0% found this document useful (0 votes)
174 views10 pages

Mse Wall

mse wall
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
174 views10 pages

Mse Wall

mse wall
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

DHAKA MAWA BHANGA HIGHWAY PROJECT

PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

Analysis of reinforced slopes


Input data
Project
Task : DHAKA MAWA BHANGA HIGHWAY PROJECT
Part : JURAIN RAILWAY OVERBRIDGE
Description : DESIGN AND ANALYSIS OF ABUTMENT WITH MECHANICALLY STABILIZED EARTH WALL
Customer : SWO-WEST/BANGLADESH ARMY
Author : PRIODEEP CHOWDHURY
Date : 7/9/2017
Project ID : #DCL-CCECC-JV
Project number : 001
Settings
USA - Safety factor
Materials and standards
Concrete structures : ACI 318-11
Wall analysis
Active earth pressure calculation : Coulomb
Passive earth pressure calculation : Mazindrani (Rankin)
Earthquake analysis : Mononobe-Okabe
Shape of earth wedge : Calculate as skew
Allowable eccentricity : 0.333
Internal stability : Standard - straight slip surface
Verification methodology : Safety factors (ASD)
Safety factors
Permanent design situation
Safety factor for overturning : SFo = 1.50 []
Safety factor for sliding resistance : SFs = 1.50 []
Safety factor for bearing capacity : SFb = 2.00 []
Safety factor for sliding along geo-reinforcement : SFsr = 1.50 []
Safety factor for geo-reinforcement strength : SFst = 1.50 []
Safety factor for pull out resistance of geo-reinf. : SFpo = 1.50 []
Safety factor for connection strength : SFcon = 1.50 []
Stability analysis
Verification methodology : Safety factors (ASD)
Safety factors
Permanent design situation
Safety factor : SFs = 1.50 []
Geometry of structure
Number of blocks n = 8
Block height h = 0.57 m
Block width b = 0.17 m
Block offset o1 = 0.02 m
Structure foundation
Foundation width bb = 0.51 m
Foundation height lb = 0.20 m
Foundation offset ab = 0.10 m

1
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

Material
Block material
Unit weight g = 25.00 kN/m3
Cohesion c = 0.00 kPa
Friction f = 0.533
Shear bearing capacity of joint Rs = 0.00 kN/m
Types of reinforcements
Type of
Name Line type Reinforcement strength Coefficient
No. reinforcement
Tult[kN/m] Rt[kN/m] Cds[] Ci[]
1 Miragrid 2XT Miragrid 2XT 29.20 7.37 0.80 0.80
2 Miragrid 5XT Miragrid 5XT 62.70 19.00 0.80 0.80
3 Miragrid 8XT Miragrid 8XT 102.10 30.94 0.80 0.80
4 Miragrid 10XT Miragrid 10XT 138.60 42.00 0.80 0.80
Reinforcement details
1. Miragrid 2XT
Short-term char. strength Tult = 29.20 kN/m
Long-term design strength Rt = 7.37 kN/m
Overall coeff. of model uncertainty FSUNC = 1.50
Calculate reduction factors
Life time : 114 years
Creep red. factor RFCR = 1.60
Chemistry : pH 4.0-9.0
Durability red. factor RFD = 1.10
Partical size : D50 22 mm
Installation damage red. factor RFID = 1.50
2. Miragrid 5XT
Short-term char. strength Tult = 62.70 kN/m
Long-term design strength Rt = 19.00 kN/m
Overall coeff. of model uncertainty FSUNC = 1.50
Calculate reduction factors
Life time : 114 years
Creep red. factor RFCR = 1.60
Chemistry : pH 4.0-9.0
Durability red. factor RFD = 1.10
Partical size : D50 22 mm
Installation damage red. factor RFID = 1.25
3. Miragrid 8XT
Short-term char. strength Tult = 102.10 kN/m
Long-term design strength Rt = 30.94 kN/m
Overall coeff. of model uncertainty FSUNC = 1.50
Calculate reduction factors
Life time : 114 years
Creep red. factor RFCR = 1.60
Chemistry : pH 4.0-9.0
Durability red. factor RFD = 1.10
Partical size : D50 22 mm
Installation damage red. factor RFID = 1.25

