DESOUQ Pipeline Integrity Management System: Developed by / Ahmed Shaaban Desouq Corrosion Engineer
DESOUQ Pipeline Integrity Management System: Developed by / Ahmed Shaaban Desouq Corrosion Engineer
DESOUQ Pipeline Integrity Management System: Developed by / Ahmed Shaaban Desouq Corrosion Engineer
Management System
Developed By / Ahmed Shaaban
Desouq Corrosion Engineer
Objectives:
Develop a PIMS
Develop technical manuals (corrosion protection, in-line inspection,
defect assessment & repair)
Develop risk assessment & risk based inspection (RBI) methodology
Perform the initial baseline risk assessment and produce inspection
& monitoring routines
Provide PIMS implementation training to the integrity responsible
persons
Asset Scope:
Upstream pipelines (raw gas trunk lines )
TL1 (12 line) connect NWSG & SS wells to CTP
TL2 (8 line) connect NWK wells to CTP
TL3 (6 line) connect SSG wells to CTP
TL4 (6 line) connect NSG wells to CTP
Downstream pipelines ( treated gas and condensate)
16 Sales gas line transfer treated gas to GASCO network
6 Condensate pipeline (transfer condensate to PPC
network)
Notes
Pipelines pass through various terrains, population densities,
environmentally sensitive areas and utilities facilities.
Pipeline buried in agriculture soil with high water content and
low soil resistivity.
No systematic Pipeline Integrity Management System in place
had been established by field originator.
All pipelines are new constructed therefore no previous data
or history.
We will consider Upstream & Downstream are two entities
and operated separately
Objectives:
Establish Pipeline Integrity Management System (PIMS)
Harmonize & Integrate integrity processes
Establish Roles & Responsibilities
Establish Continuous Improvement Systems
Establish Strategies for Mitigation, Monitoring and Inspection
Scope of Work:
Develop a PIMS
Develop technical manuals (corrosion protection, in-line inspection,
defect assessment & repair)
Develop risk assessment & risk based inspection (RBI) methodology
Perform the initial baseline risk assessment and produce inspection
& monitoring routines
PIMS Structure
Risk assessment and Integrity management Planning
Pipeline scope
Identify threat
Data collect
Data review
YES NO
OK
Risk NO
OK
YES
Integrity Planning
YES
The main task of Risk assessment and Integrity management Planning
External corrosion
Current attenuation
survey
Internal corrosion
Material Direct
Inline inspection monitoring
selection /Design
Line cleaning
Chemical
treatment
Example: Monitoring (Internal Corrosion)
Determining Inline
Inspection Goals and
Objectives
Repair options to be considered as an immediate requirement, with mobilization of repair team as soon as possible.
Catastrophic Inspection team to be on site to monitor development of threat on a very frequent basis, as appropriate. Evaluation
and Justification to be clearly presented as to why the line can continue to operate.
Mitigation options to be considered in addition to increasing the inspection and monitoring requirements. Where
Severe detected as a Hotspot, consideration for further inspection using detailed investigation to be completed as soon as
possible, where repair or mitigation is not completed. Evaluation to be completed as to whether line can continue to
operate during inspection.
A change to the Inspection and Monitoring Routine frequency, to increase the inspection and monitoring
requirements for the pipeline is required. Sources of mitigation should be identified and applied where practicable to
reduce the risk to Moderate. Where detected as a Hotspot, consideration should be given to for further inspection
Major using detailed investigation to be completed as soon as practically possible. Evaluation to be completed as to whether
line can continue to operate during inspection, although anticipated that line can continue to operate. Change to
scheduled Inspection and Monitoring Routine should be made, to monitor the Hotspot area with an increased
frequency for two further inspection cycles, if repair or mitigation is not deemed appropriate to ensure risk
development does not continue.
Risks are generally understood and adequately characterized by the current inspection and monitoring routine. No
anticipated change in the Inspection and Monitoring Routine. No reduction in Inspection and Monitoring Routine is
deemed appropriate. Where detected as a Hotspot, consideration should be given to an increase in inspection and
Moderate monitoring efforts in this area for a single cycle of inspection to ensure that Hotspot area does not develop. Where
practicable, sources of mitigation may be employed to reduce the risk to a Minor category.
Generally the Inspection and Monitoring Routine is deemed more than adequate to characterize the risk to the
pipeline system. Where multiple integrity cycles have been seen to demonstrate a consistent minor risk rating,
Minor consideration can be made to reduce the Inspection and Monitoring requirements for the system. Where detected as
a Hotspot, generally a Minor risk will not require any further mitigating actions or examination
Example Inspection & Monitoring for Corrosion Threat using ILI inspection
Inspection Threats Risk
Frequency Comments
Type Covered Category
ILI Internal/ ILI is the most preferable method.
External N/A Consideration should be given to make pipeline
Corrosion/ General piggable.
Manufacturing Notes Unpiggable pipelines, use Direct Inspection
Flaws
Maximum inspection Repairs to be completed within 1 month or as soon as
intervals to be practically possible.
determined based on Evaluation and Justification to be clearly presented as to
Catastrophic
the degradation rates why the pipeline can continue to operate at current
and/ or condition existing operational parameters.
assessment .
At least 5 locations (length dependent) covering sample of low points, welded joints, areas susceptible to stray
current interference, etc.
For locations susceptible to internal corrosion, same locations are to be inspected again during future inspections to
Modera
5 years determine degradation rates.
te
For locations susceptible to external corrosion, locations have not been inspected are to be identified and selected
for future inspection
At least 5 locations (length dependent) covering sample of low points, welded joints, areas susceptible to stray
current interference.
For locations susceptible to internal corrosion, same locations are to be inspected again during future inspection.
Minor
7 years For locations susceptible to external corrosion, locations have not been inspected are to be identified and selected
for future inspection
Inspection & Monitoring User Manual Key Performance Indicators
Characteristics:
-Measurement of Plan vs Actual
-Indication of effectiveness of preventive measure
-Monitor Monthly, quarter, yearly
KPIs Example Corrosion
Threat Performance Measurement scoring guidance
Desouq
Pipe line name
Field
Example of IMR Inspection
Example of IMR Monitoring
Monitoring
Conclusions Key benefits
Developed an integrity philosophy designed to meet regulatory
and corporate integrity requirements.
Highlighted the important a series of controlled documents
required to present an auditable and controlled integrity
process
A fit-for-purpose integrity organization, including defined roles
and responsibilities, to deliver the requirements of the integrity
philosophy
Developed working processes which are required to meet the
integrity objectives set out in the company integrity philosophy.