This IEE Checklist Report shall be used for proposed SUBDIVISION AND HOUSING PROJECTS
(i.e resettlement projects, economic and socialized housing project, open market housing) and
other similar (horizontal) land development projects to be located within Environmentally
Critical Areas (ECA).
For ECC applications, this IEE Checklist Report shall be submitted with:
Proof of Compatibility with the existing Land Use Plan
Proof of Authority over the Project Site
Accountability Statements of Proponent (see attached form) and the Preparer (if
any, following Annexes 2-22 of Revised Procedural Manual for DAO 2003-30)
Photographs or plates/vicinity map of the project site showing impact areas and
affected areas and communities
Duly Accomplished Project Environmental Monitoring & Audit Prioritization
Scheme (PEMAPS) Questionnaire (see Annex 2-7d of Revised Procedural Manual for DAO
2003-30)
(No other documents shall be required as pre-requisite to ECC applications per DENR MC 2010-14)
Read the questions carefully and write the required information on the blank spaces
provided or otherwise check () the appropriate boxes or parenthesis ( ). Boxes
with check marks() are automatically required. Use additional sheets if necessary
and indicate this in the appropriate space.
Misleading or erroneous answers are basis for legal actions and/or denial of ECC
issuance.
I. PROJECT DESCRIPTION
1.1 PROJECT LOCATION AND AREA: Street Name, Barangay, and Municipality/City, Province
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Attach vicinity map/s and photographs of the project site and site development/layout plan and survey plan
approved by Geodetic Engineer.
Geographic coordinates of the project area (Preferably use WGS 84 datum, otherwise specify datum used).
Perimeter/Boundary points
Longitude Latitude
(based on OCT/TCT/etc)
1. Residential lots
2. Commercial Area (e.g. banks,
restaurants, outlets, stores,
etc.)
3. Institutional Area (e.g. offices,
schools, etc. please specify)
4. Amenities (e.g. swimming
pools, gym, Chapel, club
house, etc.)
5. Open/Common Spaces (e.g.
reception area, garden, parks,
etc.)
6. Road system
Primary/Main road
Secondary road
Alley
7. Common Parking area
8. Water supply system
9. Drainage system
10. Support facilities (e.g.
emergency generators, guard
houses/posts, etc.)
11. Waste Water Management
Facility
12. Solid waste management
facilities
13. Others, specify
____________________
(Use additional sheets if needed)
Water Source
[ ] ground water [ ] well [ ] spring [ ] others: ____________________________
Energy/Water Efficiency
Utilities Estimated Savings Proposed Efficiency/Conservation
Water m/day
1.4 MANPOWER
a. Construction Phase
Manpower Expertise/Skills Total
Requirement
b. Operation Phase
Manpower Expertise/Skills Total
Requirement
Current land use w/in 1km radius See attached proof of compatibility with
(as per zoning ordinance): land use
Residential
Commercial/ Institutional
Industrial
Agricultural/ Recreational
Protected Areas
Others, specify
________________
Existing vegetation in the area: Compliance with conditions of DENR/LGU Annual inspection of area Cost
Forestland SLUP, Tree Cutting Permit, ROW, PCA replanted/ revegetated const
Permit
Marshland
Grassland
Limit land clearing as much as possible
Mangrove
Provide temporary fencing to vegetation
that will be retained
Wetland Promote restoration of damaged or
Others, specify destroyed vegetation where possible (e.g.,
____________________ tree planting);
on Existing soil type in the area: Implementation of the Ecological Solid Daily inspection of Cost
sandy Waste Management Plan (ESWMP) waste/recycling bins for const
clay Set-up temporary fence around the segregation
sandy-loam
construction area Daily inspection for presence
Implement re-use and recycling of waste of mixed garbage in the
Others, specify
materials facility
____________________ Weekly inspection of waste
Implement proper segregation, collection
and disposal of domestic wastes in accumulated
designated areas Others, specify
Provide receptacles / bins for solid wastes ____________________
Coordinate with the municipal / city waste
collectors
Presence of visually significant Implement landscaping and other Regular inspection of Cost
landforms/landscape/structures? beautification measures landscaping and other const
Yes Provide adequate buffer beautification activities
No Compensate adjacent property owners Regular monitoring of buffer
zones
Others, specify
Regularly monitor
________________
presence/absence of
complaints from adjacent
property owners
e Specify nearest/receiving water Set-up proper and adequate sanitary Regular (ocular) inspection of: Cost
body:
____________________________
facilities Drainage / canal systems const
Strictly require the contractor and its Water treatment facility (i.e.,
Distance to nearest/receiving water workers to observe proper waste disposal grease trap, septic tank, etc.)
body: and proper sanitation
Size of population using receiving Implement rainwater harvesting and similar Cost
surface water: measures as an alternative source of water Regularly monitor const
1,000 persons Observe water conservation measures presence/absence of
complaints
>1,000 and 5,000persons Careful selection of project site to avoid
>5,000person disruption of traditional water uses
Regular coordination with
Is the project site located in an area Use appropriate design for project facilities Regularly monitor Cost
identified by MGB/PAG-ASA as presence/absence of const
flood prone? Implement appropriate drainage system
complaints
Yes Regularly remove debris and other
Regular coordination with
materials that may obstruct water flow
No concerned agencies
Use appropriate technology (e.g. raised Regularly monitor increased
hand-pumps) to protect drinking water from frequency of flooding
flood contamination
Others, specify
Others, specify
_________________
________________________
n Distance to nearest community: Properly operate and maintain all emission Regularly monitor Cost
0 to less than 0.5 km sources (e.g. vehicles, generator, etc) presence/absence of const
complaints
0.5 to 1 km Install when applicable, the appropriate air
More than 1 km pollution control device/s
Regular (ocular) inspection of:
Strictly enforce good housekeeping
Absence of white or black
practices
smoke from vehicles,
Control vehicle speed to lessen generator, etc.
suspension of road dust
Presence of truck cover
Conduct water spraying to suppress dust during deliveries
sources and minimize discomfort to
residents
Use covered vehicles to deliver materials
that may generate dust
e Distance to nearest community: Properly operate and maintain all noise Regularly monitor Cost
0 to less than 0.5 km sources (e.g. vehicles, generator, etc) presence/absence of const
complaints
0.5 to 1 km Install when applicable, the appropriate
More than 1 km noise control device/s (e.g., mufflers, Regular monitoring of buffer
silencer, sound barriers, etc.) zones
Implement appropriate operating hours
Provide adequate buffer and/or planting of
trees
Others, specify
_____________________________
or
Schools (e.g. elementary, high and dialogues
school, college) Provide appropriate traffic/warning signs,
n
Health facilities (e.g., clinics, lighting, etc
hospitals, etc.) Others, specify
Peace and order (e.g., police ________________
outpost, brgy. Tanod, etc.)
Provide description of the Abandonment activities, such as, dismantling and waste
disposal.
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Organization Chart:
This is to certify that all the information and commitments in this Initial
Environmental Examination (IEE) Checklist Report are accurate and complete to the
best of my knowledge.
I hereby bind myself to answer any penalty that may be imposed arising from
any misrepresentation or failure to state material information in this IEE Checklist.
__________________________
NAME OF PROPONENT HEAD
(Position)
(Company Name)
SUBSCRIBED AND SWORN TO before me this _____ day of ____________ 201__, affiant
exhibiting his/her Community Tax Certificate No. ___________________ issued at
______________________ on __________________________.