2
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

4. Miragrid 10XT
Short-term char. strength Tult = 138.60 kN/m
Long-term design strength Rt = 42.00 kN/m
Overall coeff. of model uncertainty FSUNC = 1.50
Calculate reduction factors
Life time : 114 years
Creep red. factor RFCR = 1.60
Chemistry : pH 4.0-9.0
Durability red. factor RFD = 1.10
Partical size : D50 22 mm
Installation damage red. factor RFID = 1.25
Reinforcement
Total number of inputted reinforcements : 8.

Reinforcement details
Block Type of reinforcement Origin End Height from bottom Length
No. l1[m] l2[m] h[m] l[m]
1 Miragrid 5XT -0.14 3.52 0.00 3.66
2 Miragrid 8XT -0.12 3.54 0.57 3.66
3 Miragrid 8XT -0.10 3.56 1.14 3.66
4 Miragrid 8XT -0.08 3.58 1.71 3.66
5 Miragrid 8XT -0.06 3.60 2.28 3.66
6 Miragrid 8XT -0.04 3.62 2.85 3.66
7 Miragrid 8XT -0.02 3.64 3.42 3.66
8 Miragrid 5XT 0.00 3.66 3.99 3.66
Soil parameters
Sand with trace of fines (S-F), dense
Unit weight : g = 18.00 kN/m3
Angle of internal friction : jef = 30.00
Cohesion of soil : cef = 0.00 kPa
Angle of friction struc.-soil : d = 18.00
Saturated unit weight : gsat = 20.00 kN/m3

Low plasticity silt (ML,MI), consistency firm


Unit weight : g = 20.00 kN/m3
Angle of internal friction : jef = 21.00
Cohesion of soil : cef = 12.00 kPa
Angle of friction struc.-soil : d = 18.00
Saturated unit weight : gsat = 20.00 kN/m3

Geological profile and assigned soils


Layer
No. Assigned soil Pattern
[m]

1 4.50 Sand with trace of fines (S-F), dense

2 10.50 Low plasticity silt (ML,MI), consistency firm

3
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

Layer
No. Assigned soil Pattern
[m]

3 - Sand with trace of fines (S-F), dense

Terrain profile
Terrain behind the structure is flat.

Water influence
Ground water table is located below the structure.

Input surface surcharges


Surcharge Mag.1 Mag.2 Ord.x Length Depth
No. Action
new change [kN/m2] [kN/m2] x [m] l [m] z [m]
1 YES permanent 30.00 on terrain
No. Name
1 Surcharge
Resistance on front face of the structure
Resistance on front face of the structure is not considered.

Settings of the stage of construction


Design situation : permanent

Verification No. 1
Active pressure behind the structure - partial results
Layer Thickness a jd cd g dd Ka Comment
No. [m] [] [] [kPa] [kN/m3] []
1 0.57 0.00 30.00 0.00 18.00 30.00 0.297
2 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
3 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
4 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
5 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
6 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
7 0.57 -2.01 30.00 0.00 18.00 30.00 0.282
8 0.51 -2.01 30.00 0.00 18.00 30.00 0.282
9 0.06 -2.01 21.00 12.00 20.00 21.00 0.397
10 0.20 0.00 21.00 12.00 20.00 21.00 0.411
Active pressure distribution behind the structure (without surcharge)
Layer Start [m] sZ sW Pressure Hor. comp. Vert. comp.
No. End [m] [kPa] [kPa] [kPa] [kPa] [kPa]
0.00 0.00 0.00 0.00 0.00 0.00
1
0.57 10.26 0.00 3.05 2.64 1.52
0.57 10.26 0.00 2.89 2.55 1.36
2
1.14 20.52 0.00 5.79 5.11 2.72
1.14 20.52 0.00 5.79 5.11 2.72
3
1.71 30.78 0.00 8.68 7.66 4.07

4
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

Layer Start [m] sZ sW Pressure Hor. comp. Vert. comp.


