0% found this document useful (0 votes)
24 views26 pages

Result

The document analyzes the stress and deflection of a jib crane under different load cases. It includes: 1) Moment diagrams and stress analysis showing maximum stresses occur at the base of the vertical arm and column under Case 1 loads. 2) Stress distributions graphs for the jib arm, vertical arm, and column, with the highest stresses at the base of each member. 3) A deflection graph showing the greatest deflections at the tip of the jib arm. In summary, the document models and analyzes the stress and deflection behavior of a jib crane under various loading conditions.

Uploaded by

dtqc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views26 pages

Result

The document analyzes the stress and deflection of a jib crane under different load cases. It includes: 1) Moment diagrams and stress analysis showing maximum stresses occur at the base of the vertical arm and column under Case 1 loads. 2) Stress distributions graphs for the jib arm, vertical arm, and column, with the highest stresses at the base of each member. 3) A deflection graph showing the greatest deflections at the tip of the jib arm. In summary, the document models and analyzes the stress and deflection behavior of a jib crane under various loading conditions.

Uploaded by

dtqc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 26

6 Result

6.1 Moment Diagram

Figure 7: Jib Crane Moment Diagram Caused by Live Load Figure 8: Jib Crane Moment Diagram Caused by Transverse
and Dead Load Force and Wind Load

The moment diagram generated by the software is same as predicted. Hence, input of restraints for model are satisfactory.
6.2 Case 1
6.2.1 Stress Analysis
i) Overall

Figure 9: Maximum and Minimum Stress of Jib Crane at Case 1

Beam Name Element End Axial Shear1 Shear2 Moment1 Moment2 Torque
Vertical Arm 1 1 0 2.54E+05 -1341.5 53.303 0 0
2 2352.8 -2.54E+05 587.76 765.33 2.15E+05 0
2 1 -2352.8 2.54E+05 -587.76 -765.33 -2.15E+05 3.49E-05
2 4705.5 -2.54E+05 -165.93 944.32 4.30E+05 -3.49E-05
3 1 -4705.5 2.54E+05 165.93 -944.32 -4.30E+05 0.00066727
2 7058.3 -2.54E+05 -919.62 483.69 6.45E+05 -0.00066727
Column 4 1 1.66E+05 0.00015828 26494 -1.90E+05 7.64E+05 -1.10E+05
2 -1.55E+05 -0.00015828 -25397 1.46E+05 -7.64E+05 1.10E+05
5 1 1.55E+05 0 25397 -1.46E+05 7.64E+05 -1.10E+05
2 -1.44E+05 0 -24300 1.03E+05 -7.64E+05 1.10E+05
6 1 1.44E+05 -0.00015827 24300 -1.03E+05 7.64E+05 -1.10E+05
2 -1.33E+05 0.00015827 -23202 62976 -7.64E+05 1.10E+05
7 1 1.33E+05 2.54E+05 21861 -62937 7.64E+05 -1.08E+05
2 -1.24E+05 -2.54E+05 -21038 35632 -4.41E+05 1.08E+05
8 1 1.24E+05 2.54E+05 21038 -35632 4.41E+05 -1.08E+05
2 -1.16E+05 -2.54E+05 -20216 9373.7 -1.19E+05 1.08E+05
Jib Arm 9 1 0 -93051 9305.1 -3.10E-05 -0.00024016 0
2 0 95710 -11009 -12991 -1.21E+05 0
10 1 0 -95710 11009 12991 1.21E+05 0
2 0 98369 -12713 -28161 -2.45E+05 0
11 1 0 -98369 12713 28161 2.45E+05 0
2 0 1.01E+05 -14416 -45510 -3.72E+05 0
12 1 0 -1.01E+05 14416 45510 3.72E+05 0
2 0 1.04E+05 -16120 -65038 -5.03E+05 0
13 1 -0.0014293 -1.04E+05 16120 65038 5.03E+05 0.00010336
2 0.0014293 1.06E+05 -17824 -86745 -6.38E+05 -0.00010336
14 1 -2.54E+05 -1.13E+05 18744 86792 -1.27E+05 0
2 2.54E+05 1.16E+05 -20216 -1.08E+05 0 0

