0% found this document useful (0 votes)
286 views1 page

DM GPD P3 F10 Material Approval Form

This document is a submittal form for a project. It includes information such as the submittal number, project title, consultants and contractors involved, description of the technical literature being submitted, attachments, area of application and location, specifications and drawing references, origin and manufacturer details, contractor attestation of compliance with specs, alternative details if not compliant, review comments from contractor and consultant, and final decision from consultant.

Uploaded by

George Georgian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
286 views1 page

DM GPD P3 F10 Material Approval Form

This document is a submittal form for a project. It includes information such as the submittal number, project title, consultants and contractors involved, description of the technical literature being submitted, attachments, area of application and location, specifications and drawing references, origin and manufacturer details, contractor attestation of compliance with specs, alternative details if not compliant, review comments from contractor and consultant, and final decision from consultant.

Uploaded by

George Georgian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Submittal No. Rev. Date New Submittal.

Re-submittal

Project Title
Consultant Contractor
Sub-contractor Trade

Description / Technical Letrate:


.
.
.

Attachements Sample. Technical Data. QA/QC Reports. Method Statement. Others


Area of Application / Location
Specs Ref. Dwg. Ref. BOQ ref.
Origin Manufacturer Name:
Local Agent e-mail / Tel.
Contractors Attestation
Material / Submittal Comply with Specifications Yes. Alternative.
Details if Alternative: ...
.
.
.
.

For Contractor For Consultant

No Objection 1. Work may proceed.


No Objection with Comments 2. work may proceed subjectto incorporation of
Rejected comments.
Date forwarded to DM ../../.. 3. Revise & re-submit, work may proceed subject
Date Received from DM ../../.. to incorporation of comments.
4. Revise & re-submit, work may not proceed.
5. Rejected.
Comments: Comments:
... ...

Contractor Authorized: Engineer Authorized:
Signature / Date: Signature / Date:

Consultant Final Decision:


No Objection
No Objection with Comments Comments:
No Objection with Cost saving:
Rejected
Date Forwarded to contractor //
Consultant Authorizated:
Signature/Date
Note1: Cost saving if any shall be submitted according to Consultant Procedures and Contract
Conditions.
Note 2: Consultant permission to proceed does not constitute acceptance or approval of materials developed or selected
and does not absolve contractor and their subcontractors and suppliers from full compliance with contractual
obligations including the quality of final product.