No. End [m] [kPa] [kPa] [kPa] [kPa] [kPa]
1.71 30.78 0.00 8.68 7.66 4.07
4
2.28 41.04 0.00 11.57 10.22 5.43
2.28 41.04 0.00 11.57 10.22 5.43
5
2.85 51.30 0.00 14.46 12.77 6.79
2.85 51.30 0.00 14.46 12.77 6.79
6
3.42 61.56 0.00 17.36 15.33 8.15
3.42 61.56 0.00 17.36 15.33 8.15
7
3.99 71.82 0.00 20.25 17.88 9.50
3.99 71.82 0.00 20.25 17.88 9.50
8
4.50 81.00 0.00 22.84 20.17 10.72
4.50 81.00 0.00 18.49 17.49 6.02
9
4.56 82.20 0.00 18.97 17.94 6.17
4.56 82.20 0.00 20.38 19.02 7.30
10
4.76 86.20 0.00 22.02 20.56 7.89
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Gravity force 0.00 -2.46 303.61 2.16 1.000
Active pressure 50.42 -1.60 26.05 3.78 1.000
Surcharge 36.73 -2.32 19.26 3.85 1.000
Weight - wall 0.00 -2.48 19.38 0.26 1.000
Surcharge 0.00 -4.76 109.80 2.24 1.000
Verification of complete wall
Check for overturning stability
Resisting moment Mres = 1079.73 kNm/m
Overturning moment Movr = 165.99 kNm/m

Safety factor = 6.50 > 1.50


Wall for overturning is SATISFACTORY

Check for slip


Resisting horizontal force Hres = 189.64 kN/m
Active horizontal force Hact = 87.15 kN/m

Safety factor = 2.18 > 1.50


Wall for slip is SATISFACTORY

Overall check - WALL is SATISFACTORY

Dimensioning No. 1
Active pressure behind the structure - partial results
Layer Thickness a jd cd g dd Ka Comment
No. [m] [] [] [kPa] [kN/m3] []
1 0.57 0.00 30.00 0.00 18.00 18.00 0.299

5
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

Layer Thickness a jd cd g dd Ka Comment


No. [m] [] [] [kPa] [kN/m3] []
2 0.57 0.00 30.00 0.00 18.00 18.00 0.299
3 0.57 0.00 30.00 0.00 18.00 18.00 0.299
4 0.57 0.00 30.00 0.00 18.00 18.00 0.299
5 0.57 0.00 30.00 0.00 18.00 18.00 0.299
6 0.57 0.00 30.00 0.00 18.00 18.00 0.299
7 0.57 0.00 30.00 0.00 18.00 18.00 0.299
8 0.16 0.00 30.00 0.00 18.00 18.00 0.299
9 0.35 30.50 30.00 0.00 18.00 30.00 0.677
10 0.06 30.50 21.00 12.00 20.00 21.00 0.756
11 0.20 0.00 21.00 12.00 20.00 18.00 0.414
Active pressure distribution behind the structure (without surcharge)
Layer Start [m] sZ sW Pressure Hor. comp. Vert. comp.
No. End [m] [kPa] [kPa] [kPa] [kPa] [kPa]
0.00 0.00 0.00 0.00 0.00 0.00
1
0.57 10.26 0.00 3.06 2.91 0.95
0.57 10.26 0.00 3.06 2.91 0.95
2
1.14 20.52 0.00 6.13 5.83 1.89
1.14 20.52 0.00 6.13 5.83 1.89
3
1.71 30.78 0.00 9.19 8.74 2.84
1.71 30.78 0.00 9.19 8.74 2.84
4
2.28 41.04 0.00 12.26 11.66 3.79
2.28 41.04 0.00 12.26 11.66 3.79
5
2.85 51.30 0.00 15.32 14.57 4.73
2.85 51.30 0.00 15.32 14.57 4.73
6
3.42 61.56 0.00 18.38 17.48 5.68
3.42 61.56 0.00 18.38 17.48 5.68
7
3.99 71.82 0.00 21.45 20.40 6.63
3.99 71.82 0.00 21.45 20.40 6.63
8
4.15 74.74 0.00 22.32 21.23 6.90
4.15 74.74 0.00 50.58 24.91 44.02
9
4.50 81.00 0.00 54.81 27.00 47.71
4.50 81.00 0.00 49.76 30.98 38.94
10
4.56 82.20 0.00 50.66 31.54 39.65
4.56 82.20 0.00 20.32 19.32 6.28
11
4.76 86.20 0.00 21.98 20.90 6.79
Pressure profile due to surcharge - Surcharge
Point Depth Hor. comp. Vert. comp.
No. [m] [kPa] [kPa]
1 0.00 8.52 2.77
2 0.57 8.52 2.77
3 0.57 0.00 0.00
4 0.57 0.00 0.00
5 0.57 8.52 2.77

