Excel Assignment 2014
Excel Assignment 2014
Complete the assignment below and email the two required files (Sales1 and Sales2) by Thursday 24 th
April 2014. Email: [email protected]
Assignments can also be handed in in class on or before the same date. The entire assignment is worth
50 marks and goes toward the first bi-monthly of the trinity term 2014.
8. Add a column called RATE OF PAY. Using the table below and the VLOOKUP function, calculate the pay
each person receives for the 4 weeks where: TOTAL PAY = TOTAL SALES * BASE PAY
Note:
You should be able to modify the base pay in the second table and thus all other calculations would
change INCLUDING the graphs.