011), Site Specific Design Earthquake
Parameters for Nyukcharong, HEP, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
99. Wason. H.R., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, Pankaj Agarwal, Daya
Shankar, R.N. Dubey and J. Das, EQ: 201128 (2011), Site Specific Design Earthquake
Parameters for Rho Tawang, HEP, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
100. Wason. H.R., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, Pankaj Agarwal, Daya
Shankar, R.N. Dubey and J. Das, EQ: 201127 (2011), Site Specific Design Earthquake
Parameters for Tawang, HEP, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
101. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201126
(2011),Seismological Network Around Tehri Region, (from Jan2010 to Dec. 2010),
DepartmentofEarthquakeEngineering,IITRoorkee
102. SharmaM.L.,D.K.Paul,H.R.WasonandMahaeshwari,B.K.,(2011),EQ201125Soil
ProfilingusingMASWatTiuniPalasuHydroElectricProject,Dehradun,Uttarakhand
103. Wason.H.R.,M.L.Sharma,AmitaSinvhal,M.Shrikhande,B.K.Maheshwari,N.C.Singhal,
KiratPalandJ.Das,EQ:201124(2011),SiteSpecificDesignEarthquakeParametersfor
Devasari,HEP,Uttarakhand,DepartmentofEarthquakeEngineering,IITRoorkee
104. Wason. H.R., M.L. Sharma, Ashok Kumar, Y. Singh, M. Shrikhande, B.K. Maheshwari,
Daya Shankar and J. Das, EQ: 201123 (2011), Site Specific Design Earthquake
ParametersforSeli,HEP,HimachalPradesh,DepartmentofEarthquakeEngineering,IIT
Roorkee
105. Kumar. A., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, N.C. Singhal, S. Mukerjee,
Daya Shankar and J. Das, EQ: 201120 (2011), Site Specific Design Earthquake
ParametersforEtalin,HEP,ArunachalPradesh,DepartmentofEarthquakeEngineering,
IITRoorkee
106. Kumar. A., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, N.C. Singhal, S. Mukerjee,
Daya Shankar and J. Das, EQ: 201119 (2011), Site Specific Design Earthquake
ParametersforAttunli,HEP,ArunachalPradesh,DepartmentofEarthquakeEngineering,
IITRoorkee
107. Paul, D. K. , M. L. Sharma, B. K. Maheshwari, J. Das, EQ:201118 (2011) Seismic slope
statbilitystudiesofNaradam,Kandiarea,Hoshiarpur,Punjab
108. Kumar.A.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,J.P.Narayan,N.C.Singhal,J.
DasandS.C.Gupta,EQ:201114(2011),SiteSpecificDesignEarthquakeParametersfor
ChangoYangthang,HEP,DepartmentofEarthquakeEngineering,IITRoorkee
109. Kumar.A.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,DayaShankar,R.N.Dubey,S.
MukerjeeandJ.Das,EQ:201113(2011),SiteSpecificDesignEarthquakeParametersfor
Kholongchu,HEP,Bhutan,DepartmentofEarthquakeEngineering,IITRoorkee
110. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201112
(2011),Seismological Network Around Tehri Region, (from Oct 2010 to Dec. 2010),
DepartmentofEarthquakeEngineering,IITRoorkee
111. Kumar. A., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, J.P. Narayan, A.D. Pandey,
J.Das and S.C. Gupta, EQ: 201111 (2011), Site Specific Design Earthquake Parameters
for Pegadapalli, HEP, Andhra Pradesh, Department of Earthquake Engineering, IIT
Roorkee
112. Kumar.A.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,AshokKumar,DayaShankar,
R.N.DubeyandJ.Das,EQ:201109(2011),SiteSpecificDesignEarthquakeParameters
for Tagurshit, HEP, Arunachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
113. Kumar.A.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,AmitaSinvhal,Y.Singh,J.Das
and S.C. Gupta, EQ: 201105 (2011), Site Specific Design Earthquake Parameters for
KalaiII,HEP,ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
114. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201101
(2011),Seismological Network Around Tehri Region, (from July 2010 to Sept. 2010),
DepartmentofEarthquakeEngineering,IITRoorkee
115. Wason,H.R.andM.L.SharmaEQ:201035(2010),MEQdataprocessing,interpretation
andreportpreparationforMEQdatacollectedduringDec2006toNov2007,forstudy
of seismogenic sources around the Subanasi Lower HEP, Department of Earthquake
Engineering,IITRoorkee
116. Kumar. A., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, H.R. Wason, Ashok Kumar,
N.C.SinghalandJ.Das,EQ:201033(2010),SiteSpecificDesignEarthquakeParameters
for Chitrangi Power Project, Madhya Pradesh, Department of Earthquake Engineering,
IITRoorkee
117. Kumar.A.,M.L.Sharma,AmitaSinvhal,Y.Singh,M.Shrikhande,B.K.Maheshwari,S.C.
Gupta and J.Das, EQ: 201032 (2010), Site Specific Design Earthquake Parameters for
KalaiI Hydro Electric Power Project (1450MW), Arunachal Pradesh, Department of
EarthquakeEngineering,IITRoorkee
118. Sharma,M.L.andD.K.Paul,EQ:201030(2010),ProbabilisticSeismicHazardAnalysis
for Utkal Alumina Refinery Site, Orrisa, Department of Earthquake Engineering, IIT
Roorkee
119. Kumar. A., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, H.R. Wason, Ashok Kumar,
A.D.PandeyandJ.Das,EQ:201029(2010),SiteSpecificDesignEarthquakeParameters
for Tilaya Mega Power Project, Jharkhand, Department of Earthquake Engineering, IIT
Roorkee
120. SharmaM.L,EQ201028ProbabilisticSeismicHazardAssessmentforDelhiregionand
estimation of bed rock strong ground motion, Department of Earthquake Engineering,
IITRoorkee
121. Kumar.A.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,J.P.Narayan,A.D.Pandey,S.
Mukherjee and J.Das, EQ: 201027 (2010), Site Specific Design Earthquake Parameters
for Tipang Hydro Electric Project, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
122. Kumar.A.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,H.R.Wason,AshokKumar,Y.
Singh and J.Das, EQ: 201026 (2010), Site Specific Design Earthquake Parameters for
MiyarHEP,HimachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
123. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201025
(2010),Seismological Network Around Tehri Region, (from April 2010 to June 2010),
DepartmentofEarthquakeEngineering,IITRoorkee
124. Kumar.A.,M.L.Sharma,H.R.Wason,M.Shrikhande,N.C.Singhal,B.K.Maheshwari,S.
MukerjeeandJ.Das,EQ:201023(2010),SiteSpecificDesignEarthquakeParametersfor
Pemashelpu River Basin HEP, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
125. Kumar. A., M.L. Sharma, M. Shrikhande, Daya Shanker, Y. Singh, B.K. Maheshwari, S.
MukerjeeandJ.Das,EQ:201021(2010),SiteSpecificDesignEarthquakeParametersfor
TeestaIIHEP,Sikkim,DepartmentofEarthquakeEngineering,IITRoorkee
126. Kumar. A., M.L. Sharma, Daya Shanker, M. Shrikhande, Y. Singh, B.K. Maheshwari, S.
MukerjeeandJ.Das,EQ:201020(2010),SiteSpecificDesignEarthquakeParametersfor
TalcherTPSExpansion(2x660MW),DepartmentofEarthquakeEngineering,IITRoorkee
127. Kumar. A., M.L. Sharma, H.R. Wasson, M. Shrikhande, R.N. Dubery, B.K. Maheshwari,
Ashok Kumar and J. Das, EQ: 201019 (2010), Site Specific Design Earthquake
Parameters for Kudgi Super Thermal Power Project (400MW) at Bijapur District of
Karnataka,DepartmentofEarthquakeEngineering,IITRoorkee
128. Paul D.K., M.L. Sharma, Swami Saran, B.K. Maheshwari and S. Mukerjee, EQ: 201018
(2010),SiteSpecificDesignEarthquakeParametersforLayingofRailwayInfrastructure
over deposit of coal ash in Anpara, Distt. Sonbhadra, Department of Earthquake
Engineering,IITRoorkee
129. Kumar.A.,M.L.Sharma,AshokKumar,Y.Singh,M.Shrikhande,B.K.Maheshwari,Daya
ShankerandJ.Das,EQ:201016(2010),SiteSpecificDesignEarthquakeParametersfor
Gajmara Super Thermal Power Project (4x800MW), Department of Earthquake
Engineering,IITRoorkee
130. Kumar. A., A.D. Pandey, M.L. Sharma, J.P. Narayan and S.C. Gupta, EQ: 201015
(2010),Seismological Network Around Tehri Region, (from Jan 2009 to Dec 2009),
DepartmentofEarthquakeEngineering,IITRoorkee
131. Kumar.A.,A.D.Pandey,M.L.Sharma,J.P.NarayanandS.C.Gupta,EQ:201014(2010)
BLT572010(I), Seismological Network Around Tehri Region, (from Jan 2010 to Mar
2010),DepartmentofEarthquakeEngineering,IITRoorkee
132. Kumar. A., M.L. Sharma, M. Shrikhande, B.K. Maheshwari, S. Mukerjee, R.N. Dubey,
Daya Shanker and J. Das, EQ: 201013 (2010), Site Specific Design Earthquake
ParametersforNafraHEP,ArunachalPradesh,DepartmentofEarthquakeEngineering,
IITRoorkee
133. Kumar. A., M.L. Sharma, H.R. Wasson, M. Shrikhande, B.K. Maheshwari, R.N. Dubey,
Ashok Kumar and J. Das, EQ: 201011 (2010), Site Specific Design Earthquake
Parameters for Luhri Hydro Electric Power Project on River Satluj (775 MW) in H.P.,
