0% found this document useful (0 votes)
95 views52 pages

Sched of Activities

The document provides a scheduling table for various construction activities over multiple floors of a building. It lists over 100 activities in chronological order with estimated times and crew sizes. The scheduling table provides a detailed plan for the sequencing of construction tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
95 views52 pages

Sched of Activities

The document provides a scheduling table for various construction activities over multiple floors of a building. It lists over 100 activities in chronological order with estimated times and crew sizes. The scheduling table provides a detailed plan for the sequencing of construction tasks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 52

SCHEDULING

ACTIVITY ESTIMATED NUMBER OF


NO. WORK DESCRIPTION TIME MEN
A 1-2 SITE CLEARING AND GRUBBING 1
B 2-3 DELIVERY OF MATERIALS FOR FIELD OFFICE AND CONSTRUCTION 2
C 3-4 MOBILIZATION 3
D 3-5 DELIVERY OF MATERIALS 4
E 4-6 LAYOUT AND BATTERBOARD 5
F 5-7 FABRICATION OF REBARS FOR COLUMN, CF, GB AND WF (1ST FLR) 6
G 5-8 FABRICATION OF FORMS FOR COLUMN & GB, SCAFFOLDS(1ST FLR) 7
H 6-7 EXCAVATION FOR COLUMN FOOTING, GROUND BEAM AND WF 8
I 7-9 INSTALLATION OF REBARS FOR COLUMN AND CF (1ST FLR) 9
J 7-12 DUMMY 10
K 8-10 INSTALLATION OF FORMS, SCAFFOLDING FOR COLUMNS (BELOW NGL) 11
L 9-10 CONCRETING OF COLUMN FOOTING 12
M 10-11 CONCRETING OF COLUMN (BELOW NGL) 13
N 11-12 STRIPPING OF FORMS & SCAFFOLDING OF COLUMN (BELOW NGL) 14
O 12-13 INSTALLATION OF REBARS FOR WALL FOOTING AND GB (1ST FLR) 15
P 12-14 INSTALLATION OF FORMS FOR GROUND BEAM 16
Q 13-14 DUMMY 17
R 14-15 CONCRETING OF GROUND BEAM AND WALL FOOTING (1ST FLR) 18
S 14-16 FABRICATION OF REBARS FOR COLUMN (1ST FLR) 19
T 14-17 FABRICATION OF REBARS FOR ELEVATOR HOUSE 20
U 15-17 STRIPPING OF FORMS FOR GROUND BEAM 21
V 16-17 DUMMY 22
W 17-18 INSTALLATION OF REBARS FOR COLUMN (1ST FLR) 23
X 17-19 INSTALLATION OF REBARS FOR ELEVATOR HOUSE 24
Y 18-20 FABRICATION OF FORMS FOR COLUMN 25
Z 19-20 FABRICATION OF FORMS FOR ELEVATOR HOUSE 26
AA 20-21 INSTALLATION OF FORMS FOR COLUMN 27
AB 20-22 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (1ST FLR) 28
AC 21-22 DUMMY 29
AD 22-23 CONCRETING OF COLUMN AND ELEVATOR HOUSE (1ST FLR) 30
AE 23-24 STRIFFING OF FORMS FOR COLUMN (NGL TO BELOW BEAM OF 2ND FLOOR) 31
AF 23-25 SOIL POISONING AND EXCAVATING OF SEPTIC TANK AND CATCH BASIN 32
AG 24-26 BACKFILLING OF FOOTING 33
AH 24-27 EARTHFILLING FOR SLAB (SUBJECTED TO SOIL) 34
AI 24-25 FABRICATION OF REBARS FOR FOOTING OF SEPTIC TANK 35
AJ 25-26 INSTALLATION OF REBARS FOR FOOTING OF SEPTIC TANK 36
AK 25-27 DUMMY 37
AL 26-28 CONCRETING OF FOOTING OF SEPTIC TANK 38
AM 27-29 LAYING OF CHB FOR WALL (1ST FLR) 39
AN 28-29 FABRICATION OF REBARS FOR BEAMS (2ND FLR) 40
AO 28-30 LAYING OF CHB FOR SEPTIC TANK AND CATCH BASIN 41
AP 29-31 INSTALLATION OF REBARS FOR BEAM (2ND FLR) 42
AQ 29-32 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (2ND FLR) 43
AR 30-33 PLASTERING OF INSIDE WALL OF SEPTIC TANK 44
AS 31-32 DUMMY 45
AT 32-34 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (2ND FLR) 46
AU 33-35 FABRICATION OF FORMS FOR SLAB OF SEPTIC TANK AND CATCH BASIN 47
AV 34-36 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (2ND FLR) 48
AW 35-36 INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (2ND FLR) 49
AX 36-37 INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (2ND FLR) 50
AY 36-38 FABRICATION OF REBARS FOR SLAB (2ND FLR) 51
AZ 37-39 INSTALLATION OF REBARS FOR SLAB (2ND FLR) 52
BA 39-40 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (2ND FLR) 53
BB 39-41 FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY 54
BC 39-42 FABRICATION OF REBARS FOR STAIRWAY 55
BD 40-41 CONCRETING OF BEAM AND SLAB (2ND FLR) 56
BE 41-42 INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY 57
BF 41-43 STRIPPING OF FORMS OF BEAM (2ND FLR) 58
BG 41-44 FABRICATIONS OF REBARS FOR COLUMN (2ND FLR) 59
BH 41-45 FABRICATION OF REBARS FOR ELEVATOR HOUSE (2ND FLR) 60
BI 42-43 INSTALLATION OF REBARS FOR STAIRWAY 61
BJ 43-44 DUMMY 62
BK 44-45 INSTALLATIONS OF REBARS FOR COLUMN (2ND FLR) 63
BL 44-46 INSTALLATION OF REBARS FOR ELEVATOR HOUSE (2ND FLR) 64
BM 44-47 CONCRETING OF STAIRWAY 65
BN 45-48 FABRICATIONS OF FORMS FOR COLUMN (2ND FLR) 66
BO 46-48 FABRICATIONS OF FORMS FOR ELEVATOR HOUSE (2ND FLR) 67
BP 47-48 STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY 68
BQ 48-49 INSTALLATION OF FORMS FOR COLUMN (2ND FLR) 69
BR 48-50 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (2ND FLR) 70
BS 49-50 DUMMY 71
BT 50-51 CONCRETING OF COLUMN AND ELEVATOR HOUSE (2ND FLR) 72
BU 51-52 FABRICATIONS OF REBARS FOR BEAMS (3RD FLOOR) 73
BV 51-53 STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (2ND FLR) 74
BW 52-53 DUMMY 75
BX 53-54 LAYING OF CHB WALL (2ND FLR) 76
BY 54-55 INSTALLATION OF REBARS FOR BEAMS (3RD FLR) 77
BZ 54-56 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (3RD FLR) 78
CA 55-56 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (3RD FLR) 79
CB 56-57 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (3RD FLR) 80
CC 56-58 INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (3RD FLR) 81
CD 56-59 FABRICATION OF REBARS FOR SLAB (3RD FLR) 82
CE 57-58 DUMMY 83
CF 58-59 INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (3RD FLR) 84
CG 59-60 INSTALLATION OF REBARS FOR SLAB (3RD FLR) 85
CH 60-61 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (3RD FLR) 86
CI 60-62 FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (2ND FLR 87
CJ 60-63 FABRICATION OF REBARS FOR STAIRWAY (2ND FLR) 88
