ROLLING STOCK
FOR
METRO RAILWAYS
NOVEMBER 2013
2
Preface
1. Metro systems are already operational in Delhi and Bangalore and construction
work is progressing at a fast pace in Chennai, Kolkata, Hyderabad, Jaipur,
Kochi and Gurgaon. There are plans to have Metro Systems in cities with
population more than 2 million. MOUD with a view to promote the domestic
manufacturing for Metro Systems and formation of standards for such systems
in India, has constituted a Group for preparing a Base paper on Standardization
and Indigenization of Metro Railway Systems vide Order of F.No.K-
14011/26/2012 MRTS/Coord dated 30 th May 2012.
2. The Group has identified certain issues which require detailed deliberations /
review cost benefit analysis / study. The Group suggested that Sub-Committees
may be constituted consisting of officers/professional drawn from relevant field/
profession from Ministry of Urban Development/Railways/Metros and industries
associated with rail based systems / Metro Railway Systems.
(ix) Indigenization
6. The sub- committee had number of meetings and has since completed the
assigned task. Each issue included in the TOR has been deliberated in detail in
separate chapter in the report. The Key findings are given in Executive
Summary.
4
CONTENTS
Description Page
1.0 EXECUTIVE SUMMARY 9
1.1 Noise and Vibration Level 9
1.2 Emergency Evacuation System 11
1.3 Coupling Arrangement 12
1.4 Acceleration/Deceleration/Jerk Rate/Motorisation 13
1.5 Propulsion-Single source or Consortium/JV approach 15
1.6 Eligibility Criteria 17
1.7 Communication Protocol 18
1.8 Driverless Train Operation 18
1.9 Indigenisation 19
11.0 Indigenization 79
11.1 Indigenization objectives 79
11.2 Present Scenario 79
11.3 Views of Industry 79
11.4 Recommendations of the committee. 83
12.0 Bibliography 85
12.0 Submissions by Metros and Industry
6
12.1 BMRCL Annexure 1
12.2 CMRCL Annexure 2
12.3 DMRC Annexure 3
12.4 LT HMR Annexure 4
12.5 RMGL Annexure 5
12.6 Bombardier Transportation Annexure 6
12.7 BEML Annexure 7
12.8 SIEMENS Annexure 8
12.9 ALSTOM Annexure 9
7
8
1.0 EXECUTIVE SUMMARY
Committee also considered following studies on Noise and Vibrations emanating from
Metro Systems:
Athens Metro Extension Project to Piraeus Ground borne Noise and Vibration
Assessment and Control
Noise impact assessment of mass rapid transit systems in Delhi City Naveen
Garg, Omkar Sharma and S Maji. Acoustics, Ultrasonics, Shock and Vibration
Standard, National Physical Laboratory(CSIR) New Delhi 110012
METRO RAILWAY NOISE AND VIBRATION - Causes and solutions for DMRC
Phase III
9
Environmental Noise is recognized as a major Health problem. Noise exposure is a
function of two main factors:
Though most of the Metros specify measurement of internal coach noise LAeq as per
ISO 3381:2011 and measurement of external noise as per ISO 3095:2010 American
Public Transit Association (APTA) specifies maximum pass by airborne noise from
train operationsLAmax at 85 dBA. European nations specify both maximum noise
levels (Lmax) and equivalent noise levels (LAeq) for given period of the day. For
example UK specifies LAmax 85dBA and LAeq 68 dBA for 06:00 Hrs to 2400 Hrs.
Noise and Vibration norms adopted by various Metros in other countries and Indian
Metros, method of measurement etc were studied in detail. Valuable inputs were
received from Industry and Delhi Metro in this regard. Based on the detailed study and
inputs from all members of the committee, following recommendations are made:
Type of Rolling Stock Interior Noise level (ISO Exterior Noise level (ISO
3381)LAeq (dBA) 3095)LAeq (dBA)
Stationary Running Stationary Running
80 kmph
750 Volts Via-duct 66 72/70 67 80
Third rail Tunnel 70 74/72 72 82
25 KV AC Via-duct 68 72/70 67 82
Stock Tunnel 72 75 NA NA
10
Vibrations
Ground-borne vibrations caused by the dynamic impact forces generated in the wheel-
rail interaction propagate in the soil and excite the foundation walls and air borne noise
caused by low frequency emissions can excite building structural components(walls
etc) above ground. The key factors of the vehicle / track system which determine
ground vibration are related to the track design and the maintenance of wheel and rail:
Impact excitation from track discontinuities like switches & crossings and
insulation joints
Intensity of ground based noise and vibrations, are primarily dependent on track
structure, soil conditions and distance of such buildings from the railway track. It has to
be ensured that these vibration levels do not exceed the safety limits as prescribed in
ISO 14835 for which specific measures may need to be adopted while designing the
track structure.
Passengers are also subjected to the vibrations for which norms have been prescribed
by ISO 2631. It has been suggested by DMRC that only these norms be specified for
rolling stock manufacturers. This makes sense as the rolling stock manufacturers have
no control over ground vibrations emitting from Metro operations.
Recommendations
Vibrations to be measured as per ISO 2631, weighted acceleration should be less than
0.315 m/s2
Side Evacuation
In case of side evacuation a walkway is provided along the track. People get out
through normal doors and move on the walkway which takes them to the nearest
station platform. The relative merits and demerits of this system are as follows:
11
Advantages:
Advantages:
1) No need for extra walkway, hence size of the tunnel as well as via-duct
reduces hence more economical.
2) Evacuation is from emergency doors provided at the ends and can be
better regulated by motorman and stampede is prevented.
3) Walking is easier for passengers in this system as either they have to
walk through the coaches or on the track
Disadvantages:
1) Power block is necessary in case of 750 Volts DC third Rail system, which
may take some time
2) Exit from single emergency door may affect the faster evacuation.
Committee recommends that Indian Metros should adopt front evacuationonly with
door at the center as it is the most prevalent practice world-wide.
1.3Coupling Arrangement
There are three different types of couplers used in Metro Rolling Stock
12
Semi-Permanent coupler for mechanical and pneumatic coupling along with
electrical coupling is through jumper cables between cars.
Recommendations
In case of 4-car/ 8 car trains, only 50% and 75% motorisation is possible. DMRC,
who have sufficient experience with 50%,recommends 75% motorization both for
4 car and 8 car trains. 75% motorisation in 4 car rakes would require three different
type of cars. It is thus desirable to go in for 75% motorisation in case of 8 car rakes
and 50% for 4 car rakes.
13
6 Car/9 Car trains
Advantages
Even with loss of one power car the operational performance is satisfactory,
hence motor coach control can be adopted instead of bogie control.
Chances of slip/slide even under the worst conditions are reduced due to
utilization of lower adhesion factor compared to the permissible values.
Disadvantages
Number of motor coaches will go up which will also result in increase in cost,
and increase in tare weight. There will however be some reduction on
account of bogie control in cost of propulsion equipment
The initial & maintenance cost of propulsion for 66% motorization will be higher,
however there will be savings towards energy cost. World wide 66% motoring is
accepted as the most appropriate.
Recommendations
Committee recommends 3 car or 6car per rake depending on the traffic projections
with 66% motorization should be adopted as the standard for all future Metros. In case
of 3 car rakes both motored cars should have independent propulsion equipment for
complete redundancy.
14
Recommended Operating characteristics Acceleration, Deceleration, jerk rate etc
are as given below
15
The above role is normally divided amongst two different set of firms
1. Car manufacturers
They specialize in manufacture of car body/mechanicals and integration of
propulsion system and TCMS from the specialist suppliers.
Examples are BEML, CAF, ROTEM
There are suppliers who supply the complete rolling stock including propulsion system.
Examples are Bombardier, SIEMENS, ALSTOM, Ansaldo Breda etc.
Advantages of Non consortium approach ie when propulsion equipment suppliers can
be sub contractors:
Enables competitive pricing as
Rolling Stock manufacture that manufacture their own propulsion
equipment can offer better competitive price
16
Recommendations
Committee recommends that car manufacturers can either bid as a single vendor with
their own propulsion equipment in case it is manufactured by them and will have an
option to source the propulsion equipment from any propulsion equipment supplier as
a sub contractor. There should be no compulsion on the car manufacturer to have
propulsion equipment supplier as a consortium/JV partner for bidding as consortium.
Car manufacturer will have the option to bid as a single vendor or in consortium with
propulsion manufacturer
17
Eligibility criteria for Propulsion Equipment Supplier:
Propulsion equipment supplier can be consortium member or a sub-contractor meeting
the following requirements:
a) Must have cumulative experience of minimum 10 years in the Design and
manufacturing of propulsion equipment (Traction converter-Inverter,
Auxiliary converter/Inverter and Traction Motor rolling stock).
1.9 Indigenisation
19
manufacture of propulsion system including TCMS and other critical sub-
systems like propulsion, brake, door, HVAC, passenger address & Passenger
information system, CCTV etc.
Car manufacture
Indigenisation of Car body manufacture has already taken place as following
manufacturing facilities have already been set up:
BT coach manufacturing unit at Vadodara
BEML Bangalore under TOT from Hyundai Rotem
Alstom setting up unit near Chennai
CAF setting up manufacturing unit in Haryana
Kawasaki is also planning to set up coach production facilities.
ICF and RCF have facilities to manufacture EMU/MEMU coaches which can be
up graded to Metro coaches.
Above facilities can take care of the future Metro needs. There is however a need to
protect these investments and some incentives need to be given to these units for
effectively utilizing the facilities already created.
Propulsion equipment
The critical area is indigenization of manufacture of propulsion system, TCMS and
other critical sub systems. Global suppliers with satisfactory performance record need
to be encouraged to either set up their subsidiary in India or transfer technology to an
Indian company through JV. Following steps are necessary to achieve this:
Specifications for both rolling stock and traction distribution system are
standardized.This will help indigenous
Standardization will result in higher volumes. It will be possible to leaverage the bulk
procurement by a single agency to achieve development of indigenous industry
through TOT as has also been done by China.
Presently individual metros are procuring rolling stock in small quantities with different
specifications and clause to manufacture 60 to 70% cars indigenously. This does not
promote indigenisation of propulsion equipment which is mostly imported. As in case of
car body manufacture, indigenous manufacture of complete propulsion equipment in
the phased manner also needs to be mandated in the rolling stock tenders.
MoUD in order to promote indigenous manufacture of propulsion equipment should
give development orders for small quantities to local firms who can either develop on
their own or through collaboration with global suppliers. IR has adopted this approach
for development of indigenous three phase propulsion equipment for locomotive and
EMUs. After successful tests and trials these sources can be considered as regular
sources for propulsion equipment.
Committee, thus, recommends that a system of bulk order placement may be devised
preferably by MoUD by combining requirement of smaller metros. Orders should be
placed with at least 70% indigenization clause for both propulsion equipment and car
manufacture through TOT with indigenous manufacturers or setting up of Indian
subsidiaries.
20
2.0 TERMS OF REFERENCE OF THE SUB COMMITTEE ON ROLLING STOCK
Item No. 1 - Noise and Vibration level (including RS, Track etc.)
Terms of Reference
Study of the Environmental Laws in India and extracting the relevant statutory
requirements.
Study of noise and vibration criteria adopted by various metros in India in their
rolling stock and trackwork specifications.
Study of similar international regulations in other countries having vast
knowledge base in this field such as USA, Germany, Japan, Singapore etc.
Study of regulations regarding protection of ASI monuments (heritage
structures) from vibration generated by metro trains operation.
Study of regulations in other countries regarding protection of heritage
structures.
Analysis of above and recommendations for acceptable noise & vibration criteria
for rolling stock and track including suggestions for integrated responsibilities or
clarity of interface.
Report of above study.
21
Preliminary cost analysis of each type of couplers including studying impact of
imported components/assembly.
Study of maintenance practices of trains being followed by Indian Railways,
Kolkata Metro, DMRC and BMRC and assessment of instances of coupling and
de-coupling of units and coaches in depots as well as on lines.
Study of an assessment report conducted by BMRCL in this regard.
Report comprising above issues, analysis, recommendations and way forward.
22
3.0 Noise and Vibration Level
Environment (Protection) Act, 1986 (29 of 1986) read with rule 5 of the
Environment (Protection) Rules, 1986, the Central Government has made the rules
for the regulation and control of noise producing and generating sources,
namely:The Noise Pollution (Regulation and Control) Rules, 2000. Rules stipulate
following norms:
Noise Pollution Rules have been amended vide above notification on 9th March 2009
by Ministry of Forest and Environment. Operative para relevant to Metro is given
below:
23
3.2 International regulations in other countries having vast knowledge base in
this field such as USA, Germany, Japan, Singapore etc.
1 24 hours 70 dBA
2 8 hours 75 dBA
Chronic exposures that exceed these allowable combinations of duration and noise
level are expected to produce Noise induced hearing loss (NIIHL) in some
members of the exposed population.
Based on the WHO and EPA recommendations, chronic exposure to 80.3 dBA for
more than 160 minutes per day may be expected to produce hearing loss in some
exposed individuals, and a 90.2-dBA level likewise may cause hearing loss with just
18 minutes of exposure per day.
