Rana Creek Design-Landscape Architecture & Arboricultural Services - Redacted

Download as pdf or txt
Download as pdf or txt
You are on page 1of 17

REQUEST FOR QUALIFICATIONS

CITY OF CARMEL BY THE SEA STATEMENT OF QUALIFICATION

Landscape Architecture & Arboricultural Services

SUBMITIED TO:

Robert M. Harary, P.E.


Director of Public Works
City of Carmel

rana creek

ASSESS DESIGN GROW MONITOR

September 29th, 2017


rana creek

MANAGING OFFICE
Rana Creek
27875 Berwick Drive
Carmel, California 93923

BILLING ADDRESS
Rana Creek
27875 Berwick Drive
Carmel, California 93923

TELEPHONE NUMBER
(831 ) 659-3820

FAX NUMBER
(831) 646-2106

WEBSITE
RanaCreekDesign.com
L%!5 BeMD<OM-
Canne1, CA 939Z3
PH 831.659.3820
FX 831.646.2106
~

September 29th, 2017

City of Carmel
Public Works Department
ATTENTION Robert M. Harary, P.E
Director of Public Works
Junipero 2 SE of 4th Avenue
Carmel, CA 93921

RE: Qualifications for a Carmel by the Sea

Dear Mr. Robert M. Harary,

Rana Creek Design & Habitat Restoration is pleased to provide the City of Carmel by the Sea
with our qualifications for landscape architecture and arboricultural services and
environmental services. Our company has previously worked with the City of Carmel by the
Sea and the majority of the work will be performed locally.
As a local firm, we are pleased to provide our Statement of Qualifications with hope to be
chosen to provide a more comprehensive proposal for upcoming projects in the term
October 2017-2019.
Feel free to contact me at (831) 659-3820 x 111 or [email protected] if you have
any questions.

Sincerely,

Paul Kephart
Rana Creek Design & Habitat Restoration
FORM F- APPLICABLE SPECIALIZED EQUIPMENT AND RESOURCES
list specialized and/or unique equipment, vehicles, software, or other resources your firm possesses
that Is advantageous or necessary to perform this service and which your firm Is willing to commit
locally. Equipment may include, but is not limited to: heavy equipment, special purpose or specially~
equipped vehicles, equipment, specialized computer programs, reference manuals/codes, laboratory
testing equipment, audio visual equipment, tools, supplies, or other relevant resources.

1. Applicable Spedalfzed Equipment

2. Applicable Specfaltzed Software Programs

AutoCAD; 3D lllustrator; Revit- InDesb~;n; Photoshop

3. Applicable Reference Manuals, Codes, Data, etc.

4. Other Applicable Resources

15 I Page
FORM A- GENERAL FIRM INFORMATION

1. Firm's Name:
Rana Creek Design
2. Firm's Local
Address :
27578 Berwick Dr. Carmel, CA 93923
3. Is your local office the Head Office? lllYes DNo Branch Office? D Yes [lJ No
Only Office? D Yes ll1 No
4. Year your firm was established: ~19::...::9:....::6:.....__ _ __ _ _

5 . Year your local office was established: _2_0_0_7_ _ __

6 Primary contacts (Principals) in the local office


Name Title Telephone E-Mail Address
Number

Paul Kephart CEO/Owner 831-659-3820 x111 paul @ranacreekdesign .com


Marta Kephart VP/COO 831-659-3820 tnarta@ranacreekdesign .com

7. List locations of no more than three (3) other offices where work may be performed (if
applicable) :
Address Telephone Number # of Personnel

8. Total employees presently employed:

a) In your local office _ __ b) In your firm_ __

9. Errors and Omissions Insurance

a) Amount your firm presently carries: $_ _ _ _ __ _ per _ _ _ _ _ __ _ __

b) Carrier's name and address: - - - - - - - - - - - - - - - - - - -- -

10 I Page
FORM A- GENERAL FIRM INFORMATION

1. Fkm's Name:
Rana Creek Design
2. Firm's Local
Address:
27578 Berwick Dr. Carmel, CA 93923
3. Is your local office the Head Office? lllYes DNo Branch Office? D Yes ILl No
Only Office? D Yes Ill No
4. Year your firm was established: -'1:..::9~9...;::;6_ _ _ _ _ __

5. Year your local office was established: -=2=0-=-07=--------

6 Primary contacts (Principals) in the local office


Name Title Telephone E-Mail Address
Number

Paul Kephart CEO/Owner 831-659-3820 xlll paul @ranacreekdesign.com


Marta Kephart VP/COO 831-659-3820 ~n.arta@ranacreekdesign .com

7. List locations of no more than three (3) other offices where work may be performed {if
applicable):
Address Telephone Number # of Personnel

8 . Total employees presently employed:

a) In your local office 34 b) In your firm_.3....,4_ _

9. Errors and Omissions Insurance

a) Amount your firm presently carries:$ 1,000,000 per claim

b) Carrier's name and address: HISCOX Pro (Lloyds of London)% Andrieni and Company 220 West 20th
Ave. San Mateo, CA 94403-1383

10 I Page
FORM 8-TENTATIVE PROJECT TEAM
SERVICE AREA (Select one Service Area from list In SOQ package): Landscape Architecture and Aboricultural
Services
A. Consultant's Key Personnel

Please identify your tentative, key Project Team members, their titles/roles and primary duties:

Name Title/Role Primary Duties

Paul Kephart CEO Biologist

MattYurus Principal Landscape Architect Landscape Architecture

Blake Jopling Landscape Architect Landscape Architecture


Environmental Planning
John Wandke Project Manager Biologist

B. Subconsultant and Support Services

Please identify up to four (4) key subconsultants or vendors, contact persons, and services they
would provide in order to support your Project Team.

Firm Name & location Contact Person Support Services

c. Organizational Chart
Please insert an Organizational Chart of your tentative Project Team on the next page.

111Page
FORM C- RESUMES OF KEY PERSONNEL

1. Name: Paul Kephart

2 . Role in this Service Area: ..:B:.:io.:.:l::;o~gi::.st=--------------------------

3. Years of experience- Total: ~30:::..+:___ With current firm: ..:2::;0+.:.__ _ _ _ _ _ __

4. Education (Degree and S p e c i a l i z a t i o n ) - - - - - - - - - - - - - - - - - - - - - -

5. Current Registration/Certification (State & Discipline) _P_rin_c_i"""pal_Ec_o_l...:og~i_st_ _ _ _ _ _ _ _ _ __

6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)


Green Roofs for Healthy Cities Award of Excellence: Extensive Residential, McGlashan Residence, 2010
National ASLA Honor Award, Nueva School, 2010. Trame<! and expenenced m hvmg systems from green mfiastructure,
green roofs, living walls, breathing fences, bioswales, and stormwater management.
7. Relevant Project- Title & location (City & State): Slide Ranch-Golden Gate National Park Rec. Area. Marin, CA
-Year Completed- Professional Services: _20_1....;5_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Year Completed- Construction (if applicable): _N_I_A_ _ _ _ __ _ _ _ _ _ _ _ _ _ _ __
-Brief Description (Scope, size, cost, etc.) and Specific Role: Land-use decisions based on Joss of wetlands,
accessibility, site circulation, parking, views, on-site wastewater treatment, greywater, rainwater capture and reuse,
renewable energy systems, circular waste streams, best husbandry practices, historic structures, recreational amenities,
demonstration garden landscapes and educational and interpretive elements.
- Performed Relevant Project with Current Firm: Yes 0 No 0