CK 61-62 CONCRETING OF BEAM AND SLAB (3RD FLR) 89
CL 62-63 INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY(2ND FLR 90
CM 62-64 STRIPPING OF FORMS OF BEAM (3RD FLR) 91
CN 62-65 FABRICATIONS OF REBARS FOR COLUMN (3RD FLR) 92
CO 62-66 FABRICATION OF REBARS FOR ELEVATOR HOUSE (3RD FLR) 93
CP 63-64 INSTALLATION OF REBARS FOR STAIRWAY (2ND FLR) 94
CQ 64-65 DUMMY 95
CR 65-66 INSTALLATIONS OF REBARS FOR COLUMN (3RD FLR) 96
CS 65-67 INSTALLATION OF REBARS FOR ELEVATOR HOUSE (3RD FLR) 97
CT 65-68 CONCRETING OF STAIRWAY (2ND FLR) 98
CU 66-69 FABRICATIONS OF FORMS FOR COLUMN (3RD FLR) 99
CV 67-69 FABRICATIONS OF FORMS FOR ELEVATOR HOUSE(3RD FLR) 100
CW 68-69 STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (2ND FLR) 101
CX 69-70 INSTALLATION OF FORMS FOR COLUMN (3RD FLR) 102
CY 69-71 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (3RD FLR) 103
CZ 70-71 DUMMY 104
DA 71-72 CONCRETING OF COLUMN AND ELEVATOR HOUSE (3RD FLR) 105
DB 72-73 FABRICATIONS OF REBARS FOR BEAMS (4TH FLR) 106
DC 72-74 STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (3RD FLR) 107
DD 73-74 DUMMY 108
DE 74-75 LAYING OF CHB WALL (3RD FLR) 109
DF 75-76 INSTALLATION OF REBARS FOR BEAMS (4TH FLR) 110
DG 75-77 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (4TH FLR) 111
DH 76-77 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (4TH FLR) 112
DI 77-78 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (4TH FLR) 113
DJ 77-79 INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (4TH FLR) 114
DK 77-80 FABRICATION OF REBARS FOR SLAB (4TH FLR) 115
DL 78-79 DUMMY 116
DM 79-80 INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (4TH FLR) 117
DN 80-81 INSTALLATION OF REBARS FOR SLAB (4TH FLR) 118
DO 81-82 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (4TH FLR) 119
DP 81-83 FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (3RD FLR 120
DQ 81-84 FABRICATION OF REBARS FOR STAIRWAY (3RD FLR) 121
DR 82-83 CONCRETING OF BEAM AND SLAB (4TH FLR) 122
DS 83-84 INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY(3RD FL 123
DT 83-85 STRIFFING OF FORMS OF BEAM (4TH FLR) 124
DU 83-86 FABRICATIONS OF REBARS FOR COLUMN (4TH FLR) 125
DV 83-87 FABRICATION OF REBARS FOR ELEVATOR HOUSE (4TH FLR) 126
DW 84-85 INSTALLATION OF REBARS FOR STAIRWAY (3RD FLR 127
DX 85-86 DUMMY 128
DY 86-87 INSTALLATIONS OF REBARS FOR COLUMN (4TH FLR) 129
DZ 86-88 INSTALLATION OF REBARS FOR ELEVATOR HOUSE (4TH FLR) 130
EA 86-89 CONCRETING OF STAIRWAY (3RD FLR 131
EB 87-90 FABRICATIONS OF FORMS FOR COLUMN(4TH FLR) 132
EC 88-90 FABRICATIONS OF FORMS FOR ELEVATOR HOUSE(4TH FLR) 133
ED 89-90 STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (3RD FLR 134
EE 90-91 INSTALLATION OF FORMS FOR COLUMN (4TH FLR) 135
EF 90-92 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (4TH FLR) 136
EG 91-92 DUMMY 137
EH 92-93 CONCRETING OF COLUMN AND ELEVATOR HOUSE (4TH FLR) 138
EI 93-94 FABRICATIONS OF REBARS FOR BEAMS (RD ) 139
EJ 93-95 STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (4TH FLR) 140
EK 94-95 DUMMY 141
EL 95-96 LAYING OF CHB WALL (4TH FLR) 142
EM 96-97 INSTALLATION OF REBARS FOR BEAMS (RD) 143
EN 96-98 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (RD) 144
EO 97-98 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (RD) 145
EP 98-99 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (RD) 146
EQ 98-100 INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (RD) 147
ER 98-101 FABRICATION OF REBARS FOR SLAB (RD) 148
ES 99-100 DUMMY 149
ET 100-101 INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (RD) 150
EU 101-102 INSTALLATION OF REBARS FOR SLAB (RD) 151
EV 102-103 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (RD) 152
EW 102-104 FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (4TH FLR 153
EX 102-105 FABRICATION OF REBARS FOR STAIRWAY 4TH FLR 154
EY 103-104 CONCRETING OF BEAM AND SLAB (RD) 155
EZ 104-105 INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (4TH FL 156
FA 104-106 STRIFFING OF FORMS OF BEAM (RD) 157
FB 104-107 FABRICATIONS OF REBARS FOR COLUMN (RD) 158
FC 104-108 FABRICATION OF REBARS FOR ELEVATOR HOUSE (RD) 159
FD 105-106 INSTALLATION OF REBARS FOR STAIRWAY (4TH FLR) 160
FE 106-107 DUMMY 161
FF 107-108 INSTALLATIONS OF REBARS FOR COLUMN (RD) 162
FG 107-109 INSTALLATION OF REBARS FOR ELEVATOR HOUSE (RD) 163
FH 107-110 CONCRETING OF STAIRWAY (4TH FLR) 164
FI 108-111 FABRICATIONS OF FORMS FOR COLUMN (RD) 165
FJ 109-111 FABRICATIONS OF FORMS FOR ELEVATOR HOUSE (RD) 166
FK 110-111 STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (4TH FLR) 167
FL 111-112 INSTALLATION OF FORMS FOR COLUMN (RD) 168
FM 111-113 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (RD) 169
FN 112-113 DUMMY 170
FO 113-114 CONCRETING OF COLUMN AND ELEVATOR HOUSE (RD) 171
FP 114-115 FABRICATIONS OF REBARS FOR BEAMS (ROOF) 172
FQ 114-116 STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (RD) 173
FR 115-116 DUMMY 174
FS 116-117 LAYING OF CHB WALL (RD) 175
FT 117-118 INSTALLATION OF REBARS FOR BEAMS(ROOF) 176
FU 117-119 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (ROOF) 177
FV 118-119 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (ROOF) 178
FW 119-120 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (ROOF) 179
FX 119-121INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (ROOF) 180
FY 119-122FABRICATION OF REBARS FOR SLAB (ROOF) 181
FZ 120-121 DUMMY 182
GA 121-122 INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (ROOF) 183
GB 122-123 INSTALLATION OF REBARS FOR SLAB (ROOF) 184
185
GC 123-124 STRIFFING OF INSIDE FORMS, SCAFFOLDINGS AND STAGING FOR BEAMS AND
SLAB(1ST FLR TO 4RTH FLR) 186