US Housing and Urban Development criteria for noise for L1,L99 and LNP
L1 represents the maximum noise event which takes about 1% of measurement period
L99 is the background noise, which represents the lowest level during the
measurement period
L1
Normally Unacceptable 73.5<L1 <86.0 dBA
Clearly Unacceptable > 86.0 dBA
L99
Normally Unacceptable 53.0 <L99 <68.0 dBA
Clearly Unacceptable > 68.0 dBA
25
According to UK Design Manual for Roads and Bridges (DMRB) , the onset of
annoyance due to a new project activity, is considerable if the change is more than 10
dB(A)
Table below shows the various noise impact criteria followed by different European
nations. Specific maximum noise levels (Lmax) and equivalent noise levels (LAeq) for
given period of the day as related to these sensitive areas are specific.
Noise radiated from train operation and track structures generally constitute the
major noise sources from Metro System. Air borne noise is radiated from at grade
and elevated operations, ground borne noise and vibration is of prime concern for
underground operations. Following Noise need to be considered in case of Metro
System Design
a) Way side Noise
Way side noise is very important for residential areas,
hospitals,schoolsetcfalling in the vicinity of Metro Systems. There are four
basic sources of way side air borne noise.
1. Wheel rail Noise that is directly radiated from the vibrating wheels and
rails
2. Propulsion equipment including noise from traction motors, cooling fans
reduction gears etc.
3. Auxiliary equipment like compressors, ventilation system, A/C units and
other car mounted equipment
4. Elevated structure Noise radiated by vibrations of the via-duct
components excited by train pass-by.
While all countries specify LAeqaverage noise levels as given in the table
above, some countries specify maximum sound levels Lmax also for noise
impact assessment.
26
b) Interior Noise inside the cars
It directly affects the daily commuters, as commuters spend up to 1 hour in
the cars, while travelling from one end to the other. Average noise levels and
peak noise levels both are relevant here. Sources contributing to interior
noise are:
Any of these noise sources can dominate the interior noise level depending upon
the car design and operating conditions.
Passenger activity
3.4 Study of Noise assessment inside the Greater Cairo Underground Metro
ByMostafa E Aly
L1 ranges from 87.8 to 102.5 dBA., so it exceeds the limit by about 1.5 to 16.5
dBA. The highest value of L1 was noted between El-Gamaah and El-Behoos
stations, this is due to the tunnel entrance and the sharp turn of 90, which
increases the slip between the wheels and the rails, which in turn increases the
noise emission.The sources of noise at the platforms are the aerodynamic and
mechanical noises of the train, the train siren, the brakes when applied, the
passengers themselves and the attention signal sound systems.
The noise problem is very significant especially inside the metro units. This
increase of noise levels is due to the lack of air in the ventilating system of the
units, which causes the passengers to open the side windows to compensate
forthe required quantity of air. This situation permits the outside noise to enter the
units.
27
The side windows are sound-proof windows, which prevent outside noise from
entering the units. The closing of the side windows attenuates the noise inside the
units by about 20 to 25 dBA. The noise outside the metro units is due to the
mechanical and aerodynamic noise, whichincreases by reflection of sound from
the tunnel walls. The tunnel has a cylindrical shapewhich reflects the sound from
any source to the centre axis of the tunnel where the trains run.The noise at the
station platforms is due to the application of the air sirens of the trains andthe
application of the brakes. The increase of noise levels at the platforms is also due
to thereflections from the side walls, which are covered with smooth ceramic tiles.
Study recommendations
Increasing the efficiency of the ventilating system inside the metro units to
avoid the opening of the side windows.
Coating the tunnel walls with some kind of sound absorbing materials to
decrease thereflection of sound into the metro units.
Reducing the approach speed of the trains to reduce the time of application
of brakes.
Replacing the brake lining materials with other more efficient ones to reduce
the timeof application of brakes
Changing the smooth ceramic tiles of the station platforms walls by other
kinds which can absorb sound to decrease the total noise level at the station
platforms.
3.5 A study of Noise Levels associated with New York Citys Mass Transit
System by Richard Neitzel, Robyn R. M. Gershon and others
Mass Transit noise exposure has the potential to exceed limits recommended by
the WHO and the US Environmental ProtectionAgency and thus cause Noise
induced hearing loss among riders given sufficient exposures. Noise
measurements made are given in the tables below:
28
Against 24 hour 70-dBA WHO and EPA suggested exposure limit and the National
Institute for Occupational Safety and Health 8-hour 85-dBA Recommended
Exposure Limit, Leq measurements exceeded 70dBA threshold at all subways. 7%
subways had mean vehicle Leq levels greater than 85 dBA and 23% had mean
Leq platform levels greater than 85 dBA. Mean aboveground vehicle Leq levels
were 1 to 5 dBA lower than above ground platforms levels. Mean vehicle Leq
levels for underground measurements were always lower than those for
underground platforms. (Table 3 below)
Lmax Levels
Table 2 below shows the associated Lmax levels with each transit type. MTA
subways had the highest maximum noise levels on average 90.4 dBA. Highest
Lmax level among all platform measurement was 102.1 dBA at MTA subway
station. Half the subway lines had average vehicle and platform levels that exceed
90 dBA
29
30
3.6 Noise Levels specified by Various Metrosworld wide
31
Noise Study on Indian Metros
Following Noise related studies have been done on Delhi Metro which were made
available by DMRC
Quoting from the above studies mainly carried out after phase-I of DMRC,
observations are as follows:
At Stations
Average value of background noise levels in Metro stations was about 59+3 dB(A).
Average level in underground stations was 2 dB(A) lower
Average value of exterior noise levels when trains were standing in metro stations was
76 dB(A) in all sections.
Noise level due to train entering and leaving the station near exit points in underground
station was higher by 5 dB due to reverberant noise buildup of train noise in station
space.
Interior Noise
DMRCs target value of 85 dB(A) fixed for interior noise level in moving trains running at
80 kmph with all auxiliary equipment in operation is on higher side by 5-10 dB(A) when
compared to noise level of 75dB(A) experienced for face to face conversation
elsewhere. Interior noise levels were 10 to 12 dB(A) lower in at grade sections and
elevated corridor.
Average interior noise levels observed in moving trains were higher by 5 dB(A) at
90+1dB(A)
Door operation noise was also higher by 5 dB(A) vis--vis specified level of 72 dB(A)
Way side noise levels were 10 dB(A) lower than specified at 60 dB(A) on at grade
racks at 25 meter.
32
Noise specifications in various procurement tenders by Indian Metros
33
Door operation noise levels specified in various procurement tenders:
**All values measured are LpA5 - After applying the time and
frequency weighting, the
sampled measurement data of
20 seconds (10000 readings
sampled with 500 Hz from one
microphone) is divided into
classes corresponding to each
level (e.g. 10 classes per dB).
For each class the frequency
over the measurement time is
calculated. A histogram of the
frequency of each LpAF level over
the measurement time is made.
This is then converted to a graph
over cumulative relative
frequency. The value for 95% of
the time is the LpA5 level, i.e. the
A weighted sound pressure level
exceeded for 5% of the
measurement time period.
34
3.7 Deliberations on Noise specifications for Metro Rolling Stock
Method of Measurement
As can be seen from the table above Leq level of 64 to 71 dBA under stationary
conditions on via-duct and 75 dBA in tunnels and 70 to 75 dBA on via-duct and
80 to 95 dBA in the tunnels at speeds around 80 kmph have been specified. In
35
comparison World Metros as per table given above specify Leq levels of 64 to
68 dBA under stationary conditions and 68 dBA to 77 dBA at speeds around 60
kmph. No LAmaxvalue have been specified.
Most of the Metroshavejust mentioned the values specified in their tenders. DMRC has
however recommended that Maximum level of noise Lpa5 and not average noise
levels Laeq, as has been done in the past, be measured.
M/S Bombardier have proposed measurement of LpAeqt as per ISO 3095 latest
version. Interior Noise at grade should be 65 dBA at standstill and 75 dBA in saloon
and 70 dBA in cab at 80 kmph according to ISO 3381 latest. M/S Bombardier have
proposed noise increment of +2 dBA for via-duct and +5 dBA for tunnels depending on
type of tunnel.
External Noise
Indian Metros have specified Laeqof 61 to 72 dBA under stationary conditions and 80
to 85 dBA under running conditions at speeds varying from 50 to 85 kmph. Delhi Metro
has prescribed Lap5 for RS3 and RS 10 and recommends the same. M/S Siemens
have recommended LAeqT of 67 dBA under stationary conditions and 82 dBA at 75
kmph. M/S Bombardier have recommended average of LpAeq around the train of 68
dBA at standstill and 83 dBA at 80 kmph.
Though general recommendation is to specify Laeqt as per ISO 3381. DMRC is of the
view that it is not possible to accurately measure LAeq level and hence proposed LpA5
instead of LpAeq. Lpa5 gives maximum noise levels against average noise levels
36
LpAeq. It is however mentioned that LAmax level are generally 10 to 12 dB higher than
average noise levels(Laeq). Hence in that case specification will have to be different.
Type of Rolling Stock Interior Noise level (ISO Exterior Noise level (ISO
3381)LAeq (dBA) 3095)LAeq (dBA)
Stationary Running Stationary Running
80 kmph
750 Volts Via-duct 66 72/70 67 80
Third rail Tunnel 70 74/72 72 82
25 KV AC Via-duct 68 72/70 67 82
Stock Tunnel 72 75 NA NA
Delhi Metro has proposed that instead of LAeq these level be specified for LpA5
(Project Noise LAmax that exceed 5% of the time measured with T=20 seconds) as
has also been stipulated in RS10 be followed as there is very little ambiguity in its
measurement. Committee is however of the view that the Measurements be done as
stipulated in latest ISO 3381 and ISO 3095 as has been specified in all the other
tenders so far and recommended by majority of the members because all the limits
and norms exists in terms of Laeq only.
The Ancient Monuments and Archaeological Sites and Remains (Amendment and
Validation) Act 2010,
Act imposes restrictions in carrying out construction work within 100 meters of a
protected monument. Relevant excerpts from Sec 20A of the act is reproduced below:
*[20A. Declaration of prohibited area and carrying out public work or other works
in prohibited area.- Every area, beginning at the limit of the protected area or the
protected monument, as the case may be, and extending to a distance of one hundred
meters in all directions shall be the prohibited area in respect of such protected area or
protected monument:
Provided that the Central Government may, on the recommendation of the Authority,
by notification in the Official Gazette, specify an area more than one hundred meters to
be the prohibited area having regard to the classification of any protected monument or
protected area, as the case may be, under section 4A.
37
(2) Save as otherwise provided in section 20C, no person, other than an
archaeological officer, shall carry out any construction in any prohibited area.
(3) In a case where the Central Government or the Director-General, as the case may
be, is satisfied that--
(a) it is necessary or expedient for carrying out such public work or any project
essential to the public; or
(b) such other work or project, in its opinion, shall not have any substantial adverse
impact on the preservation, safety, security of, or, access to, the monument or its
immediate surroundings, it or he may, notwithstanding anything contained in sub-
section (2), in exceptional cases and having regard to the public interest, by order and
for reasons to be recorded in writing, permit, such public work or project essential to
the public or other constructions, to be carried out in a prohibited area:
This act is a legislative measure to ensure thatheritage buildings are not damaged
during the construction stage of the project and is also protected with harmful effects of
noise and vibrations on the old weak and structurally weak buildings and historical
monuments
Some countries prescribe the limits of Ground base Noise levels and vibrations
reaching the buildings, emanating from Metro projects. Maximum permissible values of
ground borne noise & vibration from train operations as recommended are as follows:
38
Ground-borne vibration caused by the dynamic impact forces generated in the
wheel-rail inter phase due to irregularities of both wheels and tracks that can
propagate in the soil and excite the foundation walls of nearby buildings,
beneath ground.
Air-borne noise, caused by low frequency emissions that can excite building
structural components (walls etc.) above ground.
The excitation of noise and vibrations stem from the wheel-rail interaction and hence is
primarily governed by the properties of the vehicle and the track. This is the case for
excitation of air-borne and ground-borne noise with frequency content above 50 Hz [3].
Ground-borne vibrations however has an essential part of the energy concentrated to
frequencies below 50 Hz. The excitation of these long-wavelength vibrations will be
governed also by the ground properties and hence the excitation will also be site-
specific. In rare cases the vibration emissions from the railway constitutes a safety risk
for the railway vehicle itself. However the vibrations excited in the wheel-rail contact
39
are primarily a problem for the environment adjacent to the railway lines. The vibration
propagates in the ground and becomes problematic as it reaches buildings or other
constructions in the vicinity of the track. The issues are primarily related to discomfort
experienced by residents but can also be more severe and damage buildings or disturb
sensitive equipment in e.g. hospitals and laboratories.
As per ISO 14837, typically, dominant frequencies are less than 100 Hz because they
represent the response of building elements. The frequency range relevant to the
evaluation of the risk of vibration-induced damage on building structures is 1 Hz to 500
Hz, although high strains associated with higher risk of damage are associated with
low frequencies. Most building damage from manmade sources occurs in the
frequency range 1 Hz to 100 Hz. This is an appropriate range for evaluating building
damage and peak particle velocity. A proposed safe level for "serious" structural
40
damage is very high: 50 mm/s peak particle velocity. Nevertheless, much lower levels
may be relevant for damage to old and historic buildings(as low as 2 mm/s), and for
more "minor" damage in ordinary building ("fine plaster cracking and reopening of old
cracks") [5]
ISO-2631 (1997) provides some guidance to the health effects of vibration as it applies
to people in normal health who are regularly exposed to vibration. The referenced
standard provides a graph showing the recommended or preferred zone (See Figure
9). Vibration exposures below the zone indicate health issues that have not been
clearly documented and/or objectively observed. Exposures above the zone indicate
that health risks are likely.
41
3.9. Deliberations on Vibrations
The key factors of the vehicle / track system which determine ground vibration are
related to the track design and the maintenance of wheel and rail:
Intensity of ground based noise and vibrations, are primarily dependent on track
structure, soil conditions and distance of such buildings from the railway track. It has to
be ensured that these vibration levels do not exceed the safety limits as prescribed in
ISO 14835 for which specific measures may need to be adopted while designing the
track structure.
Passengers are also subjected to the vibrations for which norms have been prescribed
by ISO 2631. It has been suggested by DMRC that only these norms be specified for
rolling stock manufacturers. This makes sense as the rolling stock manufacturers have
no control over ground vibrations emitting from Metro operations.
As per ISO 2631, weighted acceleration of 0.315 m/s2 is the permissible value for
passenger comfort when he is subjected to the vibrations of this intensity,
continuouslyfor 24 hours.
Committee recommends
Vibrations to be measured as per ISO 2631, weighted acceleration should be less than
0.315 m/s2
42
4.0 Emergency Evacuation System
4.1 Practices adopted in various metro systems in India and elsewhere along
with the underlying logic/reasons (at least 3 metros each in USA, Europe,
Japan, China and South East Asia to be studied).
Emergency doors are provided for evacuation during emergencies. Two types of
evacuation systems are provide in Metros world wide:
Sliding door concept : This allows train to train & train to track detrainment, in
this concept you have a emergency door which slides sideways & ramp can be
deployed to track or a passage to other train can be provided, it is mainly useful
where no side passage is available
Top opening door concept: In this concept evacuation door opens upwards on
hinges & ramp is deployed to tracks, no train to train detrainment is possible
with this.
43
Singapore Metro
Front Evacuation
Travellers on the London Underground know well how cramped trains can be. So fitting
a system for passenger evacuation required DCA to come up with a design that
combines space saving features with fast deployment.
The detrainment system designed for Bombardier are fitted to new S-Stock trains on
the Metropolitan Line. DCA says: Human factors played an important role in the
design of the escape system. Deployment has been made easy by the development of
a novel strap insertion and retention detail and by maintaining a total mass of just 15kg
for the ladder part of the system. A further complication that has been resolved was the
need to provide a lightweight interlocking bridge plate that allows the ladder to clear the
auto coupler for train-to-track egress as well as being used on its own for train-to-train
evacuation.
In pre-launch trials, deployment took under one minute and passengers escaped from
the train at a rate of one every two seconds.
44
London Metro
45
4.2 Systems adopted by different Metros in India
A walkway is provided along the track. People get out through normal doors and move
on the walkway which takes them to the nearest station platform. The relative merits
and demerits of this system are as follows:
Advantages:
Disadvantages:
Advantages:
No need for extra walkway, hence size of the tunnel as well as via-duct reduces
thus is more economical.
Evacuation is from emergency doors provided at the ends and can be better
regulated by motorman and stampede is prevented.
Walking is easier for passengers in this system as either they have to walk
through the coaches or on the track
46
Disadvantages
Power block is necessary in case of 750 Volts DC third Rail system, which may
take some time
Exit from single emergency door may affect the faster evacuation.
4.3 Recommendations
There have been instances of emergency evacuation in Kolkata Metro in its operation
during the last 25 years, but no major difficulty was faced in evacuation even though
system operates on 750 volts DC third rail and power has to be switched off before
opening of the emergency door.
Committee thus strongly recommends that Indian Metros should adopt front evacuation
only, with door at center as is also the most prevalent practice world-wide.
47
48
5.0 Coupling arrangement (Automatic, semi-automatic etc.)
Suppliers are:
Voith Turbo, Germany RS1,RS3 and BMRCL
Cost Aspects
49
The coupling arrangement in the various Indian metros is brought out below:
1. Full automatic front coupler with electrical & pneumatic head : These couplers
are required where quick connect / disconnect is required, for example EMU
trains for which one regularly couples & decouples the train to form different
train configurations. On Indian Metros configuration is very rarely changed.
Most of the metros run in fixed formation i.e. 4 car,6 car or 8 car. Hence is not
50
required for Indian Metros and in such cases even semi permanent couplers
can be provided between two basic units
4. Besides the load key criterion for couplers is their recoverable stroke
capability, and usually for metro train of fixed train configuration it should not
exceed 10 km/h, that is to say coupler should not be requested to absorb
collision energy in excess of 10 km/h
51
6.0 Acceleration/Deceleration/Jerk Rake, Power to weight ratio/ % motorization
Metros that have adopted 66% Motorisation are KMRCL Metro and Bangalore Metro
with:
6.2 Typical Operational parameters for a 6 car rake with 50% powering
Loading AW4
Time required in all out mode with 66% powering (180 KWX16) 22.9 minutes
Time savings with higher initial acceleration is very marginal around 1.5% For both 50%
and 67% motorization, the schedule speed in normal mode is almost the same. The
acceleration levels are higher in 67% motorization which will be helpful in routes with
frequent gradients. Scheduled speed with both 50% powering and 67% powering is
given in the table below:
The major advantage of 67% motorization is that more amount of regenerative energy
will be available, thereby reducing the net energy consumption for traction.
Normally regenerated energy is around 30% of the energy consumed during motoring.
Regenerated energy with 67% motoring will go up by around 12 to 13% i.e. regenerated
energy will increase from 30% to 34%.
KM earned 109593
Motoring Consumption per km(4 cars@63 tons per car) 17.82 KWH or 70 watts/ton.km
6.5 Simulation results by Mitsubishi for KMRCL 750 Volts third rail system with
67% powering
Life cycle energy cost for additional 1 watt hour per tonne.km consumption presuming a
life of 35 years and 150,000 kms per year @ Rs 5 per unit works out to
(5X35X150000X63/1000) Rs 16.5 lakh per car. This cost needs to be taken into
consideration while deciding the mode of traction and percentage powering
Motorisation
3 Car unit
For a basic 3 -car train there is no alternative but to have 66% motorization so as to
ensure that failure of one motor car does not result in immobilization of train in the
section.
In case of 4-car/ 8 car trains, only 50% and 75% motorisation is possible. DMRC
who have sufficient experience with 50% recommends 75% motorization both for 4
car and 8 car trains. 75% motorisation in 4 car rakes would require three different
type of cars. It is thus desirable to go in for 75% motorisation in case of 8 car rakes
and 50% for 4 car rakes.
Advantages
Even with loss of one power car the operational performance is satisfactory,
hence motor coach control can be adopted instead of bogie control.
Chances of slip/slide even under the worst conditions are reduced due to
utilization of lower adhesion factor compared to the permissible values.
Disadvantages
Number of motor coaches will go up which will also result in increase in cost,
and increase in tare weight. There will however be some reduction on
account of bogie control in cost of propulsion equipment
Number of pantographs in 25 KV AC system will go up. This can however be
reduced by having one common transformer and single panto for a 3 car
basic unit. This will reduce redundancy as two motor coaches will be out in
case of failures of traction transformer and is acceptable only for 6 car rake.
The initial & maintenance cost of propulsion for 67% motorization will be higher,
however there will be savings towards energy cost
Recommendations
Committee recommends 3 car or 6car per rake depending on the traffic projections with
66% motorization should be adopted as the standard for all future Metros. In case of 3
car rakes both motored cars should have independent propulsion equipment for
complete redundancy
7.1 Issue is whether bids be invited from Coach manufacturers as single source or
consortiums/JV of coach manufacturers and Propulsion equipment supplier.
i) Car body/mechanicals,
ii) train system design & integration,
iii) Propulsion system including TCMS and
iv) Interfacing, testing & commissioning with full MRTS system.
The above role is normally divided amongst two different set of firms
1. Car manufacturers
They specialize in manufacture of car body/mechanicals and integration of
propulsion system and TCMS from the specialist suppliers.
Examples are BEML, CAF, ROTEM
There are suppliers who supply the complete rolling stock including propulsion system.
Examples are Bombardier, SIEMENS, ALSTOM, Ansaldo Breda etc.
ALSTOM
Bids must be invited from JVs/Consortiums, wherein suppliers of each of the four
requirements must be part of the consortium, and share joint and several
responsibilities.
SIEMENS
The propulsion system supplier shall be allowed to bid as consortium member and also
as sub-contractor to rolling stock supplier
Bombardier
BEML
CMRCL
DMRC
Hyderabad Metro
RMGL
7.4 Recommendations
Recommendations
Committee recommends that car manufacturers can either bid as a single vendor with
their own propulsion equipment in case it is manufactured by them and will have an
option to source the propulsion equipment from any propulsion equipment supplier as a
sub contractor. There should be no compulsion on the car manufacturer to have
propulsion equipment supplier as a consortium/JV partner for bidding as consortium.
Car manufacturer will have the option to bid as a single vendor or in consortium with
propulsion manufacturer
8.0 Eligibility/qualification criteria for procurement
Eligibility criteria should aim at encouraging competition, Ensure reliability and quality
and indigenization. Eligibility criteria has a direct bearing on the cost. Broader criteria
ensures more competition and competitive prices.
Rolling stock comprises of Car body and Propulsion equipment. As there are two
distinct set of suppliers for Car body manufacturing and propulsion equipment, and sub-
contractor approach for propulsion equipment supplier is recommended. It is necessary
to have separate eligibility/qualification criteria for these two separate set of suppliers.
1. Bombardier
2. Siemens
3. Alstom
4. Toshiba
5. Mitsubishi
6. Hitachi
7. ABB
SIEMENS Views
BOMBARDIER
ALSTOM
Indian subsidiary companies who have through parent company global experience be
eligible to bid on the basis of the global credentials of parent company. This will help in
cutting cost and indigenization. Credentials be proved through
BEML
Period of satisfactory service 50% of 200 must have completed 5 years or more
Projects executed through TOT arrangement with global player, be taken as experience
BMRCL
Manufacturer of the propulsion system and other major sub-systems should have at
least 10 year experience in this field with at least 5 years outside its home country.
CMRCL
RMGL
Supplier should be necessarily a car builder and should have at least supplied 200 cars
running for a period of 3years without any major problem. The Propulsion equipment
supplier need not necessarily be a Consortium partner, but should have experience of
design and manufacture of minimum 200 nos. of Propulsion System with similar
features which should have been proven in service for a period of 3 years in a country
other than the country of origin of manufacturer
LTHMR
Propulsion supplier was decided on the basis of operational proven-ness for 10 years.
At least 4 years should have been in three different countries (it may be a consortium or
single source)
DMRC
1. Minimum number of cars 300 metro (i.e. MRT,LRT, Sub-urban railway of high
speed railways out of which minimum 200 cars
shall be of either stain less steel or Aluminum
2. No of Contracts 5
Operation Performance
150 cars out of above must be operating satisfactorily against three different contracts
in three countries for the last five years.
Propulsion System
In case of JV/Consortium lead partner must have been a lead partner in at least two
rolling stock contracts against ICB in the last ten years.
8.3 Major Issues
Propulsion equipment suppliers are mainly Japanese and Europeans for example
MELCO, Hitachi, Toshiba, Bombardier, Alstom, Siemens, ABB. There is no indigenous
supplier of modern propulsion system. Some of the above major suppliers have started
manufacturing theseequipment in India through 100 % owned subsidiaries. Some
Japanese suppliers are also planning to set up joint venture companies in India with
Indian partners. All the above suppliers have enough experience of system integration
and have been supplying propulsion equipment to all major car manufacturers in
number of countries. Indian Metros and IR have also so far obtained propulsion
equipment only from above suppliers. Recently some Indian companies like Medha and
BHEL are trying to develop their own propulsion equipment for Mumbai suburban
system. All the above suppliers meet the following criteria for propulsion system:
The above criterion has been proposed by most of the committee members
representing both Industry and also the Metros. Even 100% Indian subsidiaries of the
parent company and also their JV companies having majority stake with parent
company can be considered eligible with guaranteed support from parent company.
Barring Alstom most of the members are of the view that Propulsion equipment supplier
need not be a consortium partner and can also be a sub-contractor. It will not make any
difference to the Metros as most of the eligible propulsion equipment suppliers are
proven sources worldwide, but will give a wider choice to the car manufacturers and
likely to lead to more competitive prices.