DepartmentofEarthquakeEngineering,IITRoorkee
134. Kumar.A.,M.L.Sharma,AshokKumar,J.P.Narayan,M.Shrikhande,A.D.Pandey,B.K.
Maheshwari,andJ.Das,EQ:201010(2010),SiteSpecificDesignEarthquakeParameters
for NHDC 1320 MW Reva Thermal Power Project MP, Department of Earthquake
Engineering,IITRoorkee
135. Kumar.A.,D.K.Paul,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,R.N.Dubey,J.Das
and S.C Gupta, EQ: 201008 (2010), Site Specific Design Earthquake Parameters for
PalaisRoyale,Mumbai,DepartmentofEarthquakeEngineering,IITRoorkee
136. Kumar.A.,M.L.Sharma,AmitaSinvhal,M.Shrikhande,B.K.Maheshwari,A.D.Pandey,S.
MukerjeeandJ.Das,EQ:201007(2010),SiteSpecificDesignEarthquakeParametersfor
Lethang Hydro Electric Project, Sikkim, Department of Earthquake Engineering, IIT
Roorkee
137. Kumar.A.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,J.P.Narayan,N.C.Singhal,J.
DasandS.C.Gupta,EQ:201006(2010),SiteSpecificDesignEarthquakeParametersfor
Hirong Electric Power Project (500MW) in Arunachal Pradesh, Department of
EarthquakeEngineering,IITRoorkee
138. Kumar.A.,A.D.Pandey,M.L.Sharma,J.P.NarayanandS.C.Gupta,EQ:201004(2010),
BLT572009(III),SeismologicalNetworkAroundTehriRegion,(fromJuly2009toSept
09),DepartmentofEarthquakeEngineering,IITRoorkee
139. Kumar. A., M.L. Sharma, H.R. Wasson, M. Shrikhande, R.N. Dubey, B.K. Maheshwari,
J.Das and S.C. Gupta, EQ: 201003 (2010), Site Specific Design Earthquake Parameters
for Malari Jelam & Jelam Tamal HEP, UK, Department of Earthquake Engineering, IIT
Roorkee
140. Kumar. A., M.L. Sharma, Daya Shanker, M. Shrikhande, A.D. Pandey, B.K. Maheshwari,
AshokKumarandJ.Das,EQ:201002(2010),SiteSpecificDesignEarthquakeParameters
forShongtongKarchamHEP,DepartmentofEarthquakeEngineering,IITRoorkee
141. Kumar. A., M. L. Sharma, J.P. Narayan, M. Shrikhande, N.C. Singhal, B.K. Maheshwari,
AshokKumarandJ.Das,EQ:20101(2010),SiteSpecificDesignEarthquakeParameters
forSeismologicalNetworkAroundTehriRegion,DepartmentofEarthquakeEngineering,
IITRoorkee
142. Kumar.A.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,AmitaSinvhal,A.D.Pandey,S.
MukerjeeandJ.Das,EQ:200951(2009),SiteSpecificDesignEarthquakeParametersfor
MadiaHEProject,DepartmentofEarthquakeEngineering,IITRoorkee
143. Kumar.A.,M.L.Sharma,M.Shrikhande,B.K.Maheshwari,AmitaSinvhal,A.D.Pandey,S.
MukerjeeandJ.Das,EQ:200950(2009),SiteSpecificDesignEarthquakeParametersfor
DehraHEProject,DepartmentofEarthquakeEngineering,IITRoorkee
144. Kumar.A.,A.D.Pandey,M.L.Sharma,J.P.NarayanandS.C.Gupta,EQ:200949(2009),
BLT572009(III),SeismologicalNetworkAroundTehriRegion,(from.July2009toSept
09),DepartmentofEarthquakeEngineering,IITRoorkee
145. Kumar.A.,M.L.Sharma,H.R.Wason,AshokKumar,M.Shrikhande,B.K.Maheshwari,
N.C.Singhal,andJ.Das,EQ:200948(2009),SiteSpecificDesignEarthquakeParameters
for Bowala Nand Prayag HEP, Chamoli, Uttarakhand, Department of Earthquake
Engineering,IITRoorkee
146. Kumar. A., M. L. Sharma, J.P. Narayan, M. Shrikhande, N.C. Singhal, B.K. Maheshwari,
J.Das, and S.C. Gupta EQ: 200946 (2009), Site Specific Design Earthquake Parameters
for Naying Hydro Electric Power Project(1000,MW), in West Siang Distt. Of Arunachal
Pradesh,DepartmentofEarthquakeEngineering,IITRoorkee
147. Kumar. A., A. D. Pandey and M. L. Sharma, EQ: 200945 (2009), BLT562009
(II),"Seismological Network around Tehri Region" Preliminary Seismological Bulletin
(from.April2009toJune2009),DepartmentofEarthquakeEngineering,IITRoorkee
148. Kumar.A,M.L.Sharma,A.Sinvhal,M.Shrikhande,A.D.Pandey,B.K.Mahashwari,
AshokKumarandJ.Das(2009),EQ200944SitespecificDesignearthquakeParameters
for Upper Karnali HE Project Site, Nepal, Department of Earthquake Engineering, IIT
Roorkee
149. Kumar.A,M.L.Sharma,DayaShanker,M.Shrikhande,Y.Singh,B.K.Mahashwari,S.
C.GuptaandJ.Das(2009),EQ200943SitespecificDesignearthquakeParametersfor
Upper Marsingdi HE Project Site, Nepal, Department of Earthquake Engineering, IIT
Roorkee
150. Kumar.A,M.L.Sharma,J.P.Narayan,M.Shrikhande,R.N.Dubey,B.K.Mahashwari,
AshokKumarandJ.Das(2009),EQ200940SitespecificDesignearthquakeParameters
for Parwan HE Project Site, Rajasthan, Department of Earthquake Engineering, IIT
Roorkee
151. Kumar.A,M.L.Sharma,H.R.Wason,S.Mukerjee,M.Shrikhande,R.N.Dubey,B.K.
MahashwariandJ.Das(2009),EQ200939SitespecificDesignearthquakeParameters
for Nyamjang Chhu HE Project Site, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
152. SharmaM.L.,D.K.Paul,andJ.Das,(2009),EQ200938ProbabilisticSeismicHazard
Assessment of the Nyabarongo H.E. Project Site, Rawanda, Department of Earthquake
Engineering,IITRoorkee
153. Kumar.A, M.L. Sharma,AshokKumar,M.Shrikhande,DayaShanker,Y. Singh,B.K.
MahashwariandJ.Das(2009),EQ200937SitespecificDesignearthquakeParameters
for HutongII HE Project Site, Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
154. Paul. D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande, B. K. Maeshwari and J. Das
(2009),EQ200936SitespecificDesignearthquakeParametersforUmngotHEProject
Site,Meghalaya,DepartmentofEarthquakeEngineering,IITRoorkee
155. Kumar.A,M.L.Sharma,M.Shrikhande,DayaShanker,B.K.Mahashwari,Y.Singh,J.
DasandS.C.Gupta(2009),EQ200935SitespecificDesignEarthquakeParametersfor
ChhatruHEProjectSite,HimachalPradesh,DepartmentofEarthquakeEngineering,IIT
Roorkee
156. Kumar.A.,A.D.PandeyandM.L.Sharma,EQ:200933(2009)SeismologicalNetwork
Around Tehri Region Report on processing and Interpretation of seismological Data
Collected (from January 2008 to December 2008) Department of Earthquake
Engineering,IITRoorkee
157. Kumar.A,M.L.Sharma,H.R.Wasan,M.Shrikhande,R.N.Dubey,B.K.Mahashwari,J.
DasandS.C.Gupta(2009),EQ200932SitespecificDesignearthquakeParametersfor
Dhamwari Sunda HE Project site, Himachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
158. Kumar.A,M.L.Sharma,AshokKumar,M.Shrikhande,B.K.Mahashwari,A.Sinvhal,A.
D.PandeyandJ.Das(2009),EQ200931SitespecificDesignearthquakeParameters
forKashangHEProjectsite,HimachalPradesh,DepartmentofEarthquakeEngineering,
IITRoorkee
159. Kumar.A,M.L.Sharma,J.P.Narayan,M.Shrikhande,N.C.Singhal,B.K.Mahashwari,
Ashok Kumar and J. Das (2009), EQ 200930 Site specific Design earthquake
Parameters for Singrauli Thermal Power Project site, Uttar Pradesh, Department of
EarthquakeEngineering,IITRoorkee
160. Kumar. A., A. D. Pandey and M. L. Sharma, EQ: 200929 (2009), BLT552009
(I),"Seismological Network around Tehri Region" Preliminary Seismological Bulletin
(from.Jan2009toMar2009),DepartmentofEarthquakeEngineering,IITRoorkee
161. Paul. D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande, B. K. Maeshwari and J. Das,
(2009), EQ 200928 Site Specific Design Earthquake Parameters for Bhakra HE Project
