I~ Document No.:
Revision No.
I -S012-C-FQ-02
1
TCE.5146A-CV-570-032
IPL Performer! FQA Engineer IPL Site Engineering In charge Engineering Center! Head (Design)
CRITICAL (A)
FQA Engineer in association with Executing
CGPL Head of Section Head! Engineering
Department
LEGENDS:
A=Critical , B=Major , C=Minor ; 'A' shall be witnessed by CGPL FQAI FQC, 'B' shall be witnessed by CGPL Erection I Construction deptt. 'C' shall be witnessed by IPL (A
check shall be CGPL HOLD POINT stage ); SR-Site Register, TR-Test Report, MTC- Manufacturer's Test Certificate, LB- Log Book, IPL: The Indure Pvt. Ltd.
GENERAL NOTES:
All measuring devices and instruments mounted on equipments to be used at field laboratory as well as field must be calibrated from Govt.l NABL Approved
1
Third Party Agency! Laboratory.
2 Field calibration, if any must be witnessed by CGPL & same should be HOLD point.
3 Non Destructive Testing of welding points as per Field Welding Data Sheet.
4 Wherever log sheet is not called for, suitable record shall be maintained in logbook I protocol.
S In case of nonconformity, accepting authority shall ensure disposition of nonconformity before acceptance & disposition shall be reflected in log sheet! protocol.
6 CGPL Technical speCification and CGPL approved documents relevant to the product shall be applicable.
7 CGPL shall witness 'A' category checks. CGPL is also authorized to canry out surveillance in any of B & C category of checks at their discretion.
8 CGPLlIPL shall ensure that instruments with valid calibration are used for measurement.
10 In case of conflict with TCE Technical SpeCification, the priority should be Approved Field Quality Plan
~
THE INDliRE PRIVATE LIMITED I -5012-C-FQ-02 PACKAGE: ASH HANDLING PLANT
A General Requirements
Availability of QA &
QC manpower based As per Site As per CGPL approved
b
on deployment - B Physical Monthly
Mobilzation Plan Site Mobilization Plan
SR
schedule.
Availability of
Construction As per Site As per CGPL approved
c
Equipment in working - B Physical Monthly
Mobilzation Plan Site Mobilization Plan
SR
condition
Submission of
As per techincal specs.,
schedule of tests to As per Technical
d
be done to CGPL for - B Physical Monthly
Specifications
Drawings and approved SR
Methodology
monitoring
1 Excavation
As per Approved
a Nature of Soil As Required B Visual Random SR
Scheme
Digital
Approved
b Initial ground Level Thedoloite I B Measurement 100% SR
Drawings
Auto Level
1 OF 11
4000 MW ULTRA MEGA POWER PLANT PROJECT AT
FIELD QUALITY PLAN CIVIL WORKS PROJECT:
MUNDRA
~
THE fNDlIRE PR'VATE LIMlTED 1-5012-C-FQ-02 PACKAGE: ASH HANDLING PLANT
1 2 3 4 5 G 7 8 9 10
Dimension of Approved
c As Required B Measurement 100% SR
excavated pit Drawings
Approved
d Final pit or bed level As Required B Measure 100% SR
Drawings
Side Slope During Approved
e As Required B Measurement Random SR
Excavation Drawings
C Materials
.
1 Cement
2 OF 11
4000 MW ULTRA MEGA POWER PLANT PROJECT AT
FIELD QUAI_ITYPLAN - CIVIL WORKS PROJECT:
MUNDRA
~
THE INDURE PRIVATE LIMITED I-5012-C-FQ-02 PACKAGE: ASH HANDLING PLANT
1 2 3 4 5 6 7 8 9 10
2 Coarse Aggregate SR
Results to be as per
Sieve, balance,
Particle size and Once per 200 cum the requirement of
oven, thickness, As per techincal specs.,
shape (sieve Analysis, A or part thereof or IS: 2386 Part-l & design mix, subject to
a flakiness index,
gauge length, Physical
change of source, specifications
Canst. Dwgs. and SR
m1) variations within the
gauge Metal approved Methodology
elongation index) whichever is earlier limits specified in
Scoop
relevent IS Codes
Mechanical
IS: 2386(IV), As per techincal specs., Report from To be tested at out
Properties- Crushing Once at the time of
d As required A Physical 15:383 and Const. Dwgs. and Approved Lab I side Laboratory at the
value, abrasion value Mix design
specifications approved Methodology SR time of mix design
and impact value
3 OF 11
4000 MW ULTRA MEGA POWER PLANT PROJECT AT
FIELD QUALITY PLAN - CIVIL WORKS PROJECT:
MUNDRA
~
THE INDURE PRIVATE LIMITED 1-5012-C-FQ..Q2 PACKAGE: ASH HANDLING PLANT
3 Fine Aggregates/Sand
Silt, Clay deleterious IS: 2386 (II), IS: As per techincal specs.,
Once per each Acceptance norms
d materials, organiC As required B Physical 383 and Const. Dwgs. and SR
source shall be as per IS:383
impurities specifications approved Methodology
4 OF 11
4000 MW ULTRA MEGA POWER PLANT PROJECT AT
FIELD QUALITY PLAN - CIVIL WORKS PROJECT:
MUNDRA
~
THE INDURE PRIVATE LIMITED 1-5012-C-FQ-02 PACKAGE: ASH HANDLING PLANT
5 OF 11
4000 MW ULTRA MEGA POWER PLANT PROJECT AT
FIELD QUALITY PLAN - CIVIL WORKS PROJECT:
MUNDRA
~
THE INDURE PRIVATE LIMITED I-5012-C-FQ-02 PACKAGE: ASH HANDLING PLANT
5 Concrete
Till The
Establishment
of Site Lab.