Car Manufacturers
Present scenario
There are number of Metro car manufacturers in Europe, Korea and China. Some of
these have already supplied Metro cars to IR and have also set up or are setting up car
manufacturing units in India. Examples are Bombardier, Alstom, CAF Besides these
some Indian manufacturers have obtained TOT for coach manufacture from reputed car
manufacturers like BEML. ICF has also been manufacturing Metro coaches for Kolkata
Metro but these are conventional DC Metro cars. ICF does not have technology to
manufacture modern 3 phase Metros. There is a need to encourage European car
manufacturers to set up manufacturing facilities in India through technology transfer to
JVs with Indian coach manufacturers so that cost comes down.
Eligibility criteria for car manufacturer must ensure quality, reliability and competitive
price of the rolling stock. Taking the views of Industry and Metros into consideration,
following eligibility criteria for Rolling stock supplier is recommended.
All the Reputed rolling stock manufacturers have developed their own
Train Integrated Management Control System (TIMS) over the years.
Even though communication protocols are based on international
standards but achieving interoperability with subsystems of alternative
vendors is generally quite difficult
Support of the TIMS manufacturer is required for achieving integration.
Siemens
Bombardier
TCMS is critical for train operations, reliability and safety. Train builders and
equipment suppliers use different solutions and protocols; normally supplier
specific hardware and common network solutions and protocols such as
MVB,CAN, Ethernet. Functional requirement only need to be given for providing
flexibility of solution.
The common standard for the TCMS is defined by IEC 61375 series of
standards.
BEML
MELCO TCMS uses ARCNET defined by ANSI / ATA 878.1.The interfacing with
different sub-systems is carried out by the TMS sub-contractor and the various
sub-system suppliers in co-ordination with the rolling stock contractor.
LT HMR
BMRCL
DMRC
All the Reputed rolling stock manufacturers have developed their own Train
Integrated Management Control System (TIMS) over the years. Even though
communication protocols are based on international standards but achieving
interoperability with subsystems of alternative vendors is generally quite difficult
and support of the TIMS manufacturer is required for achieving integration.
CMRL
CMRL has MVB bus in both intra and inter vehicular communication. It is
preferred that WTB for train communication and MVB/CanOpen for inter-
vehicular be adopted for all train set.
There should be common open protocol between TCMS & respective sub-
systems.
Also Transmission data flow in the network between TCMS & sub-systems can
be standardized, so that subsystem supplier of different makes can meet the
requirement of monitoring & control of the various parameters through TCMS.
Gradually sub-system supplier should adopt IP technology.
10.0 Driver less control
Automatic departure and run from station to station, including automatic turn-
back
Door re-opening on train hold command
Remote start of stalled trains
Attendant responsibility:
control passenger doors
prevent person injuries between cars or between platform and train
ensure safe starting conditions
set in/set off operation
supervise the status of the train
10.2 Basic technical system requirements for driverless operation
Views of Siemens
It is recommended to have Driverless Trains as they enable shorter headways and cost
benefits for the operator over the project life cycle.
BMRCL
There is a need to adopt the communication based Train control (CBTC) system as a
matter of further up gradation of signalling system and subsequently Driverless train
operation can be adopted in phases
CMRL
DMRC
Rolling stock being procured for Phase-III project of DMRC (for Line-7 and Line-8)
against the tender RS10 will be suitable for operation in GoA3 and GoA4 modes i.e.
un-attendant train operation with attendant on board and without attendant on board
respectively
10.3 Recommendations
Standard clause in Metro Tenders mandates that the successful bidder will set up car
manufacturing unit in India and at least 70% of the quantity be produced indigenously.
This has led to setting up of following manufacturing units
These units are also sourcing their sub assembles from local industry example HVAC
units, transformers, Pantograph, internal furnishing material etc.
Private developers like GMRL, Reliance Metro,Mumbai, Airport Express and LTHMRL
have not imposed any condition for indigenous development and entire stock has been
procured from Hyundai-Rotem, South Korea and CSR, China.
BT
This needs detailed discussions with a view to ensure long-term Spare Parts & Service
availability during the lifetime of rolling stock. Unfortunately the indigenization
requirement is not very stringent in metro Tenders in India except a few tenders. Other
countries have utilized the mandatory localization concept effectively to develop the
local industry in terms of technology and quality through mandatory indigenization
criteria.
ALSTOM
Tender evaluation should consider landed cost at MRTS depot so that after considering
custom duties including countervailing duty (CVD), Cess on CVD and the Special
Additional duty (SAD) - to arrive at the total landed cost of the Rolling Stock at the
MRTS Depot. Landed cost of indigenous manufacture will then be cheaper, which
would act as incentive to indigenous manufacture. Lower cost of indigenous
maintenance spare would life cycle costs. This in turn will push many Global Companies
to set up local manufacturing facility under a separate locally incorporated company in
order to reduce costs.
A large number of reputed major train builders have set up manufacturing in India. In
the next phase, the emphasis should be on indigenization of propulsion system &TCMS
which, so far, has been trailing behind the localization curve.It would therefore, be
prudent to aggressively push for and support moves towards 100% indigenization and
indigenous procurement of the entire Rolling Stock, including Propulsion Systems.
This would also encourage more FDI to come in to India. The Government must must
initiate steps to ensure that investment of those manufacturers, who have invested
heavily in India in the form of manufacturing facilities, are well protected.
BEML
The specification requirement of metro cars is very stringent and based on established
international standards. The major constraintsrestrictingindigenizationare:
Infrastructural facilities for manufacture of carbody and bogie frame and its integration
are already available in the country. Indigenous sources for certain outfitting items like
GFRP panels, grab poles & rails, window glasses, glass wool insulation, electrical
panels, battery box, stainless steel and aluminum fabricated items, etc are also
available.
For critical sub-systems like propulsion, brake, door, HVAC, passenger address &
Passenger information system, CCTV, gangway, bogie suspension, gearbox, etc there
are few established global suppliers with satisfactory performance record and they
should be encouraged to either set up their subsidiary in India or transfer technology to
an Indian company through JV. Certain items like wheel and axle may have to be
imported as present Indian manufacturers are having capacity constraints.
DMRC
DMRC has followed the policy of encouraging indigenisation on consistent basis with
notable achievements by involving Indian contractors and manufacturers having
adequate experience to deliver quality products. Emphasis is made to promote transfer
of technology and suitable clauses have been included in the tender. This provides the
necessary stimulus and mandates the Rolling Stock (RS) contractors to associate with
suitable Indian companies for not only providing support during execution and the
warranty period but also for taking up manufacture of major sub-assemblies within India.
For procurement of high value Rolling Stock, specific provisions have been made in the
tender documents for manufacturing of a minimum specified number of train sets in
India with progressively increased indigenisation content by establishing the
manufacturing facilities either independently by the contractor or with an Indian partner.
Further, to facilitate ease in maintenance and availability of spares, the contractor is
bound by the contract conditions to ensure that the indigenisation of the specified items
is achieved either by setting up of the manufacturing facilities by the Principal foreign
supplier(s) of such items or by choosing a suitable Indian partner.
BMRCL
The quality of indigenized item must be of the same level as available internationally.
New product developed indigenously takes about 3 to 4 years for conducting field trials
undergoing cycles of failures and subsequent modifications before getting stabilized in
terms of performance and reliability for large scale adoption. This approach may be
feasible with IR having its own dedicated Design & development wing at RDSO but may
not be feasible for small Metros.
Metros have given the responsibility of development of local vendors to global suppliers
who have the responsibility of meeting global standards.
It has been possible to achieve about 31% indigenization on BMRCL project in rolling
stock. Details are as follows:
Indian railways
Car manufacture
Indigenisation of Car body manufacture has already taken place as following
manufacturing facilities have already been set up:
BT coach manufacturing unit at Vadodara
BEML Bangalore under TOT from Hyundai Rotem
Alstom setting up unit near Chennai
CAF setting up manufacturing unit in Haryana
Kawasaki is also planning to set up coach production facilities.
ICF and RCF have facilities to manufacture EMU/MEMU coaches which can be
up graded to Metro coaches.
Above facilities can take care of the future Metro needs. There is however a need to
protect these investments and some incentives need to be given to these units for
effectively utilizing the facilities already created.
Propulsion equipment
The critical area is indigenization of manufacture of propulsion system, TCMS and other
critical sub systems. Global suppliers with satisfactory performance record need to be
encouraged to either set up their subsidiary in India or transfer technology to an Indian
company through JV. Following steps are necessary to achieve this:
Specifications for both rolling stock and traction distribution system are standardized.
Standardization will result in higher volumes. It will be possible to leverage the bulk
procurement by a single agency to achieve development of indigenous industry through
TOT as has also been done by China.
Presently individual metros are procuring rolling stock in small quantities with different
specifications and clause to manufacture 60 to 70% cars indigenously. This does not
promote indigenisation of propulsion equipment which is mostly imported. As in case of
car body manufacture, indigenous manufacture of complete propulsion equipment in the
phased manner also needs to be mandated in the rolling stock tenders.
MOUD in order to promote indigenous manufacture of propulsion equipment should
give development orders for small quantities to local firms who can either develop on
their own or through collaboration with global suppliers. IR has adopted this approach
for development of indigenous three phase propulsion equipment for locomotive and
EMUs. After successful tests and trials these sources can be considered as regular
sources for propulsion equipment.
Committee, thus, recommends that a system of bulk order placement may be devised
preferably by MoUD by combining requirement of smaller metros. Orders should be
placed with at least 70% indigenization clause for both propulsion equipment and car
manufacture through TOT with indigenous manufacturers or setting up of Indian
subsidiary.
12.0 BIBLIOGRAPHY
Sl No. Details
1 Study of Noise assessment inside the Greater Cairo Underground Metro
ByMostafa E Aly
2 A study of Noise Levels associated with New York Citys Mass Transit
System by Richard Neitzel, Robyn R. M. Gershon and others
10 Article EuropeanRailwayReview_Vol.17issue6_2011
Vibration Stationary car 2.0mm peak-to-peak amplitude for the frequency range from 1.4Hz to 20Hz,
and 0.8mm per second peak vibration velocity for the frequency range above
20Hz.
Controlled evacuation
Un controlled evacuation
3 Coupling The minimum operational unit shall be a 4-car rake, with semi-automatic
arrangement (between trains) and semi-permanent (within the train) couplings to form a
single rake with driver cars at each end of the rake.
Car-body structure, bogie structure, seat frames, and equipment boxes shall
be designed for a service life of 30 years minimum in the Chennai
environment, based on an average annual operating distance of 150,000 km
per rake without requiring structural repair or replacement
7 TCMS CMRL has MVB bus in both intra and inter vehicular communication. It is
preferred that WTB for train communication and MVB/CanOpen for
inter-vehicuar be adopted for all train set.
9 Indigenization The present contract allows the supplier to indigenize the train production.
Hence the supplier has set up a factory in a location close to Chennai.
Indigenization is promoted in non critical areas and 35-40% of the items
manufactured in the new factory is expected to be indigenous. Constraints in
indigenization are,
NOTE
Sub: DMRCs comments on TOR for Sub-Committee on Rolling Stock
1. Item No. 1 Noise and Vibration Level (including RS, Track etc):
1.1 Recommended interior and exterior noise levels:
a. Interior and Exterior level, specified under stationery and running conditions on via-duct
as well as in tunnel for the existing rolling stock contracts (RS1, RS2 and RS3) is
indicated in the attached Annexure-I.
b. The specified interior and exterior noise levels in RS10 tender for procurement on
rolling stock for Phase-III Project of DMRC is also indicated in the Annexure-I.
1.2 It is clarified that for the rolling stock proposed to be procured for Phase-III Project of DMRC,
measurement of specified noise levels shall be in LPA5.
Annexure3 DMRC 1
6. Propulsion Single Source or consortium/JV approach:
6.1 For the rolling stock, proposed to be procured against RS10 tender to meet the requirement of
Phase-III project of DMRC, propulsion manufacturer can be either a member of the JV/
Consortium or a sub-contractor.
6.2 It is DMRCs considered view that single source/vendor for propulsion equipment (consisting of
main converter inverter and traction motor) is beneficial for realizing high reliability rolling stock.
It has been our experience that procurement of these items from different vendors results in
integration issues, thereby the lowering the reliability of the stock.
8. Driverless Control:
8.1 Rolling stock being procured for Phase-III project of DMRC (for Line-7 and Line-8) against the
tender RS10 will be suitable for operation in GoA3 and GoA4 modes i.e. un-attendant train
operation with attendant on board and without attendant on board respectively.
9. Indigenisation:
9.1 DMRC has followed the policy of encouraging indigenisation on consistent basis with notable
achievements by involving Indian contractors and manufacturers having adequate experience
to deliver quality products. Emphasis is made to promote transfer of technology and suitable
clauses have been included in the tender. This provides the necessary stimulus and mandates
the Rolling Stock (RS) contractors to associate with suitable Indian companies for not only
providing support during execution and the warranty period but also for taking up manufacture
of major sub-assemblies within India. For procurement of high value Rolling Stock, specific
provisions have been made in the tender documents for manufacturing of a minimum specified
number of train sets in India with progressively increased indigenisation content by establishing
the manufacturing facilities either independently by the contractor or with an Indian partner.
