Generation and Reservoirs Statistics: August 5, 2017
Generation and Reservoirs Statistics: August 5, 2017
August 5, 2017
330
1%
2,060 6,990
5% 19%
8,420
23% CEB Hydro
CEB Thermal Oil
8,230 CEB Coal
22% IPP Thermal
SPP Wind
11,260 SPP Solar
30%
Cumulative Dispatch
50
0
100
150
200
250
300
0
1000
2000
3000
4000
5000
6000
7000
8000
MWh
Wimalasurendra
Wimalasurendra
Old Laxapana
Old Laxapana
Canyon
Canyon
New Laxapana
New Laxapana
Polpitiya
Polpitiya
Kotmale
Kotmale
Victoria
Victoria
Randenigala
Plant Dispatch on
Randenigala
Rantambe
Rantambe
Ukuwela
Ukuwela
Bowatenna
Bowatenna
Upper Kotmale
Upper Kotmale
Samanalawewa
Installed Capacity
Samanalawewa
Kukule
Kukule
Puttalam Coal I
Puttalam Coal I
Puttalam Coal II
Puttalam Coal II
Puttalam Coal III
Puttalam Coal III
Uthura Janani
Available Capacity
Uthura Janani
Sapugaskanda B
Sapugaskanda B
August 6, 2017
Sapugaskanda A Available Generation
Sapugaskanda A
Barge CEB
Barge CEB
August 5, 2017
Asia Power
Asia Power
KCCP
KCCP
Northern Power
Northern Power
Note- Available Generation is estimated based on plant availability at 6.00am on
Westcoast
KPS GT 7
KPS Small GTs
KPS Small GTs
Agreko-Galle
Agreko-Galle
Agreko-
Agreko-Hambantota
August 6, 2017
Agreko-Kurunagala
Agreko-Kurunagala
Agreko-Pallekalle
Agreko-Pallekalle
ACE Matara
ACE Matara
Contribution to the Night Peak in MW
71.8
3%
445.6 725.5
22% 35%
CEB Hydro
CEB Thermal Oil
CEB Coal
479
23% IPP Thermal
351.9
17% SPP Wind
Note: Contribution from other SPPs (Mini Hydro, Solar and Biomass) is not included
100% 250
90%
78% 209.6
80% 200
70% 77%
60% 150
50%
40% 100
30% 73.9 30% 24%
67.1 23%
20% 15% 50
42.2 39.2
10% 31.8
0% 0
Castlereigh Maussakelle Kotmale Victoria Randenigala Samanalawewa
% of Total Capacity Reservoir level (GWh)
1200.0
1000.0
800.0
600.0
400.0
200.0
0.0
1-Jan 1-Feb 1-Mar 1-Apr 1-May 1-Jun 1-Jul 1-Aug 1-Sep 1-Oct 1-Nov 1-Dec
GWh
700.0
600.0
500.0
400.0
300.0
200.0
100.0
0.0
15-Jan
22-Jan
29-Jan
5-Feb
16-Apr
23-Apr
30-Apr
7-May
5-Mar
2-Apr
9-Apr
2-Jul
12-Feb
19-Feb
26-Feb
11-Jun
18-Jun
25-Jun
14-May
21-May
28-May
4-Jun
1-Jan
8-Jan
12-Mar
19-Mar
26-Mar
MW
3000.0
2500.0
2000.0
1500.0
1000.0
500.0
0.0
5-Feb
2-Apr
9-Apr
12-Mar
19-Mar
26-Mar
12-Feb
19-Feb
26-Feb
15-Jan
22-Jan
29-Jan
5-Mar
7-May
4-Jun
2-Jul
16-Apr
23-Apr
30-Apr
14-May
21-May
28-May
1-Jan
8-Jan
11-Jun
18-Jun
25-Jun
Nigh Peak Day Peak Minimum Demand
GWh
9,000
33
8,000 199
162
1,326 1,568
2,000
2,686 2,468
1,000
1,538 1,262
-
2014 2015 2016 2017
CEB Hydro CEB Thermal Oil CEB Coal IPP Thermal Wind Solar
Daily Load Curve - August 4, 2017
2500
2000
1500
1000
500
CEB Thermal
Sapugaskanda 1 72 Heavy Fuel
Sapugaskanda 2 72 Heavy Fuel
Kelanitissa Small Gas Turbines 68 Auto Diesel
GT 7 - Kelanitissa 115 Auto Diesel
Kelanitissa CCY 165 Naptha & Diesel
Lakvijaya (Puttalam Coal) 285 Coal
Lakvijaya (Puttalam Coal) Stage II 285 Coal
Lakvijaya (Puttalam Coal) Stage III285 Coal
Uthuru Janani 24 Heavy Fuel
Barge CEB 60 Furnace Oil