Beam Name Element End Axial Bending Dir1 Bending Dir2 Torsional Worst Case
Vertical Arm 1 1 0 -14720 0 0 14720
2 65355 2.11E+05 -2.14E+07 0 2.17E+07
2 1 65355 2.11E+05 -2.14E+07 0.0028955 2.17E+07
2 1.31E+05 2.61E+05 -4.29E+07 -0.0028955 4.33E+07
3 1 1.31E+05 2.61E+05 -4.29E+07 0.055292 4.33E+07
2 1.96E+05 1.34E+05 -6.43E+07 -0.055292 6.47E+07
Column 4 1 -1.93E+06 7.17E+06 2.89E+07 -2.08E+06 3.80E+07
2 -1.80E+06 5.50E+06 2.89E+07 2.08E+06 3.62E+07
5 1 -1.80E+06 5.50E+06 2.89E+07 -2.08E+06 3.62E+07
2 -1.67E+06 3.91E+06 2.89E+07 2.08E+06 3.45E+07
6 1 -1.67E+06 3.91E+06 2.89E+07 -2.08E+06 3.45E+07
2 -1.54E+06 2.38E+06 2.89E+07 2.08E+06 3.29E+07
7 1 -1.54E+06 2.38E+06 2.89E+07 -2.05E+06 3.29E+07
2 -1.44E+06 1.35E+06 1.67E+07 2.05E+06 1.96E+07
8 1 -1.44E+06 1.35E+06 1.67E+07 -2.05E+06 1.96E+07
2 -1.34E+06 3.54E+05 4.49E+06 2.05E+06 6.51E+06
Jib Arm 9 1 0 0.011318 -0.027132 0 0.03845
2 0 -4.75E+06 1.36E+07 0 1.84E+07
10 1 0 -4.75E+06 1.36E+07 0 1.84E+07
2 0 -1.03E+07 2.77E+07 0 3.80E+07
11 1 0 -1.03E+07 2.77E+07 0 3.80E+07
2 0 -1.66E+07 4.21E+07 0 5.87E+07
12 1 0 -1.66E+07 4.21E+07 0 5.87E+07
2 0 -2.38E+07 5.69E+07 0 8.06E+07
13 1 0.052938 -2.38E+07 5.69E+07 0.010166 8.06E+07
2 0.052938 -3.17E+07 7.20E+07 -0.010166 1.04E+08
14 1 9.39E+06 -3.17E+07 -1.43E+07 0 5.54E+07
2 9.39E+06 -3.96E+07 0 0 4.90E+07
ii) Jib Arm

Figure 10: Stress Distribution along Jib Arm at Case 1

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


14 5.54E+07 -5.78E-13 468 -459.23
13 1.04E+08 -5.78E-13 468 -1585.1
12 8.06E+07 -5.78E-13 468 -2756.1
11 5.87E+07 -5.78E-13 468 -3994.6
10 3.80E+07 -5.78E-13 468 -5098
9 1.84E+07 -5.78E-13 468 -6269
iii) Jib Vertical Arm

Figure 11: Stress Distribution along Vertical Arm at Case 1

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


3 6.47E+07 -1.20E-13 -26.632 -1105
2 4.33E+07 -1.20E-13 -849.76 -1105
1 2.17E+07 -1.20E-13 -1911 -1105
iv) Column

Figure 12: Stress Distribution along Column at Case 1

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


8 1.95E+07 0 -155.23 -2.13E-12
7 3.28E+07 0 -1343.1 -2.27E-12
6 3.45E+07 0 -2592.8 -2.42E-12
5 3.62E+07 0 -4268.2 -2.63E-12
4 3.80E+07 0 -6062.2 -2.85E-12
6.2.2 Deflection Analysis

Figure 13: Deflection Along Jib Arm at Case 1

Node Value (mm) X (mm) Y (mm) Z (mm)