GD 123-125 CONCRETING OF BEAM AND SLAB (ROOF) 187
GE 124-126 LAYING OF CHB FOR KITCHEN AND LAVATORIES (1ST FLOOR TO FOURTH FLOOR) 188
189
GF 124-127 FABRICATION OF FORMS FORTO
SLAB OF KITCHEN AND LAVATORIES (1ST FLOOR
FOURTH FLOOR)
GF 124-127 FABRICATION OF FORMS FORTO
SLAB OF KITCHEN AND LAVATORIES (1ST FLOOR
FOURTH FLOOR) 190
191
GG 125-127 INSTALLATION OF REBARS FOR SLAB OF KITCHEN AND LAVATORIES (1ST FLR TO
FOURTH FLR) 192
GH 126-127 DUMMY 193
GI 127-128 CONCRETING OF SLAB OF KITCHEN AND LAVATORIES (1ST FLR TO FOURTH FLR) 194
195
GJ 128-129 STRIFFING OF FORMS FOR SLABFOURTH
OF KITCHEN AND LAVATORIES (1ST FLOOR TO
FLOOR) 196
GK 128-130 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (GROUND FLR) 197
GL 129-131 FINISHING OF PLUMBING AND WATER PIPE CONNECTIONS 198
GM 131-132 LAYING OF REBARS FOR SLAB (GROUND FLR) 199
GN 131-133 CONCRETING OF SLAB AND SLAB OF SEPTIC TANK AND CATCH BASIN 200
GO 131-134 FIXING OF ELECTRICAL CONNECTIONS 201
GP 134-135 PLASTERING OF CHB WALL (1ST FLOOR) 202
GQ 134-136 PLASTERING OF CHB WALL (2ND FLOOR) 203
GR 134-137 PLASTERING OF CHB WALL (3RD FLOOR) 204
GS 134-138 PLASTERING OF CHB WALL (4TH FLOOR) 205
GT 134-139 PLASTERING OF CHB WALL (ROOF DECK) 206
GU 134-140 FABRICATION OF TRUSS FOR GENERATOR AND PUMP HOUSE 207
GV 135-139 DUMMY 208
GW 136-139 DUMMY 209
GX 137-139 DUMMY 210
GY 138-139 DUMMY 211
GZ 139-141 INSTALLATION OF FABRICATED WINDOWS 212
HA 139-142 INSTALLATION OF FABRICATED DOORS INCLUDING JAMB 213
HB 140-142 INSTALLATION OF TRUSS FOR GENERATOR AND PUMP HOUSE 214
HC 141-142 DUMMY 215
HD 142-143 INSTALLATION OF PURLINS 216
HE STRIPPING OF FORMS, SCAFFOLDINGS AND STAGING FOR SLAB(1ST FLR TO 217
143-144
HF 5TH FLR) 218
HG 144-145 DUMMY 219
HH 145-146INSTALLATION OF ROOF SHEET 220
HI 145-147INSTALLATION OF CEILING FRAME AND CEILING FORM 221
HJ 146-147 INSTALLATION OF RAILING 222
HK 147-148 INSTALLATION OF ELECTRICAL FIXTURES 223
HL 147-149 INSTALLATION OF TILE WORKS 224
HM 147-150 LAYING OF REBARS FOR SLAB OF PARKING 225
HN 148-150 DUMMY 226
HO 149-150 DUMMY 227
HP 150-151 INSTALLATION OF STAIR IN FIRE EXIT 228
HQ 151-152 PAINTING WORKS 229
HR 151-153 INSTALLATION OF PLUMBING FIXTURES 230
HS 152-153 CONCRETING OF SLAB OF PARKING
HT 153-154 CLEARING OF SITE FOR FINAL INSPECTION AND TRANSFER TO THE OWNER
VICENT KAW NA BAHALA MAG-AYOS SA PAGKAKASUNOD NETO
UNG MGA ACTIVITIES NA KAKAYLANGAN NYO NG ESTIMATE. KUNG WALA PAKIGAWAN NYO KASE KAYLANGAN UN

SITE CLEARING AND GRUBBING


DELIVERY OF MATERIALS FOR FIELD OFFICE AND CONSTRUCTION
MOBILIZATION
DELIVERY OF MATERIALS
LAYOUT AND BATTERBOARD
ANGAN UN
DATA
ACTI SHEET ESTIMA CRITICA
WORK DESCRIPTION START FINISH FLOAT L
VITY TED ACTIVIT
NO. TIME ES LS EF LF TF FF Y
A 1-2 SITE CLEARING AND GRUBBING 1 0 188 1 189 188 0
B 2-3 DELIVERY OF MATERIALS FOR FIELD OFFICE AND CONSTRUCTION 2 1 189 3 191 188 0
C 3-4 MOBILIZATION 3 3 191 6 194 188 0
D 3-5 DELIVERY OF MATERIALS 4 3 197 7 201 194 0
E 4-6 LAYOUT AND BATTERBOARD 5 6 194 11 199 188 0
F 5-7 FABRICATION OF REBARS FOR COLUMN, CF, GB AND WF (1ST FLR) 6 7 201 13 207 194 6
G 5-8 FABRICATION OF FORMS FOR COLUMN & GB, SCAFFOLDS(1ST FLR) 7 7 210 14 217 203 0
H 6-7 EXCAVATION FOR COLUMN FOOTING, GROUND BEAM AND WF 8 11 199 19 207 188 0
I 7-9 INSTALLATION OF REBARS FOR COLUMN AND CF (1ST FLR) 9 19 207 28 216 188 0
J 7-12 DUMMY 10 19 245 29 255 226 38
K 8-10 INSTALLATION OF FORMS, SCAFFOLDING FOR COLUMNS (BELOW NGL) 11 14 217 25 228 203 15
L 9-10 CONCRETING OF COLUMN FOOTING 12 28 216 40 228 188 0
M 10-11 CONCRETING OF COLUMN (BELOW NGL) 13 40 228 53 241 188 0
N 11-12 STRIPPING OF FORMS & SCAFFOLDING OF COLUMN (BELOW NGL) 14 53 241 67 255 188 0
O 12-13 INSTALLATION OF REBARS FOR WALL FOOTING AND GB (1ST FLR) 15 67 255 82 270 188 0
P 12-14 INSTALLATION OF FORMS FOR GROUND BEAM 16 67 271 83 287 204 16
Q 13-14 DUMMY 17 82 270 99 287 188 0
R 14-15 CONCRETING OF GROUND BEAM AND WALL FOOTING (1ST FLR) 18 99 289 117 307 190 0
S 14-16 FABRICATION OF REBARS FOR COLUMN (1ST FLR) 19 99 287 118 306 188 0
T 14-17 FABRICATION OF REBARS FOR ELEVATOR HOUSE 20 99 308 119 328 209 21
U 15-17 STRIPPING OF FORMS FOR GROUND BEAM 21 117 307 138 328 190 2
V 16-17 DUMMY 22 118 306 140 328 188 0
W 17-18 INSTALLATION OF REBARS FOR COLUMN (1ST FLR) 23 140 330 163 353 190 0
X 17-19 INSTALLATION OF REBARS FOR ELEVATOR HOUSE 24 140 328 164 352 188 0
Y 18-20 FABRICATION OF FORMS FOR COLUMN 25 163 353 188 378 190 2
Z 19-20 FABRICATION OF FORMS FOR ELEVATOR HOUSE 26 164 352 190 378 188 0
AA 20-21 INSTALLATION OF FORMS FOR COLUMN 27 190 378 217 405 188 0
AB 20-22 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (1ST FLR) 28 190 406 218 434 216 28
AC 21-22 DUMMY 29 217 405 246 434 188 0
AD 22-23 CONCRETING OF COLUMN AND ELEVATOR HOUSE (1ST FLR) 30 246 434 276 464 188 0
AE 23-24 STRIFFING OF FORMS FOR COLUMN (NGL TO BELOW BEAM OF 2ND FLOOR) 31 276 464 307 495 188 0
AF 23-25 SOIL POISONING AND EXCAVATING OF SEPTIC TANK AND CATCH BASIN 32 276 498 308 530 222 34
AG 24-26 BACKFILLING OF FOOTING 33 307 533 340 566 226 38
AH 24-27 EARTHFILLING FOR SLAB (SUBJECTED TO SOIL) 34 307 571 341 605 264 38
AI 24-25 FABRICATION OF REBARS FOR FOOTING OF SEPTIC TANK 35 307 495 342 530 188 0
AJ 25-26 INSTALLATION OF REBARS FOR FOOTING OF SEPTIC TANK 36 342 530 378 566 188 0
AK 25-27 DUMMY 37 342 568 379 605 226 0
AL 26-28 CONCRETING OF FOOTING OF SEPTIC TANK 38 378 566 416 604 188 0
AM 27-29 LAYING OF CHB FOR WALL (1ST FLR) 39 379 605 418 644 226 38
AN 28-29 FABRICATION OF REBARS FOR BEAMS (2ND FLR) 40 416 604 456 644 188 0
AO 28-30 LAYING OF CHB FOR SEPTIC TANK AND CATCH BASIN 41 416 644 457 685 228 0
AP 29-31 INSTALLATION OF REBARS FOR BEAM (2ND FLR) 42 456 644 498 686 188 0