Site,HimachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
162. Kumar Ashwani, M. L. Sharma, H. R. Wasan, M. Shrikhande, B. K. Mahashwari, R. N.
Dubey, J. Das and S.C. Gupta (2009), EQ 200927 Site specific Design earthquake
Parameters for Jelam Tamak HE Project site Uttarakhand, Department of Earthquake
Engineering,IITRoorkee
163. Paul.D.K.,M.L.Sharma,M.Shrikhande,PankajAgarwalandJ.Das,(2009),EQ200926
Site Specific Design Earthquake Parameters for Bunakha HE Project Site Bhutan,
DepartmentofEarthquakeEngineering,IITRoorkee
164. Kumar Ashwani, M. L. Sharma, Daya Shanker, M. Shrikhande, B. K. Mahashwari, Y.
Singh, J. Das and S. C. Gupta (2009), EQ 200925 Site specific Design earthquake
Parameters for Sissiri HE Project site Arunachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
165. KumarAshwani,M.L.Sharma,S.Mukerjee,M.Shrikhande,N.CSinghal,J.PNarayan,
B. K. Mahashwari and J. Das (2009), EQ 200924 Site specific Design earthquake
Parameters for Sainj HE Project site Himachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
166. Kumar Ashwani, M. L. Sharma, M. Shrikhande, B. K. Mahashwari, A. Sinvhal, A. D
Pandey, J. Das and S .C Gupta (2009), EQ 200923 Site specific Design earthquake
ParametersforBajoliHoliH.EProjectsiteHimachalPradesh,DepartmentofEarthquake
Engineering,IITRoorkee
167. PaulD.K,M.L.SharmaandB.K.Mahashwari(2009)EQ200922EvaluationofShear
Wave velocity of Shongtong Karchham HEP, Himachal Pradesh Department of
EarthquakeEngineering,IITRoorkee
168. PaulD.K,M.L.SharmaandB.K.Mahashwari(2009),EQ200920EvaluationofShear
WavevelocityofRanjitSagarDam,DepartmentofEarthquakeEngineering,IITRoorkee
169. Kumar, Ashwani, M. L. Sharma, M. Shrikhande, B. K. Mahashwari, A. Sinvhal, A. D
Pandey, J. Das and S .C Gupta (2009), EQ 200919 Site specific Design earthquake
ParametersforAnnparaThermalPowerPlant,DepartmentofEarthquakeEngineering,
IITRoorkee
170. Kumar. A., A. D. Pandey and M. L. Sharma, EQ: 200917 (2009), BLT542008
(IV),"Seismological Network around Tehri Region" Preliminary Seismological Bulletin
(from.Oct2008toDec2008),DepartmentofEarthquakeEngineering,IITRoorkee
171. KumarAshwani,M.L.Sharma,M.Shrikhande,B.K.Mahashwari,Y.Singh,S.Mukerjee,
D.SankerandJ.Das(2009),EQ200916SitespecificDesignearthquakeParametersfor
Pauk HE Project site Arunachal Pradesh, Department of Earthquake Engineering, IIT
Roorkee
172. Kumar Ashwani, M. L. Sharma, A. Sinvhal, A. D. Pandey, M. Shrikhande, B. K.
Mahashwari,J.DasandS.C.Gupta,(2009),EQ200913SitespecificDesignearthquake
Parameters for Phata Byung HE Project site Uttrakhand, Department of Earthquake
Engineering,IITRoorkee
173. SharmaM.L.,D.K.Paul,andJ.Das,(2009),EQ200912ProbabilisticSeismicHazard
Assessment of the SHWEMYA Offshore Development Sites, Myanmar, Department of
EarthquakeEngineering,IITRoorkee
174. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200911 (2009), BLT532008
(III),"Seismological Network around Tehri Region" Preliminary Seismological Bulletin
(from.July2008toSept.2008),DepartmentofEarthquakeEngineering,IITRoorkee
175. SharmaM.L.,D.K.Paul,andMahaeshwari,B.K.,(2009),EQ200910SoilProfilingin
Phuentsolingcity,DepartmentofEarthquakeEngineering,IITRoorkee
176. Kumar Ashwani, M. L. Sharma, A. Sinhval, A. D. Pandey, Ashok Kumar, B. K.
Mahashwari, M. Shrikhande and J. Das, (2009), EQ 200909 Site specific Design
earthquake Parameters for Dibbin HE Project site Arunachal Pradesh, Department of
EarthquakeEngineering,IITRoorkee
177. KumarAshwani,M.L.Sharma,M.Shrikhande,D.Shanker,Y.Singh,B.K.Mahashwari,
S. Mukharjee and J. Das, (2009), EQ 200907 Site specific Design earthquake
Parameters for Kuther HE Project site Himachal Pradesh, Department of Earthquake
Engineering,IITRoorkee
178. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2009),EQ200906
SitespecificDesignearthquakeParametersforSolapurThermalProjectsiteMaharastra,
DepartmentofEarthquakeEngineering,IITRoorkee
179. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200904 (2009), BLT522008
(II),"Seismological Network around Tehri Region" Preliminary Seismological Bulletin
(from.April2008toJune2008),DepartmentofEarthquakeEngineering,IITRoorkee
180. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2009),EQ200903
SitespecificDesignearthquakeParametersforMuzaffarpurThermalProjectsiteBihar,
DepartmentofEarthquakeEngineering,IITRoorkee
181. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2009),EQ200902
SitespecificDesignearthquakeParametersforRamgangaBarrageIrrigationSchemesite
UttarPradesh,DepartmentofEarthquakeEngineering,IITRoorkee
182. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200901 (2009), BLT512008
(I),"Seismological Network around Tehri Region" Preliminary Seismological Bulletin
(from.Jan.2008toMarch2008),DepartmentofEarthquakeEngineering,IITRoorkee
183. Sharma M. L. and M. Arora, (2008), EQ 200847 Application of Differential
Interferometery for seismic deformation studies in Garhwal Kumaon Himalaya,
DepartmentofEarthquakeEngineering,IITRoorkee
184. Paul,D.K.,M.L.SharmaandJ.Das,(2008),EQ200846DesignSpectraforKochiLNG
Thermal Project site : Assessment & Recommendations, Department of Earthquake
Engineering,IITRoorkee
185. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200845
Site specific Design earthquake Parameters for AnparaD Thermal Project site Uttar
Pradesh,DepartmentofEarthquakeEngineering,IITRoorkee
186. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200844
Site specific Design earthquake Parameters for Tanda Thermal Project site Uttar
Pradesh,DepartmentofEarthquakeEngineering,IITRoorkee
187. KumarAshwani,M.L.Sharma,A.Sinhval,N.C.Singhal,B.K.Mahashwari,S.Mukharjee,
M. Shrikhande and J. Das, (2008), EQ 200843 Site specific Design earthquake
Parameters for Makoria HE Project site Madhya Pradesh, Department of Earthquake
Engineering,IITRoorkee
188. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:200841(2008)SeismologicalNetwork
Around Tehri Region Report on processing and Interpretation of seismological Data
Collected (from January 2007 to December 2007) Department of Earthquake
Engineering,IITRoorkee
189. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200840
SitespecificDesignearthquakeParametersforLowerDamweHEProjectsiteArunachal
Pradesh,DepartmentofEarthquakeEngineering,IITRoorkee
190. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200839
SitespecificDesignearthquakeParametersforUpperDamweHEProjectsiteArunachal
Pradesh,DepartmentofEarthquakeEngineering,IITRoorkee
191. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200838 (2008), BLT50
2007(III),"Seismological Network around Tehri Region" Preliminary Seismological
Bulletin (from. Oct. 2007 to Dec. 2007), Department of Earthquake Engineering, IIT
Roorkee
192. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200836
Site specific Design earthquake Parameters for Panan HE Project site Sikkim,
DepartmentofEarthquakeEngineering,IITRoorkee
193. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200835
Site specific Design earthquake Parameters for Krishnapatnam Ultra Mega Power
ProjectsiteAndhraPradeshDepartmentofEarthquakeEngineering,IITRoorkee
194. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200833
Site specific Design earthquake Parameters for Daudhan Multipurpose Project site
MadhyaPradeshDepartmentofEarthquakeEngineering,IITRoorkee
195. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200831
SitespecificDesignearthquakeParametersforTatoHEProjectsiteArunachalPradesh.
DepartmentofEarthquakeEngineering,IITRoorkee
196. Sharma, M. L., and J. P. Narayan (2008), EQ 200830 Final report on Broadband
SeismographnetworkforModelingofEarthquakesourceanduppercostintheGarhwal
KumaunHimalayaregionDepartmentofEarthquakeEngineering,IITRoorkee
197. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200828
Site specific Design earthquake Parameters for Jangi Thopan Powari HE Project site
HimachalPradeshDepartmentofEarthquakeEngineering,IITRoorkee
198. Paul, D.K., M. L. Sharma and J. Das, (2008), EQ 200827 Structure stability of
Mullapariyar dam considering the seismic effects Part I Seismic Hazard Assessment
DepartmentofEarthquakeEngineering,IITRoorkee
199. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200826
Site specific Design earthquake Parameters for Rampur HE Project site Himachal
PradeshDepartmentofEarthquakeEngineering,IITRoorkee
200. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200825
SitespecificDesignearthquakeParametersforSasanThermalPowerPlantProjectsite
MadhyaPradeshDepartmentofEarthquakeEngineering,IITRoorkee
201. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200824
SitespecificDesignearthquakeParametersforLachung,BhimkyongandBopHEProject
sitesSikkimDepartmentofEarthquakeEngineering,IITRoorkee
202. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200823
SitespecificDesignearthquakeParametersforShahpurHEProjectsiteMaharastra(REL)
DepartmentofEarthquakeEngineering,IITRoorkee
203. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200822
Site specific Design earthquake Parameters for Mangdechhu HE Project site Bhutan
DepartmentofEarthquakeEngineering,IITRoorkee.
204. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande, B.K. Maheshwari and J. Das,
(2008),EQ200819SitespecificDesignearthquakeParametersforSrinagarHEProject
siteUttrakhand.DepartmentofEarthquakeEngineering,IITRoorkee
205. Paul,D.K.,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2008),EQ200818
SitespecificDesignearthquakeParametersforRupsiabagarHEProjectsiteUttrakhand.
DepartmentofEarthquakeEngineering,IITRoorkee
206. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200814
SiteSpecific Design Earthquake Parameter for Jamrani HE Project site, Uttarakhand,
DepartmentofEarthquakeEngineering,IITRoorkee
207. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200813 (2008), BLT49
2007(III),"Seismological Network around Tehri Region" Preliminary Seismological
Bulletin(from.July2007toSeptember2007),DepartmentofEarthquakeEngineering,
IITRoorkee
208. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200812
SiteSpecific Design Earthquake Parameter for Teesta IV HE Project site, Sikkim,
DepartmentofEarthquakeEngineering,IITRoorkee
209. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200808
SiteSpecificDesignEarthquakeParameterforRITESBridge119onKatraQuazigandRail
linkprojectJ&K,DepartmentofEarthquakeEngineering,IITRoorkee
210. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200807
SiteSpecificDesignEarthquakeParameterforRITESBridge99onKatraQuazigandRail
linkprojectJ&K,DepartmentofEarthquakeEngineering,IITRoorkee
211. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200806
SiteSpecificDesignEarthquakeParameterforRITESBridge92onKatraQuazigandRail
linkprojectJ&K,DepartmentofEarthquakeEngineering,IITRoorkee
212. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200805
SiteSpecificDesignEarthquakeParameterforRITESBridge87onKatraQuazigandRail
linkprojectJ&K,DepartmentofEarthquakeEngineering,IITRoorkee
213. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200804
SiteSpecific Design Earthquake Parameter for Badar pur TPP Project site, New Delhi,
DepartmentofEarthquakeEngineering,IITRoorkee
214. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200803
SiteSpecific Design Earthquake Parameter for Lara TPP Project site, Chhatisgarh,
DepartmentofEarthquakeEngineering,IITRoorkee
215. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200802
SiteSpecific Design Earthquake Parameter for Darlipali TPP Project site, Orissa,
DepartmentofEarthquakeEngineering,IITRoorkee
216. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2008), EQ:200801
SiteSpecific Design Earthquake Parameter for Kayam kulam Power plant Project site,
Kerala,DepartmentofEarthquakeEngineering,IITRoorkee
217. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200729
SiteSpecific Design Earthquake Parameter for Singoli Bhatwari HE Project site,
Uttarakhand,DepartmentofEarthquakeEngineering,IITRoorkee
218. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200728
SiteSpecific Design Earthquake Parameter for JakholSankri HE Project site,
Uttarakhand,DepartmentofEarthquakeEngineering,IITRoorkee
219. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200727
SiteSpecific Design Earthquake Parameter for Ramam stage III HE Project site,
Darjeeling,DepartmentofEarthquakeEngineering,IITRoorkee
220. Sharma M. L (2007), EQ:200726, Probabilistic Seismic Hazard Estimation of URI (J&K),
DepartmentofEarthquakeEngineering,IITRoorkee
221. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200725
SiteSpecificDesignEarthquakeParameterforBudhilHEsite,Chamba(H.P),Department
ofEarthquakeEngineering,IITRoorkee
222. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200723
SiteSpecific Design Earthquake Parameter for Alaknanda HE site, Uttarakhand.,
DepartmentofEarthquakeEngineering,IITRoorkee
223. Wason, H. R, M. L. Sharma,(2007),EQ:200721 Installation,Monitoring,Dta acquisition
andInterpretationforSeismicMonitoringinSubausirilowerHEproject,Departmentof
EarthquakeEngineering,IITRoorkee
224. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200720
SiteSpecific Design Earthquake Parameter for NMSEZ Project site, Navi Mumbai,
DepartmentofEarthquakeEngineering,IITRoorkee
225. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:200719(2007)SeismologicalNetwork
Around Tehri RegionReport o processing and Interpretation of seismological Data
Collected (from January 2006 to December 2006) Department of Earthquake
Engineering,IITRoorkee
226. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200718 (2007), BLT48
2007(II),"SeismologicalNetworkaroundTehriRegion"PreliminarySeismologicalBulletin
(from.April2007toJune2007),DepartmentofEarthquakeEngineering,IITRoorkee
227. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200717
SiteSpecificDesignEarthquakeParameterforMundraThermalPowerPlantGujaratHE
site,J&K,DepartmentofEarthquakeEngineering,IITRoorkee
228. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200715
SiteSpecific Design Earthquake Parameter for Teesta stageIII, Sikkim, Department of
EarthquakeEngineering,IITRoorkee
229. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200713
SiteSpecific Design Earthquake Parameter for Kawar HE site, J&K, Department of
EarthquakeEngineering,IITRoorkee
230. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200712 (2007), BLT47
2007(I),"SeismologicalNetworkaroundTehriRegion"PreliminarySeismologicalBulletin
(from.Jan2007toMarch2007),DepartmentofEarthquakeEngineering,IITRoorkee
231. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200711
SiteSpecific Design Earthquake Parameter for Bharoanghati HE site, Department of
EarthquakeEngineering,IITRoorkee
232. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200710
SiteSpecific Design Earthquake Parameter for Malana HE site, Himachal Pradesh,
DepartmentofEarthquakeEngineering,IITRoorkee
233. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200709
SiteSpecificDesignEarthquakeParameterRITESbridgeno73onKatraQuaziKhandRail
linkproject,Uttaranchal,DepartmentofEarthquakeEngineering,IITRoorkee
234. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200708
SiteSpecificDesignEarthquakeParameterRITESbridgeno62onKatraQuaziKhandRail
linkproject,Uttaranchal,DepartmentofEarthquakeEngineering,IITRoorkee
235. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200707
SiteSpecific Design Earthquake Parameter for Pala Maneri HE site, Uttaranchal,
DepartmentofEarthquakeEngineering,IITRoorkee
236. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200706
SiteSpecific Design Earthquake Parameter for Jjhajar thermal power plant, Harayana,
DepartmentofEarthquakeEngineering,IITRoorkee
237. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200705
SiteSpecificDesignEarthquakeParameterforRosathermalpowerplant,Uttarpradesh,
DepartmentofEarthquakeEngineering,IITRoorkee
238. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200704 (2007), BLT46
2006(IV),"Seismological Network around Tehri Region" Preliminary Seismological
Bulletin (from. Oct 2006 to Dec 2006), Department of Earthquake Engineering, IIT
Roorkee
239. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200703
SiteSpecificDesignEarthquakeParameterforWazirabadBridge,Delhi,Departmentof
EarthquakeEngineering,IITRoorkee
240. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2007), EQ:200702
SiteSpecificDesignEarthquakeParameterforLataTapovanH.EProject,Uttarakhand,
DepartmentofEarthquakeEngineering,IITRoorkee
241. PaulD.K.,AshokKumar,M.L.Sharma,Y.Singh,H.Bungum,C.Lindholm,A.Kayniaand
R.Bhasin(2007)IndoNorwegianprogrammeofInstitutionalCooperationonearthquake
Engineering, Final Report 20032006, Department of Earthquake Engineering, IIT
Rooorkee,NORSAR,NorwayandNorwegianGeotechnicalInstitute,Norway.
242. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200627 (2006), BLT45
2006(III),"Seismological Network around Tehri Region" Preliminary Seismological
Bulletin(from.July2006toSeptember2006),DepartmentofEarthquakeEngineering,
IITRoorkee
243. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2006), EQ:200625
SiteSpecific Design Earthquake Parameter for Bav H.E Project, Maharashtra,
DepartmentofEarthquakeEngineering,IITRoorkee
244. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2006), EQ:200624
SiteSpecific Design Earthquake Parameter for Ratle H.E Project, J&K, Department of
EarthquakeEngineering,IITRoorkee
245. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200622 (2006), BLT442006(II),
"SeismologicalNetworkaroundTehri Region"PreliminarySeismologicalBulletin(from.
April2006toJune2006),DepartmentofEarthquakeEngineering,IITRoorkee
246. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200621 (2006), BLT432006(I),
"SeismologicalNetworkaroundTehri Region"PreliminarySeismologicalBulletin(from.
January2006toMarch2006),DepartmentofEarthquakeEngineering,IITRoorkee
247. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2006), EQ:200620
SiteSpecific Design Earthquake Parameter for Bongaigaon thermal power Project,
Assam,DepartmentofEarthquakeEngineering,IITRoorkee
248. Paul, D.K., M. L. Sharma, J. P. Narayan, M. Shrikhande and J. Das, (2006), EQ:200618
SiteSpecificDesignEarthquakeParameterforkiruH.E.Project,J.&K,Departmentof
EarthquakeEngineering,IITRoorkee
249. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:200616(2006)SeismologicalNetwork
around Tehri region Report on processing and interpretation of seismological data
collected from Jan. 2005 to Dec. 2005., Department of Earthquake Engineering, IIT
Roorkee.
250. Sharma, M. L. EQ:200615 (2006) Final report on application of DIF SAR to investigate
criticaldeformationregimesinGarhwalKumaounHimalayarelatedtoearthquakesand
landslides,SubmittedtoDST,DepartmentofEarthquakeEngineering,IITRoorkee.
251. Kumar, Ashok, M. L. Sharma, EQ:200613, Report on performance acceptance test for
seismological instruments, submitted to GERI, Department of Earthquake Engineering,
IITRoorkee.
252. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200612 (2006), BLT422006(IV),
"SeismologicalNetworkaroundTehri Region"PreliminarySeismologicalBulletin(from.
Oct2005toDec.2005),DepartmentofEarthquakeEngineering,IITRoorkee
253. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200611 (2006), BLT412006(III),
"SeismologicalNetworkaroundTehri Region"PreliminarySeismologicalBulletin(from.
July2005toSept.2005),DepartmentofEarthquakeEngineering,IITRoorkee
254. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2006),EQ:200609Site
SpecificDesignEarthquakeParameterforLowerSiangHEProject,ArunanchalPradesh,
DepartmentofEarthquakeEngineering,IITRookee.
255. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 20068 (2006) Seismological Network
around Tehri region Report on processing and interpretation of seismological data
collected from Jan. 2004 to Dec. 2004., Department of Earthquake Engineering, IIT
Roorkee.
256. Sharma,M.L.,D.K.PaulandY.Singh(2006)EQ:200606Probabilisticseismichazard
assessmentforKGIIIsiteKGBasin,DepartmentofEarthquakeEngineering,IITRookee.
257. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2006),EQ:200605Site
Specific Design Earthquake Parameter for Talong HE Project, Arunachal Pradesh,
DepartmentofEarthquakeEngineering,IITRookee.
258. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200604 (2006), BLT402005(I),
"SeismologicalNetworkaroundTehri Region"PreliminarySeismologicalBulletin(from.
April2005toJune2005),DepartmentofEarthquakeEngineering,IITRoorkee
259. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2006),EQ:200603Site
SpecificDesignEarthquakeParameterforPakalDulH.E.Project,J.&K,Departmentof
EarthquakeEngineering,IITRookee.
260. Kumar,A.,M.L.Sharma,S.C.Gupta(2006),EQ:200602Reportonsourceparameters
andattenuationcharacteristicsintheenvironsofBichomandTengadamsite,Arunachal
Pradesh,DepartmentofEarthquakeEngineering,IITRookee.
261. Wason,H.R.,M.L.SharmaandS.C.Gupta(2006)EQ:200601Reportonbackground
noisesurveyforSLPproject,ArunachalPradesh,DepartmentofEarthquakeEngineering,
IITRookee.
262. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2005),EQ:200534Site
specific earthquake parameters for Kotlibehl II HE project, Uttranchal, Department of
EarthquakeEngineering,IITRookee.
263. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2005),EQ:200533Site
specificearthquakeparametersforKotlibehlIBHEproject,Uttranchal,Departmentof
EarthquakeEngineering,IITRookee.
264. Technical report of the InterInstitutional Working group on the Great Tsunami of
December26,2004inSumatraregion(2005)SubmittedtoDepartmentofScienceand
Technology,GovernmentofIndia,NewDelhi.
265. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2005),EQ:200532Site
specificearthquakeparametersforKotlibehlIAHEproject,Uttranchal,Departmentof
EarthquakeEngineering,IITRookee.
266. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2005),EQ:200531Site
specific earthquake parameters for Mauda Power plant, Department of Earthquake
Engineering,IITRookee.
267. Sharma,M.L.,D.K.PaulandY.Singh(2005EQ:200529)Probabilisticseismichazard
assessmentforKGD6siteKGBasin,DepartmentofEarthquakeEngineering,IITRookee
268. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200528 (2005), BLT392005(I),
"SeismologicalNetworkaroundTehri Region"PreliminarySeismologicalBulletin(from.
Jan2005toMarch2005),DepartmentofEarthquakeEngineering,IITRoorkee
269. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2005),EQ:200527Site
specificearthquakeparametersforFarakkathermalpowerproject,WB,Departmentof
EarthquakeEngineering,IITRookee
270. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2005),EQ:200526Site
specific earthquake parameters for Debang Multipurpose Project, Guwahati,
DepartmentofEarthquakeEngineering,IITRookee
271. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2005),EQ:200525Site
specific earthquake parameters for VishnugadPipalkoti HE project, Uttarancha,
DepartmentofEarthquakeEngineering,IITRookee
272. Basu,S,M.L.Sharma,J.P.Narayan,M.ShrikhandeandJ.Das,(2005),EQ:200524Site
Specific Design Earthquake Parameter for Dikrong HE Project, Arunachal Pradesh,
DepartmentofEarthquakeEngineering,IITRookee.
273. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200523 (2005), BLT382004(IV),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
Oct2004toDec2004),DepartmentofEarthquakeEngineering,IITRoorkee.
274. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200522(2005)Site
specific earthquake parameters for NH31Road Bridge Guwahati, Department of
EarthquakeEngineering,IITRoorkee.
275. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200520(2005)Site
specific earthquake parameters for Shahpurkandi HE project Site, Uttranchal,
DepartmentofEarthquakeEngineering,IITRoorkee.
276. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200518(2005)Site
specificearthquakeparametersforKoteshwarHEprojectSite,Uttranchal,Department
ofEarthquakeEngineering,IITRoorkee.
277. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200517(2005)Site
specific earthquake parameters for Karcham Wangtoo HE project Site, Uttranchal,
DepartmentofEarthquakeEngineering,IITRoorkee.
278. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200516 (2005), BLT372004(III),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
July2004toSeptember2004),DepartmentofEarthquakeEngineering,IITRoorkee.
279. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200514(2005)Site
specific earthquake parameters for Tapovan Vishnugad HE project Site, Uttranchal,
DepartmentofEarthquakeEngineering,IITRoorkee.
280. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200513(2005)Site
specific earthquake parameters for Loharinag Pala HE project Site, Uttranchal,
DepartmentofEarthquakeEngineering,IITRoorkee.
281. Sharma, M.L., EQ: 200512 [2005], Final Report on study of shallow earthquakes in
Indian region using Differential SAR Interferometry, Report submitted to AICTE,
DepartmentofEarthquakeEngineering,IITRoorkee.
282. Kumar Ashok and M. L. Sharma, EQ: 200511 (2005), Pre Dispatch inspection of
equipment,DepartmentofEarthquakeEngineering,IITRoorkee.
283. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200509 (2005), BLT362004(II),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
April2004toJune2004),DepartmentofEarthquakeEngineering,IITRoorkee.
284. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200507 (2005), BLT352004(I),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
Jan.2004toMarch2004),DepartmentofEarthquakeEngineering,IITRoorkee.
285. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200506(2005)Site
specific earthquake parameters for Allain Duhangan HE project Site, Himachal
Pradesh,DepartmentofEarthquakeEngineering,IITRoorkee.
286. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200505(2005)Site
specific earthquake parameters for Chutak HE project Site, J & K, Department of
EarthquakeEngineering,IITRoorkee.
287. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200504(2005)Site
specific earthquake parameters for Pipavav Power Plant project Site, Gujarat,
DepartmentofEarthquakeEngineering,IITRoorkee.
288. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200501 (2005) Seismological Network
around Tehri region Report on processing and interpretation of seismological data
collected from Jan. 2003 to Dec. 2003., Department of Earthquake Engineering, IIT
Roorkee.
289. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200422(2004)Site
specific earthquake parameters for Viyasi HE project Site, Uttranchal, Department of
EarthquakeEngineering,IITRoorkee.
290. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200421(2004)Site
specificearthquakeparametersforLakhwarHEprojectSite,Uttranchal,Department
ofEarthquakeEngineering,IITRoorkee.
291. Wason, H. R., M. L. Sharma, EQ: 200419(2004), Microearthquake investigations
around Middle Siang HE project, Siang and Subansiri Basins, Arunachal Pradesh,
DepartmentofEarthquakeEngineering,IITRoorkee.
292. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:200418(2004)SeismologicalNetwork
around Tehri region Report on processing and interpretation of seismological data
collected from Jan. 2002 to Dec. 2002., Department of Earthquake Engineering, IIT
Roorkee.
293. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200417(2004)Site
specificearthquakeparametersforGandharPowerPlantSite,Gujarat,Departmentof
EarthquakeEngineering,IITRoorkee.
294. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200416 (2004), BLT342003(IV),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
Oct.2003toDec.2003),DepartmentofEarthquakeEngineering,IITRoorkee.
295. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200415 (2004), BLT332003(III),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
July,2003toSept.2003),DepartmentofEarthquakeEngineering,IITRoorkee.
296. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200414(2004)Site
specific earthquake parameters for Chenab Railway bridge Site, J&K, Department of
EarthquakeEngineering,IITRoorkee.
297. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200413(2004)Site
specificearthquakeparametersforAnjiKhandRailwaybridgeSite,J&K,Departmentof
EarthquakeEngineering,IITRoorkee.
298. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200411 (2004), BLT322003(II),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
April,2003toJune2003),DepartmentofEarthquakeEngineering,IITRoorkee.
299. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200410 (2004), Report on the
microearthquakestudiesintheenvironsofBhichomandTengadamsite,KamengHydro
electricproject,ArunachalPradesh,DepartmentofEarthquakeEngineering,IITRoorkee.
300. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200409(2004)Site
specificearthquakeparametersforEastKorbaThermalPowerprojectSite,Department
ofEarthquakeEngineering,IITRoorkee.
301. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200408(2004)Site
specific earthquake parameters for Korba Thermal Power project Site, Department of
EarthquakeEngineering,IITRoorkee.
302. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200407 (2004), BLT312003(I),
SeismologicalNetworkaroundTehriregionReportonprocessingandinterpretation
ofseismologicaldatacollectedfromJan.2003toDec.2003,DepartmentofEarthquake
Engineering,IITRoorkee.
303. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200405 (2004), BLT302002(IV),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
Oct.2002toDec.2002),DepartmentofEarthquakeEngineering,IITRoorkee.
304. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200404(2004)Site
specific earthquake parameters for Ennore project site, Chennai, Department of
EarthquakeEngineering,IITRoorkee.
305. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200403(2004)Site
specificearthquakeparametersforNCPPDadriProjectsite,UttarPradesh,Department
ofEarthquakeEngineering,IITRoorkee.
306. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200402(2004)Site
specificearthquake parametersforNimuBazgo HE projectsite,J&K,Departmentof
EarthquakeEngineering,IITRoorkee.
307. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200401(2004)Site
specific earthquake parameters for Uri II HE project site, Jammu & Kashmir,
DepartmentofEarthquakeEngineering,IITRoorkee.
308. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200320(2003)Site
specific earthquake parameters for Omkareshwar HE project site, Madhya Pradesh,
DepartmentofEarthquakeEngineering,IITRoorkee.
309. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200319(2003)Site
specific earthquake parameters for Ujjayanata Palace, Agartala, Department of
EarthquakeEngineering,IITRoorkee.
310. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200318 (2003), BLT292002(III),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
July2002toSept.2002),DepartmentofEarthquakeEngineering,IITRoorkee.
311. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200317 (2003), BLT282002(II),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from.
April.2002toJune2002),DepartmentofEarthquakeEngineering,IITRoorkee.
312. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200316(2003)Site
specific earthquake parameters for Kishanganga HE project site, Jammu and Kashmir,
DepartmentofEarthquakeEngineering,IITRoorkee.
313. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200315(2003)Site
specificearthquakeparametersforChamerastageIIIHEprojectsite,HimachalPradesh,
DepartmentofEarthquakeEngineering,IITRoorkee.
314. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200314(2003)Site
specific earthquake parameters for Bhillai Power Plant Project site, Durg, Chattisgarh,
DepartmentofEarthquakeEngineering,IITRoorkee.
315. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200313(2003)Site
specific earthquake parameters for Nabinagar Power Plant Project site, Bihar,
DepartmentofEarthquakeEngineering,IITRoorkee.
316. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200312 (2003), BLT272002(I),
Seismological Network around Tehri Region Preliminary Seismological Bulletin(from.
Jan.2002toMarch2002),DepartmentofEarthquakeEngineering,IITRoorkee.
317. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:200311(2003)SeismologicalNetwork
around Tehri region Report on processing and interpretation of seismological data
collected from Jan. 2001 to Dec. 2001., Department of Earthquake Engineering, IIT
Roorkee.
318. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200307(2003)Site
specific earthquake parameters for Lower Siang HE project site, Arunachal Pradesh,
DepartmentofEarthquakeEngineering,IITRoorkee.
319. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200305(2003)Site
specificearthquakeparametersforSerluiBdamsite,Mizoram,NEIndia,,Departmentof
EarthquakeEngineering,IITRoorkee.
320. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200302(2003)Site
specificearthquakeparametersforSewaIIHEprojectsite,Kathua,J&K,,Department
ofEarthquakeEngineering,IITRoorkee.
321. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200301(2003)Site
specificearthquakeparametersforDhanikharisite,AndamanandNicobar,,Department
ofEarthquakeEngineering,IITRoorkee.
322. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200215 (2002), BLT262001(IV),
Seismological Network around Tehri Region Preliminary Seismological Bulletin (from
Oct.2001toDec.2001),DepartmentofEarthquakeEngineering,IITRoorkee.
323. Basu,S.,M.L.Sharma,J.P.Narayan,M.SrikhandeandJ.Das,EQ:200214(2002)Site
specific earthquake parameters for Kahalgaon site, Bihar,, Department of Earthquake
Engineering,IITRoorkee.
324. Basu, S., M. L. Sharma, M. Srikhande and J. Das, EQ: 200213 (2002) Site specific
earthquake parameters for Rani Avanti Bai Saagar Dam (Bargi) site, Madhya Pradesh,
DepartmentofEarthquakeEngineering,IITRoorkee.
325. Wason,H.R.andM.L.Sharma,EQ:200211(2002)Microearthquakeinvestigationsin
Siang and Subansiri basins, Arunachal Pradesh, Phase I Feasibility and back ground
noise survey for Middle Siang HE project, Department of Earthquake Engineering, IIT
Roorkee.
326. Chandra, B., S. Basu and M. L. Sharma, EQ: 200208 (2002) Site specific earthquake
parameters for Upper Subansiri HE Project Aunachal Pradesh,, Department of
EarthquakeEngineering,IITRoorkee.
327. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200207 (2002), BLT252001(III),
Seismological Network around Tehri Region Preliminary Seismological Bulletin (from
July.2001toSeptember2001,DepartmentofEarthquakeEngineering,IITRoorkee.
328. Basu, S. and M. L. Sharma, J. P. Narayan and J. Das, EQ: 200206 (2002) Site specific
earthquake parameters for Teesta Stage IV HE Project West Bengal,, Department of
EarthquakeEngineering,IITRoorkee.
329. Basu, S. and M. L. Sharma J. P. Narayan and J. Das, EQ: 200205 (2002) Site specific
earthquake parameters for Teesta Stage III HE Project West Bengal,, Department of
EarthquakeEngineering,IITRoorkee.
330. Chandra, B., S. Basu and M. L. Sharma, EQ: 200204 (2002) Site specific earthquake
parameters for Middle Subansiri HE Project Aunachal Pradesh,, Department of
EarthquakeEngineering,IITRoorkee.
331. Chandra, B., S. Basu and M. L. Sharma, EQ: 200201 (2002) Site specific earthquake
parameters for Middle Siang project Aunachal Pradesh,, Department of Earthquake
Engineering,IITRoorkee.
332. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200115 (2001), BLT242001(II),
Seismological Network around Tehri Region Preliminary Seismological Bulletin (from
Apr.2001toJune2001),DepartmentofEarthquakeEngineering,IITRoorkee.
333. Chandra, B., S. Basu and M. L. Sharma, EQ: 200114 (2001) Site specific earthquake
parameters for Subansiri lower HE Project Aunachal Pradesh,, Department of
EarthquakeEngineering,IITRoorkee.
334. Chandra, B., S. Basu , M. L. Sharma and J. Das, EQ: 200113(2001) Site specific
earthquake design parameters for Super Thermal Power plant site, NorthKaranpura,
Bihar,DepartmentofEarthquakeEngineering,IITRoorkee.
335. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200112 (2001), BLT232001(I),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
Jan2001toMar2001),DepartmentofEarthquakeEngineering,IITRoorkee.
336. Chandra, B., S. Basu, M. L. Sharma and J. Das, EQ: 200111 (2001) Site specific
earthquake design parameters for Super Thermal Power plant site, Barh, Bihar,
DepartmentofEarthquakeEngineering,IITRoorkee.
337. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200109 Report on processing &
interpretationofseismologicaldatacollectedfromJan.2000toDec.2000.,Department
ofEarthquakeEngineering,IITRoorkee.
338. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200107 (2001), BLT222000(IV),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
Oct.2000toDec.2000),DepartmentofEarthquakeEngineering,IITRoorkee.
339. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200105 (2001), BLT212000(III),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
July.2000toSeptember2000),DepartmentofEarthquakeEngineering,IITRoorkee.
340. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200104 (2001) BLT202000(II),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
Apr.2000toJune2000),DepartmentofEarthquakeEngineering,IITRoorkee.
341. Chandra,B.,S.Basu&M.L.Sharma,EQ:200103(2001)Sitespecificearthquakedesign
parameters for Parbati HE project state III Dam site, Kullu, Himachal Pradesh,
DepartmentofEarthquakeEngineering,IITRoorkee.
342. Chandra, B., S. Basu and M. L. Sharma, EQ: 200102 (2001) Site specific earthquake
parameters for Metntdu Leshka Project, Meghlaya,, Department of Earthquake
Engineering,IITRoorkee.
343. Chandra, B., S. Basu and M. L. Sharma, EQ: 200101 (2001) Site specific earthquake
parameters for Kameng and Damwe Project, Arunachal Pradesh,, Department of
EarthquakeEngineering,IITRoorkee.
344. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200020 (2000), Final Report on
Processing and Interpretation of seismological data from January 1999 to December
1999 of the project Seismological Network around Tehri region, Earthquake
Engineering Studies of Department of Earthquake Engineering, University of Roorkee,
Roorkee,DepartmentofEarthquakeEngineering,IITRoorkee.