19 -6.84E-02 -5.78E-13 468 0
18 -2.54E+00 -5.78E-13 468 -1105
17 -5.92E+00 -5.78E-13 468 -2384
16 -1.03E+01 -5.78E-13 468 -3663
15 -1.54E+01 -5.78E-13 468 -4942
14 -2.10E+01 -5.78E-13 468 -6221
13 -2.68E+01 -5.78E-13 468 -7500
6.3 Case 2
6.3.1 Stress Analysis
i) Overall

Figure 14: Maximum and Minimum Stress of Jib Crane at Case 2

Beam Name Element End Axial Shear1 Shear2 Moment1 Moment2 Torque
Vertical Arm 1 1 0 3.69E+05 -1341.5 53.303 0 0
2 2352.8 -3.69E+05 587.76 765.33 3.13E+05 0
2 1 -2352.8 3.69E+05 -587.76 -765.33 -3.13E+05 4.91E-05
2 4705.5 -3.69E+05 -165.93 944.32 6.27E+05 -4.91E-05
3 1 -4705.5 3.69E+05 165.93 -944.32 -6.27E+05 0.00094417
2 7058.3 -3.69E+05 -919.62 483.69 9.40E+05 -0.00094417
Column 4 1 2.13E+05 0.00020389 31147 -2.27E+05 1.11E+06 -1.45E+05
2 -2.02E+05 -0.00020389 -30049 1.75E+05 -1.11E+06 1.45E+05
5 1 2.02E+05 0 30049 -1.75E+05 1.11E+06 -1.45E+05
2 -1.90E+05 0 -28952 1.25E+05 -1.11E+06 1.45E+05
6 1 1.90E+05 -0.00020355 28952 -1.25E+05 1.11E+06 -1.45E+05
2 -1.79E+05 0.00020355 -27855 76999 -1.11E+06 1.45E+05
7 1 1.79E+05 3.69E+05 26514 -76960 1.11E+06 -1.43E+05
2 -1.71E+05 -3.69E+05 -25691 43732 -6.43E+05 1.43E+05
8 1 1.71E+05 3.69E+05 25691 -43732 6.43E+05 -1.43E+05
2 -1.62E+05 -3.69E+05 -24868 11551 -1.73E+05 1.43E+05
Jib Arm 9 1 0 -1.40E+05 13958 -4.33E-05 -0.00036458 0
2 0 1.42E+05 -15662 -18941 -1.80E+05 0
10 1 0 -1.42E+05 15662 18941 1.80E+05 0
2 0 1.45E+05 -17365 -40062 -3.64E+05 0
11 1 0 -1.45E+05 17365 40062 3.64E+05 0
2 0 1.48E+05 -19069 -63362 -5.51E+05 0
12 1 0 -1.48E+05 19069 63362 5.51E+05 0
2 0 1.50E+05 -20773 -88841 -7.41E+05 0
13 1 -0.0019762 -1.50E+05 20773 88841 7.41E+05 0.0001457
2 0.0019762 1.53E+05 -22477 -1.17E+05 -9.35E+05 -0.0001457
14 1 -3.69E+05 -1.60E+05 23396 1.17E+05 -1.78E+05 0
2 3.69E+05 1.62E+05 -24868 -1.43E+05 0 0