6
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

Point Depth Hor. comp. Vert. comp.


No. [m] [kPa] [kPa]
6 1.14 8.52 2.77
7 1.14 0.00 0.00
8 1.14 0.00 0.00
9 1.14 8.52 2.77
10 1.71 8.52 2.77
11 1.71 0.00 0.00
12 1.71 0.00 0.00
13 1.71 8.52 2.77
14 2.28 8.52 2.77
15 2.28 0.00 0.00
16 2.28 0.00 0.00
17 2.28 8.52 2.77
18 2.85 8.52 2.77
19 2.85 0.00 0.00
20 2.85 0.00 0.00
21 2.85 8.52 2.77
22 3.42 8.52 2.77
23 3.42 0.00 0.00
24 3.42 0.00 0.00
25 3.42 8.52 2.77
26 3.99 8.52 2.77
27 3.99 0.00 0.00
28 3.99 0.00 0.00
29 3.99 8.52 2.77
30 4.15 8.52 2.77
31 4.15 10.00 17.67
32 4.50 10.00 17.67
33 4.50 14.12 17.75
34 4.56 14.12 17.75
35 4.56 11.83 3.84
36 4.76 11.83 3.84
Forces acting on construction
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -2.48 19.38 0.26 1.000
Weight - earth wedge 0.00 -0.33 0.91 0.35 1.000
Active pressure 58.99 -1.57 33.92 0.37 1.000
Surcharge 42.06 -2.30 19.47 0.37 1.000
Reinforcement -19.00 -0.20 0.00 0.37 1.000
Reinforcement -30.94 -0.77 0.00 0.75 1.000
Reinforcement -30.94 -1.34 0.00 1.12 1.000
Reinforcement -30.94 -1.91 0.00 1.50 1.000
Reinforcement -30.94 -2.48 0.00 1.88 1.000
Reinforcement -30.94 -3.05 0.00 2.26 1.000

7
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

Name Fhor App.Pt. Fvert App.Pt. Design


[kN/m] z [m] [kN/m] x [m] coefficient
Reinforcement -26.85 -3.62 0.00 2.63 1.000
Reinforcement -10.04 -4.19 0.00 3.01 1.000
Verification of complete wall
Check for overturning stability
Resisting moment Mres = 463.39 kNm/m
Overturning moment Movr = 189.37 kNm/m

Safety factor = 2.45 > 1.50


Wall for overturning is SATISFACTORY

Check for slip


Resisting horizontal force Hres = 244.99 kN/m
Active horizontal force Hact = 101.05 kN/m

