February 2017 March 2017 April 2017 May 2017 June 2017 July 2017 August 2017 September 2017 October 2017
29 05 12 19 26 05 12 19 26 02 09 16 23 30 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01
27-Sep-17 05:00 PM, FACILITATION CE

Facilitation Center Start Milestone


Facilitation Center Finished MileStone
20-Aug-17 05:00 PM, Civil Work
Civil Work Start Milestone
Civil Work Finshed Miled stone
16-Feb-17 05:00 PM, Boundary Wall
Excavation
Plane Cement Concrete
Pacca Brick Work 1:6
DPC
Cement Pointing
Cement Sand Plaster 1:4
Plane Cement Concrete 1:2:4
Razer Wire Fence 2' dian rings
17-Jul-17 05:00 PM, Ground Floor
Excavation
Termite Profing
Plane Cement Concrete 1:4:8
Cement Concrete Brick & Stone Blast
Watering and Ramming Brick and Stone Blast
Dry Rammed Brick Ballast
Shuttering Roof Slab , Beam etc
Fabrication of mild steel reinforecement for cement concrete
R.C.C (1:2:4) in slab of rafts/strips foundation base slab of column and retaining wall
R.c.c (1:1.5:3) in roof slab beam columns lintels griders and other structural members
Pacca Brick work in F/P
P/L DPC
P/L vertical DPC
Filling watering ramming earth under floor
P/L polythene 500 gaugety
Pacca Brick work in Ground Floor with cement sand mortar 1:6
Pacca Brick work in Ground Floor with cement sand mortar 1:4
Shuttering Roof slab , Beam , Lintel
Fabrication of mild steel reinforecement for cement concrete including cutting bending,laying
R.C.C in Roof slab 1:2:4
R.C.C in beam columns lintels griders and other structural members l
Cement Plaster 3/8'' 1:2
1/2'' Thick Cement Plaster 1:4
1/2" Cement Plaster 1:4
P/L of fair face Gutka clading
Supplying and filling sand under floor or plugging
Provision for Gypsum sheet false ceiling
P/F ceiling mounted incandescent light fitting
P/L ceramic tile as per approved design
P/L ceramic tile skarting
P/L decorative fancy printed bath tile border
P/L watering and ramming brick and stone ballast
Cement Concrete palin including placing compacting finshing & curing ratio 1:2:4
P/L marble china verona crystel for flooring
P/L prepolished marble slab china verona with uniform texture
P/L marble china verona crystel for skirting
P/L marble china verona crystel
P/L of imported Non-skid friction tiles
P/L conglomerate flooring
P/f marble strips for dividing mosaic flooring
P/F Deodar wood dolly frame
