The presentation discusses underground coal gasification (UCG) regulations and development in India, factors that influence UCG technology selection, and what makes a UCG technology commercially viable.

Regulations in India for underground coal gasification are still being drafted but will determine the development timeline, costs, and feasibility of UCG projects.

The selection of UCG technology dictates site selection, reliability of operations, quality and consistency of products, environmental performance, and capital/operational costs.

A Pathway for Development of

Copyright Ergo
ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2014.
2014. All
Allrights
rightsreserved.
reserved.

Successful UCG Projects in India

Dr. Michael S. Blinderman

Ergo Exergy Technologies Inc.


Montral, Qubec, CANADA

7th Annual International Gasification Summit: 2016


New Delhi, India, February 11-12, 2016
The Essence
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

UCG Project Development Pathway


is controlled by
Regulations
Selected UCG technology
Selected end products
Investment Schedule
Indian UCG Regulations
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

Regulations determine development path:


Timeline
Cost
Feasibility
Indian UCG Regulations
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

"With the objective to develop


UCG, the ministry of coal has
formulated a draft policy for
UCG for approval of the
government,"
Coal and Power Minister
Piyush Goyal, December 14, 2015
When the regulations
will be ready for
development of UCG
projects in India?
Selection of UCG technology
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

Selected UCG technology dictates:


Site Selection
Reliability of operations
Quality and consistency of products
Environmental performance
Capital and operational costs
What Makes UCG Technology Commercial?
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

Environmentally Clean Operation with:


Consistent Quality (e.g. Wobbe index variation 5%)

Consistent Quantity (energy output variation 1%)

Commercial Scale - over a million tonne a year for 30 years

Copyright Ergo Exergy Technologies Inc. 2014. All rights reserved.


Commercial Scale Plant
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

Large Geological Coal Resource 50 MT


High Extraction Efficiency
Size for Greenfield Applications is determined by Syngas
Consumer Plant:
Consistent Quality?
Copyright Ergo Exergy Technologies Inc. 2015. All rights reserved.

Inherent inconsistency of gas quality in linear UCG reactors:


Growing diameter lower gas velocity less turbulence
worse mass exchange dropping gas quality
Consistent Quality?
Copyright Ergo Exergy Technologies Inc. 2015. All rights reserved.

RM1 CRIP:
Gas quality consistently drops
despite CRIP maneuvers

Depleted cavity downstream


of new injection point acts as
another reactor with poor
gasification conditions
CRIP: Mine Plan
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

(a) (b)
Proponents Dream

Somber Reality
CRIP: Mine Plan
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

(a) (b)
Proponents Dream

Somber Reality
Parallel CRIP 3m channel
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

Gasifying Coal
Parallel CRIP 25m channel
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

Cannibalizing Product Gas


UCG: Coal Mining Technology
Copyright Ergo Exergy Technologies Inc. 2014. All rights reserved.

UCG is not a 2-well process, but large-scale mining method


Rock deformation and ground water influx management
Injects oxygen, air, H2O, CO2 etc.
Drilling of directional, inclined, vertical and other wells
Modern technology based on 70+ years of Soviet work
Average panel capacity 5PJ/a (0.3 Mt/a), 2-5 years life
Mine-average coal extraction rates of 95%
Mine-average cold gas efficiency of 75-85%
Issues: large-scale consumption of GW, subsidence

vs.
UCG Technology
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.
All Kinds of Coal

