SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
SAIC-W-2035 SAIC-W-2035
Welder/Welding Operator Certs Review Use SATR-W-2003
1.2 RH R R
and Issuance of JCC
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
1.12 Welding Strip Linings* (As Required) See Remarks See Remarks Refer to SATIP-W-015-01 (*Rare application)
Receiving Inspection & Verification of Contractor & SA shall verify and inspect first
Welding Consumable Controls in Place SAIC-W-2010 delivered batch of consumables & check for
2.1 SAIC-W-2010 H W W
(Properties, type, source, segregation, SATR-W-2009 compliance to approved control procedures with
storage, Issue, Handling, etc.) random checks thereafter
3.0 INSTALLATION
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
SAIC-W-2007
3.9 Post-Welding Visual Inspection SAIC-W-2007 SATR-W-2007 H W W
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
Verify NDE Method Application and *Refer to the respective NDE SATIP
3.12 Evaluation, Documentation & Reporting See Remarks See Remarks W / RH* W / R* W / R* (SATIP-NDE-UT-01, LPT-01, MPT-01, RT-
of Results* 01, etc.):
SAIC-W-2004
3.14 Post Weld Heat Treatment Inspection SAIC-W-2004 H W&R W&R Refer to Note 1 of the General Notes
SATR-W-2005
SAIC-W-2036
Modification or Re-Work After Weld SAIC-W-2036
3.17 H H H
Acceptance (Use with SAIC-W-2013)
4.0 PRE-COMMISSIONING
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
Final Welding Insp & Documentation a) Refer to SATIP for Pressure Testing.
4.1 (Database Report, Welding Summary/ SATR-W-2008 H R R b) Verify SAEP-1160 Database Requirements are
Record & Weld Map) per SAEP-1160 complied.
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
ITEM QUALITY QUALITY ASSIGNMENTS
PROJECT PHASE TASK / ACTIVITY REMARKS
NO. PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed as "W' require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1
adjust the levels of Saudi Aramco participation based upon the Contractors performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
3
organization representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization
4
representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND