Mse Wall
Mse Wall
1
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE
Material
Block material
Unit weight g = 25.00 kN/m3
Cohesion c = 0.00 kPa
Friction f = 0.533
Shear bearing capacity of joint Rs = 0.00 kN/m
Types of reinforcements
Type of
Name Line type Reinforcement strength Coefficient
No. reinforcement
Tult[kN/m] Rt[kN/m] Cds[] Ci[]
1 Miragrid 2XT Miragrid 2XT 29.20 7.37 0.80 0.80
2 Miragrid 5XT Miragrid 5XT 62.70 19.00 0.80 0.80
3 Miragrid 8XT Miragrid 8XT 102.10 30.94 0.80 0.80
4 Miragrid 10XT Miragrid 10XT 138.60 42.00 0.80 0.80
Reinforcement details
1. Miragrid 2XT
Short-term char. strength Tult = 29.20 kN/m
Long-term design strength Rt = 7.37 kN/m
Overall coeff. of model uncertainty FSUNC = 1.50
Calculate reduction factors
Life time : 114 years
Creep red. factor RFCR = 1.60
Chemistry : pH 4.0-9.0
Durability red. factor RFD = 1.10
Partical size : D50 22 mm
Installation damage red. factor RFID = 1.50
2. Miragrid 5XT
Short-term char. strength Tult = 62.70 kN/m
Long-term design strength Rt = 19.00 kN/m
Overall coeff. of model uncertainty FSUNC = 1.50
Calculate reduction factors
Life time : 114 years
Creep red. factor RFCR = 1.60
Chemistry : pH 4.0-9.0
Durability red. factor RFD = 1.10
Partical size : D50 22 mm
Installation damage red. factor RFID = 1.25
3. Miragrid 8XT
Short-term char. strength Tult = 102.10 kN/m
Long-term design strength Rt = 30.94 kN/m
Overall coeff. of model uncertainty FSUNC = 1.50
Calculate reduction factors
Life time : 114 years
Creep red. factor RFCR = 1.60
Chemistry : pH 4.0-9.0
Durability red. factor RFD = 1.10
Partical size : D50 22 mm
Installation damage red. factor RFID = 1.25
2
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE
4. Miragrid 10XT
Short-term char. strength Tult = 138.60 kN/m
Long-term design strength Rt = 42.00 kN/m
Overall coeff. of model uncertainty FSUNC = 1.50
Calculate reduction factors
Life time : 114 years
Creep red. factor RFCR = 1.60
Chemistry : pH 4.0-9.0
Durability red. factor RFD = 1.10
Partical size : D50 22 mm
Installation damage red. factor RFID = 1.25
Reinforcement
Total number of inputted reinforcements : 8.
Reinforcement details
Block Type of reinforcement Origin End Height from bottom Length
No. l1[m] l2[m] h[m] l[m]
1 Miragrid 5XT -0.14 3.52 0.00 3.66
2 Miragrid 8XT -0.12 3.54 0.57 3.66
3 Miragrid 8XT -0.10 3.56 1.14 3.66
4 Miragrid 8XT -0.08 3.58 1.71 3.66
5 Miragrid 8XT -0.06 3.60 2.28 3.66
6 Miragrid 8XT -0.04 3.62 2.85 3.66
7 Miragrid 8XT -0.02 3.64 3.42 3.66
8 Miragrid 5XT 0.00 3.66 3.99 3.66
Soil parameters
Sand with trace of fines (S-F), dense
Unit weight : g = 18.00 kN/m3
Angle of internal friction : jef = 30.00
Cohesion of soil : cef = 0.00 kPa
Angle of friction struc.-soil : d = 18.00
Saturated unit weight : gsat = 20.00 kN/m3
3
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE
Layer
No. Assigned soil Pattern
[m]
Terrain profile
Terrain behind the structure is flat.
Water influence
Ground water table is located below the structure.
Verification No. 1
Active pressure behind the structure - partial results
Layer Thickness a jd cd g dd Ka Comment
No. [m] [] [] [kPa] [kN/m3] []
1 0.57 0.00 30.00 0.00 18.00 30.00 0.297
2 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
3 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
4 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
5 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
6 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
7 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
8 0.51 -2.01 30.00 0.00 18.00 30.00 0.282
9 0.06 -2.01 21.00 12.00 20.00 21.00 0.397
10 0.20 0.00 21.00 12.00 20.00 21.00 0.411
Active pressure distribution behind the structure (without surcharge)
Layer Start [m] sZ sW Pressure Hor. comp. Vert. comp.
No. End [m] [kPa] [kPa] [kPa] [kPa] [kPa]
0.00 0.00 0.00 0.00 0.00 0.00
1
0.57 10.26 0.00 3.05 2.64 1.52
0.57 10.26 0.00 2.89 2.55 1.36
2
1.14 20.52 0.00 5.79 5.11 2.72
1.14 20.52 0.00 5.79 5.11 2.72
3
1.71 30.78 0.00 8.68 7.66 4.07
4
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE
Dimensioning No. 1
Active pressure behind the structure - partial results
Layer Thickness a jd cd g dd Ka Comment
No. [m] [] [] [kPa] [kN/m3] []
1 0.57 0.00 30.00 0.00 18.00 18.00 0.299
5
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE
6
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE
7
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE
8
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE
Check for slip along geo-reinforcement with the maximal utilization (Reinforc. No.: 1)
Inclination of slip surface = 88.00
Overall normal force acting on reinforcement = 454.62 kN/m
Coefficient of reduction of slip along geo-textile = 0.80
Wall resistance = 10.33 kN/m
Overall bearing capacity of reinforcements = 0.08 kN/m
Resistance along geo-reinforcement = 139.61 kN/m
9
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE
10
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]