8. Relevant Project- Title & location (City & State): Lower Stillwell Waterwise Retrofit Design Ft. Ord, CA
-Year Completed- Professional Services: _2::.0;;..1::..4~.,...,-------------------
- Year Completed- Construction (if applicable): _N_/_A_ ________________
- Brief Description (Scope, size, cost, etc.) and Specific Role: Planning& design of a large-scale integrated water
management system - the first commercial graywater system of this size in California. Designed the graywater reuse
system, saving thousands of gallons of potable water from being discharged into the sewer annually. This serves as a model
for future deveiopments that strive to conserve natural resources and reduce impacts on the Salinas Valley Watershed.
- Performed Relevant Project with Current Firm: Yes lLl No 0

9. Relevant Project- Title & location (City & State): Learning Center Landscape Monterey, CA
-Year Completed- Professional Services: --'2=.:0'""1~5:.....__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Year Completed- Construction (if applicable): _.;;..N;.;../;;..:A'-----------------
- Brief Description (Scope, size, cost, etc.) and Specific Role: Landscapes were designed to serve the education
mission of the Aquarium. The site's proximity to the Monterey Bay National Marine Sanctuary provided an opportunity to
introduce a series of interpretive, themed bioretention gardens, coastal ecology, sensitive intertidal organisms affected by
runoff, benefcial pollinators, and native, drought tolerant plants. Design also includes intensive, educational living roof.
- Performed Relevant Project with Current Firm: Yes lLl No 0

12 I Page
FORM C- RESUMES OF KEY PERSONNEL

1. Name : Matt Yurus


2. Role in this Service Area: _L_an_ds_c~ap._e_Ar_c_hi...;...te...;..c_t_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

3. Years of experience- Total: __


18_ _ With current firm: _ _5_ _ _ _ _ _ __

4. Education (Degree and Specialization) BS Landscape Architecture BS Fermentation Science

5. Current Registration/Certification (State & Discipline) Licensed California Landscape Architect #4355

6. other Professional Qualifications {Publications, Organizations, Training, Awards, etc.)


Member American Society of Landscape Architects

7 . Relevant Project- Title & Location (City & State): Salesforce Executive Briefing Center: Interior Garden. San Francisco, CA
-Year Completed- Professional Services: ...:;2...;.0..;..17_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Year Completed- Construction (if applicable): ..:2..;..0..;_17_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
- Brief Description (Scope, size, cost, etc.) and Specific Role: Interior green of the executive brief floor- design
and production of construction . Drawing of columns & planter area.
Approximately 1,200 sq. ft.

- Performed Relevant Project with Current Firm: Yes Ill NoD

8. Relevant Project- Title & Location (City & State): JNBY Headquarters. Hangzhou, China
- Year Completed- Professional Services: _o_n:::.go_in...;..g~-------------------
- Year Completed - Construction (if applicable): ..:2:..:.
0:..:
19_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Brief Description (Scope, size, cost, etc.) and Specific Role: Design coordination of? acres of green trees on
project roofs. Design and coordination of approx. 400 trees within 3 acre corporate plaza of lawn and garden area

- Performed Relevant Project with Current Firm: Yes (iJ NoD

9. Relevant Project - Title & Location (City & State): 333 Brannan St. San Francisco, CA
-Year Completed - Professional Services: . .;;2;.. ;;0..;;.1..;;..
6 _ _ _ __ _ __ _ _ _ _ _ _ _ _ _ _ __
-Year Completed -Construction (if applicable): _2_0_16_ __ _ _ __ _ _ _ _ _ _ _ _ _ __
-Brief Description (Scope, size, cost, etc.) and Specific Role: Design and construction drawing oflow street
scape, corporate courtyard and intensive living roof with outdoor meeting areas. $139,000

- Performed Relevant Project with Current Firm: Yes Ill NoD

12 I Page
FORM C- RESUMES OF KEY PERSONNEL

1. Name: Blake Jopling

2. Role in this Service Area : Landscape Architect


------------------------------------------------------
3. Years of experience- Total: _1_1_____ With current firm: ...::9_ _ _ _ _ _ __ __ _