Further, to facilitate ease in maintenance and availability of spares, the contractor is bound by
the contract conditions to ensure that the indigenisation of the specified items is achieved
Annexure3 DMRC 2
either by setting up of the manufacturing facilities by the Principal foreign supplier(s) of such
items or by choosing a suitable Indian partner.
9.2 For achieving indigenisation of sub-systems, the rolling stock contractors can be mandated
with a contract condition to ensure that the indigenisation of the specified items is achieved
either by setting up the manufacturing facilities by the Principal foreign supplier(s) or by
choosing a suitable Indian partner. This would help in ensuring that these firms remain abreast
with the technological developments.
(H.S. Anand)
DRS
Annexure3 DMRC 3
Annexure I
Interior Noise Levels
* All values measured are LpAeq.5s A Weighted equivalent continuous sound pressure
level where the measurement time interval T is five
second (T=5s).
** All values measured are LpA5 After applying the time and frequency weighting, the
sampled measurement data of 20 seconds (10000
readings sampled with 500 Hz from one microphone) is
divided into classes corresponding to each level (e.g. 10
classes per dB). For each class the frequency over the
measurement time is calculated. A histogram of the
frequency of each LpAF level over the measurement time is
Annexure3 DMRC 4
made. This is then converted to a graph over cumulative
relative frequency. The value for 95% of the time is the
LpA5 level, i.e. the A weighted sound pressure level
exceeded for 5% of the measurement time period.
RS10
(a) Interior
Interior Noise Level (LpA5)
Location Interior Noise
(Section) Measurements in dBA
Stationary Running
50 Kmph
75 Kmph
Elevated
platform
Tunnel
at
Saloon 64 68 72 75
Driving Cab
63 68 68 70
(b) Exterior
Exterior Noise Level (LpA5)
Annexure3 DMRC 5
Annexure II
Annexure3 DMRC 6
Annexure III
1. Delivery Record
2. Operation Performance:
Out of 300 or more cars commissioned in accordance with above (1), have minimum of total
150 metro (i.e. MRT, LRT, Sub-urban Railways or high speed railways) cars completed
satisfactory revenue operation:
EITHER outside the country of origin in at least three(3) different contracts in MRT,
LRT, Sub-urban Railways or high speed railways of at least three(3) different countries
OR in India
for more than five(5) years.
3. Propulsion System
Does any Member of the Consortium/Joint Venture individually or its Parent company or its
group companies have cumulative experience of minimum ten(10) years in the Design and
Manufacturing of Propulsion Equipments (Traction Converter-Inverter, Auxiliary Converter
Inverter and Traction Motor) for Metro rolling stock AND do the propulsion equipments supplied
have been in satisfactory revenue operation for at least five(5) years in minimum aggregate
500 cars comprising of both powered and non-powered cars, supplied against minimum five(5)
different contracts in the Metros (i.e. MRT, LRT, Sub-urban Railways or high speed railways) of
minimum two(2) different countries outside the country of origin.
OR
Does the manufacturer of the Propulsion Equipment (Traction Converter Inverter, Auxiliary
Converter-Inverter and Traction Motor) proposed by the tenderer as a sub-contractor for supply
of the Propulsion Equipments against this tender, has minimum ten(10) years experience in the
field of Design and Manufacturing of the Propulsion Equipment AND do the Propulsion
Equipment Designed, Manufactured and Supplied by the said manufacturer have been in
satisfactory revenue operation for at least five(5) years in minimum aggregate 500 cars
comprising of both powered and non-powered cars, supplied against minimum five(5) different
contracts in the Metros (i.e. MRT, LRT, Sub-urban Railways and high speed railways) of
minimum two(2) different countries outside his country of origin.
Annexure3 DMRC 7
Hyderabad Metro - Submissions for Metro Railway Standardization
ii) Under moving conditions both inside Inside Car & Cab:-74 dB (A) as per
the tunnel and on wire duct. international standard ISO 3381.
Annexure 4 LT HMR 1
children/elderly passengers.
For two ends of the rake For two end, Automatic coupler
having mechanical and
pneumatic connection is
provided.
j. Between the coaches of the same Between the coach of the same
basic unit basic unit, Semi-permanent
coupler is provided.
n. Jerk rate 2
0.70 m/s
Annexure 4 LT HMR 2
o. Power to weight ratio
a. higher acceleration
requirement considering,
Hyderabad metro
alignment (which have
sharp curves/gradients)
b. average speed
requirement (30kmph
and above)
c. higher regeneration with
66% powering
d. train clearing section and
going upto terminal in
degraded mode with one
motor coach failure
Annexure 4 LT HMR 3
7.t. Control and communication protocol Train integrated management
(TCMS) prescribed and used in rakes system (TIMS) is a complete,
running on Hyderabad Metro. integrated system for the
Suggestions and recommendations control and monitoring of the
of Hyderabad Metro in this regard. train-borne equipment. TIMS
u. provides control and monitoring,
diagnostic and reporting of the
train-borne equipment in a
redundant manner through the
Train Bus (ARCNET) and Local
bus (RS-485). The TIMS is
designed for ease of fault
diagnosis and maintenance.
Annexure 4 LT HMR 4
Driverless Train Operation
Main Features
Driverless operation
Attendant responsibility:
- Continuous, bi-
directional
communication between
trackside / OCC and
trains (= CBTC system).
- Platform Screen Doors,
radar grid or optical
obstacle detection
systems for sealing the
guideway in the platform
areas and along the
alignment in case of
elevated systems.
- Highly reliable Rolling
Stock sub-systems.
- Obstacle detection
equipment on bogies.
- Derailment detection on
Annexure 4 LT HMR 5
bogie axles.
- Door nip protection
equipment on all train
doors.
- Complete CCTV coverage
on trains and two-way
passenger help points.
- Onboard fire, smoke and
temperature detection
equipment in passenger
compartments and inside
the equipment cabinets.
Annexure 4 LT HMR 6
9. Strategy for indigenous For LTMRHL, presently there is
development adopted by Hyderabad no indigenous development
Metro along with constraints imposed on Vendors for rolling
stock as the entire coaches are
procured from Hyundai-Rotem,
South Korea. However, the
indigenous equip can be used
provided proven-ness and RAM
requirements are met. The
Agreement with Govt calls for
stringent Key Performance
Indicator (KPI) and there are
associated penalties. This to
some extent restricts usage of
newly developed indigenous
equipment on the Project.
Annexure 4 LT HMR 7
Submissions by RMGL on TOR Items
Item No. 1
Noise levels specified:
The above values may be given for noise inside the coach as well as external noise for rakes
procured by RMGL. Remarks may also be given for Noise and Vibration level (including RS,
track etc.) as per TOR.
Vibration:
2.00mm Peak to peak amplitude for the frequency range from 1.4Hz to 20 Hz
0.8mmper second peak vibration velocity for the frequency range above 20Hz
Item no.2:
System adopted by RMGL for emergency evacuation along with underlined logic reason.
Experiences of BMRC in this regard vis-a-vis elevated, underground corridors may also be
given:
1. Energy evacuation on RMGL system is through the side door of the car nearest to the
driver.
2. The emergency evacuation of passengers in a metro train should meet the following
requirements:
Annexure 5 RMGL 1
a) As far as possible evacuation should be avoided in between the stations and
trains should be taken to the next station, if possible, where the evacuation is safe
and faster.
b) Passengers should be evacuated under the supervision and guidance of metro
staff to avoid stampede and injury to passengers.
c) The rate of evacuation should be fast as large no. of passenger in a train, which
may be high as high 2700 passengers in an 8-car train, are required be evacuated
in less than 60 min.
d) There should be no harm/injury to passenger while coming out of train on to the
walkway.
3. Generally there are two methods of evacuation: one through the ramp door at the
front end of each cab and the other from the side doors of the car. In the first method,
front ramp door is opened by the train operator, which on opening rests on the track.
In this method the passengers have to move on the track structure upto the next
station. The track design should be such as to provide a safe and smooth passage to
the passengers. The main advantage of this method is that evacuation is carried out in
orderly fashion with the assistance of driver and other helping staff. The main
drawbacks of this system are as follow:
a) The width of the ramp door is limited and rate of discharge of passengers is rather
slow. In case of 8-car train, with a fully loaded train, it will be a challenge to
disembark all the passengers in less than 60min.
b) The provision a ramp door in a centre of the cab implies that drivers seat would
be provided on the left hand side of the cab and provision of a wide glass on the
front of the cab, will not be possible, which certain metro authorities, prefer for
aesthetic reasons.
4. The second method is through a side door nearest to the drivers cab which can be
opened by the driver sitting in the cab in emergency situation. As the door is
sufficiently wide the evacuation rate is faster. In this case the passengers need to be
evacuated on a walkway on the viaduct/underground tunnel for movement upto the
next station. As the evacuation is permitted through only one door it is possible to
regulate the flow of passengers by the driver or assisting metro staff. However, this
method suffers from the following problems:
a) The width of the walkway may vary between 750-950 mm. There is a possibility
that the passengers may fall from the walkway due to pushing by the fellow
passengers in panic mode.
b) The gap between the door of the train and the walkway has to meet the K.E.
/Structure Gauge requirements. K.E. in-between sections has to be designed for
max. speed of the train along with other train movements due to various factors.
The gap between the car body and walkway in between the station, on a tangent
track is expected to be approx 275mm. On curves the gap will become wider to
take care of the mid/end throw of cars. With such a wide gap there is every
Annexure 5 RMGL 2
possibility that passenger may fall in-between the gap between the carbody and
walkway. In such a situation, it is required that a bridging device is fixed between
the carbody and walkway before the passengers are permitted to come out. This
device will be kept under the seat and will have to fixed by the railways staff
before the evacuation starts.
c) Walking on the walkway of limited width at the car floor level on the elevated
corridor, may be more difficult for the passengers than on the railway track in first
method.
5. DMRC uses both methods of evacuation through a front ramp door in (RS-1 and RS-
2 Contract) and side door in (RS-3 Contract). A comparative evaluation of both
methods of evacuation can be made through the mock drills in DMRC under
controlled conditions and safer of the two alternatives may be adopted for future
metro railways.
Item No.3:
Coupling Arrangement :
Note: Automatic couplers at the ends of the trains may be slightly different from those in
between the basic units in respect of electric head of the coupler. The requirement of
electrical contacts on electric head on the automatic couplers at the end of the train is
significantly lower than those in between the basic units, resulting in cost reduction.
Costs implications for various coupling arrangements is not available currently with RMGL
Item No.4:
Annexure 5 RMGL 3
Acceleration/ Deceleration:
Values of acceleration/deceleration and jerk rate, power to weight ratio and percentage
motorization may be given for rakes procured by RMGL
Any analysis or simulation report for merits of 50% power over 66% powering.
Based on the traffic forecast there is no requirement of increase in no. of cars/basic units in
future on RMGL system. No simulation analysis was carried out for 50% powering v/s 66%
powering. Further following comments are made:
For a basic 3 -car train there is no alternative but to have 66% motorization so as to
ensure that failure of one motor car does not result in immobilization of train in the
section.
In case, a basic 2-car train is required to be operated as a unit, 100% motorization is
required.
In case of 4-car train with 2 basic 2-cars units, 50% motorization appears to be a
preferred choice.
a. Even with loss of one power car the operational performance is satisfactory.
b. Higher level of acceleration and declaration is possible, subject to adhesion limits.
c. Higher regeneration level is achieved resulting in lower application of friction
braking and consequently less wear of pad /disc.
d. Changes of slip/slide even under the worst conditions are reduced due to utilization of
lower adhesion factor compared to the permissible values.
Annexure 5 RMGL 4
The eligibility/qualification criteria adopted by RMGL was as follows:
The Rolling Stock supplier should be a car builder.
The requirement of cars for RMGL project was 15 cars only. Initially there was
no response from the established Rolling Stock manufactures for supply of these
cars. Finally Consortium of Siemens AG, Germany and Siemens Limited, India
offered cars manufactured in the factory of Zhuzhou Electric Locomotive
Company Limited (ZELC), China to a design almost identical to the cars running
on Guangzhou Line-3 (GZL-3) in China. These cars were originally manufactured
to Siemens design in the Year 2005 under a technology transfer agreement. The
propulsion equipment was also of Siemens design.
However RMGLs views are that RS supplier should be necessarily a car builder
and should have at least supplied 200 cars running for a period of 3years without
any major problem. The Propulsion equipments supplier need not necessarily be a
Consortium partner, but should have experience of design and manufacture of
minimum 200 nos. of Propulsion System with similar features which should have
been proven in service for a period of 3 years in a country other than the country
of origin of manufacturer.
Propulsion equipments need not be generally procured from a single source but
the supplier must have sufficient experience and the equipment should have
proven record of satisfactory service in revenue operation as stated above.
However, it would be positively preferable if Propulsion equipment is procured
from the same manufacturer on a particular metro railway to reduce the spare
inventory and avoid training of staff in different designs of propulsion systems.
