Project Plan - Gantt Chart
Project Plan - Gantt Chart
t Date in Number Form 42576.00 Use this number for the Minimum Bound of the Horizontal Axis to set the beginning of the chart.
Task Seve n
Task Eight 8/5/2016 8/12/2016 7
Tas k Ei ght
Task Nine 8/6/2016 8/9/2016 3
Tas k Ni ne
Task Ten 8/6/2016 8/10/2016 4
Tas k Te n
Task Eleven 8/7/2016 8/13/2016 6
Tas k Eleven
Task Twelve 8/10/2016 8/16/2016 6
Ta s k Twelve
Task Thirteen 8/14/2016 8/19/2016 5
Tas k Thi rteen
These cells will be automatically calculated based on These cells require manual input so the calculated cells
the inputs on other cells. have data to work with.
Task Name Start Date End Date
Tas k Si x
7 1.75 5.25 25%
Ta s k Seven
7 4.90 2.10 70%
Ta s k Ei ght
6 0.90 5.10 15%
Ta s k Ni ne
4 2.40 1.60 60%
Ta sk Te n
6 3.90 2.10 65%
Tas k El even
6 1.50 4.50 25%
Ta s k Twel ve
5 1.50 3.50 30% Ta s k Thi rte en
Key:
42576.00 Use this number for the Minimum Bound of the Horizontal Axis to set the beginning of the chart.
These cells will be automatically calculated based on the These cells require manual input so the calculated
inputs on other cells. cells have data to work with.
s to set the beginning of the chart.
Meaning Legend
Study
Key parameter
CFD
Writing
Poster/Presentation
Break
Exams
Duration Days Days Percent
End Week (Days) Start Date in Number Form
###
Complete Remaining Complete
Easter brea k
Sem 1 exams
10/2/17 10/22/17 11/11/17 12/1/17 12/21/17 1/10/18 1/30/18 2/19/18 3/11/18 3/31/18 4/20/18 5/10/18 5/30/18
eading
revi ew
na mi cs
chani cs
ct pl an
rn CFD
model s
pe flow
fri ction
m report
ha nger
model
u to He)
s brea k
transfer
1 exams
effici ent
transfer
ow path
al i date
r brea k
1 exams
effici ent
transfer
ow path
al i date
r brea k
report
2 exams
mi s s i on
tion day