First class deodar wood wrought
P/F M.S sheet hollowed pressed frame of doors chowkhat
P/F soild flush door shutter with comercial ply
UPVC doors
P/F all types of glazed aluminum window
P/F M.S square Bar
P/F Brass sliding bolt
1/2'' Thick Cement Plaster 1:4 upto 20' height with polythene sheet 500 gauge
P/F curtain railing to doors and windows compressing of TO SO- elite J apan made ser ies
destemper 3 coat on new surface
Preparing surface and painting with matt finshing plastic amulsion poaint ICI
Liquar Polish after preparing smooth surface with sand paper for making glass surface
Preparing Surface and Painting of Doors and Windows any type three coats
P/F hydraulic doors
P/F site of work fancing cylender type lock 6''x9'' europen origin complete
P/F counter compressing of 4'' height 3' 3'' high stainless steel pipe 10 mm thick
P/F MDF broad lasini
P/F kitchen cabnit
P/F almirah shutters
P/F omamental wooden architave
Single layer of tile 9''x4.5''x1.5''
P/L 1'' thick jambolon insulation board made of dimond foam for insulation
P/F and testing UPVC nikasi pipe
P/F stainless steel pipe stair railing comprising of 1 No 2'' dia steel pipe 18 SWG
P/F stainless steel pipe
Filling of expansion joints
12-Aug-17 05:00 PM, First Floor
Pacca brick ratio ( 1:6 )
Pacca brick ratio ( 1:4 )
Shuttering Roof Slab , Beam ,Column etc
Fabrication of mild steel
R.C.C (nominal mix 1:2:4)
R.C.C l (nominal mix 1:1/2:3)
Cement plaster ratio ( 1:2 )
Cement plaster ratio ( 1:4 )
Face Gutka
Brick ballast + sand
P.C.C ratio (1:2:4)
Marble China Verona Crystel
Ceramic tiles
Ceramic tiles for skirting/dado
Bath tile Border
Marble slab China Ver ona
Marble China Verona Crystel for skirting
Marble China Verona Crystal Prepolished gola
Gypsum sheet false ceiling
Ceiling
Deodar wood dolly frame
Deodar wood wrought joinery
M.S sheet hollow
Solid flush door shutter
UPVC Doors
Glazed aluminium windows
M.S Sq Bar grill
Brass sliding bolt
Cement plaster( 1:4 )+polythene sheet+ bitumen coating
Curtain railling to doors & windows
Distempring
Painting plastic emulsion paint
Liquar polishing
painting of doors & windowspainting of doors & windows
Hydraulic door
Fancy cylinder type lock
Counter comprising
MDF board lasini
kitchen cabnit
Almirah shutters
Omamental wooden architrace
Tiles laid over earth and mud plaster
Khuras on roof
Jambolon insulation board

