Air System Sizing Summary For CENTREPOINT

This document provides an air system sizing summary for the Centrepoint project in Masqat, Oman. The air system serves a single zone with a floor area of 3340 square meters. Key sizing details include a total cooling coil load of 397.1 kW occurring in July, with a required airflow of 17,207 liters per second. The supply fan is designed to deliver 17,207 liters per second of air with a motor requiring 8.55 brake horsepower. Outdoor ventilation requirements are met with 0 liters per second of outside air.

Uploaded by

mechmohsin4745
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

Air System Sizing Summary For CENTREPOINT

This document provides an air system sizing summary for the Centrepoint project in Masqat, Oman. The air system serves a single zone with a floor area of 3340 square meters. Key sizing details include a total cooling coil load of 397.1 kW occurring in July, with a required airflow of 17,207 liters per second. The supply fan is designed to deliver 17,207 liters per second of air with a motor requiring 8.55 brake horsepower. Outdoor ventilation requirements are met with 0 liters per second of outside air.

Uploaded by

mechmohsin4745
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 1

Air System Sizing Summary for CENTREPOINT

Project Name: 21014 BARKA MALL R4 08/01/2017


Prepared by: Amjaad 07:55AM

Air System Information


Air System Name ................................ CENTREPOINT Number of zones ............................................................. 1
Equipment Class ............................................ CW AHU Floor Area ............................................................... 3340.0 m
Air System Type ................................................ SZCAV Location .................................................... Masqat, Oman

Sizing Calculation Information


Zone and Space Sizing Method:

Zone L/s .......................... Sum of space airflow rates Calculation Months ......................................... Jan to Dec
Space L/s ...................... Individual peak space loads Sizing Data ...................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ........................................................ 397.1 kW Load occurs at ..................................................... Jul 1700
Sensible coil load ................................................. 360.0 kW OA DB / WB ...................................................... 45.2 / 29.8 C
Coil L/s at Jul 1700 .............................................. 17207 L/s Entering DB / WB ............................................. 29.7 / 18.5 C
Max block L/s ...................................................... 17207 L/s Leaving DB / WB .............................................. 12.3 / 11.3 C
Sum of peak zone L/s ......................................... 17207 L/s Coil ADP ..................................................................... 10.4 C
Sensible heat ratio ............................................... 0.907 Bypass Factor .......................................................... 0.100
m/kW ....................................................................... 8.4 Resulting RH ................................................................. 51 %
W/m ..................................................................... 118.9 Design supply temp. ................................................... 12.2 C
Water flow @ 6.0 K rise ...................................... 15.84 L/s Zone T-stat Check .................................................... 1 of 1 OK
Max zone temperature deviation .................................. 0.0 K

Supply Fan Sizing Data

Actual max L/s ..................................................... 17207 L/s Fan motor BHP ........................................................... 8.55 BHP
Standard L/s ........................................................ 17176 L/s Fan motor kW ............................................................. 6.37 kW
Actual max L/(s-m) ................................................ 5.15 L/(s-m) Fan static ..................................................................... 200 Pa

Outdoor Ventilation Air Data


Design airflow L/s ........................................................ 0 L/s L/s/person ................................................................... 0.00 L/s/person
L/(s-m) ................................................................... 0.00 L/(s-m)