Control and communication protocol (TCMS) prescribed and used in rakes running
on Bangalore Metro. Suggestions and recommendations of Bangalore Metro in this
regard.
Item No. 08 :
Suggestions of RMGL on driverless train operation in Indian context. Data available
with RMGL regarding Metros having driverless train operation.
RMGL presently doesnt have its own experience of Driverless Train Operation (DTO)
or Unattended Train Operation (UTO).
Annexure 5 RMGL 5
runs, more uniform ride quality, flexible timetables, lower turnover times and
lower life cycle costs and this is also equally applicable in the Indian context.
Further, DMRC has planned DTO/UTO on Lines 7 and Line 8 in their Phase-3,
and their views on the subject would be useful.
**Unattended train operations on metro line, with no person aboard (UTO) were
in Kobe (Japan) in 1982, Lille (France) in 1983 and Vancouver (Canada) in 1985.
The Kobe and Lille systems were based on fixed-block technology whereas the
Vancouver system utilized CBTC technology. Other examples of UTO utilizing
CBTC technology would include, for example, Lyon Line D(1992), Paris Meteor
Line (1998), Kuala Lumpur (1998) and Singapore North-East Line (2003).
Examples of UTO based on fixed block technology would include Osaka (1982)
and Copenhagen Metro (2002).
**Based on reference IRSE NEWS | ISSUE 150 | NOVEMBER 2009
The holding of metro cars in RMGL system is rather small i.e.15 nos. in Phase-I.
Even after completion of Phase-II the holding is not likely to exceed 36 cars. With
such a small holding, there is no significant incentive to go in for indigenous
development of equipments/components in a big way. The local industry will
undertake indigenous development of equipments/spares only when the quantities
are significant. In view of above, it is considered that Major Metro Railways
with sufficient experience in operation and maintenance will be in a better
position to frame a suitable policy in this regard.
The reliability standards of the metro railways are, by necessity, very high as any
dislocation of services would cause adverse public reaction. The quality of the
indigenous products should therefore be as good as that of imported product. To
ensure this, it is essential that proper specifications of the products and testing
procedures are established before initiating the development process. It should
also be ensured that the proper manufacturing and testing facilities are available
with the supplier. The locally developed product will also need to be proved for
satisfactory performance in service for a specified period before clearance is
given for bulk application. The prospective suppliers should therefore be
identified through a rigorous process of inspection of the design and production
facilities of their works.
The main problem in this respect is that the Rolling Stock suppliers do not furnish
detailed technical specifications of the spares/equipments without a technology
transfer agreement with the local industry. The local industry would obviously not
invest money in local development of spare/equipments or go in for a technology
transfer arrangement unless there is a sizable order and there is a guarantee for
supply of the developed product for a certain period by the metro railway. There
will be only a few items which will have very large consumption to justify local
Annexure 5 RMGL 6
development. Summarizing indigenous development should be taken with caution
and after considering the various aspects, some of which have been stated above.
Annexure 5 RMGL 7
BT COMMENTS ITEMWISE
Item No. 1 Noise and Vibration level (including RS, Track etc.)
Terms of Reference
Study of the Environmental Laws in India and extracting the relevant
statutory requirements.
Study of noise and vibration criteria adopted by various metros in India
in their rolling stock and trackwork specifications.
Study of similar international regulations in other countries having vast
knowledge base in this field such as USA, Germany, Japan, Singapore
etc.
Study of regulations regarding protection of ASI monuments (heritage
structures) from vibration generated by metro trains operation.
Study of regulations in other countries regarding protection of heritage
structures.
Analysis of above and recommendations for acceptable noise & vibration
criteria for rolling stock and track including suggestions for integrated
responsibilities or clarity of interface.
Report of above study.
For measurements we should always make reference to standard ISO 3095 indicating always
the last version (pr EN ISO 3095:2010). In that standard you will find details of the track
acoustics characteristics like rail roughness and track decay rates.
For interior noise we should use the standard ISO 3381 (which is in phase of rewriting it).
- Exterior noise
- Interior noise
1. In viaducts, based on our experience, the noise increment to the above values is : + 4 dB
would be more suitable for exterior noise and +2 for interior noise.
2. For tunnels the differences could be too much different depending on the type of tunnel and
the its section, etc. So it is difficult to provide a suitable value. However for one project,
where we measured the values in tunnels the noise increment for a tunnel of double track,
ballasted was around +5 dB(A).
Terms of reference
Terms of reference
BT Comments:
Acceleration with 50% motorisation is around 0.8 m/s maximum between
0 to 30 kmph
Acceleration with 67% motorisation is around 1.1 m/ maximum between
0 to 30 kmph.
Service Deceleration Rate - same level as acceleration rate to ensure max. use
of regeneration
Emergency Deceleration Rate (DR) - Specify braking distance instead of
deceleration rate - normally maximum DR is 1.2 m/s. Higher rate shall
complicate brake pad design due to high thermal requirements.
Annexure 6 Bombardier Transportation 3
Average interstation distance - 1 to 1.2 kms
Motorisation - Most of the Metros around the world are above 50%
motorisation either 60%, 67% , 75% or even 100%. Motorisation of 50%
is suboptimal as it leads to low acceleration, lesser scheduled speeds,
maximum usage of brake pads and less regeneration energy. See attached
power point slides.
Motorisation - Most of the Metros around the world are above 50%
motorisation either 60%, 67% , 75% or even 100%. Motorisation of 50%
is suboptimal as it leads to low acceleration, lesser scheduled speeds,
maximum usage of brake pads and less regeneration energy. See attached
power point slides.
BT Comments:
A consortium approach ensures that the Propulsion supplier is part of
the consortium and is committed to delivering his commitment as
per the contractual obligations.Else normally the suppliers may have
a separate arrangement on warranty clauses/ reliability clauses with
the Rolling Stock bidders which may not be aligned with Contractual
requirements. This may create contractual issues during execution.
On the other side a non- consortium approach may allow certain
bidders ( who do not manufacture propulsion equipment ) to have
enough negotiating power post contract. However, this seems to
have little effect on bidding price as the same is decided by
competition.
BT Comments:
TCMS is critical for train operation, reliability and safety. Train builders
and equipment suppliers use different solutions and protocols; normally
supplier specific hardware and common network solutions and protocols,
such as MVB, CAN, Ethernet. Requirements need to be of functional type
while flexibility is provided for type of solutions.
IR Query
Indigenization
Your views on indigenous development and constraints in the process and
strategy required to be adopted for the same.
BT Comments
Additional points to be considered:
The price of the rolling stock depends not only on Technical features but
also on delivery conditions, contractual conditions, ordered quantity,
Design Cost ( closeness to standard product)
Some areas which can be looked into are the following:
2. Bidding Time - Provide suitable bid time - Atleast 3 months from the
date of release of final addendum after discussions with suppliers
Noise level:
The permissible noise levels specified in some of the Indian metros are brought out
below.
Annexure 7 BEML 1
The external noise is to be measured in accordance with ISO 3095 and internal noise
as per ISO 3381.
Achieving the interior and exterior noise limits on elevated track in running condition
are the main constraints. As train noise running on the elevated track is highly
influenced by the vibro-acoustic characteristics of infrastructure, giving guaranteed
noise performance of train on the elevated track is difficult. Sound and vibration will
not be properly absorbed on elevated track as compared to at-grade track. Also, rail
and wheel roughness should be maintained within acceptable limits of the standards
before taking measurements.
To recommend the acceptable noise performance vis a vis track specifications for
Indian metros, it is opined that experts in the field may be required to carry out a
study.
All rail vehicles should have sufficient evacuation facilities to ensure that people may
make a rapid and safe exit. Where the vehicles are to be used on routes which have
restricted clearances, due to significant operation in tunnels, end emergency egress
facilities are provided. For other routes, side egress leading to side walkway is
provided. Vehicles shall be designed to ensure that evacuation & escape can be
performed safely under reasonably foreseeable emergency conditions.
BS 6853:1999, Code of practice for fire precautions in the design and construction of
passenger carrying trains, classifies rail vehicle into two categories; Category I as
underground and category II as surface. Category I is further subdivided into category
Ia and Ib. Category Ia refers to vehicles having substantial operating periods in a
single track tunnel with no side exits to a walkway. Category Ib refers to vehicles
having substantial operating periods in a multi track tunnel or a tunnel with side exits
to a walkway. Category II refers to surface stock with no substantial operating period
Annexure 7 BEML 2
in tunnels. The fire test requirements brought out in the standard are different for
the above category of vehicles with category Ia having the most stringent values.
In view of the above, it is opined that the choice of end egress or side egress is
dependent on the operating environment and the decision needs to be taken based on
the proposed metro system. Either of the systems can be provided by the rolling stock
supplier.
Coupling arrangement:
The type of coupling arrangement depends on the train configuration. The various
combinations in the Indian metros are as follows:
Annexure 7 BEML 3
Semi-permanent coupler between coaches in the same basic unit. Electrical
coupling is through jumper cables between cars.
Automatic mechanical, pneumatic and electrical coupler between two basic
units.
The coupling arrangement in the various Indian metros is brought out below:
Annexure 7 BEML 4
6 car cables for electrical
DMRC RS10 Automatic mechanical Semi-permanent Automatic mechanical,
6 car & pneumatic pneumatic & electrical
The couplers for the Indian metros are mainly being supplied by Voith Turbo, Germany
and Dellner, Sweden. Voith Turbo has supplied for DMRC RS1 and RS3 & BMRCL
projects. Dellner has supplied for DMRC RS2 project. Both the firms have set up
subsidiary units in India for local manufacturing. Faiveley also manufactures couplers
& their make couplers are proposed for Chennai metro. Voith couplers are of
Scharfenberg (Schaku) type. The Dellner and Faiveley couplers are also of similar
type. The design of the couplers depends on the type of coupler head, amount of
energy absorption required, coupling range, etc.
Semi-permanent coupler is the cheapest, costing around 2.5 to 3.0 lakhs INR.
Automatic mechanical & pneumatic coupler costs around 3 to 4 times of semi-
permanent. Automatic mechanical, electrical & pneumatic coupler costs almost two
times the cost of automatic mechanical & pneumatic coupler. In view of this, to
reduce the cost of car, automatic electrical coupling may be avoided or kept to the
bare minimum.
Operating Characteristics
The typical values of acceleration, deceleration, jerk rate, etc adopted by Indian
metros for Standard Gauge track are as follows:
50% motorization:
Annexure 7 BEML 5
to 30 kmph in m/s2
Instantaneous 1.0 1.0 1.0
deceleration from
80 to 0 kmph in
m/s2
Average emergency 1.3 1.3 1.3
deceleration in
m/s2
Jerk rate in m/s3 0.7 0.7 0.7
Schedule speed 34 34 34
(normal mode) in
kmph
67% motorization:
Annexure 7 BEML 6
Schedule speed 34 33 - -
(normal mode) in
kmph
For both 50% and 67% motorization, the schedule speed in normal mode is almost the
same. The acceleration levels are higher in 67% motorization which will be helpful in
routes with frequent gradients. The major advantage of 67% motorization is that more
amount of regenerative energy will be available, thereby reducing the net energy
consumption for traction. However, whether the regenerated energy can be utilized
in a 750 VDC third rail system, needs to be studied. For 25 KV AC system, the
regenerated energy can be utilized fully. This kind of system is being adopted for
Hyderabad and DMRC RS10 projects. The initial & maintenance cost of propulsion for
67% motorization will be higher, however there will be savings towards energy cost.
The net savings and performance of 67% motorization in 25 KV AC system in Indian
conditions can be evaluated after Hyderabad metro is operational.
At present, Metro corporations float Global Tenders for sourcing Rolling Stock with
typical eligibility criteria as follows.
Annexure 7 BEML 7
The rolling stock, including all sub-systems and equipment shall be of proven
design. Sub-systems and equipment of similar design philosophy shall have been
in use and have established their performance reliability on a mass rapid
transit system or suburban EMUs in revenue service over a period of five years
or more. Where similar equipment or sub-systems of a different rating are
already proven in service, then the design shall be based on such equipments.
For certain subsystems like Propulsion, at least 200 cars of the proposed
assembly/sub assembly should have been proven in service in metro cars in the
last 10 years; Out of the 200 cars, 100 cars should have been proven in service
for at least 5 years in a country other than the country of origin of manufacture
The eligibility and qualification criteria may include the following provisions for Indian
manufacturers:
It is opined that the propulsion may be procured from a single source so that the
responsibility for the integration of the complete system is with a single party. Also,
JV of reputed foreign & Indian companies may be allowed to ensure transfer of latest
technology & indigenous manufacture in the country.
DMRC RS3 and BMRCL projects are having MELCO supplied TMS. The train bus
communication in these systems is ARCNET defined by ANSI / ATA 878.1. Local bus
communication is RS485 / RS422 defined by EIA (Electronics Industries Association).
The interfacing with different sub-systems is carried out by the TMS sub-contractor
and the various sub-system suppliers in co-ordination with the rolling stock
contractor.