345. Kumar, A., A. D. Pandey and M. L. Sharma, EQ: 200019 (2000), BLT192000(I),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
Jan.2000toMarch2000),DepartmentofEarthquakeEngineering,IITRoorkee.
346. Paul, D. K., Chandra, B., S. Basu S. Mukharji and M. L. Sharma, EQ : 200015 (2000),
Precaution in designing of power plant foundation and structures of Talcher II Super
ThermalPowerPlantsite,Orissa,DepartmentofEarthquakeEngineering,IITRoorkee.
347. Chandra, B., S. Basu and M. L. Sharma, EQ : 200014 (2000) Updation of site specific
earthquake parameters for Kol dam, Himachal Pradesh,, Department of Earthquake
Engineering,IITRoorkee.
348. Chandra,B.,S.Basu,M.L.SharmaandJ.P.Narayan,EQ:200013(2000)Sitespecific
earthquake parameters for Parbati dam stage II , Himachal Pradesh,, Department of
EarthquakeEngineering,IITRoorkee.
349. Chandra, B., S. Basu and M. L. Sharma, EQ : 200012 (2000) Site specific earthquake
parameters for Teesta Stage V H. E. Project, Sikkim, Department of Earthquake
Engineering,IITRoorkee.
350. Chandra, B., S. Basu and M. L. Sharma, EQ : 200011 (2000), Site specific earthquake
parameters Talcher II Super Thermal Power Plant site, Orissa, Department of
EarthquakeEngineering,IITRoorkee.
351. Chandra, B., S. Basu and M. L. Sharma, EQ : 200010 (2000), Site specific earthquake
parametersforTuivaiDamsite,Meghalaya,DepartmentofEarthquakeEngineering,IIT
Roorkee.
352. Chandra, B., S. Basu and M. L. Sharma, EQ : 200008 (2000), Site specific earthquake
parameters for Rihand Super Thermal Power Plant, UP, Department of Earthquake
Engineering,IITRoorkee.
353. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 200007 (2000), BLT1899(IV),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
October1999toDecember1999),DepartmentofEarthquakeEngineering,IITRoorkee.
354. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 200006 (2000), BLT1799(III),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
July1999toSeptember1999),DepartmentofEarthquakeEngineering,IITRoorkee.
355. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 200005 (2000), BLT1699(II),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
April1999toJune1999),DepartmentofEarthquakeEngineering,IITRoorkee.
356. Chandra, B., S. Basu and M. L. Sharma, EQ : 200003 (2000), Site specific earthquake
parameters for Ghatghar pumped storage scheme, Maharashtra , Department of
EarthquakeEngineering,IITRoorkee.
357. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 200002 (2000), BLT1599(I),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
Jan.1999toMarch1999),DepartmentofEarthquakeEngineering,IITRoorkee.
358. Chandra, B., S. Basu and M. L. Sharma, EQ : 200001 (2000), Site specific earthquake
parameters for North Chennai Thermal Power Plant site, Tamilnadu , Department of
EarthquakeEngineering,IITRoorkee.
359. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:9913(1999),FinalReportonProcessing
and Interpretation of seismological data from January 1998 to December 1998 of the
projectSeismologicalNetworkaroundTehriregion,EarthquakeEngineeringStudiesof
DepartmentofEarthquakeEngineering,UniversityofRoorkee,Roorkee,Departmentof
EarthquakeEngineering,IITRoorkee.
360. Chandra, B., S. Basu and M. L. Sharma, EQ : 9912 (1999), Site specific earthquake
parameters for Mid Vaitarana Dam Site, Maharashtra, Department of Earthquake
Engineering,IITRoorkee.
361. Kumar,A.,A.D.PandeyandM.L.Sharma,THDCRishikesh(1999)Seismologicalnetwork
inandaroundTehriregion,DepartmentofEarthquakeEngineering,IITRoorkee.
362. Wason,H.R.,S.K.Upadhyay,M.L.Sharma,I.SarkarandS.Mukhopadhaya,Finalreport
(1999),ReportonModelingofearthquakesourceandearthstructureintheGearwheel
Kaman Himalayan region using broad band seismic data, Submitted to DST,
DepartmentofEarthquakeEngineering,IITRoorkee.
363. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9910 (1998), BLT1198(IV),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
October1998toDecember1998),DepartmentofEarthquakeEngineering,IITRoorkee.
364. Chandra, B., S. Basu and M. L. Sharma, EQ : 9907 (1999), Site specific earthquake
parameters for Sipat Super Thermal Power Plant, Madhya Pradesh, Department of
EarthquakeEngineering,IITRoorkee.
365. Chandra, B., S. Basu and M. L. Sharma, EQ : 9906 (1999), Site specific earthquake
parametersforKalpongH.E.Project,AndamanandNicobar,DepartmentofEarthquake
Engineering,IITRoorkee.
366. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9905 (1999), BLT1398(III),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
July1998toSeptember1998),DepartmentofEarthquakeEngineering,IITRoorkee.
367. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9903 (1999), BLT1298(II),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
April1998toJune1998),DepartmentofEarthquakeEngineering,IITRoorkee.
368. Chandra, B., S. Basu and M. L. Sharma, EQ : 9901 (1999), Site specific earthquake
parameters for Auriya II power Plant structures, Uttar Pradesh, Department of
EarthquakeEngineering,IITRoorkee.
369. Chandra, B., S. Basu and M. L. Sharma, EQ : 9819 (1998), Site specific earthquake
parameters for Anta II power Plant structures, Rajasthan , Department of Earthquake
Engineering,IITRoorkee.
370. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:9817(1998),FinalReportonProcessing
and Interpretation of seismological data from January 1997 to December 1997 of the
projectSeismologicalNetworkaroundTehriregion,EarthquakeEngineeringStudiesof
DepartmentofEarthquakeEngineering,UniversityofRoorkee,Roorkee,Departmentof
EarthquakeEngineering,IITRoorkee.
371. Chandra, B., S. Basu and M. L. Sharma, EQ : 9816 (1998), Site specific earthquake
parameters for Kawas II power Plant structures, Gujarat, Department of Earthquake
Engineering,IITRoorkee.
372. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9815 (1998), BLT1198(I),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
January1998toMarch1998),,DepartmentofEarthquakeEngineering,IITRoorkee.
373. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9809 (1998), BLT1097(IV),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
October1997toDecember1997),,DepartmentofEarthquakeEngineering,IITRoorkee.
374. Chandra, B., S. Basu and M. L. Sharma, EQ : 9806 (1998), Site specific earthquake
parametersLowerKopiliHEProject,NEIndia,DepartmentofEarthquakeEngineering,
IITRoorkee.
375. Chandra, B., S. Basu and M. L. Sharma, EQ : 9805 (1998), Site specific earthquake
parameters for Shillong Water Supply, Meghalaya , Department of Earthquake
Engineering,IITRoorkee.
376. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9801 (1998), BLT997(III),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
July1997toSeptember1997),,DepartmentofEarthquakeEngineering,IITRoorkee.
377. Kumar, A., A. D. Pandey and M. L. Sharma, NAPP/NPC Bombay (1998) Design Basis
reportforthedigitaltelemeteredseismicarrayaroundNaroraAtomicPowerPlantsite,
UP,DepartmentofEarthquakeEngineering,IITRoorkee.
378. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9716 (1997), BLT897(II),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
April1997toJune1997),,DepartmentofEarthquakeEngineering,IITRoorkee.
379. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:9713(1997),BLT797(I),Seismological
NetworkaroundTehriRegionPreliminarySeismologicalBulletin,(fromJanuary1997
toMarch1997),,DepartmentofEarthquakeEngineering,IITRoorkee.
380. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:9711(1997),FinalReportonProcessing
and Interpretation of seismological data from January 1996 to December 1996 of the
projectSeismologicalNetworkaroundTehriregion,EarthquakeEngineeringStudiesof
DepartmentofEarthquakeEngineering,UniversityofRoorkee,Roorkee,Departmentof
EarthquakeEngineering,IITRoorkee.
381. BrijeshChandra,S.BasuandM.L.Sharma,EQ:9707(1997),Sitespecificearthquake
parameters for Tuirial dam project, Mizoram, Department of Earthquake Engineering,
IITRoorkee.
382. Chandra, B., S. Basu and M. L. Sharma, EQ : 9705 (1997), Site specific earthquake
parameters for Simahdari 1000 MW coal based power plant, Andhra Pradesh ,
DepartmentofEarthquakeEngineering,IITRoorkee.
383. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9704 (1997), BLT696(IV),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
October1996toDecember1996),,DepartmentofEarthquakeEngineering,IITRoorkee.
384. Agrawal, P. N. and M. L. Sharma, EQ : 9703 (1997), Interpretation of Tiltmeter data
from Harabagh underground vault across Shali thrust, Department of Earthquake
Engineering,IITRoorkee.
385. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9702 (1997), BLT596(III),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
July1996toSeptember1996),,DepartmentofEarthquakeEngineering,IITRoorkee.
386. Kumar, A., A. D. Pandey and M. L. Sharma , EQ : 9619 (1996), BLT496(II),
SeismologicalNetworkaroundTehriRegionPreliminarySeismologicalBulletin(from
April1996toJune1996),,DepartmentofEarthquakeEngineering,IITRoorkee.
387. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:9612(1996),BLT396(I),Seismological
NetworkaroundTehriRegionPreliminarySeismologicalBulletin(fromJanuary1996to
March1996),,DepartmentofEarthquakeEngineering,IITRoorkee.
388. BrijeshChandra,S.BasuandM.L.Sharma,EQ:9609(1995),Sitespecificearthquake
parameters for refinery site in Gujarat , Department of Earthquake Engineering, IIT
Roorkee.
389. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:9606(1996),FinalReportonProcessing
and Interpretation of seismological data from January 1995 to December 1995 of the
projectSeismologicalNetworkaroundTehriregion,EarthquakeEngineeringStudiesof
DepartmentofEarthquakeEngineering,UniversityofRoorkee,Roorkee.,Departmentof
EarthquakeEngineering,IITRoorkee.
390. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:9604(1996),BLT295(II),Seismological
Network around Tehri Region Preliminary Seismological Bulletin (from October 1995
toDecember1995),,DepartmentofEarthquakeEngineering,IITRoorkee.
391. R. Chandrasekaran and M. L. Sharma, EQ : 9602 (1996), Site specific earthquake
parameters for Mahadayi Hydel Project, Goa, Department of Earthquake Engineering,
IITRoorkee.
392. Kumar,A.,A.D.PandeyandM.L.Sharma,EQ:9601(1996),BLT195(I),Seismological
Network around Tehri Region Preliminary Seismological Bulletin (from July 1995 to
September1995),,DepartmentofEarthquakeEngineering,IITRoorkee.
393. Chandrasekaran, A. R., and M. L. Sharma, EQ : 9523 (1995), Site specific earthquake
parameters for Bhira site, Distt. Raigarh, Maharashtra , Department of Earthquake
Engineering,IITRoorkee.
394. Chandrasekaran,A.R.,andM.L.Sharma,EQ:9520(1995),Sitespecificearthquake
parameters for Essar Refinery site, Kutch, Gujarat , Department of Earthquake
Engineering,IITRoorkee.
395. Kumar, A., A. D. Pandey and M. L. Sharma, EQ : 9519 (1995), Final Report on the
project Digital Telemetered Seismic Array in Ganga Yamuna Valley for Monitoring of
Local Seismicity, Earthquake Engineering Studies of Department of Earthquake
Engineering, University of Roorkee, Roorkee., Department of Earthquake Engineering,
IITRoorkee.
396. R. Chandrasekaran and M. L. Sharma, EQ : 9517 (1995), Site specific earthquake
parametersforacombinedgasbasedpowerplantprojectatFaridabad,Departmentof
EarthquakeEngineering,IITRoorkee.
397. Chandrasekaran, A. R., and M. L. Sharma, EQ : 9515 (1995), Site specific earthquake
parametersforbridgesiteonriverRavinearBhasoli,Jammu&Kashmir,,Departmentof
EarthquakeEngineering,IITRoorkee.
398. Chandrasekaran,A.R.,andM.L.Sharma,EQ:9514(1995),Sitespecificearthquake
parameters for a 250 MW steam power plant at Neyvelli (Tamilnadu), Department of
EarthquakeEngineering,IITRoorkee.
399. Agrawal,R.C.,andM.L. SharmaEQ: 9510(1995),Reportontheseismologicaldata
from April 93March 94 obtained at observatories in Ganga Yamuna Valley, Vol. XIV,
Department of Earthquake Engineering, Roorkee, Department of Earthquake
Engineering,IITRoorkee.
400. Agrawal,R.C.,andM.L.Sharma,EQ:9502(1995)Stationseismologicalbulletinfor
TehriandNarendranagarObservatoryfortheperiodApril93toMarch94,Department
of Earthquake Engineering, Roorkee, Department of Earthquake Engineering, IIT
Roorkee.
401. Kumar, A., A. D. Pandey and M. L. Sharma, THDC Rishikesh (1995), Seismological
network in and around Tehri region, Department of Earthquake Engineering, IIT
Roorkee.
402. Agrawal,P.N.,A.R.Chandrasekaran,B.C.MathurandM.L.Sharma,EQ:9410(1994),
Site specific earthquake parameters for Renuka Dam site (Himachal Pradesh),
Department of Earthquake Engineering, Roorkee, Department of Earthquake
Engineering,IITRoorkee.
403. Chandrasekaran,A.R.,andM.L.Sharma,EQ:9408(1994),Sitespecificearthquake
parameters for Jegurupadu combined cycle power plant site (Andhra Pradesh),
Department of Earthquake Engineering, Roorkee, Department of Earthquake
Engineering,IITRoorkee.
404. Agrawal, R. C., and M. L. Sharma, EQ : 9407 (1994) Station seismological bulletin for
TehriandNarendranagarObservatoryfortheperiodApril92toMarch93,Department
of Earthquake Engineering, Roorkee, Department of Earthquake Engineering, IIT
Roorkee.
405. Agrawal R. C., and M. L. Sharma, EQ : 9406 (1994), Report on the seismological data
from April 92March 93 obtained at observatories in Ganga Yamuna Valley, Vol. XIII,
Department of Earthquake Engineering, Roorkee, Department of Earthquake
Engineering,IITRoorkee.
406. Kumar,A.,A.D.PandeyandM.L.Sharma,Statusreport(1994),DeploymentofShort
ApertureDigitalTelemeteredSampleSeismicArrayinGangaYamunaValley,submitted
totheDST,DepartmentofEarthquakeEngineering,IITRoorkee.
407. Agrawal,R.C.,andM.L.Sharma,EQ:9321(1993),Reportontheseismologicaldata
from April 90March 92 obtained at observatories in Ganga Yamuna Valley, Vol. XII,
Department of Earthquake Engineering, Roorkee, Department of Earthquake
Engineering,IITRoorkee.
408. Agrawal, R. C., and M. L. Sharma, EQ : 9319 (1993) Station seismological bulletin for
TehriandNarendranagarObservatoryfortheperiodApril90toMarch91,Department
of Earthquake Engineering, Roorkee, Department of Earthquake Engineering, IIT
Roorkee.
409. Kumar,A.,A.D.PandeyandM.L.Sharma,Statusreport(1993),DeploymentofShort
ApertureDigitalTelemeteredSampleSeismicArrayinGangaYamunaValley,submitted
totheDST,DepartmentofEarthquakeEngineering,IITRoorkee.
410. Kumar, A., A. D. Pandey and M. L. Sharma, DST, New Delhi (1992), Monitoring of
microearthquake activity around Tehri region using telemetered seismic array,
DepartmentofEarthquakeEngineering,IITRoorkee.
411. Srivastava,L.S.,andM.L.Sharma,Finalreport(1992),DeploymentofShortAperture
Digital Telemetered Sample Seismic Array in GangaYamuna Valley, submitted to the
DST,DepartmentofEarthquakeEngineering,IITRoorkee.
412. Srivastava,L.S.,andM.L.Sharma,Statusreport(1991),DeploymentofShortAperture
Digital Telemetered Sample Seismic Array in GangaYamuna Valley, submitted to the
DST,DepartmentofEarthquakeEngineering,IITRoorkee.
413. Sharma,M.L.,EQ:9003(1990),Datamanagementandsoftwareforshortaperture
Telemetered digitalseismicarrayin GangaYamunavalley,DepartmentofEarthquake
Engineering,Roorkee,DepartmentofEarthquakeEngineering,IITRoorkee.
414. Srivastava,L.S.,andM.L.Sharma,Statusreport(1990),DeploymentofShortAperture
Digital Telemetered Sample Seismic Array in GangaYamuna Valley, submitted to the
DST,DepartmentofEarthquakeEngineering,IITRoorkee.
415. Srivastava, L. S., H. R. Wason, Kirat Pal and M. L. Sharma, Status report (1989),
Deployment of Short Aperture Digital Telemetered Sample Seismic Array in Ganga
Yamuna Valley, submitted to the DST, Department of Earthquake Engineering, IIT
Roorkee.
416. Srivastava, L. S., B. C. Mathur, S. Basu, A. R. Chandrasekaran, A. Sinhval and M. L.
Sharma,EQ:8803(1988),Reportonreviewofdesignofearthquakeparametersand
ground motion data for evaluation of structures of Narora Atomic Power Plant site,
DepartmentofEarthquakeEngineering,IITRoorkee.
417. Srivastava, L. S., H. R. Wason, Kirat Pal and M. L. Sharma, Status report (1988),
Deployment of Short Aperture Digital Telemetered Sample Seismic Array in Ganga
Yamuna Valley, submitted to the DST, Department of Earthquake Engineering, IIT
Roorkee.
418. Srivastava, L. S., H. R. Wason, Kirat Pal and M. L. Sharma, Status report (1987),
Deployment of Short Aperture Digital Telemetered Sample Seismic Array in Ganga
Yamuna Valley, submitted to the DST,, Department of Earthquake Engineering, IIT
Roorkee.
419. Srivastava,L.S.,H.R.WasonandM.L.Sharma,DST,NewDelhi,Statusreport(1986),
ShortApertureTelemeteredDigitalSeismicArrayinGangaYamunaValley,Department
ofEarthquakeEngineering,IITRoorkee.
420. Srivastava,L.S.,H.R.Wason,KiratPalandM.L.Sharma,EQ:8612(1986),Status
report on Short aperture telemetered sample seismic array in Ganga Yamuna Valley,
DepartmentofEarthquakeEngineering,Roorkee.

You might also like