4. Education (Degree and Specialization) _B_S_L_a_n_d_sc_a_p_e_ru_c_h_it_ec_t_ure


__________________________

5. Current Registration/Certification {State & Discipline) _c_AJL


__an_d_sc_a.::..pe_AI_c_h_itec_t- - - - - - - - -
6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
ASLA; Presenter at2015 & 2016ASLANational Conference

7. Relevant Project- Title & location (City & State): 333 Brannan Street. San Francisco, CA
- Year Completed- Professional Services: _2_0_1_4_________________________________
-Year Completed - Construction (if applicable): ..:2:..:.0.::..16=-------------------
- Brief Description (Scope, size, cost, etc.) and Specific Role:--,----,-----------------------
Landscape architect for all phases of project- commercial office building, including Green Roof, roof deck amenities,
sunken garden/terrace, multi-level plaza/entry courtyard, streetscape design, preliminary water re-use and graywater
and stormwater calculations.
- Performed Relevant Project with Current Firm: Yes lZJ No 0

8. Relevant Project- Title & location (City & State): 8800 Sunset Blvd. West Hollywood, CA
- Year Completed -Professional Services: _2_0_13______________________________________
-Year Completed - Construction (if applicable): -=20:.:.:1:.:5_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
-Brief Description (Scope, size, cost, etc.) and Specific Role: Planting design, irrigation design, water re-use system
design for large scale, complex, undulating living wall mounted on an existing 6 story bid.

-Performed Relevant Project with Current Firm: Yes IZI NoD

9. Relevant Project- Title & location (City & State): San Clemente Dam Removal. Carmel Valley ,CA
- Year Completed- Professional Services: ""2::.:0:.:1..::.5___________________________________
-Year Completed- Construction (if applicable): ..:.2:..:.0.::..17.:...__ _ _ _ _ _ _ _ _ _ __ __ _ __
- Brief Description (Scope, size, cost, etc.) and Specific Role: Preparation of planting, irrigation, soil preparation plans
for 60 acre restoration of the San Clemente Dam site - the largest dam removal in CA history. Rana Creek was also
responsible for the installation of planting and irrigation +5 years of ongoing maintenance.

-Performed Relevant Project with Current Firm: Yes 1!1 NoD

12 I Page
FORM C- RESUMES OF KEY PERSONNEL

1. Name: John Wandke

2. Role in this Service Area: _ _B_i_o_lo~g-is_t- - - - - - - - - - - - - - - - - - - - - -

3. Years of experience- Total: __::.16.:;..___ With current firm: 9


--------------
4. Education (Degree and Specialization) _B_A_G_eo_1_o.::::gy:___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

5. Current Registration/Certification (State & Discipline) - - - - - - - - - - - - - - - -


6. Other Professional Qualifications (Publications, Organizations, Training, Awards, etc.)
Scientific Collecting Permit #SC-10346; California Department of Pesticide Regulation QAC #125416
OSHA HAZWOPER 40-hi certificate

7. Relevant Project- Title & location (City & State): Great Tidepool Restoration & Enhancement
-Year Completed - Professional Services: _2_0_1_4-...;p::....r_e_se_n_t- - - - - - - - - - - - - - - - - - - - -
-Year Completed- Construction (if applicable): _N_IA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
- Brief Description (Scope, size, cost, etc.) and Specific Role: Project ecologist/manager. Coastal development
permitting, biological assessment, dune habitat restoration, interpretive signage, coastal trail and public access

- Performed Relevant Project with Current Firm: Yesi!J NoD

8. Relevant Project- Title & location (City & State): San Clemente Dam Removal & Carmel River Reroute Project
- Year Completed - Professional Services: _2_0_13_-..:..p_re_se_n_t______________________
- Year Completed- Construction (if applicable): _.:..;Ju:.:n:..:.e-=2-=-01:...:6:....__ _ _ _ _ _ _ _ _ _ _ _ _ __
- Brief Description (Scope, size, cost, etc.) and Specific Role: Project ecologist/manager. Habitat restoration design
and implementation at 60 acre site after removal of San Clemente Dam. 5 year establishment, maintenance, monitoring
and compliance reporting
$2,400,000
- Performed Relevant Project with Current Firm: Yes Iii NoD

9. Relevant Project- Title & location (City & State): A.R Wilson Quany Reclamation
- Year Completed- Professional Services: _1_9_98_-~p:-::re.,..,se,_n_t_____________________
- Year Completed- Construction (if applicable): _N_IA _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ __
- Brief Description (Scope, size, cost, etc.) and Specific Role: Erosion control compliance monitory and reporting,
revegetation and irrigation system design, revegetation performance and compliance monitoring.

