Construction Log

Over nine days, a Rube Goldberg machine was constructed through the addition of various simple machines and mechanisms. The builders began with a domino platform and pulley system on day one. By day two, they finished the pulleys and added a broomstick. On subsequent days, they attached a wedge, added two inclined planes, planned and installed a screw, redesigned a lever mechanism, added supports, and set up a way to catch a second marble. On the final day, they decorated and tested the fully constructed machine.

Uploaded by

api-375178431
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
118 views1 page

Construction Log

Over nine days, a Rube Goldberg machine was constructed through the addition of various simple machines and mechanisms. The builders began with a domino platform and pulley system on day one. By day two, they finished the pulleys and added a broomstick. On subsequent days, they attached a wedge, added two inclined planes, planned and installed a screw, redesigned a lever mechanism, added supports, and set up a way to catch a second marble. On the final day, they decorated and tested the fully constructed machine.

Uploaded by

api-375178431
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Trick or Treat

Construction Log
Day One: On the first construction day we put up the first domino platform and began
the pulley systems.

Day Two: On the second day we finished the pulleys and started the attached the
broomstick.

Day Three: On the third day, we worked out how the wedge would work and attached
the wedge.

Day Four: On the fourth day we added in two more inclined planes.

Day Five: On the fifth day we planned and attached the screw on to the machine.

Day Six: On the sixth day we did some re-designing and finally found a way for the
lever to trigger the wedge.

Day Seven: On the seventh day we put up supports to stabilize the machine.

Day Eight: On the eighth day we set up a way to catch the second marble, and tested
the machine with the pieces that werent attached.

Day Nine: On the final build day, we decorated the machine and put it through a series
of tests and fixed the remaining problems.