0% found this document useful (0 votes)
38 views4 pages

Acknowledgement: List OF Tables

This document provides an acknowledgement for the successful completion of an assignment project. It recognizes that individual efforts alone are not sufficient and the project involved contributions from many people. It thanks the project supervisor, Mr. Vintin Lohan, for allowing the author to work on the project, providing timely feedback on progress reports, and suggestions to improve the work. It also expresses gratitude to friends, colleagues, and the company for providing a supportive environment.

Uploaded by

amanbansal007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views4 pages

Acknowledgement: List OF Tables

This document provides an acknowledgement for the successful completion of an assignment project. It recognizes that individual efforts alone are not sufficient and the project involved contributions from many people. It thanks the project supervisor, Mr. Vintin Lohan, for allowing the author to work on the project, providing timely feedback on progress reports, and suggestions to improve the work. It also expresses gratitude to friends, colleagues, and the company for providing a supportive environment.

Uploaded by

amanbansal007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

ACKNOWLEDGEMENT

An assignment puts to litmus test of an individuals knowledge, credibility and experience and
thus sole efforts of an individual are not sufficient to accomplish the desire. Successful
completion of the project involves interest and efforts of many people. So this becomes
obligatory on my part to record my thanks to all of them. Therefore, on this way would like to
thank Mr. Vintin Lohan (Asst Professor in CSE). The project supervisor who had allowed me
to work NewEdgeSoftSoul and listened my progress report timely. He had discussed about the
project and suggested me to do work in enhanced manner. At last but not least, I express my
heartiest gratitude to all my friends, company and Colleagues and all in all almighty for
providing me the favorable environment and support,

Lalit Kumar
MCA VI SEM
Roll No. 344

LIST OF TABLES
AMC_AMOUNT
AMC_COMPLAINT
AMC_FLOOR
AMC_REG
AREA_MAPPING
COMPLAINT_CLOSE
CUSTOMER_MONUS_MONTH
CUSTOMER_INCENTIVE_TABLE
CUSTOMER_REGISTRATION
DESIGNATION
EMP_AREA_TABLE
EMP_BANK_DETAILS
EMP_CMP_HANDLE_DECISION
EMP_INCENTIVE_RECORD
EMP_REG_DETAILS
EMPCODE
PRODUCT_MAPPING
STATE_CODE
TAX_RATE
TOTAL_DESG
Index
Page No.
1. Introduction
1.1Company Profile 1
1.2Overview Of Project.. 7
2. Software Development Life Cycle... 14
2.1.Introduction 15
2.2.Phases Of SDLC 15
3. Feasibility Study. 17
3.1 Operational Feasibility.. 19
3.2 Technical Feasibility. 20
3.3 Economical Feasibility.. 21
3.3 Behavioral Feasibility 21
4. System Requirement And Analysis. 22
4.1 Hardware And Software Requirements 23
4.2 Technologies Used 24
4.3 System Analysis 29
5. System Design. 35
5.1 System Designs. 36
5.2 Data Flow Diagrams.. 37
5.3 Tables. 43
5.4 Use Case Diagram. 52
5.5 ER Diagram . 57
6. Coding.. 58
7. Testing.. 62
Page No.

8. Designs Screen Shot 66


8.1 Relationship Between Tables. 75
9. Implementation 80
10 Maintenance 84
11. Conclusion 87
12 Future Scope 88
13 References 88

You might also like