Beam Name Element End Axial Bending Dir1 Bending Dir2 Torsional Worst Case
Vertical Arm 1 1 0 -14720 0 0 14720
2 65355 2.11E+05 -3.12E+07 0 3.15E+07
2 1 65355 2.11E+05 -3.12E+07 0.0040698 3.15E+07
2 1.31E+05 2.61E+05 -6.25E+07 -0.0040698 6.29E+07
3 1 1.31E+05 2.61E+05 -6.25E+07 0.078237 6.29E+07
2 1.96E+05 1.34E+05 -9.37E+07 -0.078237 9.41E+07
Column 4 1 -2.47E+06 8.59E+06 4.21E+07 -2.74E+06 5.32E+07
2 -2.34E+06 6.63E+06 4.21E+07 2.74E+06 5.11E+07
5 1 -2.34E+06 6.63E+06 4.21E+07 -2.74E+06 5.11E+07
2 -2.21E+06 4.73E+06 4.21E+07 2.74E+06 4.91E+07
6 1 -2.21E+06 4.73E+06 4.21E+07 -2.74E+06 4.91E+07
2 -2.08E+06 2.91E+06 4.21E+07 2.74E+06 4.71E+07
7 1 -2.08E+06 2.91E+06 4.21E+07 -2.71E+06 4.71E+07
2 -1.98E+06 1.65E+06 2.43E+07 2.71E+06 2.81E+07
8 1 -1.98E+06 1.65E+06 2.43E+07 -2.71E+06 2.81E+07
2 -1.88E+06 4.37E+05 6.53E+06 2.71E+06 9.26E+06
Jib Arm 9 1 0 0.015842 -0.041189 0 0.057032
2 0 -6.92E+06 2.04E+07 0 2.73E+07
10 1 0 -6.92E+06 2.04E+07 0 2.73E+07
2 0 -1.46E+07 4.11E+07 0 5.57E+07
11 1 0 -1.46E+07 4.11E+07 0 5.57E+07
2 0 -2.32E+07 6.22E+07 0 8.54E+07
12 1 0 -2.32E+07 6.22E+07 0 8.54E+07
2 0 -3.25E+07 8.37E+07 0 1.16E+08
13 1 0.073194 -3.25E+07 8.37E+07 0.014331 1.16E+08
2 0.073194 -4.26E+07 1.06E+08 -0.014331 1.48E+08
14 1 1.37E+07 -4.26E+07 -2.01E+07 0 7.64E+07
2 1.37E+07 -5.23E+07 0 0 6.60E+07
ii) Jib Arm

Figure 15: Stress Distribution along Jib Arm at Case 2

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


14 5.54E+07 -5.78E-13 468 -459.23
13 1.04E+08 -5.78E-13 468 -1585.1
12 8.06E+07 -5.78E-13 468 -2756.1
11 5.87E+07 -5.78E-13 468 -3994.6
10 3.80E+07 -5.78E-13 468 -5098
9 1.84E+07 -5.78E-13 468 -6269
iii) Vertical Arm

Figure 16: Stress Distribution along Vertical Arm at Case 2

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


3 6.47E+07 -1.20E-13 -26.632 -1105
2 4.33E+07 -1.20E-13 -849.76 -1105
1 2.17E+07 -1.20E-13 -1911 -1105
iv) Column

Figure 17: Stress Distribution along Column at Case 2

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


8 1.95E+07 0 -155.23 -2.13E-12
7 3.28E+07 0 -1343.1 -2.27E-12
6 3.45E+07 0 -2592.8 -2.42E-12
5 3.62E+07 0 -4268.2 -2.63E-12
4 3.80E+07 0 -6062.2 -2.85E-12
6.3.2 Deflection Analysis

Figure 18: Deflection along Jib Arm at Case 2

Node Value (mm) X (mm) Y (mm) Z (mm)


19 -6.84E-02 -5.78E-13 468 0
18 -2.54E+00 -5.78E-13 468 -1105
17 -5.92E+00 -5.78E-13 468 -2384
16 -1.03E+01 -5.78E-13 468 -3663
15 -1.54E+01 -5.78E-13 468 -4942
14 -2.10E+01 -5.78E-13 468 -6221
13 -2.68E+01 -5.78E-13 468 -7500
6.4 Case 3
6.4.1 Stress Analysis
i) Overall

