Q MS-5 : MANAGEMENT OF MACHINES
AND MATERIALS
Time : 3 hours Maximum Marks : 100
(Weightage 70%)
MS-5 1 P.T.O.
Observed Cycle Time in Minutes
Job
1 2 3 4 Rating
Elements
A 3 4 5 4 105
B 0.5 0.4 0.3 0.5 95
C 2 2 1 2 95
MS-5 2
5. (a) Define Wastivity and Productivity. Explain
taxonomy of wastes.
(b) Explain in details about codification,
standardisation and variety reduction.