Report from For trial mix min. of 6
Approved Lab cubes for each mix., 3
Min. 2 Trial Mixes
to be specimen shall be
Trial Mix & Design for each grade of IS:516, IS:456 &
a As required A Physical
concrete to be
As per techincal specs forwarded, tested at 7 days,
Mix Specification
Carried Out At
Site.
Acceptance norms
Standard
As per techincal shall be as per IS 456.
Apparatus for IS: 456 &
b Workability test. B Physical As required specs.,Const. Drgs. And SR slump test for
measuring specifications
6 OF 11
4000 MW ULTRA MEGA POWER PLANT PROJECT AT
FIELD QUALITY PLAN CIVIL WORKS PROJECT:
MUNDRA
~
THE INDURE PRIVATE LIMITED 1-5012-C-FQ-02 KAGE: ASH HANDLING PLANT
1 2 3 4 5 6 7 8 9 10
As per
As per construction
(3) Palcing of Concrete Visual B Physical 100% construction
methodology
methodology
Chech for
Chech for Segregation
(4) Compaction As Required B Physical At random Segregation As
As per IS 456.
per IS 456.
7 OF 11
4000 MW ULTRA MEGA POWER PLANT PROJECT AT
FIELD QUALITY PLAN - CIVIL WORKS PROJECT:
MUNDRA
~
THE INDURE PRIVATE LIMITED I-5012-C-FQ-02 PACKAGE: ASH HANDLING PLANT
6 Form Work
Staging Work
Construction As per techincal
(Durability, strength Concrete Pour
b As required B Visual Once Drawings and specs.,Const. Drgs. And
and soundness of Card
specifications approved Methodology
staging, joints
c Shuttering
Form work material
shall be strictly as per
specifications and
approval of the
Engineer. Materials
for form work shall
As per techincal specs.,
As per unwarped, throughly
(1 ) Materials As required B Visual Random Const. Drgs. And
Specification clean and without
approved Methodology
broken or damaged
edges either due to
repetative use or
otherwise. Oiling of
form work before
concrete
8 OF 11
4000 MW ULTRA MEGA POWER PLANT PROJECT AT
FIELD QUALITY PLAN - CIVIL WORKS PROJECT:
MUNDRA
~
THE INDlJRE PRIVATE LIMITED I-5012C-FQ-02 PACKAGE: ASH HANDLING PLANT
1 2 3 4 5 6 7 8 9 10
7 Reinforcement steel
90F 11
4000 MW ULTRA MEGA POWER PLANT PROJECT AT
FIELD QUALITY PLAN - CIVIL WORKS PROJECT:
MUNDRA
~
THE INDURE PRIVATE LIMITED 1-5012-C-FQ-02 PACKAGE: ASH HANDLING PLANT
I Grouting
Procurement to be
Technical
Technical Specifications done from approved /
a Material As required B Physical Randomly Specifications &
& AFC drawings acceptable
AFC drawings
manufacturer / source
Approved
b Grouting pressure Test set up B Physical At random Approved drawings
drawings
As per
manufacture's As per manufacture's Random to be
c Composition of grout As required B Physical Each lot / Batch
Tech. Tech. specifications checked by QAP
specifications
10 OF 11
4000 MW ULTRA MEGA POWER PLANT PRO.IECT AT
FIELD QUALITY PLAN - CIVIL WORKS PROJECT:
MUNDRA
~
THE INDUREPRIVATE LIMITED 1-5012-C-FQ-02 PACKAGE: ASH HANDLING PLANT
r:-r
1 2
TC submitted should
bear proper
All bought out items to identification or
be procured from the Tech correlation with the
Verification of Tech Specification. 1
a approved vendor and B 100% Specification. I batch of material
TC or testing BOQ
on approval of Quality BOQ supplied and same
plans by CGPL shall be brought out in
the challan I
consignment note
Submission of list of
bought out itemsand
Tech
their vendors for Tech Specification.
b 8 Physical one time Specification.
eachof the bought out 180Q
IBOQ
item identified for
approval
11 OF 11