Turf Image Inc.-Geotechnical Engineering Materials & Testing
Turf Image Inc.-Geotechnical Engineering Materials & Testing
CITYOFCARMELBYTHESEA,CALIFORNIA
SUBMITTED TO:
CityofCarmel
PublicWorksDepartment
Attn:RobertM.Harary,P.E.,DirectorofPublicWorks
Junipero2SEof4thAvenue,Carmel,CA93921
September29th,2017
MANAGING OFFICE
Patterson Building Suite 8
On 6th Street Between Lincoln & Dolores
Carmel-by-the-Sea, California 93921
BILLING ADDRESS
177 Webster Street, Suite 368
Monterey, CA 93940
TELEPHONE NUMBER
(831) 521-5088
FAX NUMBER
(831) 309-9994
WEBSITE
TurfImage.com
TEAM
Geographic Information Systems (GIS)
Global Positioning Systems (GPS)
ArcGIS Server and Online Management
Geospatial Mapping and Cartography
September29th,2017
CityofCarmelbytheSea
PublicWorksDepartment
Attn:RobertM.Harary,P.E.,DirectorofPublicWorks
Junipero2SEof4thAvenue,Carmel,CA93921
RE:QualificationsforaGeographicInformationSystems(GIS)
DearMr.RobertM.Harary
TurfImageGeospatialispleasedtoprovidetheCityofCarmelbytheSea,PublicWorksDepartment
with our qualifications for Geographic Information Systems (GIS). Our Company has previously
workedwiththeCityofCarmelbytheSeaandhavebeencontractedbyotheragenciestodowork
fortheCityofCarmelbytheSeaincludingtheMissionTrailsBrochure,CaliforniaAmericanWater,
andtheCarmelAreaWastewaterDepartment.
Our company is located in CarmelbytheSea down the street from the Public Works Office. We
wouldliketosubmitourqualificationsforServicesArea9GISandAssetManagement.Anyandall
workperformedbyourcompanywillbeconductedatourofficeon6thstreetbetweenLincolnand
Dolores.
Sincerely,
JohnJ.Schweisinger
PresidentofTurfImageGeospatial
AboutTurfImage
ThevisionofTurfImageistoprovidegeospatialconsultingforourclientsusingGeographicInformation
Systems (GIS) and Global Positioning Systems (GPS). Our mission is to provide support for geospatial
projectdevelopment.ThegoalofTurfImageistolowerthecostofyourgeospatialprojects.
1|Page
REQUESTSFORQUALIFICATIONS
CITYOFCARMELBYTHESEA,CA
SOQ ORDER AND PAGE LIMITS
To keep SOQs limited to a maximum of 17 pages, each Service Area submittal must conform (order,
page limits, and contents) to the following:
Must identify the Service Area, the name of firm, and submittal date. The Cover is
not one of the 17 pages.
Provide a one (1) page cover letter identifying the Service Area and name of firm .
The letter must also include the following:
a. The location of the firm's office in closest proximity to the City of Carmel;
b. Whether or not a majority of the work will be performed locally (Monterey, San
Luis Obispo, Santa Cruz, or San Benito Counties).
c. The name of a local or regional office representative who is able to legally execute
agreements and amendments with the City of Carmel; and
d. A non-electronic signature executed in blue ink by a firm officer.
SOQOrder
FORMA General Firm Information: Limit one (1) page.
FORMC Resumes of Key Personnel: Limit one (1) page per each person, up to a
maximum of 6 people. Please include only personnel who would likely be
available and would directly work on the assigned project. Up to four (4) of
the 6 key people may be subconsultants.
FORME Key Personnel Participation in Example Projects : Limit one (1) page.
FORMF Applicable Specialized Equipment and Resources: Limit one (1) page.
9IPage
FORM A- GENERAL FIRM INFORMATION
1. Firm's Name:
Turf Image, Inc.