AQ 29-32 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (2ND FLR) 43 456 688 499 731 232 44
AR 30-33 PLASTERING OF INSIDE WALL OF SEPTIC TANK 44 457 685 501 729 228 0
AS 31-32 DUMMY 45 498 686 543 731 188 0
AT 32-34 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (2ND FLR) 46 543 731 589 777 188 0
AU 33-35 FABRICATION OF FORMS FOR SLAB OF SEPTIC TANK AND CATCH BASIN 47 501 729 548 776 228 0
AV 34-36 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (2ND FLR) 48 589 777 637 825 188 0
AW 35-36 INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (2ND FLR) 49 548 776 597 825 228 40
AX 36-37 INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (2ND FLR) 50 637 826 687 876 189 0
AY 36-38 FABRICATION OF REBARS FOR SLAB (2ND FLR) 51 637 825 688 876 188 0
AZ 37-39 INSTALLATION OF REBARS FOR SLAB (2ND FLR) 52 687 876 739 928 189 0
BA 38-39 DUMMY 52 688 876 740 928 188 -1
BB 39-40 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (2ND FLR) 53 739 928 792 981 189 0
BC 39-41 FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY 54 739 983 793 1037 244 55
BD 39-42 FABRICATION OF REBARS FOR STAIRWAY 55 739 1039 794 1094 300 111
BE 40-41 CONCRETING OF BEAM AND SLAB (2ND FLR) 56 792 981 848 1037 189 0
BF 41-42 INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY 57 848 1037 905 1094 189 0
BG 41-43 STRIPPING OF FORMS OF BEAM (2ND FLR) 58 848 1097 906 1155 249 60
BH 41-44 FABRICATIONS OF REBARS FOR COLUMN (2ND FLR) 59 848 1158 907 1217 310 121
BI 41-45 FABRICATION OF REBARS FOR ELEVATOR HOUSE (2ND FLR) 60 848 1224 908 1284 376 183
BJ 42-43 INSTALLATION OF REBARS FOR STAIRWAY 61 905 1094 966 1155 189 0
BK 43-44 DUMMY 62 966 1155 1028 1217 189 0
BL 44-45 INSTALLATIONS OF REBARS FOR COLUMN (2ND FLR) 63 1028 1221 1091 1284 193 0
BM 44-46 INSTALLATION OF REBARS FOR ELEVATOR HOUSE (2ND FLR) 64 1028 1219 1092 1283 191 0
BN 44-47 CONCRETING OF STAIRWAY 65 1028 1217 1093 1282 189 0
BO 45-48 FABRICATIONS OF FORMS FOR COLUMN (2ND FLR) 66 1091 1284 1157 1350 193 4
BP 46-48 FABRICATIONS OF FORMS FOR ELEVATOR HOUSE (2ND FLR) 67 1092 1283 1159 1350 191 2
BQ 47-48 STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY 68 1093 1282 1161 1350 189 0
BR 48-49 INSTALLATION OF FORMS FOR COLUMN (2ND FLR) 69 1161 1350 1230 1419 189 0
BS 48-50 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (2ND FLR) 70 1161 1420 1231 1490 259 70
BT 49-50 DUMMY 71 1230 1419 1301 1490 189 0
BU 50-51 CONCRETING OF COLUMN AND ELEVATOR HOUSE (2ND FLR) 72 1301 1490 1373 1562 189 0
BV 51-52 FABRICATIONS OF REBARS FOR BEAMS (3RD FLOOR) 73 1373 1562 1446 1635 189 0
BW 51-53 STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (2ND FLR) 74 1373 1636 1447 1710 263 74
BX 52-53 DUMMY 75 1446 1635 1521 1710 189 0
BY 53-54 LAYING OF CHB WALL (2ND FLR) 76 1521 1710 1597 1786 189 0
BZ 54-55 INSTALLATION OF REBARS FOR BEAMS (3RD FLR) 77 1597 1786 1674 1863 189 0
CA 54-56 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (3RD FLR) 78 1597 1864 1675 1942 267 78
CB 55-56 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (3RD FLR) 79 1674 1863 1753 1942 189 0
CC 56-57 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (3RD FLR) 80 1753 1942 1833 2022 189 0
CD 56-58 INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (3RD FLR) 81 1753 2024 1834 2105 271 82
CE 56-59 FABRICATION OF REBARS FOR SLAB (3RD FLR) 82 1753 2107 1835 2189 354 165
CF 57-58 DUMMY 83 1833 2022 1916 2105 189 0
CG 58-59 INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (3RD FLR) 84 1916 2105 2000 2189 189 0
CH 59-60 INSTALLATION OF REBARS FOR SLAB (3RD FLR) 85 2000 2189 2085 2274 189 0
CI 60-61 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (3RD FLR) 86 2085 2274 2171 2360 189 0
CJ 60-62 FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (2ND FLR 87 2085 2362 2172 2449 277 =J93-L91
CK 60-63 FABRICATION OF REBARS FOR STAIRWAY (2ND FLR) 88 2085 2451 2173 2539 366 177
CL 61-62 CONCRETING OF BEAM AND SLAB (3RD FLR) 89 2171 2360 2260 2449 189 0
CM 62-63 INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY(2ND FLR 90 2260 2449 2350 2539 189 0
CN 62-64 STRIPPING OF FORMS OF BEAM (3RD FLR) 91 2260 2542 2351 2633 282 93
CO 62-65 FABRICATIONS OF REBARS FOR COLUMN (3RD FLR) 92 2260 2636 2352 2728 376 187
CP 62-66 FABRICATION OF REBARS FOR ELEVATOR HOUSE (3RD FLR) 93 2260 2735 2353 2828 475 282
CQ 63-64 INSTALLATION OF REBARS FOR STAIRWAY (2ND FLR) 94 2350 2539 2444 2633 189 0
CR 64-65 DUMMY 95 2444 2633 2539 2728 189 0
CS 65-66 INSTALLATIONS OF REBARS FOR COLUMN (3RD FLR) 96 2539 2732 2635 2828 193 0
CT 65-67 INSTALLATION OF REBARS FOR ELEVATOR HOUSE (3RD FLR) 97 2539 2730 2636 2827 191 0
CU 65-68 CONCRETING OF STAIRWAY (2ND FLR) 98 2539 2728 2637 2826 189 0
CV 66-69 FABRICATIONS OF FORMS FOR COLUMN (3RD FLR) 99 2635 2828 2734 2927 193 4
CW 67-69 FABRICATIONS OF FORMS FOR ELEVATOR HOUSE(3RD FLR) 100 2636 2827 2736 2927 191 2
CX 68-69 STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (2ND FLR) 101 2637 2826 2738 2927 189 0
CY 69-70 INSTALLATION OF FORMS FOR COLUMN (3RD FLR) 102 2738 2927 2840 3029 189 0
CZ 69-71 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (3RD FLR) 103 2738 3030 2841 3133 292 103
DA 70-71 DUMMY 104 2840 3029 2944 3133 189 0
DB 71-72 CONCRETING OF COLUMN AND ELEVATOR HOUSE (3RD FLR) 105 2944 3133 3049 3238 189 0
DC 72-73 FABRICATIONS OF REBARS FOR BEAMS (4TH FLR) 106 3049 3238 3155 3344 189 0
DD 72-74 STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (3RD FLR) 107 3049 3345 3156 3452 296 107
DE 73-74 DUMMY 108 3155 3344 3263 3452 189 0
DF 74-75 LAYING OF CHB WALL (3RD FLR) 109 3263 3452 3372 3561 189 0