Actual Work Critical Remaining Work Date Revision Checked Approved

Remaining Work Milestone


printed on 15-Aug-17 03:34 PM page 2 of 3
February 2017 March 2017 April 2017 May 2017 June 2017 July 2017 August 2017 September 2017 October 2017
29 05 12 19 26 05 12 19 26 02 09 16 23 30 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01
Testing UPVC Nikasi pipe
Testing UPVC Nikasi pipe
stair railing
Wall mounted railling
Polyurethane sealer
16-Jul-17 05:00 PM, Main Gate & Pillers
Excavation
Cement concrete in F & P
Fabrication of M.S reinforcement for P.C.C
R.C.C in slab of raft strip foundation
Pacca brick work in cement sand mortar (1:4)
Cement pointing (1:2)
P/F steel grated door of angle Iron frame
P.C.C (1:2:4) Complte
Preparing surface and painting 3 coats on new surface
01-Aug-17 05:00 PM, Tuff Tile
Excavation
P/L watering ramming stone ballast
Construction of Toe Wall
Providing and laying "Tuff Paver"
23-Jul-17 05:00 PM, Toe Wall
Excavation
Dry rammed bricks or stone ballast
Pacca Brick work
Cement Concrete plain
20-Aug-17 05:00 PM, Pakrking Shed
Excavation
P/L watering ramming brick or stone
Cutting jointing & testing G.I pipe
PCC 1:2:4
Galvanized iron sheets
Fabrication of heavy steel work
P/L watering ramming brick or stone
Paca brick work 1:6 F&P
Painting to girder beam
Providing and laying Tuff Pavers
05-Aug-17 05:00 PM, ManHole
Excavation
Cement concrete brick or stone ballast
P/L Cement concrete
pacca brick work
Extra for making & finishing benching floor work
Cement plaster (1:4)
Fabrication of mild steel reinforcement
R.C.C work
Rehandling of earth load
R.C.C Manhole cover
27-Sep-17 05:00 PM, Electrification
Electrification Start Milestone
Electrification Finished Milestone
24-May-17 12:00 PM, Ground Floor
S/E of PVC pipe for wiring (3/4",1",2")
S/E of singel core PVC insulated (3/0.029",7/0.029",7/0.044")
S/E of copper conductor cable
S/E of MS fan hooks
Earthing of iron clad/aluminium switches
S/E A.C celling fan
S/E of Exhaust fan
S/E of bracket fans
Celling fan alonghwith regulator
S/E of energy savor lamp
P/F M.S cabinet
P/F MCCB 400 Amp TPN
P/F MCCB 125 to 200 amp
P/F MCCB 15 to50 amp TPN
P/F MCB 5 TO 20 Amp
P/F at site of work copper bus bars i/c copper screws
P/F at site of work Thimbles for Bus Bars
P/F at site of work Amp se lector Sw it ch
P/F at site of work voit selsctor switchNew Activity
P/F at site of work phase indicator
P/F at site of work Amp Meter 500 volt
P/F at site of work volt meter 30-500 volt
P/F at site of work Currenttransfarmer
P/F fancy globe
P/F wallmounted single brecket
P/F fancy garden light
S/E LED Down lights
P/F LEDSpot elevation light
S/E of switch kit
Call bellswitch kit
Jack pinkit for telephone cable
30-Jul-17 05:00 PM, First Floor
S/E of PVC pipe for wiring (3/4",1",2")
S/E of singel core PVC insulated copperb cable (3/0.029",7/0.029",7/0.044")
S/E of copper conductor cable
S/E of MS fan hooks
Earthing of iron clad/aluminium
S/E A.C celling fan
Exhaust fan
S/E of bracket fans
Celling fan alonghwith regulator
S/E of energy savor lamp
P/F of M.S cabinet
P/F MCCB 400 Amp TPN
P/F MCCB 125 to 200 amp
P/F MCCB 15 to50 amp TPN
P/F MCB 5 TO 20 Amp
P/F copper bus bars i/c copper screws
P/F at site of work Thimbles for Bus Bars
P/F at site of work Amp selector Switch
P/F at site of work voit selsctor switch
P/F at site of work phase indicator
P/F of Amp Meter 500 volt
P/F of volt meter 30-500 volt
P/F of Current transfarmer
P/F of fancy globe
P/F wallmounted single brecket
P/F of fancy garden light
S/E of LED Down lights
P/F of LEDSpot elevation light
S/E of Switch kit
S/E of call bellswitch kit
S/E of jack pinkit for telephone cable
07-Aug-17 05:00 PM, Street Light
G.I Pipes
Welding roads , material
Excavation in foundation
CC B/ballast 1:6:12
PCC 1:2:4
Painting to new surface
Steel welding
Pipe Fixing& inspection
SE PVC pipe
PVC insulated
PVC Pipes wiring
S/E of single core PVC insulated
15-Aug-17 05:00 PM, Emergency Alarim System
Fir Alarim

