Construction Log
Construction Log
Construction Log
Day One: On the first construction day we put up the first domino platform and began
the pulley systems.
Day Two: On the second day we finished the pulleys and started the attached the
broomstick.
Day Three: On the third day, we worked out how the wedge would work and attached
the wedge.
Day Four: On the fourth day we added in two more inclined planes.
Day Five: On the fifth day we planned and attached the screw on to the machine.
Day Six: On the sixth day we did some re-designing and finally found a way for the
lever to trigger the wedge.
Day Seven: On the seventh day we put up supports to stabilize the machine.
Day Eight: On the eighth day we set up a way to catch the second marble, and tested
the machine with the pieces that werent attached.
Day Nine: On the final build day, we decorated the machine and put it through a series
of tests and fixed the remaining problems.