DM GPD P3 F10 Material Approval Form

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Submittal No. Rev. Date New Submittal.

Re-submittal

Project Title
Consultant Contractor
Sub-contractor Trade

Description / Technical Letrate:


.
.
.

Attachements Sample. Technical Data. QA/QC Reports. Method Statement. Others


Area of Application / Location
Specs Ref. Dwg. Ref. BOQ ref.
Origin Manufacturer Name:
Local Agent e-mail / Tel.
Contractors Attestation
Material / Submittal Comply with Specifications Yes. Alternative.
Details if Alternative: ...
.
.
.
.

For Contractor For Consultant

No Objection 1. Work may proceed.


No Objection with Comments 2. work may proceed subjectto incorporation of
Rejected comments.
Date forwarded to DM ../../.. 3. Revise & re-submit, work may proceed subject
Date Received from DM ../../.. to incorporation of comments.
4. Revise & re-submit, work may not proceed.
5. Rejected.
Comments: Comments:
... ...

Contractor Authorized: Engineer Authorized:
Signature / Date: Signature / Date:

Consultant Final Decision:


No Objection
No Objection with Comments Comments:
No Objection with Cost saving:
Rejected
Date Forwarded to contractor //
Consultant Authorizated:
Signature/Date
Note1: Cost saving if any shall be submitted according to Consultant Procedures and Contract
Conditions.
Note 2: Consultant permission to proceed does not constitute acceptance or approval of materials developed or selected
and does not absolve contractor and their subcontractors and suppliers from full compliance with contractual
obligations including the quality of final product.