UCG Plant Rank Thickness, m Depth, m Dip LHV,MJ/kg

Lisichansk Bituminous 0.44 - 2.0 60 - 250 38 - 60 20.1 - 23.0

Yuzhno-Abinsk Bituminous 2.2 - 9.0 130 - 380 35 - 58 28.9 - 30.7

Podmoskovnaya Lignite 2.5 30 - 80 <1 11.8

Angren Lignite 3.0 - 24.0 110 - 250 7 15.3

Shatskaya Lignite 2.6 30 - 60 <1 11.0

Sinelnikovo Lignite 3.5 - 6.0 80 <1 8.0

Chinchilla Sub-bituminous 10.0 135 <1 21.7

Majuba Bituminous 3.5-4.5 285 3 20.3

Kingaroy Sub-bituminous 17.0 200 5 23.5

Huntly West Bituminous 4.0-22.0 220-540 0-75 24.5

CC Alberta Sub-bituminous 7.0 150-260 6 20.5-23.0


Lignite/
Alaska SHR 1.0-12.0 50-650 0-75 11.0-16.5
Sub-bituminous
Chinchilla I (Ergo 1997-2006)
Copyright Ergo
ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2014.
2014. All
Allrights
rightsreserved.
reserved.

Status Nov. 2006 : fully quenched, shut down.


1 panel - 9 process wells; capacity 80,000 Nm3/h, 30 months
35,000 t of coal extracted, over 80 million Nm3 of gas, stable
gas quality LHV=5.0 MJ/Nm3, p = 1100 kPa, t = 120o C
Demonstrated 95% recovery of the target coal resource and
75% total energy recover.
Gasifier pressure was always lower than hydrostatic.
Three-phase gradual shutdown procedure ended in 2003.
Venting cavity at the time of shutdown operation.
Cavity cooling by natural water influx.
Environmental monitoring during operation, shutdown and post
shutdown complied with rigorous EPA requirements; quarterly
environmental performance reports prepared by Golder Associates have
been submitted to Queensland EPA.
Annual environmental audits by independent company Sinclair Knight
Merz during all seven audits no environmental issues reported.
No environmental issues from1997 to Nov. 2006
Chinchilla I (Ergo 1997-2006)
Copyright Ergo
ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2014.
2014. All
Allrights
rightsreserved.
reserved. Groundwater Protection
Chinchilla II (Linc 2007-2015)
Copyright Ergo
ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2014.
2014. All
Allrights
rightsreserved.
reserved.

No Involvement of Ergo Exergy Technologies Inc.


In operation : 2007 2013, four consecutive trials, total extraction under 10,000t; shutdown underway
Major environmental investigation by Department of Environmental and Heritage Protection (QEHP) :
More than 230 bores were drilled; water and soil samples were collected from 13 farms.
Lab tests confirmed presence of carbon monoxide, hydrogen, hydrogen sulphide, BTEX and other
chemicals.
Allegedly found scientific evidence of operation above hydrostatic pressure, fracturing the landform,
and excursion of contaminants.
QEHP alleges that plant owner failed to report numerous plant incidents:
Fire that caused site evacuation in 2007
Persistent leaks of toxic gas into air and groundwater from 2007 till 2011
Workers claims about their ill health as result of uncontrolled releases of gas at site in 2007-2013.
QEHP Charges:
Irreversible damage to more than one environmental receptor [the atmosphere, vegetation, water
and soil].
A 320 km2 exclusion zone around 1 km2 plant.
EHP has laid 5 criminal charges against the plant owner
Majuba UCG Project (Eskom)
Copyright Ergo Exergy Technologies Inc. 2014. All rights reserved.

Multiple unresolved small faults and dykes


Very low: permeability, moisture, VM, reactivity
Sponcom Hazard
Overburden rock: negative angles of draw
7 years of UCG operation, over 60,000t
1 directional, 10 vertical wells
Record RCL rates
Successful environmental management
Co-firing syngas in commercial boilers
Controlled Shutdown of panel 1 underway
FEED for 140MWe Gas Turbine Plant
Commissioning of 6MWe UCG co-firing plant
Developing 70,000 m3/h plant
Pathway to 2,100MWe UCG-IGCC plant
Source: Eskom Holding Ltd.
Kingaroy UCG Project (Cougar)
Copyright Ergo Exergy Technologies Inc. 2014. All rights reserved.