DG 75-76 INSTALLATION OF REBARS FOR BEAMS (4TH FLR) 110 3372 3561 3482 3671 189 0
DH 75-77 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (4TH FLR) 111 3372 3672 3483 3783 300 111
DI 76-77 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (4TH FLR) 112 3482 3671 3594 3783 189 0
DJ 77-78 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (4TH FLR) 113 3594 3783 3707 3896 189 0
DK 77-79 INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (4TH FLR) 114 3594 3898 3708 4012 304 115
DL 77-80 FABRICATION OF REBARS FOR SLAB (4TH FLR) 115 3594 4014 3709 4129 420 231
DM 78-79 DUMMY 116 3707 3896 3823 4012 189 0
DN 79-80 INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (4TH FLR) 117 3823 4012 3940 4129 189 0
DO 80-81 INSTALLATION OF REBARS FOR SLAB (4TH FLR) 118 3940 4129 4058 4247 189 0
DP 81-82 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (4TH FLR) 119 4058 4247 4177 4366 189 0
DQ 81-83 FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (3RD FLR 120 4058 4368 4178 4488 310 121
DR 81-84 FABRICATION OF REBARS FOR STAIRWAY (3RD FLR) 121 4058 4490 4179 4611 432 243
DS 82-83 CONCRETING OF BEAM AND SLAB (4TH FLR) 122 4177 4366 4299 4488 189 0
DT 83-84 INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY(3RD FL 123 4299 4488 4422 4611 189 0
DU 83-85 STRIFFING OF FORMS OF BEAM (4TH FLR) 124 4299 4614 4423 4738 315 126
DV 83-86 FABRICATIONS OF REBARS FOR COLUMN (4TH FLR) 125 4299 4741 4424 4866 442 253
DW 83-87 FABRICATION OF REBARS FOR ELEVATOR HOUSE (4TH FLR) 126 4299 4873 4425 4999 574 381
DX 84-85 INSTALLATION OF REBARS FOR STAIRWAY (3RD FLR 127 4422 4611 4549 4738 189 0
DY 85-86 DUMMY 128 4549 4738 4677 4866 189 0
DZ 86-87 INSTALLATIONS OF REBARS FOR COLUMN (4TH FLR) 129 4677 4870 4806 4999 193 0
EA 86-88 INSTALLATION OF REBARS FOR ELEVATOR HOUSE (4TH FLR) 130 4677 4868 4807 4998 191 0
EB 86-89 CONCRETING OF STAIRWAY (3RD FLR 131 4677 4866 4808 4997 189 0
EC 87-90 FABRICATIONS OF FORMS FOR COLUMN(4TH FLR) 132 4806 4999 4938 5131 193 4
ED 88-90 FABRICATIONS OF FORMS FOR ELEVATOR HOUSE(4TH FLR) 133 4807 4998 4940 5131 191 2
EE 89-90 STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (3RD FLR 134 4808 4997 4942 5131 189 0
EF 90-91 INSTALLATION OF FORMS FOR COLUMN (4TH FLR) 135 4942 5131 5077 5266 189 0
EG 90-92 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (4TH FLR) 136 4942 5267 5078 5403 325 136
EH 91-92 DUMMY 137 5077 5266 5214 5403 189 0
EI 92-93 CONCRETING OF COLUMN AND ELEVATOR HOUSE (4TH FLR) 138 5214 5403 5352 5541 189 0
EJ 93-94 FABRICATIONS OF REBARS FOR BEAMS (RD ) 139 5352 5541 5491 5680 189 0
EK 93-95 STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (4TH FLR) 140 5352 5681 5492 5821 329 140
EL 94-95 DUMMY 141 5491 5680 5632 5821 189 0
EM 95-96 LAYING OF CHB WALL (4TH FLR) 142 5632 5821 5774 5963 189 0
EN 96-97 INSTALLATION OF REBARS FOR BEAMS (RD) 143 5774 5963 5917 6106 189 0
EO 96-98 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (RD) 144 5774 6107 5918 6251 333 144
EP 97-98 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (RD) 145 5917 6106 6062 6251 189 0
EQ 98-99 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (RD) 146 6062 6251 6208 6397 189 0
ER 98-100 INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (RD) 147 6062 6399 6209 6546 337 148
ES 98-101 FABRICATION OF REBARS FOR SLAB (RD) 148 6062 6548 6210 6696 486 297
ET 99-100 DUMMY 149 6208 6397 6357 6546 189 0
EU 100-101 INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (RD) 150 6357 6546 6507 6696 189 0
EV 101-102 INSTALLATION OF REBARS FOR SLAB (RD) 151 6507 6696 6658 6847 189 0
EW 102-103 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (RD) 152 6658 6847 6810 6999 189 0
EX 102-104 FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (4TH FLR 153 6658 7001 6811 7154 343 154
EY 102-105 FABRICATION OF REBARS FOR STAIRWAY 4TH FLR 154 6658 7156 6812 7310 498 309
EZ 103-104 CONCRETING OF BEAM AND SLAB (RD) 155 6810 6999 6965 7154 189 0
FA 104-105 INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (4TH FL 156 6965 7154 7121 7310 189 0
FB 104-106 STRIFFING OF FORMS OF BEAM (RD) 157 6965 7313 7122 7470 348 159
FC 104-107 FABRICATIONS OF REBARS FOR COLUMN (RD) 158 6965 7473 7123 7631 508 319
FD 104-108 FABRICATION OF REBARS FOR ELEVATOR HOUSE (RD) 159 6965 7638 7124 7797 673 480
FE 105-106 INSTALLATION OF REBARS FOR STAIRWAY (4TH FLR) 160 7121 7310 7281 7470 189 0
FF 106-107 DUMMY 161 7281 7470 7442 7631 189 0
FG 107-108 INSTALLATIONS OF REBARS FOR COLUMN (RD) 162 7442 7635 7604 7797 193 0
FH 107-109 INSTALLATION OF REBARS FOR ELEVATOR HOUSE (RD) 163 7442 7633 7605 7796 191 0
FI 107-110 CONCRETING OF STAIRWAY (4TH FLR) 164 7442 7631 7606 7795 189 0
FJ 108-111 FABRICATIONS OF FORMS FOR COLUMN (RD) 165 7604 7797 7769 7962 193 4
FK 109-111 FABRICATIONS OF FORMS FOR ELEVATOR HOUSE (RD) 166 7605 7796 7771 7962 191 2
FL110-111 STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (4TH FLR) 167 7606 7795 7773 7962 189 0
FM 111-112 INSTALLATION OF FORMS FOR COLUMN (RD) 168 7773 7962 7941 8130 189 0
FN 111-113 INSTALLATION OF FORMS FOR ELEVATOR HOUSE (RD) 169 7773 8131 7942 8300 358 169
FO 112-113 DUMMY 170 7941 8130 8111 8300 189 0
FP 113-114 CONCRETING OF COLUMN AND ELEVATOR HOUSE (RD) 171 8111 8300 8282 8471 189 0
FQ 114-115 FABRICATIONS OF REBARS FOR BEAMS (ROOF) 172 8282 8471 8454 8643 189 0
FR 114-116 STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (RD) 173 8282 8644 8455 8817 362 173
FS 115-116 DUMMY 174 8454 8643 8628 8817 189 0
FT 116-117 LAYING OF CHB WALL (RD) 175 8628 8817 8803 8992 189 0
FU 117-118 INSTALLATION OF REBARS FOR BEAMS(ROOF) 176 8803 8992 8979 9168 189 0