Figure 19: Maximum and Minimum Stress of Jib Crane at Case 3

Beam Name Element End Axial Shear1 Shear2 Moment1 Moment2 Torque
Vertical Arm 1 1 0 1.49E+05 -1341.5 53.303 0 0
2 2352.8 -1.49E+05 587.76 765.33 1.26E+05 0
2 1 -2352.8 1.49E+05 -587.76 -765.33 -1.26E+05 3.16E-05
2 4705.5 -1.49E+05 -165.93 944.32 2.53E+05 -3.16E-05
3 1 -4705.5 1.49E+05 165.93 -944.32 -2.53E+05 0.0004176
2 7058.3 -1.49E+05 -919.62 483.69 3.79E+05 -0.0004176
Column 4 1 1.12E+05 0.0001218 23889 -1.69E+05 4.49E+05 -1.03E+05
2 -1.01E+05 -0.0001218 -22791 1.29E+05 -4.49E+05 1.03E+05
5 1 1.01E+05 0 22791 -1.29E+05 4.49E+05 -1.03E+05
2 -89786 0 -21692 91160 -4.49E+05 1.03E+05
6 1 89786 -0.00012299 21692 -91160 4.49E+05 -1.03E+05
2 -78462 0.00012299 -20593 55119 -4.49E+05 1.03E+05
7 1 78462 1.49E+05 19252 -55081 4.49E+05 -1.02E+05
2 -70007 -1.49E+05 -18431 31096 -2.59E+05 1.02E+05
8 1 70007 1.49E+05 18431 -31096 2.59E+05 -1.02E+05
2 -61551 -1.49E+05 -17611 8154.9 -69676 1.02E+05
Jib Arm 9 1 0 -33700 3370 0 -5.69E-05 0
2 0 36342 -5062.8 -5357.8 -44502 0
10 1 0 -36342 5062.8 5357.8 44502 0
2 0 38985 -6755.5 -12867 -92362 0
11 1 0 -38985 6755.5 12867 92362 0
2 0 41627 -8448.3 -22527 -1.44E+05 0
12 1 0 -41627 8448.3 22527 1.44E+05 0
2 0 44269 -10141 -34337 -1.98E+05 0
13 1 0 -44269 10141 34337 1.98E+05 0
2 0 46911 -11834 -48299 -2.56E+05 0
14 1 0 -46911 11834 48299 2.56E+05 0
2 0 49553 -13527 -64412 -3.17E+05 0
15 1 -0.00096001 -49553 13527 64412 3.17E+05 5.00E-05
2 0.00096001 52195 -15219 -82676 -3.82E+05 -5.00E-05
16 1 -1.49E+05 -59253 16139 82720 -66744 0
2 1.49E+05 61551 -17611 -1.01E+05 0 0

Beam Name Element End Axial Bending Dir1 Bending Dir2 Torsional Worst Case
Vertical Arm 1 1 0 -14720 0 0 14720
2 65355 2.11E+05 -1.26E+07 0 1.29E+07
2 1 65355 2.11E+05 -1.26E+07 0.002619 1.29E+07
2 1.31E+05 2.61E+05 -2.52E+07 -0.002619 2.56E+07
3 1 1.31E+05 2.61E+05 -2.52E+07 0.034604 2.56E+07
2 1.96E+05 1.34E+05 -3.78E+07 -0.034604 3.81E+07
Column 4 1 -1.30E+06 6.38E+06 1.70E+07 -1.95E+06 2.47E+07
2 -1.17E+06 4.88E+06 1.70E+07 1.95E+06 2.31E+07
5 1 -1.17E+06 4.88E+06 1.70E+07 -1.95E+06 2.31E+07
2 -1.04E+06 3.45E+06 1.70E+07 1.95E+06 2.15E+07
6 1 -1.04E+06 3.45E+06 1.70E+07 -1.95E+06 2.15E+07
2 -9.10E+05 2.08E+06 1.70E+07 1.95E+06 2.01E+07
7 1 -9.10E+05 2.08E+06 1.70E+07 -1.92E+06 2.00E+07
2 -8.12E+05 1.18E+06 9.80E+06 1.92E+06 1.19E+07
8 1 -8.12E+05 1.18E+06 9.80E+06 -1.92E+06 1.19E+07
2 -7.14E+05 3.08E+05 2.63E+06 1.92E+06 4.13E+06
Jib Arm 9 1 2.11E-05 0.0019944 -0.0064234 0 0.0084389
2 2.11E-05 -1.96E+06 5.03E+06 0 6.99E+06
10 1 -2.11E-05 -1.96E+06 5.03E+06 0 6.99E+06
2 -2.11E-05 -4.70E+06 1.04E+07 0 1.51E+07
11 1 2.07E-05 -4.70E+06 1.04E+07 0 1.51E+07
2 2.07E-05 -8.23E+06 1.62E+07 0 2.45E+07
12 1 0 -8.23E+06 1.62E+07 0 2.45E+07
2 0 -1.26E+07 2.24E+07 0 3.49E+07
13 1 0 -1.26E+07 2.24E+07 0 3.49E+07
2 0 -1.77E+07 2.89E+07 0 4.66E+07
14 1 0 -1.77E+07 2.89E+07 0 4.66E+07
2 0 -2.35E+07 3.59E+07 0 5.94E+07
15 1 0.035556 -2.35E+07 3.59E+07 0.004913 5.94E+07
2 0.035556 -3.02E+07 4.32E+07 -0.004913 7.34E+07
16 1 5.51E+06 -3.02E+07 -7.54E+06 0 4.33E+07
2 5.51E+06 -3.71E+07 0 0 4.26E+07
ii) Jib Arm

