FIELD DATA
TUBING
LOCATION WELL NO. CASING SIZE TYPE OF INSTALL Date
TYPE/WT
3-1/2" EUE
D1 D1 - C6 9-5/8" NEW 01-Nov-14
Tbg,9.3ppf
COMPLETION TALLY DETAILS
SEAL
NO. OF
PUMP DEPTH (M) PUMP INTAKE DEPTH (M) DEPTH(Tandem MOTOR DEPTH (M) SENSOR DEPTH (M)
STANDS/JOINTS
)
1726.12m from
58 Stands/04 Joints 1723.72m md KB 1724.02m from KB 1731.33m from KB 1731.9m from KB
KB
SUB-ASSEMBLY DETAILS
SUB-ASSEMBLY Workshop
FACTORY FITTED Torque value Assembly Type
DETAILS Make up
Motor to well lift
No 35 ft-lbs N/A NEW. TORQUED AT SITE
sensor
Well Lift Sensor 205-05202 Well Lift Sensor N/A 4.5 0.57
Reel No.
02SOL/5KV/90/LD/B/GAL/F/NO
Power cable 78H52626/Batch No. N/A N/A 1803m
ADH
104760007C
Packer Penetrator Assy C315907/C322195 QCI Packer Penetrator N/A N/A N/A
Before Startup/After
3.3 3.3 3.3 480 M 480 M 480 M
packet setting
DISCHARGE
YES YES 4000 Psi 10 Mins OK
PRESSURE LINE
SPLICING DETAILS
Total Cable splices Location
4 MLE to #2 AWG DH Power Cable
Additonal Comments
Job carried out by RIG: Discovery1. Tool box talk for each crew change was conducted. Equipment assembly done as per Baker Hughes
procedure/ONGC Programme. Well head surface penetrator connections fastened and secured. 1 Cross coupling per joint provided by BHI up to the
top, (Total nos. 179).Twin Seal Packer set/Safety valves installed as per Baker Hughes procedure and ONGC programme.Electrical Checks conducted
and redaings found to be OK. Ph-Ph 3.3 Ohms. Ph-GND 480 MOhms.
Field Service
Company Man Expat Field Service Engineer Third Party Date of Installation
Engineers
Mr.Chaturvedi/Mr.R
Veeramani/Giri 28-Oct-14
anjan Das
Baker Hughes
Santosh/Simbu
Supervisor
Veeramani R Date of Completion
01-Nov-14
Date
Installation Report Made by Veeramani R