0% found this document useful (0 votes)
85 views1 page

Leveling Adjustment

This document appears to be leveling notes from a surveying job. It contains a header with the job title, numbers, dates and observers. The table has columns for point number, back sight, intermediate sight, foresight, collimation height, rise or fall, reduced level, adjustment and adjusted level.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views1 page

Leveling Adjustment

This document appears to be leveling notes from a surveying job. It contains a header with the job title, numbers, dates and observers. The table has columns for point number, back sight, intermediate sight, foresight, collimation height, rise or fall, reduced level, adjustment and adjusted level.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Leveling and Adjustment

Job Title: Start Value : 3.1290


Job No: Finish Value : 3.1290
Date: Misclosure:
Observer: Set-ups:
Staffman: Error/Set-up:

Point Back Inter For Collimation Rise (+) Reduced Adjustment Adjusted
Remarks
No Sight Sight Sight Height Fall (-) Level (m) Level

You might also like