FV 117-119 FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (ROOF) 177 8803 9169 8980 9346 366 177
FW 118-119 INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (ROOF) 178 8979 9168 9157 9346 189 0
FX 119-120 FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (ROOF) 179 9157 9346 9336 9525 189 0
FY 119-121 INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (ROOF) 180 9157 9527 9337 9707 370 181
FZ 119-122 FABRICATION OF REBARS FOR SLAB (ROOF) 181 9157 9709 9338 9890 552 363
GA 120-121 STRIFFING
DUMMY 182 9336 9525 9518 9707 189 0
OF INSIDE
GB 121-122 FORMS,
INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (ROOF) 183 9518 9707 9701 9890 189 0
GC 122-123 SCAFFOLDI
INSTALLATION OF REBARS FOR SLAB (ROOF) 184 9701 9890 9885 10074 189 0
NGS AND
GD 123-124 STAGING 185 9885 10074 10070 10259 189 0
FOR BEAMS
FABRICATIO
AND
N OF
GE 123-125 FORMS
CONCRETING OF BEAM AND SLAB (ROOF)
SLAB(1ST 187 9885 10262 10072 10449 377 0
124-126 INSTALLATI
FLR
FOR TO
SLAB
GF LAYING OF CHB FOR KITCHEN AND LAVATORIES (1ST FLOOR TO FOURTH FLOOR)
OF OFFLR)
ON
4RTH
188 10070 10259 10258 10447 189 0
124-127 REBARS
KITCHEN 189 10070 10451 10259 10640 381 192
AND SLAB
FOR
GG LAVATORIES
OF
125-127 KITCHEN
(1ST FLOOR 191 10072 10449 10263 10640 377 188
TO FOURTH
AND
GH FLOOR)
LAVATORIES
GI 126-127 (1ST
DUMMYFLR TO 193 10258 10447 10451 10640 189 0
FOURTH
GJ 127-128 CONCRETING
FLR) OF SLAB OF KITCHEN AND LAVATORIES (1ST FLR TO FOURTH FLR) 194 10451 10640 10645 10834 189 0
128-129 STRIFFING OF FORMS FOR SLAB OF KITCHEN AND LAVATORIES (1ST FLOOR TO F 195 10645 10834 10840 11029 189 0
GK
GL 128-130 ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (GROUND FLR) 197 10645 11040 10842 11237 395 0
GM 129-131 FINISHING OF PLUMBING AND WATER PIPE CONNECTIONS 198 10840 11029 11038 11227 189 0
GN 130-132 DUMMY 199 10842 11237 11041 11436 395 196
GO 131-132 LAYING OF REBARS FOR SLAB (GROUND FLR) 199 11038 11237 11237 11436 199 0
GP131-133 CONCRETING OF SLAB AND SLAB OF SEPTIC TANK AND CATCH BASIN 200 11038 11447 11238 11647 409 201
GQ131-134 FIXING OF ELECTRICAL CONNECTIONS 201 11038 11227 11239 11428 189 403
GR132-133 DUMMY 202 11237 11436 11439 11638 199 0
GS133-134 DUMMY 203 11439 11647 11642 11850 208 0
GT134-135 PLASTERING OF CHB WALL (1ST FLOOR) 202 11642 11434 11844 11636 -208 0
GU134-136 PLASTERING OF CHB WALL (2ND FLOOR) 203 11642 11432 11845 11635 -210 0
GV134-137 PLASTERING OF CHB WALL (3RD FLOOR) 204 11642 11430 11846 11634 -212 0
GW134-138 PLASTERING OF CHB WALL (4TH FLOOR) 205 11642 11428 11847 11633 -214 0
GX134-139 PLASTERING OF CHB WALL (ROOF DECK) 206 11642 11638 11848 11844 -4 210
GY134-140 FABRICATION OF TRUSS FOR GENERATOR AND PUMP HOUSE 207 11642 11850 11849 12057 208 0
GZ135-139 DUMMY 208 11844 11636 12052 11844 -208 6
HA136-139 DUMMY 209 11845 11635 12054 11844 -210 4
HB 137-139 DUMMY 210 11846 11634 12056 11844 -212 2
HC138-139 DUMMY 211 11847 11633 12058 11844 -214 0
HD139-141 INSTALLATION OF FABRICATED WINDOWS 212 12058 11844 12270 12056 -214 0
HE139-142 INSTALLATION OF FABRICATED DOORS INCLUDING JAMB 207 12058 12058 12265 12265 0 0
HF140-142 INSTALLATION
STRIPPING OF TRUSS FOR GENERATOR AND PUMP HOUSE 208 11849 12057 12057 12265 208 208
HG141-142 OF
DUMMY
FORMS, 209 12270 12056 12479 12265 -214 -214
HH142-143 SCAFFOLDI
INSTALLATION OF PURLINS 210 12265 12265 12475 12475 0 0
NGS AND
HI
143-144 STAGING 214 12475 12475 12689 12689 0 0
FOR
HJ SLAB(1ST
HK144-145 FLR
DUMMY
TO 5TH 215 12689 12689 12904 12904 0 0
HL145-146 FLR)
INSTALLATION OF ROOF SHEET 216 12904 12904 13120 13120 0 0
HM145-147 INSTALLATION OF CEILING FRAME AND CEILING FORM 217 12904 13121 13121 13338 217 217
HN146-147 INSTALLATION OF RAILING 218 13120 13120 13338 13338 0 0
HO147-148 INSTALLATION OF ELECTRICAL FIXTURES 219 13338 13339 13557 13558 1 0
HP147-149 INSTALLATION OF TILE WORKS 220 13338 13338 13558 13558 0 0
HQ147-150 LAYING OF REBARS FOR SLAB OF PARKING 221 13338 13559 13559 13780 221 221
HR148-150 DUMMY 222 13557 13558 13779 13780 1 1
HS149-150 DUMMY 222 13558 13558 13780 13780 0 0
HU150-151 INSTALLATION OF STAIR IN FIRE EXIT 223 13780 13780 14003 14003 0 0
HV 151-152 PAINTING WORKS 222 14003 14003 14225 14225 0 -1
HW 151-153 INSTALLATION OF PLUMBING FIXTURES 223 14003 14226 14226 14449 223 223
HX 152-153 CONCRETING OF SLAB OF PARKING 224 14225 14225 14449 14449 0 0
HY 152-154 DUMMY 225 14226 14449 14451 14674 223 223
HZ 153-154 CLEARING OF SITE FOR FINAL INSPECTION AND TRANSFER TO THE OWNER 225 14449 14449 14674 14674 0 0
IA
FFOLDINGS AND STAGING FOR BEAMS AND SLAB(1ST FLR TO 4RTH FLR)
VICENT KAW NA BAHALA MAG-AYOS SA PAGKAKASUNOD NETO
UNG MGA ACTIVITIES NA KAKAYLANGAN NYO NG ESTIMATE. KUNG WALA PAKIGAWAN NYO KASE KAYLANGAN UN

FALSE= ---
TRUE=
ACTIVITIES 5 10 15
A SITE CLEARING AND GRUBBING
B DELIVERY OF MATERIALS FOR FIELD OFFICE AND CONSTRUCTION
C MOBILIZATION
D DELIVERY OF MATERIALS
E LAYOUT AND BATTERBOARD
F FABRICATION OF REBARS FOR COLUMN, CF, GB AND WF (1ST FLR)
G FABRICATION OF FORMS FOR COLUMN & GB, SCAFFOLDS(1ST FLR)
H EXCAVATION FOR COLUMN FOOTING, GROUND BEAM AND WF
I INSTALLATION OF REBARS FOR COLUMN AND CF (1ST FLR)
J DUMMY
K INSTALLATION OF FORMS, SCAFFOLDING FOR COLUMNS (BELOW NGL)
L CONCRETING OF COLUMN FOOTING
M CONCRETING OF COLUMN (BELOW NGL)
N STRIPPING OF FORMS & SCAFFOLDING OF COLUMN (BELOW NGL)
O INSTALLATION OF REBARS FOR WALL FOOTING AND GB (1ST FLR)
P INSTALLATION OF FORMS FOR GROUND BEAM
Q DUMMY
R CONCRETING OF GROUND BEAM AND WALL FOOTING (1ST FLR)
S FABRICATION OF REBARS FOR COLUMN (1ST FLR)
T FABRICATION OF REBARS FOR ELEVATOR HOUSE
U STRIPPING OF FORMS FOR GROUND BEAM
V DUMMY
W INSTALLATION OF REBARS FOR COLUMN (1ST FLR)
