1195 mm
Are the deeper units beams or slabs?
Should they abide by normal RC rules?
Extrusion or slipformed
100-150 m long bed; no-slump mix grade C50-60
Extrusion - rotating screws turn opposite hands
Extrusion circular mandrels make the holes
Extrusion circular mandrels make the holes
Slipforming shear compactor (hammers down
flanges and webs)
Sliding
motion t
o
and fro
Curing temperature contours (c Branco, Lisbon)
Sliding
motion t
o
and fro
Splitting cracks due to sawing
restraints as prestress in transferred
At 16-18 hours, circular saw cuts
to length +10 to -15 mm
The new carousel system for continuous
production of 2 x 1.2 m wide units
Sawing room
Steam curing
ID chip marker under covers
Tensioned wire
5 mm indented wire
tensioned over 120 m
Continuous concrete delivery for
2 x 120 m long extrusions
Production at the rate of 4.8 sq. m per minute,
yielding 1200 sq. m per day
Steam curing under cover for 16 hours.
Transfer strength = 40 N/mm 2
Identification chip is automatically
glued onto top of unit
Units cut to length +
- 10 mm accuracy
Final lifting into stockyard
400 450 deep units have a new market
for 16 m long clear span car parks
Too much plasticiser !! in 450 deep units
Locks in
Strand pull-in:
An important indicator
of success
Should be about 1 mm,
irrespective of length
Msr = (f bc + f ct ) Z b
Allowable span
Bearing limit
Imposed load
Handling limit
span/depth = 50
Span
Bearing limit
Imposed load
Handling limit
span/depth = 50
Span
Bearing
Shear
Imposed load
Service
moment
Deflection
Handling
Span
Service moment
Possibly shear ? control
Deflection
control
Routine bending tests to 25% overload
with 95% recovery
Flexural cracks extend rapidly through the
section due to narrow webs
Approx
200 mm spacing
Effective stiffness changes
with increasing load
Load
Deflection
2 to 6
EIeff = EI c + (EIu - EI c ) (M/ Mcrack )
Watch out for flexural-shear (Vcr ) failure !
Decompression
Vco point
Vcr
Vcr = 0.55(1-loss) vc b v d + M o Vu
Mu
P
UDL
SF diagram
Vcr failure
here
Failure of solid prestressed unit during
pouring of insitu topping
Cover to the tendons
100 mm
50-55 mm
Shear failure in 400 deep units
(c. Engstrom, Sweden)
Shear searches
out the
weakest web
Shear capacity of single webs more reliable
Shear keys in
longitudinal joints
LINE LOADS
PARL TO SPAN
POINT LOAD
PER UNITS
LATERAL
DISTRIBUTION
SIMPLY
SUPPORTED
TIE STEEL
distribution
Edge loads
m
15
6-
FLOOR SPAN
= 1.0 TO 1.5
BEAM SPAN
Vibrations and Natural Frequency of
Precast Concrete Floor Elements
Sports halls -
human activities (aerobic, jumping, dancing)
Concert halls
Grandstands -
human activities (jumping, stamping)
Vibration & natural frequency The most
important
vibration
property of a
floor is its
natural
frequency fn,
or frequency
of its first
mode.
Vibration & natural frequency
Vibration & natural frequency
Egenfrekvenser DT-elementer
16
14 DT-200/50
12 DT-300/50
Frekvens f [Hz]
DT-400/50
10
DT-500/50
8
DT-600/50
6
DT-700/500
4
DT-800/500
2 Grense
0
2 4 6 8 10 12 14 16 18 20
Spennvidde [L [m]
Vibration & natural frequency spreadsheet
Summary
Double 500
Tee 800
Double 500
Approx 25 supply, 30 fixed
Tee 800 per sq.m
Double 500
Tee* 800
* + 75 mm structural topping
Summary