Actual Work Critical Remaining Work Date Revision Checked Approved

Remaining Work Milestone


printed on 15-Aug-17 03:34 PM page 3 of 3
February 2017 March 2017 April 2017 May 2017 June 2017 July 2017 August 2017 September 2017 October 2017
29 05 12 19 26 05 12 19 26 02 09 16 23 30 07 14 21 28 04 11 18 25 02 09 16 23 30 06 13 20 27 03 10 17 24 01
Fir Alarim 4 Zone
Wire
Installation
23-Aug-17 05:00 PM, Networking
Channel panasonci exchange
Exchange cable
Main set Panasonic
Telephone set Panasonic
Assocceries per set
31-Aug-17 05:00 PM, CCTV Camere
Cameras
VGA output Recording
Hard Disk
Power supplies DC
BNC connector
LED
video cables
Installation of Cameras
27-Sep-17 05:00 PM, Power Wiring
Excavation of trenches
PVC pipe wiring
2" dia pipes
Service connection in prelaid pipe
Service connection in prelaid pipe
PVC insulated
S/F sand under floor or plugging in well
Rehanding off earthwork lead
26-Aug-17 12:00 PM, Sainitary Work
Sanitary Work Start Milestone
Sainitary Work Finished Milestone
01-Jul-17 12:00 PM, Ground Floor
P/F Bath room coupled set
P/F Glazed earthen wear water closet
P/F bath room flesh tank
P/F bathroom fitting economy set
P/F fancy bath accessories set
P/F loking glass 6'*2' size
P/F muslim double bib cock
P/F Glazed earthen wear
P/F Glazed earthen wear vinity
P/F chromium plated tee stop cock
P/F C.P bib-cock heavy
P/F chromium plated
P/F Stainless steel sink
P/F chromium plated or brass oxidised swan neck cock
P/F floor trap
P/F 10 cm gully trap 30*30 cm
PFT UPVC Nikasi pipe type
PFT UPVC Nikasi pipes fittings type "B"
PLT & commissioning POLYPROPYLENE RANDOM COPLYNER (25,32mm)
PFT & commissioningPPRC water supply fitting (PN20)
08-Aug-17 05:00 PM, First Floor
P/F Bath room coupled set
P/F Glazed earthen wear water closet
P/F bath room flesh tank
P/F bathroom fitting economy set
P/F fancy bath accessories set
P/F loking glass 6'*2' size
P/F muslim double bib cock
P/F Glazed earthen wear
P/F Glazed earthen wear vinity
P/F chromium plated tee stop cock
P/F C.P bib-cock heavy 1/2" dia
P/F chromium plated
P/F Stainless steel sink
P/F chromium plated or brass oxidised swan neck cock 15 mm single way
P/F floor trap of cast iron including concrete chamber
P/F 10 cm gully trap 30*30 cm
PFT UPVC Nikasi pipe type
PFT UPVC Nikasi pipes fittings type "B"
PLT & commissioning POLYPROPYLENE RANDOM COPLYNER (25,32mm)
PFT & commissioningPPRC water supply fitting (PN20)
16-Aug-17 05:00 PM, Water Supply
Boring for tubewell
P/I of PVC bail plug BSS Class
P/I of PVC strainer BSS class
P/I of PVC blind pipe BSS class (4", 1.25",1" Dia)
Providing, Laying, Cutting, Jointing, Testing and Disinfwcting G.I pipeline in trenches (1.5", 1" Dia)
P/F handle valve brass (1.5", 1" Dia)
P/F Goldamatic pump
P/F super Tuff water tank
26-Aug-17 12:00 PM, Sewerage
Earthwork Excavation (9", 12" Dia)
Providing and laying R.C.C pipe (9", 12" Dia)
Masonary Manhole
Rehandling of Earthwork lead upto a single throw of Kassi (same as item no 1)
17-Aug-17 05:00 PM, Pump System
P/F Goldamatic Pump
S/E Ejector
31-Jul-17 05:00 PM, Sui Gass Work
Sui Gass Work Start Milestone
Sui Gass Work Finished Milestone
24-Jun-17 05:00 PM, Ground Floor
P/L cutting jointing testing and disinfecting G.I pipeline
P/F Handel valve with brosball valve C.P
P/F Sui gas geyser 55 gallion capacity
S/F OF sui gas room heater double plate made by cannon
Soi gas kitchen burner
31-Jul-17 05:00 PM, First Floor
P/L cutting jointing testing and disinfecting G.I pipeline in trenches with socket joint
P/F Handel valve with brosball valve C.P
P/F Sui gas geyser 55 gallion capacity
S/F of sui gas room heater double plate made by cannon
Soi gas kitchen burner
11-Feb-17 05:00 PM, Miscalenious Work
Miscalenious Start Milestone
Miscalenious Work Finished MileStone
11-Feb-17 05:00 PM, Fire Fighting Arrangement
Fire Extinguisher DCP 50 Kg
Fire Extinguisher DCP 6 Kg
Fire Extinguisher DCP 5 Kg
House Rell
Fire Bucker with stand
safety shoes
Rubber shoes
Hand operater siron
Safety Helmet
Gas Mask
Showel
Google
First aid box

Actual Work Critical Remaining Work Date Revision Checked Approved

Remaining Work Milestone