0% found this document useful (0 votes)
120 views4 pages

Project: 4 Doors Duplex Type Boarding House: Item Materials Qty. Unit U/P Amount

This document provides a materials estimate and cost breakdown for constructing a 4 unit duplex boarding house with the following key details: - The materials estimate includes items for layout/scaffolding, foundation, walls/masonry, flooring, kitchen sink, doors/windows, roof framing/roofing, electrical, plumbing, septic tank, and labor costs. - The total estimated materials cost for one unit is PHP 99,553.86 and total estimated labor cost is PHP 34,843.85, for a total estimated cost per unit of PHP 134,397.71. - For a 4 unit project, the total estimated cost is PHP 537,590.84.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
120 views4 pages

Project: 4 Doors Duplex Type Boarding House: Item Materials Qty. Unit U/P Amount

This document provides a materials estimate and cost breakdown for constructing a 4 unit duplex boarding house with the following key details: - The materials estimate includes items for layout/scaffolding, foundation, walls/masonry, flooring, kitchen sink, doors/windows, roof framing/roofing, electrical, plumbing, septic tank, and labor costs. - The total estimated materials cost for one unit is PHP 99,553.86 and total estimated labor cost is PHP 34,843.85, for a total estimated cost per unit of PHP 134,397.71. - For a 4 unit project, the total estimated cost is PHP 537,590.84.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Project : 4 DOORS DUPLEX TYPE BOARDING HOUSE

By : JERRY VILLEGAS
Item Materials qty. unit U/P Amount
I. LAYOUT/STAKING/SCAFOLDINGS/MISC.
2 X 2 X 10 Coco Lumber 40 pcs 46.00 1,840.00
2 X 3 X 10 Coco Lumber 60 pcs 70.00 4,200.00
1/4 Plywood 2 pcs 320.00 640.00
4'' Common Nails 15 kg 65.00 975.00
3'' Common Nails 10 kg 65.00 650.00
1 1/2'' Common Nails 2 kg 70.00 140.00
Nylon/tansi 3 roll 18.00 54.00
8,499.00
II. ZOCALO
Cement 17 bags 265.00 4,505.00
Sand 1 cu.m 380.00 380.00
Gravel 2 cu.m 400.00 800.00
10mm deformed bars 12 lgth 124.00 1,488.00
# 16 Gi Tie wires 3 kg 70.00 210.00
7,383.00
III. WALLS/MASONRY ( no plaster )
4'' Concrete Hollow Blocks 850 pcs 7.00 5,950.00
Cement 27 bags 265.00 7,155.00
Sand 5 cu.m 380.00 1,900.00
10mm deformed bars 46 lgth 124.00 5,704.00
# 16 Gi Tie wires 10 kg 70.00 700.00
1/4 Screen 1 l.m 140.00 140.00
21,549.00
IV. FLOORING
Cement 22 bags 265.00 5,830.00
Sand 3 cu,m 380.00 1,140.00
Gravel 4 cu.m 400.00 1,600.00
8,570.00
V. KITCHEN SINK
Cement 2 bags 265.00 530.00
Sand 0.027 cu.m 380.00 10.26
Gravel 0.054 cu.m 400.00 21.60
10mm deformed bars 2 lgth 124.00 248.00
# 16 Gi Tie wires 0.2 kg 70.00 14.00
1/4 Plywood 1 pc 320.00 320.00
4'' chb 8 pcs 7.00 56.00
1,199.86
VI. DOORS & WINDOWS
2 X 4 X 8 Gemilina / Mahogani 5 pcs 96.00 480.00
PVC Door CR 1 set 3,200.00 3,200.00
Jalousi Glass/frame 10 set 900.00 9,000.00
Loose pin Hinges 3 x 4 4 set 120.00 480.00
Door Knob 3 set 650.00 1,950.00
1/4 thk. Marine Plywood 3 pcs 750.00 2,250.00
17,360.00
VII. ROOF FRAMING / ROOFING
2 X 5 X 12 Wood Rafter 10 pcs 140.00 1,400.00
2 x 3 x 12 Wood Purlins 22 pcs 84.00 1,848.00
1 x 8 x 10 Fascia Board 6 pcs 93.33 560.00
# 26 GI Corrugated Sheetx 12 12 shts 320.00 3,840.00
# 26 GI Corrugated Sheetx 8 12 shts 210.00 2,520.00
# 26 GI Plain Sheet 4 shts 240.00 960.00
2'' Umbrella Nails 8 kgs 85.00 680.00
4'' Common Nails 3 kgs 65.00 195.00
2 1/2 Common Nails 2 kgs 65.00 130.00
12,133.00
VIII. CEILING
2 X 2 X 10 Coco Lumber
3/16 Plywood
1'' Finishing Nails
4'' Common Nails
2 1/2 '' Common Nails

IX. ELECTRICAL
Check Meter 1 unit 1,500.00 1,500.00
Switches 5 pcs 140.00 700.00
Convenience Outlet 2 gang 5 pcs 180.00 900.00
Junction Box PVC 4 pcs 40.00 160.00
Utility Box PVC 10 pcs 36.00 360.00
Safety Switch box type 1 pcs 380.00 380.00
Circuit Breaker 30A 1 pcs 350.00 350.00
Receptacle 7 pcs 75.00 525.00
1/2 PVC Flexible Pipe 1 roll 1,200.00 1,200.00
Led light 18 watts 7 pcs 280.00 1,960.00
3.5mm THHn Wire 1 roll 2,650.00 2,650.00
Electrical Tape big 3 pcs 45.00 135.00
10,820.00
X. PLUMBING & FIXTURES
Water Closet Buhos type 1 pc 900.00 900.00
Sink Drain 4x4 1 pc 140.00 140.00
CR Floor Drain 4x4 1 pc 140.00 140.00
4'' PVC Pipe 3 pc 320.00 960.00
2'' PVC Pipe 2 pc 240.00 480.00
4'' PVC Tee 1 pc 86.00 86.00
4'' PVC Elbow 2 pc 76.00 152.00
4''x 2'' PVC Tee Reducer 1 pc 86.00 86.00
4'' PVC Clean Out 1 pc 68.00 68.00
Solvent 1 can 120.00 120.00
3,132.00
XI. SEPTIC TANK
4'' CHB 180 pcs 7.00 1,260.00
Cement 18 bags 265.00 4,770.00
Sand 1 cu.m 380.00 380.00
Gravel 2 cu.m 400.00 800.00
10mm deformed bars 12 lgth 124.00 1,488.00
# 16 Gi Tie wires 3 kg 70.00 210.00
8,908.00
MATERIAL COST UNIT 1 99,553.86
LABOR COST COST UNIT 1 34,843.85
COST PER UNIT 134,397.71

4 UNITS ESTIMATED COST 537,590.84

NOTE : ESTIMATE NO CEILING, PARTITION & PAINTING


Area lm
Fire wall 38.955 0.8 mortar/setting
half 19.4775 0.4
front 11.73892 0.4027
side 13.692 0.5125
rear 12.66892 0.4027
cr 7.49 0.32
65.06734 2.0379

floor 23.42568 1.756926


3.794826 vol.

chb 813.3418

You might also like