Indigenisation:
The specification requirement of metro cars is very stringent and based on established
international standards. This is required in view of the need for safety of the
passengers, high reliability and availability of the rolling stock.
Infrastructural facilities for manufacture of carbody and bogie frame and its
integration are already available in the country. Indigenous sources for certain
outfitting items like GFRP panels, grab poles & rails, window glasses, glass wool
insulation, electrical panels, battery box, stainless steel and aluminium fabricated
items, etc are also available. For critical sub-systems like propulsion, brake, door,
HVAC, passenger address & Passenger information system, CCTV, gangway, bogie
suspension, gearbox, etc there are few established global suppliers with satisfactory
performance record and they should be encouraged to either set up their subsidiary in
India or transfer technology to an Indian company through JV. Certain items like
wheel and axle may have to be imported as present Indian manufacturers are having
capacity constraints.
Annexure 7 BEML 10
Infrastructure & Cities
Dear Sir,
With reference to the agenda for Sub-committee on Rolling Stock and subsequent meeting, we are
pleased to submit our comments as under :
1. Noise
Siemenss comments :
Interior Exterior
Motorization
( %) Tunnel Elevated Cab Tunnel Elevated
Stationary Running Stationary Running Running Stationary Running Stationary Running
72 dBA 68 dBA
82 dBA
( 50 KmpH) ( 50 kmph)
67 68 dBA NA 64 dBA NA NA 67 dBA (at 75
75 dBA 70 dBA
kmph)
( 75 Kmph) ( 75 KmpH)
Standard for measurement shall be ISO 3381 and ISO 3095 for inside and outside measurements
respectively.
2. Vibration
As discussed in sub-committees meeting, the study under this topic is beyond the scope sub-committee.
Siemenss comments:
Emergency Evacuation System should be at the Front centre in Driving cars of the train.
4. Coupling Arrangement
Siemenss comments:
Considering the operation, maintenance and costs aspects we recommend to use as under :
Automatic coupler without electrical head at the two ends of the train.
Automatic couplers without electrical head between the basic units with electrical connection via
jumper cables OR Semi permanent couplers between the basic units.
_ Semi-permanent couplers between the cars within the basic unit.
Gangways : Split type of gangways for all interconnection between the coaches.
We would like to share that the automatic couplers without electrical heads are cheaper by nearly 20%
than the automatic couplers with electrical heads. Further the Semi-permanent couplers are cheaper by
nearly 20% than the automatic couplers without electrical heads.
5. Acceleration
Siemenss comments:
Minimum Design Average Acceleration rate for fully loaded ( AW3) train on level tangent track shall be as
under:
0 kmph to 40 kmph : 1.0 m/s2
0 to 60Kmph : 0.6 m/s2
0 to 80Kmph : 0.3 m/s2
Minimum Operational Average Acceleration rate for AW2 loaded train on level tangent track shall be as
under:
0 kmph to 35 kmph : 1.20 m/s2
0 to 60Kmph : 0.65 m/s2
0 to 80Kmph : 0.35 m/s2
Please note that for Metro Lines between 15 to 20 Kms, higher acceleration is more suitable as with higher
schedule speeds fleet size can be optimized.
This is more so important as Tier 2 & 3 cities in India would have such line lengths.
Siemenss comments:
Service braking rate from 85 kmph to standstill for fully loaded (AW3)
train on level tangent track : 1.0 m/s2
Service braking rate from 85 kmph to standstill for AW2 train on level
tangent track : 1.1 m/s2
7. Jerk Rate
8. Motorization rate
Siemenss comments:
We would like to share that the motorization rate and the train size are related topics and should be decided
together for all new metro projects.
Therefore, We should first finalize the optimum train size in terms of number of cars and then based on
evaluation of suitable motorization rate, appropriate Basic Unit configuration should be finalized.
Step - 1 : Optimum Train Size
In order to work out a optimum train size, we would like to evaluate the optimum requirement with respect
to the PHPDT (Peak Hour Peak Direction Traffic) Demand. Following table highlights the utilization rate of
different train sizes w.r.t PHPDT demand :
4 Car PHPDT Capacity 60800 60800 60800 60800 60800 60800 60800
6 Car PHPDT Capacity 91200 91200 91200 91200 91200 91200 91200 91200 91200 91200
Utilization rate 10.96% 21.93% 27.41% 32.89% 38.38% 43.86% 54.82% 65.79% 76.75% 87.72%
8 Car PHPDT Capacity 121600 121600 121600 121600 121600 121600 121600 121600 121600 121600
Utilization rate 8.22% 16.45% 20.56% 24.67% 28.78% 32.89% 41.12% 49.34% 57.57% 65.79%
9 Car PHPDT Capacity 136800 136800 136800 136800 136800 136800 136800 136800 136800 136800
Utilization rate 7.31% 14.62% 18.27% 21.93% 25.58% 29.24% 36.55% 43.86% 51.17% 58.48%
Table 1
Based on the conclusions from Step - 1, in order to finalize the motorization rate and the basic unit
configuration, please refer to different possibilities as depicted in Table 2 below :
Following are possible train configurations corresponding to 50%, 67% and 100%.
Legend: DMC Driving Motor Car
DTC Driving Trailer Car
MC Motor Car
TC Trailer Car
+ Automatic coupler
= Semi-permanent coupler
Train formations with 50% Motorization rate :
_
6-car formation
+DMC=TC+MC=TC+TC=DMC+ or +DTC=MC+MC=TC+MC=DTC+
Capacity: 2250 passengers in W3 load (seats + 8 standees per sqm)
Note : Each 2-car unit is equipped with 1 transformer and 1 pantograph, means in total there are 3
transformer/ pantograph sets per 6-car train.
Train formations with 67% Motorization rate :
3-car formation :
+DMC=TC=DMC+
Capacity: 1106 passengers in W3 load (seats + 8 standees per sqm)
6-car formation
+DMC=TC=DMC+DMC=TC=DMC+ or +DMC=TC=MC+MC=TC=DMC+
Capacity: 2252 passengers in W3 load (seats + 8 standees per sqm)
Note : 3-car unit is equipped with only 1 transformer and 1 pantograph, means in total there are 2
transformer/pantograph sets per 6-car train.
The possible acceleration rates for different motorization rates at normally available adhesion limits is as
under :
Table 3
Please refer to Annexure -1 which depicts the calculation of adhesion limits for the desired accelerations.
a) From above it can be seen that it is possible to accelerate at > 0.85 m/s2 within the adhesion limit of
18% in case of 25% loss of power with 67% traction and 100% traction as compared to 50% traction
wherein a maximum acceleration of 0.66 m/s2 is ONLY possible which will not be sufficient to meet
the Time Table of the metro service.
b) Higher acceleration helps to increase the schedule speeds upto 38 kmph as compared to 31kmph in
recent metros. This is very critical in projects wherein the lines are 15 to 20 Kms long as fleet size of
rolling stock can be optimized.
_ c) Acceleration more than 1.0 m/s2 would not be necessary in a metro system as the inter-station
distances are small. Therefore 67% traction would be more than sufficient.
B. Cost Impact on 6 car train with50% , 67% and 100% motorization rates
Capital Costs :
Possible indicator for capital cost is the number of main equipments in both types of traction systems.
A comparison of number of equipments is as under :
6 car train 6 car train 6 car train
(50% motorization) (67% Motorization) (100% Motorization)
Basic Unit 2 car 3-car 1 car/ 2 car
Configuration
No. of Traction 3 2 6/ 3
Transformers
No. of Traction 6 4 6
Converters (Bogie Control is (Coach Control is (Coach Control is
necessary for acceptable ensuring acceptable ensuring
redundancy) redundancy) redundancy)
No. of Aux. 3 2 6/3
Converters
Sets of 3 sets 2 sets 6/3
Pantograph, VCBs
& HV components
No. of Automatic 2 2 2
couplers without
electrical head
No. of Automatic 4 2 10/4
Couplers with
electrical heads
Sets. Of Semi- 2 sets 4 sets 0/2 sets
permanent
Couplers
Brakes Disc Brakes TBUs TBUs
(as costly disc brakes (as costly disc brakes
can be avoided due to can be avoided due to
higher available higher available
electrical braking electrical braking
power) power)
Error! Reference source not
found.6Error! Reference source not found.9
Table - 4
Following conclusions can be drawn from Table 4 :
a) The number of main costly equipments like transformers, converters etc. is least with 67%
motorization rate as compared with 50% & 100% motorization rate.
b) Since the number of equipments are fewer with 67% motorization rate, not only the cost of
equipments but also the installation & commissioning costs per train would be less.
c) 67% motorization rate provides right balance between the redundancy and reliability& availability.
d) Therefore it can be clearly concluded that the capital cost of complete rolling stock with 67%
motorization rate shall be lower in comparison with 50% & 100% motorization rate.
Maintenance Costs :
_
Maintenance costs with 67% motorization rate shall be lower as compared to maintenance costs
with 50% & 100% motorization rate. Main reasons being :
a. Use of Fewer number of equipments per train which has following advantages :
Less wear and tear on Overhead Catenary Line due to less no. of pantographs km.
Maintenance cost of tracks shall be lower. This can be substantiated from the summary of
achievable adhesions limits with both systems as under :
b. As use of mechanical brakes is minimized due to higher available electrical braking, the wear &
tear of mechanical brakes is less.
Energy Costs :
With 67% traction, there is 17% extra regeneration of electrical power during braking w.r.t
50% motorization rate.
However, energy saving for 100% motorization over 67% motorization is practically zero
as electrical brakes would be sufficient to brake the train at the given deceleration rates
without use of mechanical brakes and hence the energy savings would be comparable to
100% motorization.
3. 3 Car formation with 67% and 6 car formation with 67% motorization rate should be standardized.
It can be noted that all latest projects in India Hyderabad, Kolkata (E-W), Bangalore,
Gurgaon and Delhi Ph III have adopted the concept of 3 car basic unit with 67% motorization.
This is also a trend in global market.
9. Eligibility Criteria
Siemenss comments:
We would like to share that almost all components of rolling stock are manufactured by local companies
including subsidiaries of multinational companies in our country. This has been possible with the projects
coming from Indian Railways and Metros projects mainly Delhi, Bangalore and Chennai.
These investments are in the interest of our nation considering the employment opportunities and
availability of technology locally. In view of this, items like Car body, Bogies and Propulsion equipment like
Traction Transformer, Traction converter, auxiliary converter and Traction Motors "MUST" be localized.
Please note that cost economics of localization would be highly favorable with the progress of
standardization.
Siemenss comments:
It is recommended to have "Single source" for full propulsion chain i.e transformers, traction converter,
auxiliary converter and Traction Motors considering the interface and integration aspects of the system.
The recommended eligibility criteria for a propulsion supplier shall be as per Annexure 2.
Further regarding the Consortium or sub-supplier approach, the issue primarily depends upon the
_ strengths of the mechanical partner in terms of system integration and interface management.
For an experienced car manufacturer, propulsion supplier could be a sub-supplier however for a lesser
experienced mechanical partner who is also leader of the project, it would be better to have propulsion
supplier as consortium partner.
11. TCMS : TCMS should be from the propulsion supplier same as in point 10 above
Siemenss comments:
TCMS should be from the propulsion supplier for better integration of the complete propulsion system
and controls to avoid any technical glitches due to interface management issuesin case of different
suppliers for TCMS and propulsion supplier.
This will enable single party liability during the DLP and post DLP period and also lower cost of inventory of
spares.
Siemenss comments:
It is recommended to have Driverless Trains as Driverless trains enable shorter headways and cost benefits
for the operator over the project life cycle.
This is for your kind reference and perusal. Please feel free to contact us for any additional information.
Yours truly,
Raminder Singh
Chief Manager Metros & Coaches, South Asia
Siemens Ltd.
Encls .:
Annexure 1
Annexure 2
Eligibility criteria has a direct bearing on the cost. Broader the criteria, more the competition and
lesser the cost
Eligibility criteria shouldEncourage competition. Ensure reliability and quality of the rolling
stock
Rolling stock comprises of Car body and Propulsion equipment. Car body manufacturing and
propulsion equipment is supplied by two separate set of suppliers
Alstom Comment: Rolling stock (train) firstly involves a system level design for train
configuration and integration of various RS sub-systems such as mechanicals (car body),
propulsions, TCMS, bogies & brakes, HVAC, electrical equipment (pantographetc), couplers,
interiors, seating etc. and testing & commissioning and full Mass Rail Transit Systems(MRTS)
site-integration in terms of interfacing with other MRTS systems. There are, in summary,
broadly four distinct requirements, namely:
Propulsion System is the core of the train in as much as a diesel engine is of the diesel electric
locomotive. Therefore, the reliability and quality of the propulsion system is central to the
overall performance and energy efficiency of the train.