X INSTALLATION OF REBARS FOR ELEVATOR HOUSE
Y FABRICATION OF FORMS FOR COLUMN
Z FABRICATION OF FORMS FOR ELEVATOR HOUSE
AA INSTALLATION OF FORMS FOR COLUMN
AB INSTALLATION OF FORMS FOR ELEVATOR HOUSE (1ST FLR)
AC DUMMY
AD CONCRETING OF COLUMN AND ELEVATOR HOUSE (1ST FLR)
AE STRIFFING OF FORMS FOR COLUMN (NGL TO BELOW BEAM OF 2ND FLOOR)
AF SOIL POISONING AND EXCAVATING OF SEPTIC TANK AND CATCH BASIN
AG BACKFILLING OF FOOTING
AH EARTHFILLING FOR SLAB (SUBJECTED TO SOIL)
AI FABRICATION OF REBARS FOR FOOTING OF SEPTIC TANK
AJ INSTALLATION OF REBARS FOR FOOTING OF SEPTIC TANK
AK DUMMY
AL CONCRETING OF FOOTING OF SEPTIC TANK
AM LAYING OF CHB FOR WALL (1ST FLR)
AN FABRICATION OF REBARS FOR BEAMS (2ND FLR)
AO LAYING OF CHB FOR SEPTIC TANK AND CATCH BASIN
AP INSTALLATION OF REBARS FOR BEAM (2ND FLR)
AQ FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (2ND FLR)
AR PLASTERING OF INSIDE WALL OF SEPTIC TANK
AS DUMMY
AT INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (2ND FLR)
AU FABRICATION OF FORMS FOR SLAB OF SEPTIC TANK AND CATCH BASIN
AV FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (2ND FLR)
AW INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (2ND FLR)
AX INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (2ND FLR)
AY FABRICATION OF REBARS FOR SLAB (2ND FLR)
AZ INSTALLATION OF REBARS FOR SLAB (2ND FLR)
BA DUMMY
BB ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (2ND FLR)
BC FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY
BD FABRICATION OF REBARS FOR STAIRWAY
BE CONCRETING OF BEAM AND SLAB (2ND FLR)
BF INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY
BG STRIPPING OF FORMS OF BEAM (2ND FLR)
BH FABRICATIONS OF REBARS FOR COLUMN (2ND FLR)
BI FABRICATION OF REBARS FOR ELEVATOR HOUSE (2ND FLR)
BJ INSTALLATION OF REBARS FOR STAIRWAY
BK DUMMY
BL INSTALLATIONS OF REBARS FOR COLUMN (2ND FLR)
BM INSTALLATION OF REBARS FOR ELEVATOR HOUSE (2ND FLR)
BN CONCRETING OF STAIRWAY
BO FABRICATIONS OF FORMS FOR COLUMN (2ND FLR)
BP FABRICATIONS OF FORMS FOR ELEVATOR HOUSE (2ND FLR)
BQ STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY
BR INSTALLATION OF FORMS FOR COLUMN (2ND FLR)
BS INSTALLATION OF FORMS FOR ELEVATOR HOUSE (2ND FLR)
BT DUMMY
BU CONCRETING OF COLUMN AND ELEVATOR HOUSE (2ND FLR)
BV FABRICATIONS OF REBARS FOR BEAMS (3RD FLOOR)
BW STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (2ND FLR)
BX DUMMY
BY LAYING OF CHB WALL (2ND FLR)
BZ INSTALLATION OF REBARS FOR BEAMS (3RD FLR)
CA FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (3RD FLR)
CB INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (3RD FLR)
CC FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (3RD FLR)
CD INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (3RD FLR)
CE FABRICATION OF REBARS FOR SLAB (3RD FLR)
CF DUMMY
CG INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (3RD FLR)
CH INSTALLATION OF REBARS FOR SLAB (3RD FLR)
CI ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (3RD FLR)
CJ FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (2ND FLR)
CK FABRICATION OF REBARS FOR STAIRWAY (2ND FLR)
CL CONCRETING OF BEAM AND SLAB (3RD FLR)
CM INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY(2ND FLR)
CN STRIPPING OF FORMS OF BEAM (3RD FLR)
CO FABRICATIONS OF REBARS FOR COLUMN (3RD FLR)
CP FABRICATION OF REBARS FOR ELEVATOR HOUSE (3RD FLR)
F INSIDE FORMS, SCAFFOLDINGS
CQ INSTAL
AND STAGING FOR BEAMS AND SLAB(1ST FLR TO 4RTH FLR)
CR DUMMY
CS INSTALLATIONS OF REBARS FOR COLUMN (3RD FLR)
CT INSTALLATION OF REBARS FOR ELEVATOR HOUSE (3RD FLR)
CU CONCRETING OF STAIRWAY (2ND FLR)
CV FABRICATIONS OF FORMS FOR COLUMN (3RD FLR)
CW FABRICATIONS OF FORMS FOR ELEVATOR HOUSE(3RD FLR)
CX STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (2ND FLR)
CY INSTALLATION OF FORMS FOR COLUMN (3RD FLR)
CZ INSTALLATION OF FORMS FOR ELEVATOR HOUSE (3RD FLR)
DA DUMMY
DB CONCRETING OF COLUMN AND ELEVATOR HOUSE (3RD FLR)
DC FABRICATIONS OF REBARS FOR BEAMS (4TH FLR)
DD STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (3RD FLR)
DE DUMMY
DF LAYING OF CHB WALL (3RD FLR)
DG INSTALLATION OF REBARS FOR BEAMS (4TH FLR)
DH FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (4TH FLR)
DI INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (4TH FLR)
DJ FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (4TH FLR)
DK INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (4TH FLR)
DL FABRICATION OF REBARS FOR SLAB (4TH FLR)
DM DUMMY
DN INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (4TH FLR)
DO INSTALLATION OF REBARS FOR SLAB (4TH FLR)
DP ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (4TH FLR)
DQ FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (3RD FLR)
DR FABRICATION OF REBARS FOR STAIRWAY (3RD FLR)
DS CONCRETING OF BEAM AND SLAB (4TH FLR)
DT INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY(3RD FLR
DU STRIFFING OF FORMS OF BEAM (4TH FLR)
DV FABRICATIONS OF REBARS FOR COLUMN (4TH FLR)
DW FABRICATION OF REBARS FOR ELEVATOR HOUSE (4TH FLR)
DX INSTALLATION OF REBARS FOR STAIRWAY (3RD FLR
DY DUMMY
DZ INSTALLATIONS OF REBARS FOR COLUMN (4TH FLR)
EA INSTALLATION OF REBARS FOR ELEVATOR HOUSE (4TH FLR)
EB CONCRETING OF STAIRWAY (3RD FLR
EC FABRICATIONS OF FORMS FOR COLUMN(4TH FLR)
ED FABRICATIONS OF FORMS FOR ELEVATOR HOUSE(4TH FLR)
EE STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (3RD FLR
EF INSTALLATION OF FORMS FOR COLUMN (4TH FLR)
EG INSTALLATION OF FORMS FOR ELEVATOR HOUSE (4TH FLR)
EH DUMMY
EI CONCRETING OF COLUMN AND ELEVATOR HOUSE (4TH FLR)
EJ FABRICATIONS OF REBARS FOR BEAMS (RD )
EK STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (4TH FLR)
EL DUMMY
EM LAYING OF CHB WALL (4TH FLR)
