Management Programme Term-End Examination June, 2013 (Q Ms-5: Management of Machines and Materials

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

No.

of Printed Pages : 3
I MS-5 I
MANAGEMENT PROGRAMME

Term-End Examination
June, 2013
[
Q MS-5 : MANAGEMENT OF MACHINES
AND MATERIALS
Time : 3 hours Maximum Marks : 100
(Weightage 70%)

Note : Answer any four questions. All questions carry equal


marks.

1. (a) Elaborate your understanding regarding the


classification of decision in the area of
Production and Operation management.
(b) Discuss the process of systematic layout
planning.

2. (a) Define Job Design. Explain the various


issues need to be considered while designing
the job.
(b) The task of a worker has been broken into
three elements A, B and C. Four cycles of
the work are timed and observations are
given below. The organisation has a policy
to permit 15% time allowances for all
contingencies. Determine the standard time
for the task. Also determine the standard
output everyday if that department is
working in two shifts of 8 hours each.

MS-5 1 P.T.O.
Observed Cycle Time in Minutes
Job
1 2 3 4 Rating
Elements
A 3 4 5 4 105
B 0.5 0.4 0.3 0.5 95
C 2 2 1 2 95

3. (a) What are the various types of maintenance


systems ? How you measure the
performance of maintenance department ?
(b) Discuss aggregate production planning in
details.

4. (a) What do you mean by Value Engineering


and Analysis ? Discuss Job Plan method of
VE and VA.
(b) The suitings for men are manufactured in
big rolls. OMC cloth mill wants to monitor
the quality of its rolls. Twenty rolls were
inspected of random and the results are as
follows :
Roll No : 1 2 3 4 5 6 7 8 9 10
No. of
12 8 5 7 14 9 10 11 8 6
defects :
Roll No : 11 12 13 14 15 16 17 18 19 20
No. of
15 10 12 13 9 8 7 12 12 12
defects :
Draw a suitable control chart for this process
and indicate whether the process is under
control or not.

MS-5 2
5. (a) Define Wastivity and Productivity. Explain
taxonomy of wastes.
(b) Explain in details about codification,
standardisation and variety reduction.

6. Write short notes on any three of the following :


(a) Assembly Line Balancing
(b) Material Requirement Planning
(c) Acceptance Sampling
(d) Capacity Planning
(e) Tero - technology