It must be noted that the average life of a MRTS Train is about 30 to 40 years. The quality and
performance of the train over its life period will be severely impacted if a patchwork approach
rather than an integrated and optimized design and manufacturing approachare adopted. While
the patchwork approach of procuring the propulsion systems for one supplier, the bogie and
mechanicals from another and the car body from yet another may reduce the capital cost in the
Therefore, we strongly recommend that in order to ensure international quality, safety and
reliability and performance standards during the entire life cycle, bidders for Indian
MRTS Projects must be jointly and severally responsible for the four critical systems viz:
(i) train system design & integration,
(ii) car body/mechanicals,
(iii) propulsion system including TCMS and
(iv) interfacing, testing & commissioning with full MRTS system
In other words, manufacturers/suppliers of these four components must bid at the JV level rather
than as subcontractors to the main bidder. This is the practice followed internationally for Mass
Rail Transit Systems (MRTS) wherein suppliers of each of the four requirements must be part of
the consortium, and share joint and several responsibilities for RAMS during the life of the
trains.
Car body
The specifications of the material, coach parameters and inspection and testing can ensure the
quality of the rolling stock. Some of the reputed Car manufacturers are:
1. CAF
2. BEML
3. CNR
4. CSR
5. ROTTEM
6. Bombardier
7. ALSTOM
8. SIEMENS
Propulsion equipment
Propulsion equipment include Transformer, Motors, Traction Converters and Inverters and
TCMS. The reliability performance of the Rolling stock largely depends on Propulsion
equipment whichneed to be sourced from a proven source. Known propulsion equipment
suppliers include:
Suggestions of Vendors:
BEML views The bidder should have metro car The bidder should have executed
for Indian manufacturing facility in India projects in India based on Transfer
Manufacturer and should have manufactured, of Technology arrangement with
assembled and supplied minimum reputed global players
300 nos. metro car to Indian
Metro corporations either through
consortium route or
independently
Siemens Views Has the Bidder/Cons members, Out of 300 minimum of total 150
individually or jointly as a cars completed satisfactory
member of other Consortia/Joint revenue operation:
Venture or as sub-contractor to EITHER outside the country of
it's parent company have origin in at least three(3) different
experience of and carried out contracts in MRT,LRT,Sub-urban
Vehicle Design, Interface (with Railways or high speed railways
other designated Contractors such of at least three(3) different
as signaling, Track, Traction etc.), countries
Assembly & Supply, Testing and OR in India
Commissioning of minimum of for more than five(5) years.
total 300 metro (i.e.
MRT,LRT,Sub-urban Railways
Major Issues
1. Bidder should be car manufacturer or Propulsion equipment manufacturer having system
integration capabilities or one having both the capabilities?
If the Cars are to be procured from sources that manufacture cars and are also OEMs of
propulsion equipment including TCMS, the number of suppliers will get restricted to
very few European suppliers. Car body and propulsion equipment require completely
different kind of manufacturing facilities. Car manufacturers mostly procure 3 phase
propulsion equipment from different vendors like Hitachi, Mitsubishi, Bombardier,
Siemens, Toshiba etc. Hence if car manufacturers are permitted to outsource 3 phase
propulsion equipment from reputed and experienced OEMs with full responsibility with
the OEM for system integration, failure reliability and punctuality performance,
competition will be wider and costs will reduce.
Alstom Comments:There is a significant benefit in having the Bidders who have the
experience and capability to design and integrate a full train. There are already a total of
more than six such RS suppliers Japanese, European, Asian/Korean& Indian firms - as
was witnessed in the recent tenders for Indian Metro Projects. It is felt that competition is
already wide enough. Hence, the benefit of additional competition by allowing
suppliers/manufacturers of propulsion systems, without having joint and several
responsibility of integrating at the train level is likely to be marginal. On the contrary,
this may jeopardize the quality of Rolling Stock/trains supplied in Indian market, given
that these MRTS Rolling stock/trains must operate for a lifecycle of 30 to 40 years.
Alstom Comments:The RAMS and field service performance of the entire train system
is what ultimatelymatters. The reliability of individual sub-systems is of little
consequence. Ultimately, the responsibility of system integrity rests with the Joint
Venture and hencethe proposal to have the supplier of the Propulsion system as a sub-
contractor goes against the basic philosophy of seeking an integrated metro rolling stock
system, particularly when the RAMS& field service performancedepends to a large
extent on the Propulsion System. This approach of permitting the propulsion system
supplier as a sub contractoris akin to allowing a sub-contractor to provide the diesel
engine of a diesel- electric locomotive and appears to be contrived to suit vested interests.
For RMGL there was only one bid i.e. from Siemens who took full responsibility of the
rolling stock/trains, signaling system and the 750vDC traction electrification. Reliance
Metro will be a very different and new experience and needs to be contrasted from
procurement by a Public Authority. Inthe former case, the private player is willing to take
a calculated risk which cannot be taken in case of procurement by a Public Authority. In
any case, private MRTS are a new experience and we should wait for their successful
operations, before validating that approach.
Introduction of this clause pushes up the cost. IR also has never imposed the country
condition in any of its global tenders, except where Ministry of external affairs restrict
dealings with any country
Rolling stock has to be seen as Car body plus propulsion equipment. As far as car body is
concerned, the performance will not be affected by the environment, performance of
metro cars will however be greatly impacted by the performance of propulsion
equipment. Responsibility of commissioning, system integration rests with the propulsion
equipment supplier. Hence eligibility criteria for the 3 phase propulsion equipment
supplier need to be stringent for ensuring the quality of the rolling stock.
It is thus proposed that more than one country restriction should not be imposed for
qualifying as coach manufacturer. As far as propulsion equipment is concerned, coach
manufacturer who will be the lead partner/bidder should be allowed to source propulsion
equipment from reputed vendorswho have supplied propulsion equipment to more than
one country.
3. Number of years
Some Metro tenders specify that bidder should have at least ten year experience in the
field of system integration and supply of Metro cars and must have supplied 200 to 300
cars in last 10 years, out of which 50% in last 5 years. This clause is very restrictive and
will discourage indigenization. BEML who have been supplying Stainless steel coaches
successfully cannot independently bid for Metros.
Alstom Comments: The average life of a Metro Rolling Stock/Train is in the vicinity of
30 to 40 years and hence the ten years performance track record seems to be realistic. Ten
years is also a good period to determine whether the trains being supplied by the Bidder
are capable of providing flawless service for the entire life. Given the long gestation
period of infrastructure projects, a prior experience of at least ten years helps to develop a
better assessment of the capability & capacity of the bidder.
Key Recommendations
Bidder must be a coach manufacturer with sufficient experience in supplying Metro
cars during the last 5 years. Bidder can procure propulsion equipment from any
vendor meeting following criteria.
Interfacing with other subsystems like ATC/ATO, Brake System, Signaling, Passenger
Information system, Power supply etc.
Energy efficiency,
System Reliability.
Safety
Availability
A consortium approach ensures that the Propulsion supplier is part of the consortium
and is committed to delivering his commitment as per the contractual obligations.Else
normally the suppliers may have a separate arrangement on warranty clauses/ reliability
clauses with the Rolling Stock bidders which may not be aligned with Contractual
requirements. This may create contractual issues during execution.
On the other side a non- consortium approach may allow certain bidders (who do not
manufacture propulsion equipment) to have enough negotiating power post contract.
This will reduce the price.
Non consortium approach will help Metros in getting more competitive prices, without
compromising with quality. Tender conditions will be required to clearly spell out the
responsibility of Propulsion supplier. In such cases entire responsibility for choosing
sub vendors etc will rest with the propulsion equipment supplier. For example BEML,
the coach manufacturer should have the option to go with Mitsubishi, Siemens or
Toshiba. Consortium approach will restrict the bids to number of Propulsion equipment
manufacturers.
Alstom view:There are two critical issues that need to be considered by the Committee:
a) It has been witnessed in the recent tenders that there is one leading propulsion system
manufacturer, who, by virtue of the restrictive criteria (e.g. past experience in 25
In order to correct this situation, it is recommended that the propulsion system supplier
should be in the Joint Venture where the parties are responsible, jointly and severally,
overall train system performance.The emphasis should be to promote a number of
Propulsion suppliers through a more relaxed eligibility criteria for Propulsion System
Suppliers so that there are more firms who can form Joint Venture with different RS
builders. Also, given that the Propulsion System is at the heart of the Rolling
Stock/Trains, it is for consideration whether the three years should not be increased to
at least 5 years.
Terms of reference
Train integrated management system (TIMS) is a complete, integrated system for the
control and monitoring of the train-borne equipment. TIMS provides control and
monitoring, diagnostic and reporting of the train-borne equipment in a redundant
manner through the Train Bus (ARCNET) and Local bus (RS-485). The TIMS is
designed for ease of fault diagnosis and maintenance.
TIMS controls and monitors all non-safety critical systems and shall monitor vital or
safety critical systems.
Subsystems of the train utilize microprocessor-based control. The subsystems are
inter-linked via a communication data bus system for the monitoring, fault data
logging and for first line diagnostics of faults on board the train.
TIMS hardware system shall conform to International standard IEC 60571.
Bangalore Metro:
BT Comments:
TCMS is critical for train operation, reliability and safety. Train builders and equipment
suppliers use different solutions and protocols; normally supplier specific hardware and
common network solutions and protocols, such as MVB, CAN, Ethernet. Requirements
need to be of functional type while flexibility is provided for type of solutions.
The common standard for the TCMS is defined by IEC 61375 series of standards.
Collection of data regarding metros having driverless train operation and study of the
same for adoption in metros in India.
LT HMR
Hyderabad Metro evaluated about driverless system but in absence of CBTC system
decision, this decision could not be taken (driverless system requires CBTC) Hyderabad
Metro operation/signaling concept is
Recommendations
Driver less operation is required to achieve 90 seconds frequency for full utilization of
Metro infrastructure capacity. This will require communication based Train Control
(CBTC) system.
Terms of reference
Standard clause in Metro Tenders mandates that the successful bidder will set up car
manufacturing unit in India and at least 70% of the quantity be produced indigenously. This has
led to BEML developing facilities for Metro car production and BT and Alstom setting up their
manufacturing units in India. M/S CAF is also likely to set up a manufacturing unit in India.
Private developers like GMRL, Reliance Metro,Mumbai, Airport Express and LTHMRL have
not imposed any condition for indigenous development and entire stock has been procured from
Hyundai-Rotem, South Korea and CSR, China.
For true development of Indigenous sources for 3 phase Metro cars, it is necessary that some
development orders be given to indigenous sources for complete propulsion equipment, with
stringent performance requirements. IR has successfully adopted this approach for indigenous
development of 3 phase propulsion equipment for locos for production at CLW. Initiative can be
taken by MOUD as is done by Ministry of Railways for IR. This will help in Indian firms
acquiring technology thorough collaborations or indigenous development on their own.
Air conditioned Metro rakes for Kolkata(though with conventional DC Motors) were produced
completely indigenously with support from Indian Industry, with number of advanced features.
Further for development of Indian Industry, it is necessary that eligibility criteria enables
sourcing from Indigenous manufacturers without imposing conditions like proven-ness in two or
three countries as indigenous industry will never qualify with those conditions.
It is felt that the correct approach of tender evaluation should be to include the entire taxes and
duties - basic custom duty (BCD), countervailing duty (CVD), Cess on CVD and the Special
Additional duty (SAD) - to arrive at the total landed cost of the Rolling Stock at the MRTS
Depot. From the standpoint of the customer, the cash outflow would be lower for indigenously
manufactured trains. Going forward, as more localization happens, the landed cost of
manufacturing of trains and their sub-systems/components, including domestically manufactured
spares will reduce drastically over the life of the train, thus giving a clear benefit on the lift cycle
cost. In summary, Public Authority must evaluate tenders based on landed costs and this in itself,
will promote reduction in costs as a result of localization of design and manufacturing. This in
turn will push many Global Companies to set up set up local manufacturing facility under a
separate locally incorporated company in order to reduce costs.
With the clear support of Public Metros Authorities such as DMRC, BMRCL, CMRL and Metro
Kolkata (Indian Railways), a large number of reputed major train builders have set up
manufacturing in India. In the next phase, the emphasis should be on indigenization of
propulsion system & TCMS which, so far, has been trailing behind the localization curve. As a
result, there is heavy dependence on foreign imports and this has a long term detrimental impact
of the foreign exchange reserves. The situation gets further aggravated in a scenario where there
is only one dominant supplier of propulsion system. There is also a view that the current
arrangement for calling tenders (RFQ and RFP) in which suppliers of propulsion system are kept
out of the consortium, is adversely affecting the level of competition as explained in our
comments in Item no.6, above. It would therefore, be prudent to aggressively push for and
support moves towards 100% indigenization and indigenous procurement of the entire Rolling
Stock, including Propulsion Systems. This would also encourage more FDI to come in to India.
Further, it respect of Rolling Stock for Metro, it is felt that all bidders who have invested heavily
in India in the form of manufacturing facilities have in effect, brought in FDI, generated
employment, and helped train local manpower in cutting edge technology. The Government must
ensure that these investments are well protected. As India urbanises and more metros are added,
Government of India must initiate steps to ensure that these manufacturing facilities have a
steady stream of order intake.Such a step will encourage further FDI through expansion of
existing factories and introduction of new manufacturing units. Over time, this will also result in
cost reduction through improved localization. It will also reduce cost of spares and maintenance
of the Metro Trains over their economic life cycle.