This document provides a summary of project activities and milestones for the Matindok EPC project. It outlines the original and actual durations for the overall project and key phases, including engineering, safety, mechanical, piping, electrical, instrumentation, and telecommunications. The project activities covered design, material requisition, drawings, and commissioning/start-up milestones. The original duration was 247 days but the actual duration was 831 days, indicating the project took longer than originally planned to complete.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
331 views102 pages
Project Master Schedule Matindok
This document provides a summary of project activities and milestones for the Matindok EPC project. It outlines the original and actual durations for the overall project and key phases, including engineering, safety, mechanical, piping, electrical, instrumentation, and telecommunications. The project activities covered design, material requisition, drawings, and commissioning/start-up milestones. The original duration was 247 days but the actual duration was 831 days, indicating the project took longer than originally planned to complete.
Project Key Milestone Project Key Milestone Common Common Diesel Hydrotreating Unit (DHDT - Unit No 109) Diesel Hydrotreating Unit (DHDT - Unit No 109)