EN INSTALLATION OF REBARS FOR BEAMS (RD)
EO FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (RD)
EP INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (RD)
EQ FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (RD)
ER INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (RD)
ES FABRICATION OF REBARS FOR SLAB (RD)
ET DUMMY
EU INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (RD)
EV INSTALLATION OF REBARS FOR SLAB (RD)
EW ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (RD)
EX FABRICATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (4TH FLR)
EY FABRICATION OF REBARS FOR STAIRWAY 4TH FLR
EZ CONCRETING OF BEAM AND SLAB (RD)
FA INSTALLATION OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (4TH FLR)
FB STRIFFING OF FORMS OF BEAM (RD)
FC FABRICATIONS OF REBARS FOR COLUMN (RD)
FD FABRICATION OF REBARS FOR ELEVATOR HOUSE (RD)
FE INSTALLATION OF REBARS FOR STAIRWAY (4TH FLR)
FF DUMMY
FG INSTALLATIONS OF REBARS FOR COLUMN (RD)
FH INSTALLATION OF REBARS FOR ELEVATOR HOUSE (RD)
FI CONCRETING OF STAIRWAY (4TH FLR)
FJ FABRICATIONS OF FORMS FOR COLUMN (RD)
FK FABRICATIONS OF FORMS FOR ELEVATOR HOUSE (RD)
FL STRIFFING OF FORMS, SCAFFOLDING AND STAGGING FOR STAIRWAY (4TH FLR)
FM INSTALLATION OF FORMS FOR COLUMN (RD)
FN INSTALLATION OF FORMS FOR ELEVATOR HOUSE (RD)
FO DUMMY
FP CONCRETING OF COLUMN AND ELEVATOR HOUSE (RD)
FQ FABRICATIONS OF REBARS FOR BEAMS (ROOF)
FR STRIPPING OF FORMS FOR COLUMN AND ELEVATOR HOUSE (RD)
FS DUMMY
FT LAYING OF CHB WALL (RD)
FU INSTALLATION OF REBARS FOR BEAMS(ROOF)
FV FABRICATION OF FORMS, SCAFFOLDING FOR BEAMS (ROOF)
FW INSTALLATION OF FORMS, SCAFFOLDING FOR BEAMS (ROOF)
FX FABRICATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (ROOF)
FY INSTALLATION OF FORMS, SCAFFOLDING & STAGGING FOR SLAB (ROOF)
FZ FABRICATION OF REBARS FOR SLAB (ROOF)
GA DUMMY
GB INSTALLING OF ELECTRICAL WIRINGS W/ CONDUIT (ROOF)
GC INSTALLATION OF REBARS FOR SLAB (ROOF)
GD STRIFFING OF INSIDE FORMS, SCAFFOLDINGS AND STAGING FOR BEAMS AND SLAB(1ST FLR TO 4RTH FLR)
GE CONCRETING OF BEAM AND SLAB (ROOF)
GF LAYING OF CHB FOR KITCHEN AND LAVATORIES (1ST FLOOR TO FOURTH FLOOR)
GG FABRICATION OF FORMS FOR SLAB OF KITCHEN AND LAVATORIES (1ST FLOOR TO FOURTH FLOOR)
GH INSTALLATION OF REBARS FOR SLAB OF KITCHEN AND LAVATORIES (1ST FLR TO FOURTH FLR)
GI DUMMY
GJ CONCRETING OF SLAB OF KITCHEN AND LAVATORIES (1ST FLR TO FOURTH FLR)
GK STRIFFING OF FORMS FOR SLAB OF KITCHEN AND LAVATORIES (1ST FLOOR TO FOURTH FLOOR)
GL ROUGHING IN PLUMBING AND WATER PIPE CONNECTIONS (GROUND FLR)
GM FINISHING OF PLUMBING AND WATER PIPE CONNECTIONS
GN DUMMY
GO LAYING OF REBARS FOR SLAB (GROUND FLR)
GP CONCRETING OF SLAB AND SLAB OF SEPTIC TANK AND CATCH BASIN
GQ FIXING OF ELECTRICAL CONNECTIONS
GR DUMMY
GS DUMMY
GT PLASTERING OF CHB WALL (1ST FLOOR)
GU PLASTERING OF CHB WALL (2ND FLOOR)
GV PLASTERING OF CHB WALL (3RD FLOOR)
GW PLASTERING OF CHB WALL (4TH FLOOR)
GX PLASTERING OF CHB WALL (ROOF DECK)
GY FABRICATION OF TRUSS FOR GENERATOR AND PUMP HOUSE
GZ DUMMY
HA DUMMY
HB DUMMY
HC DUMMY
HD INSTALLATION OF FABRICATED WINDOWS
HE INSTALLATION OF FABRICATED DOORS INCLUDING JAMB
HF INSTALLATION OF TRUSS FOR GENERATOR AND PUMP HOUSE
HG DUMMY
HH INSTALLATION OF PURLINS
HI STRIPPING OF FORMS, SCAFFOLDINGS AND STAGING FOR SLAB(1ST FLR TO 5TH FLR)
HJ
HK DUMMY
HL INSTALLATION OF ROOF SHEET
HM INSTALLATION OF CEILING FRAME AND CEILING FORM
HN INSTALLATION OF RAILING
HO INSTALLATION OF ELECTRICAL FIXTURES
HP INSTALLATION OF TILE WORKS
HQ LAYING OF REBARS FOR SLAB OF PARKING
HR DUMMY
HS DUMMY
HT INSTALLATION OF STAIR IN FIRE EXIT
HU INSTALLATION OF STAIR IN FIRE EXIT
HV PAINTING WORKS
HW INSTALLATION OF PLUMBING FIXTURES
HX CONCRETING OF SLAB OF PARKING
HY DUMMY
HZ CLEARING OF SITE FOR FINAL INSPECTION AND TRANSFER TO THE OWNER
20
AB(1ST FLR TO 4RTH FLR)
25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180
185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260
265 270 275 280 285 290 295 300 305 310 315 320 325 330 335 340
345 350 355 360 365 370 375 380 385 390 395 400 405 410 415 420
425 430 435 440 445 450 455 460 465 470 475 480 485 490 495 500
505 510 515 520 525 530 535 540 545 550 555 560 565 570 575 580
585 590 595 600 605 610 615 620 625 630 635 640 645 650 655 660
665 670 675 680 685 690 695 700 705 710 715 720 725 730 735 740
745 750 755 760 765 770 775 780 785 790 795 800 805 810 815 820
825 830 835 840 845 850 855 860 865 870 875 880 885 890 895 900
905 910 915 920 925 930 935 940 945 950 955 960 965 970 975 980
985 990 995 1000 1005 1010 1015 1020 1025 1030 1035 1040 1045 1050 1055 1060
1065 1070 1075 1080 1085 1090 1095 1100 1105 1110 1115 1120 1125 1130 1135 1140
1145 1150 1155 1160 1165 1170 1175 1180 1185 1190 1195 1200 1205 1210 1215 1220
1225 1230 1235 1240 1245 1250 1255 1260 1265 1270 1275 1280 1285 1290 1295 1300
1305 1310 1315 1320 1325 1330 1335 1340 1345 1350 1355 1360 1365 1370 1375 1380
1385 1390 1395 1400 1405 1410 1415 1420 1425 1430 1435 1440 1445 1450 1455 1460
1465 1470 1475 1480 1485 1490 1495 1500 1505 1510 1515 1520 1525 1530 1535 1540
1545 1550 1555 1560 1565 1570 1575 1580 1585 1590 1595 1600 1605 1610 1615 1620
1625 1630 1635 1640 1645 1650 1655 1660 1665 1670 1675 1680 1685 1690 1695 1700
1705 1710 1715 1720 1725 1730 1735 1740 1745 1750 1755 1760 1765 1770 1775 1780
1785 1790 1795 1800 1805 1810 1815 1820 1825 1830 1835 1840 1845 1850 1855 1860
1865 1870 1875 1880 1885 1890 1895 1900 1905 1910 1915 1920 1925 1930 1935 1940
1945 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020
2025 2030 2035 2040 2045 2050 2055 2060 2065 2070 2075 2080 2085 2090 2095

You might also like