- Performed Relevant Project with Current Firm: Yes Ill NoD

12 I Page
FORM D- EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRM'S QUALIFICATIONS

Project Key Number (1 to 4): 11ll 20 30 40 (Match the bottom of Form E)

1. Title of Example Project: _B_r_an_n_an_S_t_.Wh_arf


_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

2. Project location (City and State): _s_an_Fr_an_c_is_c_o,:...C_A_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

3. Year Completed- Professional Services: ..=2;=.0=-14;..___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

4. Year Completed- Construction (if applicable): ..=2;=.0=-


14;..___ _ __ _ _ _ _ _ _ _ _ _ _ __

5. Project Owner's lnfermation:

- Project Owner: Port of San Francisco

-Point of Contact N a m e : - - - - - - - - - - - - - - - - - - - - - - - - - - -

- Point of Contact Telephone Number: - - -- - - - - - - - - - - - - - - - - - -

-Point of Contact E-Mail Address: - - - - - - - - - - - - - - - - - -- - -- - -

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
The project encompasses a 57,000 square foot open space and the new urban meadow is comprised of a raised
bed of lawn that spans 400 feet and is bordered by a seat wall that will engage the local community with the
space. The meadow is punctuated on the eastern side by a planting bed featuring native species that will
encourage biodiversity. $22,000

7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm location Support Service

13IPage
FORM D- EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRM'S QUALIFICATIONS

Project Key Number (1 to 4}: 10 2 IZI 30 40 (Match the bottom of Form E)

1. Title of Example Project: _3_3_3_B_rann_an_S_t_


. ---------------------

2. Project Location (City and State): _S_an_Fr_an_c_is_c'""'o,_C_A_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

3. Year Completed- Professional Services: -'-2...;..0.;...16'--------------------

4. Year Completed- Construction (if applicable}: _2_0_16_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

5. Project Owner's Information:

-Project Owner: ___:K:=i=lr..::.oyL.R:::.::e:::.::al::..:ty&....-------------------------

-Point of Contact N a m e : - - - - - - - - - - - - - - - - - - - - - - - - - - -

- Point of Contact Telephone N u m b e r : - - - - - - - - - - - - - - - - - - - - - -

- Point of Contact E-Mail A d d r e s s : - - - - - - - - - - - - - - - - - - -- - - --

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
Dropbox's new home received LEED Platinum certification; focusing on effectiveness and quality with a design that
allows ample natural light and 100% outside air. Integrated photovoltaics on the roof supply a portion of the building's
energy needs and are expected to reduce energy usage by 26% . On-site water capture and reuse reduces potable water
demand by an expected 45%, and landscaped courtyards are planted with native drought-resistant species. An extensive
living roof and porous paving contribute to water-friendly landscape design.

7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm Location Support Service

13 I Page
FORM D- EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRM'S QUALIFICATIONS

Project Key Number (1 to 4): 10 20 3 1!.1 40 (Match the bottom of Form E)

1. Title of Example Project: Slide Ranch- Golden Gate National Park Recreation Area

2. Project Location (City and State): _M_an__n_,C_A


_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

3. Year Completed- Professional Services: ..:2:..:;0..:.15=---------------------

4. Year Completed- Construction (if applicable): ..:N..;../A=-=------------------

5. Project Owner's Information:

- Project Owner: _ __:M:..:. .;:ar::.:k.. :C:.. :.a_va.. .!:g::.;.;n..;. ero_;;__A_s_soc:.. .:. :.;.ia_te.. ;.s_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