Safety factor = 2.42 > 1.50


Wall for slip is SATISFACTORY

Overall check - WALL is SATISFACTORY

Bearing capacity of foundation soil


Design load acting at the center of footing bottom
Moment Norm. force Shear Force Eccentricity Stress
No.
[kNm/m] [kN/m] [kN/m] [] [kPa]
1 -255.23 73.68 -109.54 0.000 144.47
Service load acting at the center of footing bottom
Moment Norm. force Shear Force
No.
[kNm/m] [kN/m] [kN/m]
1 -255.23 73.68 -109.54
Verification of slip on georeinforcement No. 1
Forces acting on construction (verification of most utilized reinforcement)
Name Fhor App.Pt. Fvert App.Pt. Design
[kN/m] z [m] [kN/m] x [m] coefficient
Weight - wall 0.00 -2.28 19.38 -0.02 1.000
Active pressure 46.44 -1.52 24.50 3.71 1.000
Surcharge 34.29 -2.27 18.11 3.74 1.000
Gravity force 0.00 -2.28 301.64 1.90 1.000
Surcharge 0.00 -4.56 110.38 1.98 1.000
Reinforcement -0.01 -0.57 0.00 3.68 1.000
Reinforcement -0.01 -1.14 0.00 3.70 1.000
Reinforcement -0.01 -1.71 0.00 3.72 1.000
Reinforcement -0.01 -2.28 0.00 3.74 1.000
Reinforcement -0.01 -2.85 0.00 3.76 1.000
Reinforcement -0.01 -3.42 0.00 3.78 1.000
Reinforcement -0.01 -3.99 0.00 3.80 1.000

8
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

Check for slip along geo-reinforcement with the maximal utilization (Reinforc. No.: 1)
Inclination of slip surface = 88.00
Overall normal force acting on reinforcement = 454.62 kN/m
Coefficient of reduction of slip along geo-textile = 0.80
Wall resistance = 10.33 kN/m
Overall bearing capacity of reinforcements = 0.08 kN/m
Resistance along geo-reinforcement = 139.61 kN/m

Check for slip:


Resisting horizontal force Hres = 150.02 kN/m
Active horiz. force Hact = 80.74 kN/m
Factor of safety = 1.86 > 1.50
Slip along geotextile is SATISFACTORY

Calculation of internal stability No. 1


Calculated forces and strength of geo-reinforcements
Name Fx Depth Rt Utilization Tp Utilization
No.
[kN/m] z[m] [kN/m] [%] [kN/m] [%]
1 Miragrid 5XT -8.82 4.56 19.00 69.62 184.78 7.16
2 Miragrid 8XT -16.19 3.99 30.94 78.50 221.37 10.97
3 Miragrid 8XT -14.28 3.42 30.94 69.25 171.36 12.50
4 Miragrid 8XT -12.68 2.85 30.94 61.49 127.47 14.92
5 Miragrid 8XT -11.08 2.28 30.94 53.73 89.72 18.53
6 Miragrid 8XT -9.48 1.71 30.94 45.97 58.10 24.48
7 Miragrid 8XT -7.88 1.14 30.94 38.21 32.60 36.26
8 Miragrid 5XT -8.82 0.57 19.00 69.63 13.24 99.96
Check for tensile strength (georeinforcement No.2)
Tensile strength Rt = 30.94 kN/m
Geo-reinforcement force Fx = 16.19 kN/m
Factor of safety = 1.91 > 1.50
Geo-reinforcement for tensile strength is SATISFACTORY

Check for pull out resistance (georeinforcement No.8)


Pull out resistance Tp = 13.24 kN/m
Geo-reinforcement force Fx = 8.82 kN/m
Factor of safety = 1.50 > 1.50
Geo-reinforcement for pull out resistance is SATISFACTORY

Overall verification - geo-reinforcement is SATISFACTORY

Global stability analysis No. 1


Slip surface parameters
(slip surface after optimization)
Center S = (-1.30;-0.06) m
Radius r = 5.14 m
Angle a1 = -20.32
a2 = 89.33
The restrictions of points of circular slip surface
Keep the left end point of the slip surface

9
[GeoStructural Analysis - MSE Wall | version 5.19.5.0 | Copyright 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
DHAKA MAWA BHANGA HIGHWAY PROJECT
PRIODEEP CHOWDHURY JURAIN RAILWAY OVERBRIDGE

Keep the right end point of the slip surface


Slope stability check (Bishop)
FS = 1.65 > 1.50
Slope stability is SATISFACTORY