AJ3 3 Oct Time Sheet

The attendance sheet summarizes the work hours and tasks of nine employees for the ATC area on October 3rd, 2017. It shows that each employee worked 8 hours and performed various pre-checking tasks like 11kV busbar lead resistance tests, switchgear checks, transformer checks, and protection relay tests for the 132kV SS/Al Juhaniya-3/Siemens/Qatar MP project. The total hours worked were 72 hours. The attendance was marked as not approved.

Uploaded by

aravindhana1a1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
99 views1 page

AJ3 3 Oct Time Sheet

The attendance sheet summarizes the work hours and tasks of nine employees for the ATC area on October 3rd, 2017. It shows that each employee worked 8 hours and performed various pre-checking tasks like 11kV busbar lead resistance tests, switchgear checks, transformer checks, and protection relay tests for the 132kV SS/Al Juhaniya-3/Siemens/Qatar MP project. The total hours worked were 72 hours. The attendance was marked as not approved.

Uploaded by

aravindhana1a1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SAP ATTENDENCE SHEET 1/1

Area Name: ATC Date 3/Oct/17 p


Trans T. Hours Total Present (P) Total Sick T (W ) T (V) T. BT T Overtime Total Hours
- 8.00 9.00 - - - - - 72.00
NOT APPROVED
Sr. No File No Name Attendance HRS WBS1 WBS Name HRS WBS 2 WBS Name OT WBS WBS Name R.Hrs Status OT Deserve OT KM using personal car Travelling notes Activity Note
290 31633 Jayabal Gnanapragasam P 8.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP #N/A 0.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP Not Ok NO 0.0 60 0 11kv busbar lead resistance
325 32749 Ayub Shaik Ameer Basha P 8.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP #N/A 0.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP Not Ok NO 0.0 60 0 11kv swgr ACDC checks
338 33444 Venkatesan Ramu P 8.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP #N/A 0.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP Not Ok NO 0.0 60 0 11kV TCS checks
599 43440 Balamurugan Madasamy P 8.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP #N/A 0.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP Not Ok NO 0.0 60 0 11VT loop pre checks
45102 ARAVINDHAN AMBALAGAN P 8.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP #N/A 0.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP Not Ok 0 60 0 11Kv Tcs checks
45101 KRISHNASAMY RAMESH P 8.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP 0 LS-00361-001 60 11kv protection relay BI verification pre checks
45105 KRISHNASAMY KANNAN P 8.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP 0 LS-00361-001 60 11kv swgr ACDC checks
45104 SELVAMANI RAVI P 8.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP 0 LS-00361-001 60 CT Loop pre checks
45103 WILSON ANTOMY BRIGHT P 8.0 LS-00361-001 132kv SS/Al Juhaniya-3/siemens /qatar MP 0 LS-00361-001 60 11kv protection relay BI verification pre checks