This document provides instructions for using a spreadsheet application called WorkExpress-2010 to prepare work estimates, work orders, bills, and related documents. It outlines the key sheets and cells to populate at each stage: A) preparing the work estimate, B) sanctioning the estimate, C) inviting quotations, D) issuing work orders, E) executing agreements, F) estimating additional work, G) creating pole/consumer schedules, H) measuring bills, and I) providing location-wise work details. Caution is given not to use copy/paste functions or drag cells.

Uploaded by

Midhun Varghese
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views2 pages

Instruction

This document provides instructions for using a spreadsheet application called WorkExpress-2010 to prepare work estimates, work orders, bills, and related documents. It outlines the key sheets and cells to populate at each stage: A) preparing the work estimate, B) sanctioning the estimate, C) inviting quotations, D) issuing work orders, E) executing agreements, F) estimating additional work, G) creating pole/consumer schedules, H) measuring bills, and I) providing location-wise work details. Caution is given not to use copy/paste functions or drag cells.

Uploaded by

Midhun Varghese
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as ODS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Page 1

WorkExpress-2010
Instructions
This is a simple spread sheet application to prepare Estimate, Work Order, PC Bill and allied documents.
Sheets
1 Wrk Data entry sheet
2 Ld Labour data with Key Nos & Material list
3 Est Work Estimate
4 We WE sanction proceedings
5 Qn Quotation/ Tender notice
6 Qtn Quotation form to be filled/ signed and submitted by contractor.
7 Wo Work Order
8 Ag Agreement
9 Sh Schedule to the agreement
10 Ex Estimate / supplementary schedule for additional/ extra work
11 Ps Pole/ Consumer wise schedule
12 Dw Details of work - location wise split up (optional)
13 1-to-8 PC Bill
14 An Audit note
Causion (1). Do not use Cut/Paste or Copy/Paste tool (2). Do not try to drag down the cells
Initialise Sheet - Wrk
1 R1 Name of Section
2 W1 Name of Sub. Division
3 AB1 Name of Division
4 AE1 Name of Circle
5 R6 Current Year
6 B165:B179 Address of contractors
7 AD6 % hike recommended for hill/ kayal area
Sheet - Ld
8 B330:D579 Material, unit, rate(optional)
Save "WorkExpress-2010" as Template file ( .ots)
Take copy of this file and use for various works - Keep one file for one contract work.
A) Preparation of Work Estimate
1 A2 Name & quantum of work
2 A4 AS No.
3 C4 AS - issued authority
4 F4 TS No.
5 H4 TS - issued authority
6 B7:B62 Key of Labour Data
7 C7:C62 Quantity
8 D7:D62 Km transported (where ever necessary)
9 AD7:AD62 % Hike allowed in hilly/kayal area
10 AE7:AE62 Remarks limited to 40 characters
11 K2 Estimate sanction Authority
12 AE2 Select 'Work Estimate' Print - 'Est'
B) Sanctioning Work Estimate
1 O2 Estimate sanction No.
2 Q2 Estimate sanction Financial year.
3 S2 Estimate sanction Date
4 V2 Ref letter No of AE/AEE
5 X2 Budget provision / Amount chargeable to
6 Z2 Amount chargeable to ----A/c head.
7 AB2 Collection particulars ( if cost of work remitted by party) Print - 'Est' & 'We'
C) Inviting Quotations
1 K3 Quotation inviting / work order issuing authority
2 O3 Quotation / Tender No.
3 Q3 Quotation Date.
4 T3 EMD in %
5 V3 Cost of Tender form
6 X3 Time limit for completing the work (in days)
7 Y3 Quotation / Tender Receiving date.
8 AB3 Quotation / Tender Receiving time.
9 K4 Special conditions if any. Print - 'Qn' & 'Qtn'
Page 2

D) Issue Work Order.


1 A5 Name & Address of Contractor
2 O4 Work Order No.
3 Q4 WO Financial year
4 S4 WO Date
5 V4 Time limit for executing the agreement (in days)
6 X4 Security Deposit (in %)
AB4 % quoted above/ below Est. rate (%)
AE2 Select 'Schedule of work' Print - 'Wo' &'Est'
E) Execute Agreement
1 K5 Agreement authority
2 O5 Agreement No.
3 Q5 Agreement Financial year.
4 S5 Agreement Date.
5 Z4 Rt.No of Security deposit
6 V5 Official date of commencement of work Print - 'Ag' & 'Sh'
F) Estimate Sanction for Extra item of work
1 B64:B73 Key of Labour Data
2 C64:C73 Quantity
3 D64:D73 Km transported (where ever necessary
4 AD64:AD73 % Hike allowed in hilly/kayal area
5 AE64:AE73 Remarks limited to 40 characters
AD5 % quoted above/ below Extra work (%)
Sheet 'Ex' Select (A1) 'Estimate..exta work' / 'Schedule to ..Agr.. extra work' Print - 'Ex'
G) Pole wise / Consumer wise Schedule
1 B75:B126 Key of Material
2 X75:EM126 Pole/Consumer wise material
3 B128:B152 Key of Material (Taken back)
4 C128:C152 Qty of Material (Taken back)
Enter more details in sheet 'Ps' A5:A104 Print 'Ps'
H) Measure PC-Work Bill
1 E7:E62 Quantity - actual work done
2 F7:F62 Km transported (where ever necessary
3 E64:E73 Quantity (Extra item work done)
4 F64:F73 Km transported (where ever necessary
5 Y5 MCS Nos.
6 AA5 MASA for the month
7 AD2 Bill No.
8 AD3 Bill Register No.
9 AD4 M Book No.
10 AE3 Actual date of commencement of work
11 AE4 Actual date of completion of work
12 AE5 Date of measurement
13 AF7:AF73 M Book page No. Print '1'.'8'

Observe the anomalies


Sheet 'Wrk' G6 & E74
Any cell - Red background indicates the serious error.
I) Split up details of work at various location
Sheet 'Dw'
1 B6:B90 Key (From sheet Wrk)
2 C6:C90 Qty
3 D6:D90 Km
4 H6:H90 Key of Material (From sheet Wrk)
5 K6:K90 Location / Collection particulars - Remarks