Figure 20: Stress Distribution along Jib Arm at Case 3

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


16 4.33E+07 -5.78E-13 468 -89.218
15 7.34E+07 -5.78E-13 468 -1361
14 5.94E+07 -5.78E-13 468 -2580.9
13 4.66E+07 -5.78E-13 468 -3748.8
12 3.49E+07 -5.78E-13 468 -4994.6
11 2.45E+07 -5.78E-13 468 -6266.4
10 1.51E+07 -5.78E-13 468 -7616.1
9 6.99E+06 -5.78E-13 468 -9121.4
iii) Vertical Arm

Figure 21: Stress Distribution along Vertical Arm at Case 3

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


3 3.81E+07 -1.20E-13 -145.24 -1105
2 2.56E+07 -1.20E-13 -918.93 -1105
1 1.29E+07 -1.20E-13 -1827.5 -1105
iV) Column

Figure 22: Stress Distribution along Column at Case 3

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


8 1.18E+07 0 -353.32 -2.15E-12
7 2.00E+07 0 -1428.5 -2.28E-12
6 2.15E+07 0 -2621.2 -2.43E-12
5 2.30E+07 0 -4304.3 -2.63E-12
4 2.47E+07 0 -6058.6 -2.85E-12
6.4.2 Deflection Analysis

Figure 23: Deflection along Jib Arm at Case 3

Node Value (mm) X (mm) Y (mm) Z (mm)


21 -4.18E-02 -5.78E-13 468 0
20 -1.50E+00 -5.78E-13 468 -1105
19 -3.48E+00 -5.78E-13 468 -2375.7
18 -6.08E+00 -5.78E-13 468 -3646.4
17 -9.18E+00 -5.78E-13 468 -4917.1
16 -1.27E+01 -5.78E-13 468 -6187.9
15 -1.64E+01 -5.78E-13 468 -7458.6
14 -2.04E+01 -5.78E-13 468 -8729.3
13 -2.44E+01 -5.78E-13 468 -10000
6.5 Case 4
6.5.1 Stress Analysis
i) Overall