- Point of Contact Name: . :.K. ;. an.:.:cg"'-'-Ki;;.a


. n-'g"'------------------------

-Point of Contact Telephone Number:---- - - - -- - - - - - - - - - - - - - -

-Point of Contact E-Mail Address: - - - - - - - - - - - - - - - - - -- -- - - - -

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
Design driven by exploration of the social and ecological vulnerabilities for the Slide Ranch Educational Center
Design/Build project. Land-use decisions based on loss of wetlands , accessibility, site circulation, parking, views,
on-site wastewater treatment, graywater, rainwater capture and reuse, renewable energy systems, circular waste
streams, best husbandry practices, historic structures, recreational amenities, demonstration garden landscapes
and educational and interpretive elements. $10,000

7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm Location Support Service

131Page
FORM 0- EXAMPLE PROJECTS THAT BEST ILLUSTRATE
PROPOSED FIRM'S QUALIFICATIONS

Project Key Number (1 to 4): 1D 2D 3D 40 (Match the bottom of Form E)

1. Title of Example Project: San Clemente Dam Removal Habitat Restoration

2. Project Location {City and State): _c_arm_e_l_V;_al_Ie...:.y_,C_A


_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

3 . Year Completed- Professional Services: ...:.2;.;;..0.;;.;17;.,.__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

4. Year Completed- Construction (if applicable): ...:.2;.;;..0.;;.;18;.,.__ _ _ _ _ _ _ _ _ _ _ _ _ _ __

5. Project Owner's Information:

-Project Owner: -=C~a.:..:IAm-=---------------------------

-Point of Contact Name: - - - - - - - - - - - - - - - - - - - - - - - - - - -

- Point of Contact Telephone Number:-- - - - - - - - - - - - - - - - - - - - -

- Point of Contact E-Mail A d d r e s s : - - - - - - - - - - - - - - - - - - - - - - - -

6. Description of Project and Relevance to this Service Area (include scope, size, cost, etc.):
Planting design for the project considered proposed slope, aspect, soil hydrology and microclimate to correspond to
appropriate biological communities. Rana Creek Nursery cultivated 100,000 container plants, 7,000 live willow
stakes, and used locally collected seed mixes for planting. Designed a temporary irrigation system which considered
local climatic and evapotranspiration data, soils, flood elevations, and anticipated water demand for establishment.
Will conduct the next five years of monitoring and maintenance. 62 acres . $50,000

7. Subconsultants from FORM B Involved with this Example Project, if any:

Firm Name Firm location Support Service

13 I Pa g e
FORM E- KEY PERSONNEL PARTICIPATION
IN EXAMPLE PROJECTS
Example Projects from FORM D
(Fill in "Example Projects Key"
section shown below before
No. Key Personnel From Role completing this table. Then,
FORMC place "X" under project key
numbers below for key
personnel's participation in
Example Projects.

1 2 3 4
1.
X X X X
Paul Kephart Biologist/ecologist
z.
X X X X
MattYurus Landscape Architect
3.
X X
Blake Jopling Planning
4.
X X
JohnWandke Ecologist/manager
5.

6.

7.

8.

9.

10.

Example Projects Key from FORM D


No. Title of Example Project No. Title of Example Project
1. 3.
Brannan St. Wharf Slide Ranch - Golden Gate National Park Recreation Area
2. 4.
333 Brannan St. San Clemente Dam Removal Habitat Restoration

14 I Page
FORM H- ADDITIONAL INFORMATION

Provide any additional information that would further clarify your interest, expertise, similar
experience, and/or capabilities relevant to this Service Area.

Signature of Authorized Representative: --r~c.;.o:..-=-.__..:..._~.....;:;_=--------


Printed Name: :J . Wa
Title of Signer: fryje~+ EC()leyst
Date Signed: 9 - j.'l - I 7 - -
17 I Page

You might also like