210m depth, 19m thick sub-bituminous coal


seam
Partial (top 50%) coal seam extraction
Soft unconsolidated overburden with strong
basalt layers multiple casing completion
High permeability coal seam: vertical wells with
RCL (15.7m/day)
Short operation RCL only

Commissioned March 15, 2010


Shut down due to laboratory error
17,000 analyses of GW have been undertaken
on and around the site and no contamination of
ground water has been detected
Plant moth-balled
Huntly West UCG Project (SENZ)
Copyright Ergo Exergy Technologies Inc. 2014. All rights reserved.

Depth 240 540 m, very complex geology


Two target coal seams gasified together
Coal thickness >17m
Partial (top 30%) coal seam extraction
Over 35 bar hydrostatic pressure
Very weak coal, overburden multiple casings
Sponcom Management
Vertical wells, Aquasplitt & RCL

Pilot Plant Started April 12, 2012


5 months operation, over 5,000t
Controlled shut-down completed
No environmental issues

Image: Solid Energy New Zealand Ltd


Alberta UCG Project (Laurus Energy)
Copyright Ergo Exergy Technologies Inc. 2014. All rights reserved.

Consistent 7m coal seam


Depth 180 -350m
High quality subbituminous coal
No known faults or geological
complications
Target Zone Low permeability coal
Poor coal aquifer
180-350 m deep

Protection of sub-surface aquifers

Status
P-F & Site characterization completed
Demonstration Plant permits obtained
Commenced EIA
Built demonstration plant
GW monitoring
Calibration burn pending
SHR UCG Project (Laurus Energy)
Copyright Ergo Exergy Technologies Inc. 2014. All rights reserved.

Depth 200-1650m
Weak, partly unconsolidated surrounding rock
Sequence of 14 coal seams, 2 7m thick
Remote location, limited site access
Rank varies from lignite to subbituminous
within project area
Multiple major faults
Multiple sand bands in the formation
Completed Exploration & Site Selection
Site Characterization starting

Images: StoneHorneRidge Project


NFS UCG Project (Sasol)
Copyright Ergo Exergy Technologies Inc. 2014. All rights reserved.

1.5 to 8m coal seams


Depth 140 470m
Strong stable overburden rock
Piezopermeability effects
Oxygen injection
F-T syngas
Site Selection and Pre-Feasibility completed
The Essence
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

Economics of

products from UCG

(India 2014)
Synthesis Products (India 2014)
CopyrightErgo
Copyright ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2015.
2014.All
Allrights
rightsreserved.
reserved.
UCG vs. CG Electricity (India 2014)
CopyrightErgo
Copyright ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2015.
2014.All
Allrights
rightsreserved.
reserved.
UCG vs. CG SNG (India 2014)
CopyrightErgo
Copyright ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2015.
2014.All
Allrights
rightsreserved.
reserved.
UCG vs. CG Methanol (India 2014)
CopyrightErgo
Copyright ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2015.
2014.All
Allrights
rightsreserved.
reserved.
UCG vs. CG Gasoline (India 2014)
CopyrightErgo
Copyright ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2015.
2014.All
Allrights
rightsreserved.
reserved.
UCG vs. CG Diesel (India 2014)
CopyrightErgo
Copyright ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2015.
2014.All
Allrights
rightsreserved.
reserved.
UCG vs. CG Urea (India 2014)
CopyrightErgo
Copyright ErgoExergy
ExergyTechnologies
TechnologiesInc.
Inc.2015.
2014.All
Allrights
rightsreserved.
reserved.
The Essence
Copyright Ergo Exergy Technologies Inc. 2015.
2014. All rights reserved.

What must be done to bring

UCG development

into India?
Necessary for Success:
Copyright Ergo Exergy Technologies Inc. 2015. All rights reserved.

GOI Strategic UCG Facilitation Program


Pragmatic
Transparent
Scientific
Government/Private Co-operation

Regulation in place schedule and project feasibility


Selection of UCG technology
Suitable coal resources - careful exploration and evaluation
Committed developer and investors
Capable and reliable Indian participants
Thank you!