Figure 24: Maximum and Minimum Stress of Jib Crane at Case 4

Beam Name Element End Axial Shear1 Shear2 Moment1 Moment2 Torque
Vertical Arm 1 1 0 2.05E+05 -1341.5 53.303 0 0
2 2352.8 -2.05E+05 587.76 765.33 1.74E+05 0
2 1 -2352.8 2.05E+05 -587.76 -765.33 -1.74E+05 4.04E-05
2 4705.5 -2.05E+05 -165.93 944.32 3.48E+05 -4.04E-05
3 1 -4705.5 2.05E+05 165.93 -944.32 -3.48E+05 0.00057195
2 7058.3 -2.05E+05 -919.62 483.69 5.21E+05 -0.00057195
Column 4 1 1.29E+05 0.00014315 25575 -1.83E+05 6.17E+05 -1.20E+05
2 -1.18E+05 -0.00014315 -24476 1.40E+05 -6.17E+05 1.20E+05
5 1 1.18E+05 0 24476 -1.40E+05 6.17E+05 -1.20E+05
2 -1.07E+05 0 -23377 99113 -6.17E+05 1.20E+05
6 1 1.07E+05 -0.00014458 23377 -99113 6.17E+05 -1.20E+05
2 -95313 0.00014458 -22279 60199 -6.17E+05 1.20E+05
7 1 95313 2.05E+05 20937 -60161 6.17E+05 -1.18E+05
2 -86857 -2.05E+05 -20117 34030 -3.57E+05 1.18E+05
8 1 86857 2.05E+05 20117 -34030 3.57E+05 -1.18E+05
2 -78401 -2.05E+05 -19296 8943.7 -95840 1.18E+05
Jib Arm 9 1 0 -50550 5055.4 -1.44E-05 -0.00013055 0
2 0 53193 -6748.2 -7499.5 -65914 0
10 1 0 -53193 6748.2 7499.5 65914 0
2 0 55835 -8440.9 -17150 -1.35E+05 0
11 1 0 -55835 8440.9 17150 1.35E+05 0
2 0 58477 -10134 -28951 -2.08E+05 0
12 1 0 -58477 10134 28951 2.08E+05 0
2 0 61119 -11826 -42904 -2.84E+05 0
13 1 0 -61119 11826 42904 2.84E+05 0
2 0 63761 -13519 -59008 -3.63E+05 0
14 1 0 -63761 13519 59008 3.63E+05 0
2 0 66403 -15212 -77262 -4.46E+05 0
15 1 -0.0012975 -66403 15212 77262 4.46E+05 7.42E-05
2 0.0012975 69045 -16905 -97668 -5.32E+05 -7.42E-05
16 1 -2.05E+05 -76103 17824 97711 -85364 0
2 2.05E+05 78401 -19296 -1.18E+05 0 0

Beam Name Element End Axial Bending Dir1 Bending Dir2 Torsional Worst Case
Vertical Arm 1 1 0 -14720 0 0 14720
2 65355 2.11E+05 -1.73E+07 0 1.76E+07
2 1 65355 2.11E+05 -1.73E+07 0.0033465 1.76E+07
2 1.31E+05 2.61E+05 -3.47E+07 -0.0033465 3.50E+07
3 1 1.31E+05 2.61E+05 -3.47E+07 0.047393 3.50E+07
2 1.96E+05 1.34E+05 -5.20E+07 -0.047393 5.23E+07
Column 4 1 -1.50E+06 6.90E+06 2.33E+07 -2.27E+06 3.18E+07
2 -1.37E+06 5.29E+06 2.33E+07 2.27E+06 3.01E+07
5 1 -1.37E+06 5.29E+06 2.33E+07 -2.27E+06 3.01E+07
2 -1.24E+06 3.75E+06 2.33E+07 2.27E+06 2.84E+07
6 1 -1.24E+06 3.75E+06 2.33E+07 -2.27E+06 2.84E+07
2 -1.11E+06 2.28E+06 2.33E+07 2.27E+06 2.68E+07
7 1 -1.11E+06 2.27E+06 2.33E+07 -2.24E+06 2.68E+07
2 -1.01E+06 1.29E+06 1.35E+07 2.24E+06 1.59E+07
8 1 -1.01E+06 1.29E+06 1.35E+07 -2.24E+06 1.59E+07
2 -9.09E+05 3.38E+05 3.62E+06 2.24E+06 5.36E+06
Jib Arm 9 1 2.59E-05 0.0052531 -0.014749 0 0.020028
2 2.59E-05 -2.74E+06 7.45E+06 0 1.02E+07
10 1 -2.62E-05 -2.74E+06 7.45E+06 0 1.02E+07
2 -2.62E-05 -6.27E+06 1.53E+07 0 2.15E+07
11 1 2.57E-05 -6.27E+06 1.53E+07 0 2.15E+07
2 2.57E-05 -1.06E+07 2.35E+07 0 3.41E+07
12 1 -1.12E-05 -1.06E+07 2.35E+07 0 3.41E+07
2 -1.12E-05 -1.57E+07 3.21E+07 0 4.77E+07
13 1 1.12E-05 -1.57E+07 3.21E+07 0 4.77E+07
2 1.12E-05 -2.16E+07 4.10E+07 0 6.26E+07
14 1 -1.17E-05 -2.16E+07 4.10E+07 0 6.26E+07
2 -1.17E-05 -2.82E+07 5.04E+07 0 7.86E+07
15 1 0.048054 -2.82E+07 5.04E+07 0.0073019 7.86E+07
2 0.048054 -3.57E+07 6.01E+07 -0.0073019 9.58E+07
16 1 7.58E+06 -3.57E+07 -9.64E+06 0 5.29E+07
2 7.58E+06 -4.32E+07 0 0 5.08E+07
ii) Jib Arm