2. Firm's Local
Address: 177 Webster Street, Suite 368 Monterey, CA 93940
3. Is your local office the Head Office? DYes
X DNo Branch Office? D
X Yes D No
Only Office? D Yes DX No
4. Year your firm was established: _2002
_ _ _ _ _ _ __
7. list locations of no more than three (3) other offices where work may be performed (if
applicable):
Address Telephone Number # of Personnel
6th and Lincoln, Patterson Building #8
Carmel-by-the-Sea, CA 93940 (831) 521-5088 2
2,000,000
a) Amount your firm presently carries:$ _ Incident
_ _ _ _ _ _ per _ _ _ _ _ _ _ _ __
Hartford
b) Carrier's name and address: - - -------------------
10 I Page
FORM B- TENTATIVE PROJECT TEAM
SERVICE AREA (Select one Service Area from list in SOQ package):
Please identify your tentative, key Project Team members, their titles/roles and primary duties:
Please identify up to four (4) key subconsultants or vendors, contact persons, and services they
would provide in order to support your Project Team.
C. Organizational Chart
Please insert an Organizational Chart of your tentative Project Team on the next page.
11 I Page
FORM C- RESUMES OF KEY PERSONNEL
l.Name: ________________________________________________________________
John Schweisinger _
15_
3. Years of experience- Total: _ _ With current firm: 15
--------------------
Earth Systems Science GIS
4. Education (Degree and Specialization) --------------------------------------------
GISP
5. Current Registration/Certification (State & Discipline) -------------------------------
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
American Society for Photogrammerty and Remote Sensing
12 I Page
FORM C- RESUMES OF KEY PERSONNEL
l.Name: ________________________________________________________________
Michael Schweisinger _
15_
3. Years of experience- Total: _ _ With current firm: 15
--------------------
Electrical Engineering GIS
4. Education (Degree and Specialization) --------------------------------------------
GISP
5. Current Registration/Certification (State & Discipline) -------------------------------
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
Land Survey in Training
Water Certification Class
GIS Mapping California American Water
7. Relevant Project- Title & Location (City & State):-----------------------------------
2015
- Year Completed - Professional Services: -------------------------------------------
-Year Completed- Construction (if applicable):-------------------------------------
- Brief Description (Scope, size, cost, etc.) and Specific Role:-----------------------------
GIS and GPS Mapping of Water Utilities for systems across the
State of California
12 I Page
FORM C- RESUMES OF KEY PERSONNEL
l.Name: ________________________________________________________________
Alexis Schweisinger _
12 I Page
FORM D- EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRM'S QUALIFICATIONS
California
-Project O w n er:--- American
- - - - -Water
--------------------
13IPage
FORM E- KEY PERSONNEL PARTICIPATION
IN EXAMPLE PROJECTS
Example Projects from FORM D
(Fill in "Example Projects Key"
section shown below before
No. Key Personnel From Role completing this table. Then,
FORMC place "X" under project key
numbers below for key
personnel's participation in
Example Projects.
1 2 3 4
1.
John Schweisinger GIS and GPS Field X
2.
Michael Schwheisnger GIS and GPS FIeld X
3.
Alexis Schweisinger Database
X
4.
s.
6.
7.
8.
9.
10.
2. 4.
14 I Page
FORM F- APPLICABLE SPECIALIZED EQUIPMENT AND RESOURCES
List specialized and/or unique equipment, vehicles, software, or other resources your firm possesses
that is advantageous or necessary to perform this service and which your firm is willing to commit
locally. Equipment may include, but is not limited to: heavy equipment, special purpose or specially-
equipped vehicles, equipment, specialized computer programs, reference manuals/codes, laboratory
testing equipment, audio visual equipment, tools, supplies, or other relevant resources.
ESRI ArcGIS
15 I Page
FORM G- HOURLY RATE SHEET
Please initial here to acknowledge that markups for subconsultants and other direct costs shall not
exceed 10.0% JS
16 I Page
FORM H- ADDITIONAL INFORMATION
Provide any additional information that would further clarify your interest, expertise, similar
experience, and/or capabilities relevant to this Service Area.
Signature of Authorized R e p r e s e n t a t i v e : - - - - - - - - - - - - - - - - - - - -
Printed N a m e : - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Title of S i g n e r : - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Date S i g n e d : - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17 I Page