Action Plan: S.No. Required Action Action by Time Line

The document outlines an action plan with 15 items to facilitate the integration of renewable energy into the grid. Key actions include developing regulatory frameworks for forecasting, scheduling, and balancing of renewable generation at both intra-state and inter-state levels. Other actions focus on technical standards, market designs, availability of real-time data, incentivizing flexibility in conventional generation, and capacity building for load dispatch centers. Various central and state regulators, grid operators, and renewable energy organizations are assigned responsibilities and deadlines to implement the different action items between June 2016 and April 2017.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views1 page

Action Plan: S.No. Required Action Action by Time Line

The document outlines an action plan with 15 items to facilitate the integration of renewable energy into the grid. Key actions include developing regulatory frameworks for forecasting, scheduling, and balancing of renewable generation at both intra-state and inter-state levels. Other actions focus on technical standards, market designs, availability of real-time data, incentivizing flexibility in conventional generation, and capacity building for load dispatch centers. Various central and state regulators, grid operators, and renewable energy organizations are assigned responsibilities and deadlines to implement the different action items between June 2016 and April 2017.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Action Plan

S.No. Required Action Action By Time Line


st
1 Load Forecasting as per IEGC Section 5.3 All States 01 June,
(Already Started at NLDC/RLDCs) 2016

2 Demonstration of Adequacy of Balanced Portfolio All States / SLDCs


st
3 Regulatory Framework for Intra-State Settlement System and FOR / SERCs / 01 July,
Imbalance Handling Mechanism SLDCs 2016
(Already implemented at inter-state level in 5 states)

4 Regulatory Framework for Forecasting of Renewable Generation and CERC, NLDC, Implemented
st
Scheduling and Implementation at inter-state level RLDCs, RE w.e.f 01
(Regulatory Framework already in place) Generators, REMC Nov., 2015

5 Regulatory Framework for Forecasting of Renewable Generation and SERCs / FOR / 01st June,
Scheduling including Aggregators and Implementation at intra-state MNRE, SLDCs, RE 2016
level Generator, REMCs
(FOR Model Regulations notified in November, 2015, States of MP,
Rajasthan, Karnataka, Tamil Nadu, Odisha, Jharkhand floated draft
regulations )

6 Regulatory Framework for Reserves SERCs 01st June,


(Framework at inter-state level has already been specified by CERC 2016
th
on 13 Oct 2015)
th
7 Regulatory Framework for Ancillary Services Operation, CERC, RPCs, 15 April,
(Implementation of Ancillary Services at Inter-state level done) NLDC, RLDCs 2016

8 Implementation of Frequency Response (Primary Response). CERC 01st June.,


th
(Roadmap already provided by CERC on 13 Oct 2015) All Generators 2016

9 Regulatory Framework for Secondary Response (AGC) CERC, SERCs 01st April,
th
(Roadmap already provided by CERC on 13 Oct 2015) 2017
st
10 Technical Standards and Protection Requirements for Renewables CEA, CTU, STUs, 01 June,
such as LVRT, FRT, etc. & implementation RE Generators 2016
st
11 Market Design Frequent clearing, more opportunities, New entities MNRE, CERC 01 June,
(Aggregators) 2016
(FOR Model Regulations notified in November, 2015 provide for
Qualified Coordinating Agency (QCA) at state level)
st
12 Regulatory Framework for Communication in Power Sector, CERC, RE 01 June,
Availability of Real Time Data at the SLDCs/RLDCs/NLDC particularly of Generators, 2016
RE generators SLDCs, POSOCO

13 Implementation of Renewable Energy Management Centres (REMCs) CTU, STU, SLDCs, 01st April,
RLDCs, NLDC 2017
st
14 Standards and Regulatory Framework for incentivizing Flexibility in CEA, CERC 01 May,
Conventional Generation 2016
(CERC IEGC Fourth Amendment Regulations regarding Technical
Minimum Schedule for operation of Central Generating Stations and
th
Inter-State Generating Stations notified on 06 April, 2016)

15 Capacity Building of SLDCs particularly in RE Rich States FOLD, POSOCO, Ongoing


States