Figure 25: Stress Distribution along Jib Arm at Case 4

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


16 5.29E+07 -5.78E-13 468 -115.17
15 9.58E+07 -5.78E-13 468 -1335
14 7.86E+07 -5.78E-13 468 -2580.9
13 6.26E+07 -5.78E-13 468 -3774.8
12 4.77E+07 -5.78E-13 468 -4942.7
11 3.41E+07 -5.78E-13 468 -6370.2
10 2.15E+07 -5.78E-13 468 -7616.1
9 1.02E+07 -5.78E-13 468 -9069.5
iii) Vertical Arm

Figure 26: Stress Distribution along Vertical Arm at Case 4

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


3 5.23E+07 -1.20E-13 -90.787 -1105
2 3.50E+07 -1.20E-13 -1096.2 -1105
1 1.76E+07 -1.20E-13 -1770.5 -1105
iv) Column

Figure 27: Stress Distribution along Column at Case 4

Element Value (N/m^2) X (mm) Y (mm) Z (mm)


8 1.58E+07 0 -122.73 -2.12E-12
7 2.67E+07 0 -1428.5 -2.28E-12
6 2.83E+07 0 -2595.4 -2.42E-12
5 3.00E+07 0 -4280.8 -2.63E-12
4 3.17E+07 0 -6034.4 -2.84E-12
6.5.2 Deflection Analysis

Figure 28: Deflection along Jib Arm at Case 4

Node Value (mm) X (mm) Y (mm) Z (mm)


21 -5.01E-02 -5.78E-13 468 0
20 -2.05E+00 -5.78E-13 468 -1105
19 -4.78E+00 -5.78E-13 468 -2375.7
18 -8.39E+00 -5.78E-13 468 -3646.4
17 -1.27E+01 -5.78E-13 468 -4917.1
16 -1.76E+01 -5.78E-13 468 -6187.9
15 -2.28E+01 -5.78E-13 468 -7458.6
14 -2.84E+01 -5.78E-13 468 -8729.3
13 -3.40E+01 -5.78E-13 468 -10000
7 Conclusions

Case 1
Maximum Stress = 103700000 N/m2
Maximum Deflection = 26.82 mm

Allowable Stress = 0.59 x 250000000 N/m2


= 147500000 N/m2 (according to BS 2573 : Part 1)
Allowable Deflection = 7500/250
= 30 mm (according to BS 7333 : 1990)

The maximum stress and deflection is within the allowable value. Hence, the Jib Crane size is adequate to support 4.5ton load
at 7.5m outreach without fail.

Case 2
Maximum Stress = 148200000 N/m2

The maximum stress is lower than the yield strength. Hence, the jib crane is remain safe lifting 150% designated load.

Case 3
Maximum Stress = 73380000 N/m2
Maximum Deflection = 24.43 mm

Allowable Stress = 0.59 x 250000000 N/m2


= 147500000 N/m2 (according to BS 2573 : Part 1)
Allowable Deflection = 7500/250
= 30 mm (according to BS 7333 : 1990)

The maximum stress and deflection is within the allowable value. Hence, the Jib Crane size is adequate to support 3ton load
at 10m outreach without fail.

Case 4
Maximum Stress = 95790000 N/m2

The maximum stress is lower than the yield strength. Hence, the jib crane is remain safe lifting 150% designated load.